Top Banner
Impact of Wind Energy Development: Perception and Realties What Drives Growing Opposition to Wind Power Projects Jay Vincent SVP – Energy Sector Practice Leader Anaheim, CA May 2011
76

Impact of Wind Energy Development: Perceptions and Realities

Dec 18, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Impact of Wind Energy Development: Perceptions and Realities

Impact of Wind Energy Development: Perception and Realties

What Drives Growing Opposition to Wind Power Projects

Jay VincentSVP – Energy Sector Practice Leader

Anaheim, CAMay 2011

Page 2: Impact of Wind Energy Development: Perceptions and Realities

Overview

• Review 2010 Saint Index Results

• High Level Review of Key Opposition Drivers

• Review of Strategies to Deal with Opposition

Page 3: Impact of Wind Energy Development: Perceptions and Realities

US Political Climate for Real Estate Development

The NIMBY Dilemma: Americans say they are more willing to support new development but also say their hometown does not need any new

development.

• 67% of Americans believe the relationship between developers and elected officials makes the approval process unfair – DEEP CYNICISM

• 73% grade their community a C or worse when it comes to deciding what does and does not get permitted – LACK OF TRUST

Page 4: Impact of Wind Energy Development: Perceptions and Realities

US Political Climate for Real Estate Development

74% of Americans Oppose Any Development In There Community

Page 5: Impact of Wind Energy Development: Perceptions and Realities

US Political Climate for Real Estate Development

MID – ATLANTIC top NIMBY region

MIDWEST most welcoming to development

Page 6: Impact of Wind Energy Development: Perceptions and Realities

US Political Climate for Real Estate Development

Page 7: Impact of Wind Energy Development: Perceptions and Realities

US Political Climate for Real Estate Development

Page 8: Impact of Wind Energy Development: Perceptions and Realities

US Political Climate for Real Estate Development

Page 9: Impact of Wind Energy Development: Perceptions and Realities

Key Drivers to Opposition to Wind Energy Projects

1. Saint Index Survey Findings: Fear, Property Values, etc…

2. Education Gap

3. Method of Communication and Grassroots Education

4. Competitive Pressures

Page 10: Impact of Wind Energy Development: Perceptions and Realities

Strategies for Mitigating Opposition

1. Early political and opposition risk analysis

2. Fill education gap in a grassroots way

3. Respond directly and often to opposition fear mongering

4. Begin outreach early and before opposition arises

Page 11: Impact of Wind Energy Development: Perceptions and Realities

WIND ENERGY SECTOR PRACTICE

Over 30 controversial wind projects of 4000 MW company wide

Highly trained staff in specifically wind energy issues

Jay VincentSVP – Energy Sector Practice Leader312-212-8889 [email protected]

Page 12: Impact of Wind Energy Development: Perceptions and Realities

NEXT PRESENTATION

Robert O’NeilEpsilon Associates, Principal

Low Frequency Sound and Infrasound From Wind Turbines

Page 13: Impact of Wind Energy Development: Perceptions and Realities

Low Frequency Sound and Infrasound from Wind Turbines

Robert D. O’Neal, CCM, INCERobert D. Hellweg, Jr., INCE Bd. CertifiedRichard M. Lampeter, INCEEpsilon Associates, Inc.

May 24, 2011

Page 14: Impact of Wind Energy Development: Perceptions and Realities

The issue of Low Frequency Noise (LFN) and Infrasound are often raised during permitting

• “…significant issues related to audible low frequency noise of a persistent, pulsatile nature, such as created by wind turbines.” [from sworn affidavit filed in wind energy case]

• NextEra Energy Resources commissioned a comprehensive, scientific study to answer this recurring question

Page 15: Impact of Wind Energy Development: Perceptions and Realities

Purpose of this presentation is to summarize a scientific study that evaluated LFN and Infrasound

1. Literature search2. Field measurement program3. Comparison to criteria

Page 16: Impact of Wind Energy Development: Perceptions and Realities

What is Low Frequency Noise & Infrasound?

