Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Jan 12, 2016

Download

Documents

Alvin Stewart
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Implementation of information system

Page 2: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Implementation in system’s lifecycle

It can be done after the system is designed,

It is one of the most difficult stages,The system changes its owner,The mistakes are revealed..

Page 3: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Difficulties in implementation..

Depend on:If the system is implemented in new

organization or existing before?It is easier to implement the system in a

new organization.Is the system customized or unique?It is easier to implement the typical

(customized) system.

Page 4: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Implementation procedure

Total implementation Pilot implementationTrial implementationConcurrent implementation

Page 5: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Total implementation

New system (resignation of an old system),

The easiest and the cheapest,Dangerous because: there is no way back

(if the system is not tested)

Page 6: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Partial implementation

Less risk,More expensive (comparing to total

implementiation),Should be structuralised (regions and/or

functions),Pilot implentation is difficult when

subsystems cannot be distincted.

Page 7: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Concurrent implementation

An old system is being used when the new is being implemented,

Generates conflicts,Expensive.

Page 8: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Implementation process

PreparationTestingexploitation

Page 9: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Preparation

sOrganization:Risk definition, assessment and

minimization,Users training,Databases building,Documentation changing,Structure changing

Page 10: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Preparation

System:System instalation,Appointing supervising team (copyrights),Users training

Page 11: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Users manual

IntroductionSystem description (parametres),Databases description,Algorithms description,Rules description,Exploitation characteristics

Page 12: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Preparation

Infrastructure (hardware):Hardware instalation,Computer nets instalation.

Page 13: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Testing

Testing, checking, examining the system

Page 14: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Implementation

Preliminary exploitation (trials),Problems elimination

Page 15: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Exploitation

System exploitation

Page 16: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Implementation management

Managers are responsible for :Resources allocation,Methods, processes, procedures definition,Tasks sequencing and scheduling,Jobs assignement,Assessment methods definition

Page 17: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Users participation

Supervisers (least active),Conceptualizer,Member of implementation team (most

active),

Page 18: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Conflicts

Limited resources sharing,Different aims and tasks,Job sequencing,Different approach to work quality,Different approach to management,Differences concerning age, education,

background,Problems with work organization.m

Page 19: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Implementation efficiency

DefrostingChanges implementation,Frosting..

Page 20: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Defrosting

Need for changes,Potential problems..

Page 21: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Changes implementation

Switching the systems,New system instalation

Page 22: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Frosting

New balance should be found

Page 23: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Risk in implementation

Problems with users,Problems with implementation.

Page 24: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Risk analysis

Discordances in implementation,Corrective action planning,Solutions finding.

Page 25: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Information in IT systems

Page 26: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Information in IT systems

DatabasesModels basesProcedures basesKnowledge bases

Page 27: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Databases

A group of sets used in customers service process,

A database system is to developed to gather, store, process and visualize information,

A database system users include final users, coders, deesigners, systems analytics, databases administrators, data administrators

Page 28: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Users reuirements

Fast work,Possibilities of development and

reorganization,Accesibility,Efficiency,Safety,Data consistency and independency,Accuracy.

Page 29: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Models

Simple data,Complex data,Records,Sets.

Page 30: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Models

General models,Logical models,Physical models.

Page 31: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

General models

Holistic approach to data,Requirements data should meet,Stable,Important for users..

Page 32: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Logical models

Hierarchical (traditional),Net (traditional),Relative,Object.

Page 33: Implementation of information system. Implementation in system’s lifecycle It can be done after the system is designed, It is one of the most difficult.

Data warehouse