Land use distribution and transportation both are very important issue for Dhaka city in recent period. To relate these two issues with each other is also a very effective job but a difficult one indeed. This study intends to find out the impact of different land use changes on the transportation system of Dhaka city. One of the most important roads of Dhaka city, Mirpur Road has been taken to understand and to analyze for this study. This study will help to take significant decisions and generate proper policies in transportation sector. It will also contribute to the attempts of combining land use planning and transportation planning. By assessing the land use change impact on transportation system, traffic management, congestion control and improvement of road network will be possible to make
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Impact of Different Types of Land Use on Transportation System of Dhaka City:

A Case Study of Mirpur Road and Its Adjacent Land Uses Presented by : Shancharpath

Rifat Rahman (06 15 005)

Nabila Nur Kuhu (06 15 009)

Shahadat Hossain Shakil (06 15 020)

Khaled Bin Abdul Quader (06 15 030)

Page 2: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Mirpur Road

One of the Busiest Road of the City

Almost Linear in Shape

Dual Carriageway

Length : 8.05 km (Azimpur to Gabtoli)

7.40 km (Azimpur to Technical)

High Traffic Congestion in the Peak Period

Study Area Profile

Section-7 (BRTC Market-Technical)

End Section of Mirpur Road

Length : 1.05 km

1 Major Intersection – Technical Intersection

Dhaka, Bangladesh

-Mirpur Road

Source: MediaFire; URL: http://www.mediafire.com/?zzmk4fkmnoiyzkj; Retrieved On: 27th April,2010

Source: GIS Database, Sheltech (Pvt.) Ltd. (Consultancy Division)Source: GIS Database, Sheltech (Pvt.) Ltd. (Consultancy Division)

Page 3: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Objectives

To explore the current pattern of land use distribution and traffic condition.

To identify the trip rate for different types of land use.

Identifying the impact of land use change on transportation system.

Page 4: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

MethodologyProject Identification and Selection of Study Area

Literature Review

Fixation of the Objectives

Primary Data

Data Collection

Secondary Data

Geometric Feature Survey of the Road

Roadside Land Use Survey

Trip Rate Analysis & Modal Share Survey

Traffic Volume Survey

Journey and Spot Speed Survey

Base Map Collection

Cross-Sectional Element Data of Road

Previous Land Use Distribution Data

Previous Traffic Volume Data

Previous Speed Data

Data Compilation

Exploring the Current Land Use Pattern and Traffic Condition

Impact Analysis for Land Use Change

Major Findings and Recommendations

Trip Rate Calculation for Different Types of Land Use

Preparation of the Final Report

Page 5: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Ele

me

nts

Ave

rag

e(ft

)

Ma

xi

mu

m(f

t)

Mi

ni

mu

m(

ft)

Rig

ht

of

wa

y

101.

45

13

0.1

6

1.

5

Ca

rri

age

wa

y

41.2 52 2

3.

5

La

ne

wid

th

11.2

6

23 9

Me

dia

n

4.6 11.

3

2.

1

Fo

ot

pat

h

7.78 15.

75

2.

5

N

MT

lan

e

24.5

8

54 1

6

Present Traffic Condition and Land Use Pattern

Traffic Condition:Geometric Features

Elements Average(ft) Maximum(ft) Minimum(ft)

Right of way 101.45 130.1 61.5

Carriage way 41.2 52 23.5

Lane width 11.26 23 9

Median 4.6 11.3 2.1

Foot path 7.78 15.75 2.5

NMT lane 24.58 54 16

•Total 62 intersections (43-T intersection; 7-Y intersection; 12 - 4 leg intersection)

•18-signalized and others un-signalized

•7 foot over bridges

Source: Field Survey, 2011

Traffic Condition:Capacity

-Assuming 12’ as Per Lane Width

-Design Capacity of Urban Arterial Road is 1400 PCU/Lane/Hour According to DITS (1994)

Direction (S-N) (N-S)

Av. Carriageway Width(feet) 40.94 41.46

Capacity(PCU/Hour) 4895.124 4928.02

Source: Field Survey, 2011

Page 6: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Ele

me

nts

Ave

rag

e(ft

)

Ma

xi

mu

m(f

t)

Mi

ni

mu

m(

ft)

Rig

ht

of

wa

y

101.

45

13

0.1

6

1.

5

Ca

rri

age

wa

y

41.2 52 2

3.