• Audible range: 20 Hz – 20,000 Hz

• Low Frequency: 12.5 Hz – 200 Hz

• Infrasound: Below 20 Hz

Page 17: Impact of Wind Energy Development: Perceptions and Realities

Low Frequency Noise & Infrasound is found everywhere and is not unique to wind turbines

Page 18: Impact of Wind Energy Development: Perceptions and Realities

Low Frequency Noise & Infrasound is found everywhere and is not unique to wind turbines

Page 19: Impact of Wind Energy Development: Perceptions and Realities

Guidelines/criteria for three areas of reaction were used to evaluate LFN and Infrasound

Can I hear it? [Audibility criteria]

Can I feel it? [Wall vibration and rattle criteria]

Is it annoying? [Disturbance/annoyance guidelines]

Page 20: Impact of Wind Energy Development: Perceptions and Realities

Development and Discussion of Criteria

Audibility ISO 226:2003 for 20 Hz to 160 Hz Watanabe and Moeller for 4 Hz to 20 Hz

Vibration and Rattle CriteriaANSI/ASA S12.2-2008 (indoor)ANSI/ASA S12.9 Part 4 (outdoor)

Disturbance/annoyance GuidelinesUK Department for Environment, Food, and Rural Affairs (DEFRA) proposed one-third octave band LFN criteria for use by environmental health officers.ANSI/ASA S12.2-2008 (indoor)ANSI/ASA S12.9 Part 4 (outdoor)

Page 21: Impact of Wind Energy Development: Perceptions and Realities

Data were collected for the two most common wind turbines in NextEra fleet• GE 1.5sle (1.5 MW)• Siemens SWT-2.3-93 (2.3 MW)• Horse Hollow Wind Farm, Taylor County, TX• Data collected at 1,000 feet and 1,500 feet from

strings of turbines.• Four houses used for interior/exterior

Page 22: Impact of Wind Energy Development: Perceptions and Realities

Horse Hollow Wind Farm

Page 23: Impact of Wind Energy Development: Perceptions and Realities

Sound levels were measured under period of maximum electrical power and light ground winds

Siemens turbines – outdoor measurements

Sample #34 = 1,847 kW; hub wind ~10.3 m/s; ground wind = 3.3 m/sSample #39 = 1,608 kW; hub wind ~9.7 m/s; ground wind = 3.4 m/s

Siemens turbines – indoor measurements

Window closed = 1,884 kW; hub wind ~10.3 m/s; ground wind = 3.2 m/sWindow open = 1,564 kW; hub wind ~9.6 m/s; ground wind = 3.7 m/s

Page 24: Impact of Wind Energy Development: Perceptions and Realities

Sound level meter with windscreen and ground level meteorological instruments

Page 25: Impact of Wind Energy Development: Perceptions and Realities

Comparison to Criteria – Audibility Outdoors

Page 26: Impact of Wind Energy Development: Perceptions and Realities

Comparison to Criteria - Equivalent Outdoor DEFRA

Page 27: Impact of Wind Energy Development: Perceptions and Realities

Comparison to Criteria – Perceptible Vibration, Rattle and Annoyance – Outdoors

Page 28: Impact of Wind Energy Development: Perceptions and Realities

Comparison to Criteria – Perceptible Vibration, Rattle and Annoyance – Indoors

Page 29: Impact of Wind Energy Development: Perceptions and Realities

Conclusions

Wind farms with Siemens SWT-2.3-93 and GE 1.5sle wind turbines at maximum noise do not pose LFN or Infrasound problem at 1,000 feet or more.

• Meet ANSI/ASA S12.2 indoor levels for LFN in bedrooms, classrooms and hospitals;

• Meet ANSI/ASA S12.2 indoor levels for perceptible vibration in walls/ceilings;

• Meet ANSI S12.9 Part 4 thresholds for annoyance and beginning of rattles;

• Meet UK DEFRA disturbance guidelines;

• Have no audible infrasound;

• Might have slightly audible LFN at 50 Hz and above depending on other LFN source levels.

Page 30: Impact of Wind Energy Development: Perceptions and Realities

Detailed LFN study just published in peer-reviewed technical journal

Page 31: Impact of Wind Energy Development: Perceptions and Realities

1.800.580.3765 • WWW.TETRATECH.COM

Cultural Resources:Connecting DevelopersWith Local Communities

AWEA WINDPOWER 2011May 24, 2011

Sydne B. Marshall, PhD, RPANational Cultural Resources Discipline Lead

[email protected]

Page 32: Impact of Wind Energy Development: Perceptions and Realities

Goals of Presentation

Use cultural resources to connect with local communities

View cultural resources issues as you would other environmental issues

Present strategies for successful cultural resource management that save time, money, and headache

