Implementation of 2000L SUB and Disposable Clarification System in Existing cGMP Facility Dave Wolton CMC Biologics 2011-10-25
31

Implementation Of 2000 L Sub And Disposable Clarification System

May 22, 2015

Download

Documents

woltond

Implementation of new single use bioreactor system
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Implementation Of 2000 L Sub And Disposable Clarification System

Implementation of 2000L SUB and

Disposable Clarification System in

Existing cGMP Facility

Dave Wolton

CMC Biologics

2011-10-25

Page 2: Implementation Of 2000 L Sub And Disposable Clarification System

Overview

• CMC Biologics

• Why is the 2000L a game changer?

• Integration into Existing Facility

• Defining the Bioreactor Process

• Facility Design Challenges

• Disposable Harvest System

• Lessons Learnt

2

Page 3: Implementation Of 2000 L Sub And Disposable Clarification System

CMC Biologics

Contract Manufacturer of Biological Therapeutics utilizing

MAMMALIAN & MICROBIAL CELL CULTURE TECHNOLOGIES

• Cell-line Development – CHEF1™ technology • Upstream/Downstream – process development and manufacture • Analysis, Characterization, Formulation, Quality and Regulatory

Target

& Lead

ID

Pre-

tox Tox Phase I Phase II Phase III

Commercial

Production

CMC Biologics

Page 4: Implementation Of 2000 L Sub And Disposable Clarification System

Background to why I believe the

2000L is a game changer

• 13 years at contract manufacturer in Slough 2000L

scale

• 6 years producing Enbrel in a 6 x 12,000L plant

• 1 year designing 12 x 1000L SUB plant

• Approximately 1 million Euros spent on basis of design

• Moved to CMC 2 years ago

CONFIDENTIAL 4

Page 5: Implementation Of 2000 L Sub And Disposable Clarification System

– Plant runs for 300 days per year

– Protein A Cycles per batch approx. 4

– Harvest two reactors every 2 days

– Assumed product campaigns are the norm

– Cell culture only work days

= 2 x 12,000L stainless plant

5

Blockbuster ‘in market supply’

potential of the 2000L SUB factory

Output from model

Page 6: Implementation Of 2000 L Sub And Disposable Clarification System

Plants of the future

6

6 x 12,000L stainless

12 x 2,000L Disposable Conventional design

12 x 2,000L Disposable Lean design

Page 7: Implementation Of 2000 L Sub And Disposable Clarification System

Plants of the future

7

Reactor hall 15M x 15M

Page 8: Implementation Of 2000 L Sub And Disposable Clarification System

Copenhagen 2000L SUB

Implementation and proof of

concept

Page 9: Implementation Of 2000 L Sub And Disposable Clarification System

2000L SUB

• 2000L capacity retrofitted to a 100L stainless

steel suite

9

Page 10: Implementation Of 2000 L Sub And Disposable Clarification System

Aim of the project

• Increase US/DS capacity to match launch/commercial

production (MAB): 2000L

• Integrate into existing facility without affecting current

clinical manufacturing

• Minimize limited company recourses

• Project used 1 Engineer and two validation resources

• Meet cGMP requirements – EMEA, FDA

10

Page 11: Implementation Of 2000 L Sub And Disposable Clarification System

2000L SUB in 100L SS facility

11

Microbial 2x 1500L

CCI 2x 750L

CCII 100L

CCIII 300L

Page 12: Implementation Of 2000 L Sub And Disposable Clarification System

Stainless Steel

12

SIP

CIP

HPW

Automatic valves

DCS

70 elastomers

Page 13: Implementation Of 2000 L Sub And Disposable Clarification System

Disposable Bioreactor

• Minimize limited

company recourses

• Low level of

atomization

• Off the shelf

• High flexibility

• Waste – Supported by

existing infra-structure

at CMC Biologics

13

SIP

CIP

HPW

DCS

Waste

Page 14: Implementation Of 2000 L Sub And Disposable Clarification System

Defining the Bioreactor Process

14

Page 15: Implementation Of 2000 L Sub And Disposable Clarification System

Project Plan

15

7 months from start to finish

Right. On time.

Page 16: Implementation Of 2000 L Sub And Disposable Clarification System

Vendor:

• Security of supply

• Market leader in number of units sold

• Back up in both USA and Europe

• We already use their single use mixers,

100L, and 500L SUBs

• Willingness to negotiate a bag supply

agreement

• Track record in supplying disposables

• Conventional design

• Compact storage

• Wide choice of control systems

16

Page 17: Implementation Of 2000 L Sub And Disposable Clarification System

Vendor: EZ controller

• Wheel in wheel out seed reactor concept

• Simple

• Robust

• Large number of units sold

• Fast to set up, train on and validate

• Compact (can be mounted on the SUB)

• Cost effective to have multiple units on

multiple SUB’s

17

Page 18: Implementation Of 2000 L Sub And Disposable Clarification System

Factory Acceptance Testing

18

Page 19: Implementation Of 2000 L Sub And Disposable Clarification System

Installation

19

Page 20: Implementation Of 2000 L Sub And Disposable Clarification System

Installation

20

Reception as

it was

Page 21: Implementation Of 2000 L Sub And Disposable Clarification System

Installation

21

Page 22: Implementation Of 2000 L Sub And Disposable Clarification System

Installation

22

Reception as

it looks now….

Page 23: Implementation Of 2000 L Sub And Disposable Clarification System

Engineering Run - Inoculation

23

XG2Cb

Page 24: Implementation Of 2000 L Sub And Disposable Clarification System

2000L SUB data

24

• The light blue

datapoints

represent the

2000L SUB

• The other data is

from 500L SUB

runs of the same

product

Page 25: Implementation Of 2000 L Sub And Disposable Clarification System

Disposable Harvst System

25

Page 26: Implementation Of 2000 L Sub And Disposable Clarification System

26

Integrated 2000L depth filter system

Page 27: Implementation Of 2000 L Sub And Disposable Clarification System

Lessons Learnt

27

• Decide on controller early – This will impact timelines

and complexity

• Agree who mounts the control system and where it will

be mounted

• Do a cost benefit analysis on the seed strategy

• Take into account fabrication and shipping costs/time

• Be careful in regards vessel orientation and hose

location

Page 28: Implementation Of 2000 L Sub And Disposable Clarification System

28

Summary

• Slide from Johannes R. Roebers, PhD

Page 29: Implementation Of 2000 L Sub And Disposable Clarification System

Thanks to…

• Andreas Mark Arnung, CMC Biologics

• Christian Skjødt, CMC Biologics

• Esben Eggertsen, CMC Biologics

• Gustavo Mahler, CMC Biologics

• Henrik Knudsen, CMC Biologics

• Jakob Ravnsborg, CMC Biologics

• Johannes R. Roebers PhD, Elan

• Mads Laustsen, CMC Biologics

• Martin Oscar Miret Hattel , CMC Biologics

• Martin Kelly, Thermo Scientific

• Ronni Glenn Refstrup Hansen , CMC Biologics

29

Page 30: Implementation Of 2000 L Sub And Disposable Clarification System

CONFIDENTIAL 30