5

La

ne

wid

th

11.2

6

23 9

Me

dia

n

4.6 11.

3

2.

1

Fo

ot

pat

h

7.78 15.

75

2.

5

N

MT

lan

e

24.5

8

54 1

6

Traffic Condition:Volume

Source: Field Survey, 2011

DirectionVolume (PCU/ Hour)

Peak Off-Peak Average

North bound 2083.62 1279.11 1735.33

South bound 2437.89 1620.31 2149.33

Both Side(Av.) 5351.53 3399.99 4621.97

Traffic Condition:Modal Share

Present Traffic Condition and Land Use Pattern(Contd..)

Page 7: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Traffic Condition:Speed – Spot Speed

Source:

•Impacts of Policy Measures on Urban Transportation System: A Case Study of Mirpur Road; (2003), Report of Group-“Motion”, Transportation

Planning Studio (PLAN 342), DURP Library, BUET, Dhaka.

•Field Survey, 2011

Bus Car0

5

10

15

20

25

30

35

40

45

32.5

38.25

27.68525.575

Spot Speed Comparision

Speed-2003(K.P.H) Speed-2011(K.P.H)

Traffic Condition:Speed – Journey Speed

Source:

•Impacts of Policy Measures on Urban Transportation System: A Case Study of Mirpur Road; (2003), Report of Group-“Motion”, Transportation

Planning Studio (PLAN 342), DURP Library, BUET, Dhaka.

•Performance Impact of Transportation Policy Shift on Mirpur Road – A Comparative Analysis; (2006), Report of Group-(01,04), Transportation

Planning Studio (PLAN 342), DURP Library, BUET, Dhaka.

•Field Survey, 2011

Journey Speed-2003(K.P.H) Journey Speed-2006(K.P.H) Journey Speed-2011(K.P.H)0

5

10

15

20

25

30

14.45

27.86

15.9417.2033333333329

2118.4

Journey Speed Comparision

Northbound Southbound

Direction(Northbound)Year Speed Level of Service2003 14.45 F2006 27.86 D2011 15.94 E

Direction(Southbound)Year Speed Level of Service2003 17.20 E2006 21 E2011 18.4 E

Level of Service Comparison for Journey Speed

Present Traffic Condition and Land Use Pattern(Contd..)

Page 8: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Present Traffic Condition and Land Use Pattern(Contd..)

Land Use Pattern(2011):Mirpur Road

Source: Field Survey, 2011

27%

26%1%

13%

3%5%

10%

15%0%Commercial

Education & ResearchGarmentsHospitalMixedOfficeOthersResidentialUnder construction

Land Use Change(2007-2011):Mirpur Road

Change Percentage(%)

Source: Field Survey, 2011; GIS Database 2007,Sheltech (Pvt.) Limited

Commercial

Education & Research

Garments

Hospital

Mixed

Office

Others

Residential

Under Construction

-30.00 -20.00 -10.00 0.00 10.00 20.00 30.00

25.11

18.24

2.29

6.79

1.93

6.98

10.68

-26.50

1.46

Page 9: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Present Traffic Condition and Land Use Pattern(Contd..)

Land Use Pattern(2011):Section-7: BRTC Market-Technical

Source: Field Survey,2011

27%

25%21%

12%

1%4%

11%Commercial Activity

Residential

Education & Research

Hospital

Office

Garments

Others

Land Use Change(2007-2011):Section-7: BRTC Market-Technical

Change Percentage(%)Source: Field Survey, 2011;GIS Database 2007,Sheltech (Pvt.) Limited

Commercial Activity

Residential

Education & Research

Hospital

Office

Garments

Others

-20.00 0.00 20.00 40.00 60.00 80.00

13.15

59.11

2.72

17.51

0.00

3.45

-4.07

Page 10: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Trip Rate Calculation

Land Use Type No. of Sample Surveyed Highest Hourly Trip Rate(Per 1000 sq.ft.)

Commercial 5 6.09 Residential 4 1.11

Educational 3 95.98/1000 Student

Hospital 3 13.31 Office 3 8.66

Garments 2 37.77

Total 8 Hour Survey Conducted for Every Sample of All Land Use Type

Source: Field Survey,2011

Page 11: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Trip Rate Calculation(Contd..)

