TE-MPE-EP, RD, 22-Mar-2012 1 Implementation and performance of the DHQDS with reduced nominal voltage for RQX.R1 R. Denz Acknowledgements: K. Dahlerup-Petersen, J. Mourao
Jan 13, 2016
TE
-MP
E-E
P, R
D,
22-M
ar-2
012
1
Implementation and performance of the DHQDS with reduced nominal voltage for RQX.R1
R. Denz
Acknowledgements: K. Dahlerup-Petersen, J. Mourao
TE
-MP
E-E
P, R
D,
22-M
ar-2
012
2
Hardware and software modifications
Mains transformer:Secondary voltage rating changed
QPS supervision:QPS_OK setting changed for signal U_HDS_2_Q2 to 0.95 * 800 V = 760 V
Capacitor bank:6 x 6 mF instead of 6 x 4.7 mF850 V charging voltage
TE
-MP
E-E
P, R
D,
22-M
ar-2
012
3
Quench heater discharge
U_HDS_2_Q2 = 850 V 820 V across heater strip (Rcable = 0.7 Ω , Rheater = 19.0 Ω)Uearth = |410 V| during nominal discharge Uearth_max = |820 V| during discharge and capacitor bank fuse blown
MQXBMQXA modified
TE
-MP
E-E
P, R
D,
22-M
ar-2
012
4
Quench heater discharge
MQXA19.7 Ω
MQXB11.5 Ω
MQXA modified
TE
-MP
E-E
P, R
D,
22-M
ar-2
012
5
Quench heater discharge
Enominal = 2.65 kJ
Emodified = 3.03 kJ
To be re-checked after LS1 as the length of warm cables will increase (relocation of protection systems within R2E campaign).