Page 33: Impact of Wind Energy Development: Perceptions and Realities

Narrow View of Cultural Resources

Opera

Movies

Ballet

Page 34: Impact of Wind Energy Development: Perceptions and Realities

Broader View of Cultural Resources

Oregon Trail marked by wagon wheel rutsRock pile

Native American stone tools

Page 35: Impact of Wind Energy Development: Perceptions and Realities

Broader View of Cultural Resources

Hunting cabin in West Virginia Monticello in Virginia

Cultural resources include examples of vernacular and high design

Page 36: Impact of Wind Energy Development: Perceptions and Realities

Broader View of Cultural Resources

Landscapes and locations of local and national significance are other examples of types of cultural resources

Ground Zero, NY Three Mile Island, PA

Page 37: Impact of Wind Energy Development: Perceptions and Realities

Not All Cultural Resources Are Significant

Criteria For Listing in National Register of Historic Places - 36 CFR 60 Districts, sites, buildings, structures and objects that embody the quality of

significance in American history, architecture, archeology, engineering, and culture

A. associated with events that have made a significant contribution to broad patterns of our history;

B. associated with the lives of persons significant in our past;C. embody distinctive characteristics of a type, period, or

method of construction; work of a master, significant and distinguishable entity;

D. yielded or may be likely to yield information important in prehistory or history

Page 38: Impact of Wind Energy Development: Perceptions and Realities

National Register-Eligible Resources

Your cultural contractors make recommendations about resource eligibility using the National Register criteria

The State Historic Preservation Office (SHPO) makes determinations of eligibility

Federal law treats NRHP-eligible cultural resources and those listed in the NRHP equally

Page 39: Impact of Wind Energy Development: Perceptions and Realities

Locally Important Cultural Resources

Communities may have resources they deem locally important using their own criteria

Host communities may request avoidance of impacts to selected local resources

These local ‘landmarks’ may warrant further attention by a developer

Page 40: Impact of Wind Energy Development: Perceptions and Realities

Cultural Resources Identified In Project Area

Cultural resources in your Project Area do not signal the end of your Project

Page 41: Impact of Wind Energy Development: Perceptions and Realities

Reap Benefit From Cultural Resources

Use cultural resources as a gateway for communication with locals and an avenue for community support

Choose to identify cultural resources in Project Area, even if not required

Connect with local community by respecting local cultural heritage

Invest in addressing cultural resources to gain support from community, state regulators, and investors

Page 42: Impact of Wind Energy Development: Perceptions and Realities

Manage Cultural Resources Issues

Follow same paradigm as managing other environmental issues

• Establish baseline conditions

• Perform on-the-ground surveys

• Evaluate if inventoried resources qualify as significant

• Consider if impacts to significant or locally important resources may be avoided

Page 43: Impact of Wind Energy Development: Perceptions and Realities

If Impacts Cannot Be Avoided

Work with local community to understand historic preservation preferences

• Keep relevant permitting agencies involved and informed

• Consider mitigations that will be acceptable to your company and that would be locally meaningful

Page 44: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money, and Create Good Will

Strategy 1 – Involve Cultural Resources Specialists in the Early Planning Process

• Cultural Resource Specialists have information that may be useful

• Include cultural resource information in early constraint mapping

• Begin process of site avoidance early in planning process

• These actions will help you anticipate some issues of local opposition

Page 45: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money and Create Good Will

Strategy 2 – Communicate

• Keep communication going among entire project team (including contractors)

• Engineering and development interests working together allow meaningful design modifications that minimize additional studies and additional regulatory reviews

• Inform regulators of project modifications

Page 46: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money and Create Good Will

Strategy 3 – Develop and Commit to an Unanticipated Finds Plan

• Required under Federal process (if National Historic Preservation Act applies to Project)

• Voluntary under most other scenarios

• Establishes process to be followed in event of discovery of human remains or unanticipated archeological site

• Paves way to address issue while minimizing delays in construction

Page 47: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money and Create Good Will

Strategy 4 – Understand and Respect Host Community’s Priorities for Cultural Resources Preservation

• Honor community-based requests to design around locally and nationally recognized cultural resources

• Engage with host community to sponsor a local historic preservation project

• Projects must be locally meaningful but not necessarily elaborate or excessively expensive

Page 48: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money and Create Good Will

Support requested to paint local historic structure

Page 49: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money and Create Good Will

Community requested funds to maintain historic cemetery and fence

Page 50: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money and Create Good Will

Scanner Donated to Local Historical Society To

Assist in Curation of Historical Documents

Page 51: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money and Create Good Will