Change

d Area

Trip Rate

Person

Trip

Modal

Share(%)

Vehicle Trip

Occupancy Rate

No. of

Vehicles

PCE Valu

ePCU/Hr

Land Use Change TrafficCalculation Procedure

Land Use Change Traffic(PCU/Hr)Mirpur Road

-“Educational”

and “Others”

is excluded

from the

calculation

Land Use Change Traffic(PCU/Hr)Section-7(BRTC Market-Technical)

-“Educational”

and “Others”

is excluded

from the

calculation

Com-mercial

Residential Hospital Garments Office

-400

-200

0

200

400

600

800

1000

1200

1400

16001445.45

-251.94

869.68

50.14

514.72

Total

Commer-cial Activity

Residential Hospital Garments0.00

50.00100.00150.00200.00250.00300.00350.00400.00

123.68 93.63

365.07

12.28

Total 2628.05 (PCU/Hr)Total 594.66 (PCU/Hr)

Page 12: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Trip Rate Calculation(Contd..) Forecasting Traffic Volume for 2013 (Section-7: BRTC Market-Technical)

2006 2009 2011

Peak Hourly Volume(PCU/Hr)

5021 4826.5 5226.7

Off-Peak Hourly Volume(PCU/Hr)

4103 4075.1 3338.33933333336

Average Hourly Volume(PCU/Hr)

4632.8 4460.0375 3997.38260869565

500

1500

2500

3500

4500

5500

Traffi

c Vo

lum

e(PC

U/H

r)

Source:

Performance Impact of Transportation Policy Shift on Mirpur Road – A Comparative Analysis; (2006), Report of Group-(01,04), Transportation

Planning Studio (PLAN 342), DURP Library, BUET, Dhaka.

DTCB-2009 Volume Data

Field Survey,2011

Peak Hourly Volume (2006)

Peak Hourly Volume

(2011)

Increase in 5 Years

Annual Growth Growth Rate (%)

5021 5226.7 205.7 41.14 0.82

- Derivation of the Annual Growth Rate-Forecasted Volume

Mode

Present Volume-2011

(PCU/Hr)

Annual Growth Rate for 2 years

Forecasted Increased

Volume (from growth rate)

for 2013

Forecasted Volume for 2013

1 2 3=(2*1) 4=(1+3)

Car 1104.14

(0.82*2)/100=

0.016

18.093 1122.23Microbus 93.55 1.53 95.083Office Vehicle 11.91 0.19 12.10Taxi 59.13 0.96 60.10CNG 386.66 6.33 393Bus 2121.72 34.76 2156.49School Bus 0.73 0.01 0.74Human Hauler 45.27 0.74 46.01Motorcycle 166.91 2.73 169.64Rickshaw 1153.10 18.89 1172Bicycle 83.54 1.36 84.91Total 5226.7 85.65 5312.35

Page 13: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Area (sq.ft.)Trip Rate-In Peak

(Per 1000 sq.ft/Per Hr. )Trip Rate-In Peak

(Per 1 sq.ft/Per Hr. ) Total Person Trip(Per Hr.)

195866.432 6.09 0.00609 1193.314712

Trip Rate Calculation(Contd..) Forecasting Development Traffic in 2013 (Section-7: BRTC Market-Technical)

- Total PCU Generated from the Under Construction Commercial Complex in 2013

Area (sq.ft.)Trip Rate-In Peak

(Per 1000 sq.ft./Per Hr. )Trip Rate-In Peak

(Per 1 sq.ft./Per Hr. )Total Person Trip(Per Hr.) Total PCU/Hr

195866.43 6.09 0.00609 1193.31 331.08

Page 14: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Impact for Land Use Change (Mirpur Road)

Impact for Land Use Change (BRTC Market-Technical)

Impact for Development Traffic in 2013 (BRTC Market-Technical)

Land Use Change Impact

Page 15: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Direction AverageCarriageway Width(feet)

No. of lanes (Assuming 12’ as Per Lane Width)

Standard Capacity/Lane(PCU/Hr)

Total Capacity (PCU/Hr)

Bothway 82.4 6.867 1400 6.867*1400 = 9613.33

Capacity of Mirpur Road (Azimpur – Technical)

Traffic Volume

(PCU/hr)

Estimated Capacity (PCU/hr)

V/C ratio

(Traffic Volume/Capacity)

Level of Service (LOS)

Year 2006 4995.35

9613.33

0.52 AYear 2011 (without Landuse Change Traffic)

(5351.53-2703.77)= 2647.76

0.28 A

Year 2011

( with Landuse Change Traffic)

