100 Climate Solutions Project Campaign ~ 2016 Waste Project REGIONS OF CLIMATE ACTION Summary Mandating Authority : Expected project CAPEX : Main stakeholders Project Type : Social and environmental impact Location and population IMO PALM PLANTATION: integrated biogas production from combined waste materials Reduction of fossil fuel consumption for Imo Palm and industrial energy off-takers; Elec- trifying the surrounding villages through the project operated micro-grid; Reducing the electricity production costs which are based on fossil fuels; Introduction of bio-methane based CNG as transport fuel. This project involves utilizing selected and pre-treated biomass waste materials to gen- erate biogas energy for the Imo Palm Oil Plantation. Excess energy will be provided to the surrounding villages through a micro-grid as well as to commercial off-takers. The project will also establish electrification to surrounding villages and a bio-methane regional transport capacity. Imo Palm 6'490'000 € IMO Palm Plantation Nigeria, Sustainable Environmental Technologies – SET GmbH Austria, Imo State Government Nigeria, General Electrics – Clark Energy, Heineken (Awomama Breweries), Coca Cola bottling plant Imo State and other energy off-takers Biogas Imo State, Nigeria 4 million inh.
2

IMO PALM PLANTATION

Jan 13, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IMO PALM PLANTATION

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Waste Project

REGIONS OFCLIMATE ACTION

Summary

Mandating Authority :

Expected project CAPEX :

Main stakeholders

Project Type :

Social and environmental impact

Location and population

IMO PALM PLANTATION: integrated biogas production from combined waste materials

Reduction of fossil fuel consumption for Imo Palm and industrial energy off-takers; Elec-trifying the surrounding villages through the project operated micro-grid; Reducing the electricity production costs which are based on fossil fuels; Introduction of bio-methane based CNG as transport fuel.

This project involves utilizing selected and pre-treated biomass waste materials to gen-erate biogas energy for the Imo Palm Oil Plantation. Excess energy will be provided to the surrounding villages through a micro-grid as well as to commercial off-takers. The project will also establish electrification to surrounding villages and a bio-methane regional transport capacity.

Imo Palm

6'490'000 €

IMO Palm Plantation Nigeria, Sustainable Environmental Technologies – SET GmbH Austria, Imo State Government Nigeria, General Electrics – Clark Energy, Heineken (Awomama Breweries), Coca Cola bottling plant Imo State and other energy off-takers

Biogas

Imo State, Nigeria4 million inh.

Page 2: IMO PALM PLANTATION

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

STAGE 5 : Engineering / Construction / Commercial Operation

Waste stream data Comments

Operation and Maintenance Contractor

Engineering, Procurement and Construction Contractor

STAGE 3 : Feasibility Studies

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study :

Feasibility study :

Technology :

Site access :

Adequate road Rail access Port facilities

STAGE 1 : Concept Development, Site identification

Land identified

Expected capacity ( Input- Output )

Building permits signed

STAGE 4 : Permitting / Financing / Contracts

Land concession signed

Environmental impact study

Identified sources of fundings

Project maturity ( IFC / World Bank Categories )

STAGE 1 : Concept Development, Site identification

STAGE 2 : Pre-Feasibility Studies

STAGE 3 : Feasibility Studies

STAGE 4 : Permit t ing / Financing / Contracts

STAGE 5 : Engineering/Construction/Commercial Operation

This biogas project represents a lighthouse project for integrated palm oil and agricultural production by introducing a closed circle and zero emission energy production technology that will reduce operational costs through energy independence.

Inlay material pre-treatment through SET biomass crusher. Multi-stage anaerobic fermentation with biogas utilisation for co-gen-eration of electricity and heat. Excess biogas refinery for vehicle utilisation in the form of bio-methane CNG.

Yes

No

Yes

No

SET is prepared to take overall responsibility for the tendering, selection process and oversight of the engineering, procurement and construction as implementing partner and one-stop-shop for the project SPV.

SET is prepared to act as the general operator and maintenance contractor for the SPV. General Electrics will provide for maintenance of the co- generation units of the project phases.

Partially

Co-investor identified

The expected installed capacity for project phase I will be 1 MWel/h plus 1,15 MWth/h and excess refined biogas for vehicle operation

Yes

Yes