Interested parties may request opportunity to record their sacred sites

Page 52: Impact of Wind Energy Development: Perceptions and Realities

Strategies that Save Time, Money and Create Good Will

Oral History Program

Page 53: Impact of Wind Energy Development: Perceptions and Realities

Presentation Take-Away

Use cultural resources issues as a way to connect with local host community

Demonstrate good environmental stewardship by identifying sites in Project Area and avoiding impacts to them, even when not required

Apply the strategies discussed to meaningfully engage the local community and gain project support

Page 54: Impact of Wind Energy Development: Perceptions and Realities

Visual Impacts: Providing Decision-Makers With the Information They Need

Thomas Priestley, Ph.D. ASLA/AICP

Page 55: Impact of Wind Energy Development: Perceptions and Realities

55

Page 56: Impact of Wind Energy Development: Perceptions and Realities

56

Page 57: Impact of Wind Energy Development: Perceptions and Realities

57

Page 58: Impact of Wind Energy Development: Perceptions and Realities

58

Page 59: Impact of Wind Energy Development: Perceptions and Realities

59

Page 60: Impact of Wind Energy Development: Perceptions and Realities

60

NEPA Requires Analysis of Visual & Aesthetic Resources

• Aesthetically pleasing surroundings• Preservation of important historic, cultural, and

natural aspects of our national heritage• A diverse environment• Integration of the environmental design arts in

planning and decision making

NEPA strives to use all practical means, to improve and coordinate Federal plans, functions, programs, and resources by assuring:

Page 61: Impact of Wind Energy Development: Perceptions and Realities

Many States Require Consideration of Visual & Aesthetic ResourcesEnvironmental Analyses in California mustdetermine whether a project would:• Adversely affect scenic vistas• Damage scenic resources in a scenic

highway• Degrade the visual character or quality of

the site and its surroundings• Impact day or nighttime views with

light/glare

61

Page 62: Impact of Wind Energy Development: Perceptions and Realities

62

Page 63: Impact of Wind Energy Development: Perceptions and Realities

A Paradigm for Aesthetic Impact Assessment• In the US, an Outgrowth of NEPA’s Requirements and

Federal Agency Investments in the Development ofVisual Resource Management Systems

Page 64: Impact of Wind Energy Development: Perceptions and Realities

Systematic Assessment of Visual Change

• Forest Service Scenery Management System

• Bureau of Land Management Visual Resource Management System

• Federal Highway Administration Visual Impact Assessment Method

64

Page 65: Impact of Wind Energy Development: Perceptions and Realities

Standard Visual Impact Assessment Procedures

• Determine the viewshed• Identify key viewpoints• Assess existing conditions• Document the project changes• Analyze what the changes mean• Develop mitigation where needed

Page 66: Impact of Wind Energy Development: Perceptions and Realities

Viewshed Analysis, AKA: ZVI – Zone of Visual Influence

66

Page 67: Impact of Wind Energy Development: Perceptions and Realities
Page 68: Impact of Wind Energy Development: Perceptions and Realities
Page 69: Impact of Wind Energy Development: Perceptions and Realities

Assessment of Existing Conditions• Identify and Document Key Viewpoints

– photos of existing conditions– identify visual character, quality, and degree of

uniqueness of view

• Determine who sees the views, why they are important, and what formal recognition they have been given– consider viewer perceptions, values, and concerns– give serious consideration to management agency

plans and other adopted public policies that provide protection of the view

Page 70: Impact of Wind Energy Development: Perceptions and Realities

Existing View from aKey Viewpoint

Page 71: Impact of Wind Energy Development: Perceptions and Realities

Visual Simulation withProject in Place

Page 72: Impact of Wind Energy Development: Perceptions and Realities

Document the Changes

• Visibility of turbines and degree of visual contrast created

• Visual effects of vegetative clearing and grading

• Visibility and degree of visual integration of ancillary facilities

Page 73: Impact of Wind Energy Development: Perceptions and Realities

What Do the ChangesReally Mean?• To what extent are the changes visible?• When are they visible?• Who sees the changes and under what

circumstances?• To what degree will the visual character

and quality of the view be altered? • What is the relationship of the changes to

identified landscape values and policies?

Page 74: Impact of Wind Energy Development: Perceptions and Realities

Identify Measures toMitigate Impacts

• A number of compendia of measures for good siting and design of wind power installations are available

Page 75: Impact of Wind Energy Development: Perceptions and Realities
Page 76: Impact of Wind Energy Development: Perceptions and Realities

Questions and Answers