5351.53 0.54 A

Comparison of LOS for Land Use Change (for Peak Hourly Traffic Flow) Source: Field Survey 2011

Land Use Change Impact(Contd..)Impact for Land Use Change (Mirpur Road)

Page 16: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Direction AverageCarriageway Width(feet)

No. of lanes (Assuming 12’ as Per Lane Width)

Standard Capacity/Lane(PCU/Hr)

Total Capacity (PCU/Hr)

Bothway 81.82 6.818 1400 6.818*1400 = 9545.67

Traffic Volume

(PCU/hr)

Estimated Capacity (PCU/hr)

V/C ratio

(Traffic volume/Capacity)

Level of Service (LOS)

Year 2006 5021

9545.67

0.53 AYear 2011 (without Landuse Change Traffic)

(5226.7-594.7) = 4632

0.485 A

Year 2011

( with Landuse Change Traffic) 5226.7 0.55 A

Comparison of LOS for Land Use Change (for Peak Hourly Traffic Flow)

Capacity of Section-7 (BRTC Market – Technical)

Source: Field Survey 2011

Land Use Change Impact(Contd..)Impact for Land Use Change (BRTC Market-Technical)

Page 17: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Traffic Volume (PCU/hr)

Estimated Capacity (PCU/hr)

V/C ratio

(Traffic volume/Capacity)

Level of Service (LOS)

Year 2011 5226.7

9545.67

0.55 AYear 2013 (without Development Traffic) 5312.3 0.56 A

Year 2013

( with Development Traffic)

(5312.3+331.1)=5643.4 0.59 A

Impact on LOS in 2013 for New Construction

Land Use Change Impact(Contd..)

Impact for Development Traffic in 2013 (BRTC Market-Technical)

Page 18: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

The average carriage way width of the road is 82.4 which is quite

satisfactory but the peak hourly traffic volume 5351.53 PCU is quite high.

Journey Speed and Spot Speed is deteriorating over the period.

Commercial and Educational land use change is in the dominating position

and Residential land use change is in a negative trend.

Peak hourly traffic volume from the land use is dominated by the

commercial land uses(1445.45 PCU/hr)

The vehicle capacity ratio (v/c) is increasing over the time which indicates

deterioration of the road condition according to the standards of the LOS.

Major Findings

Page 19: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

Recommendations

Commercial land uses act as the major point of traffic generation and

attraction for this road, there should be strong restrictions, regulations and

guidelines for establishing any kind of new commercial land use along this

road.

Garments and Educational land use generate and attract a huge amount of

traffic at a specific time which creates a huge pressure on the road in a

certain time period. The establishment of any new Garments and

Educational institution should be strictly prohibited on this road to reduce

the peak hourly traffic flow.

Page 20: Impact of Different Types of Land Use on Transportation System of Dhaka City : A Case Study of Mirpur Road

References

• Sharmin N. Rupom N. J. and Sadat K.(2011) Developing a Generic Methodology for Traffic Impact Assessment of a Mixed land Use in

Dhaka City, (2011), Chapter (1-8), BURP Thesis of Group-02, DURP, BUET, Dhaka.

•Performance Impact of Transportation Policy Shift on Mirpur Road – A Comparative Analysis; (2006), Report of Group-(01,04),

Transportation Planning Studio (PLAN 342), DURP Library, BUET, Dhaka.

•Impacts of Policy Measures on Urban Transportation System: A Case Study of Mirpur Road; (2003), Report of Group-“Motion”,

Transportation Planning Studio (PLAN 342), DURP Library, BUET, Dhaka.

•Mitra, R. (2004), Land Use- Transportation Cycle Reexamined: A Case Study of Land Use Changes in Dhanmondi R/A and its Impacts on

Mirpur Road, World Habitat Day 2004 Souvenir, Centre for Urban Studies (CUS) and Bangladesh Institute of Planners (BIP), Dhaka,

Bangladesh.

•Rahman M. M. (2006), “Study of parking Facility for the New Market Shopping Zone in Dhaka City ” Unpublished MURP Thesis,

Department of Urban and Regional Planning, Bangladesh University of Engineering and Technology, Dhaka.

•Kadiyali L.R. (2003), “Traffic Engineering and Transport Planning” Sixth Edition, Khanna Publishers, New Delhi.(page: 823-828)