Page 1: IMO Coating KR Pspc

1

IMO PerformanceStandard for

Protective Coatings

Joo-Sung Park/Statutory Service Team

Page 2: IMO Coating KR Pspc

2

Mandatory performance standard by the SOLAS II-1/3-2:“PERFORMANCE STANDARD FOR PROTECTIVE COATINGS FOR DEDICATED SEAWATER BALLAST TANKS IN ALL TYPE OF SHIPS

AND DOUBLE-SIDE SKIN SPACES OF BULK CARRIERS”

1. Amendment of SOLAS Reg. II-1/3-2 to introduce mandatory protective coating requirements in SOLAS

- Adoption: To be adopted by MSC 82(Dec. 2006)- Enter into force: 1 July 2008- Scope - Maintenance and Repair: Guidelines to be developed later

2. SOLAS Reg. XII/6.3(for bulk carriers): deleted as of 1 July 2008

Amendment to SOLAS regulation

Page 3: IMO Coating KR Pspc

3

APPLICATION DATE

Contract date based:The vessel(s) contracted on or after 1st July 2008 or

Delivery date based:The vessel(s) delivered on or after 1st of July 2012

- Dedicated seawater ballast tanks in all vessels above GT 500 T and above- Double –side skin spaces in bulk carriers of 150m in length and above- Permanent Means of Access(PMA): shall be applied to structural strength

members and recommend to apply for non-structural strength members

Bulk Carriers of 150 m and above:The SOLAS Contracting Government may apply the PSPC in advance for the ships in its flag constructed on or after 1 July 2006(I.e. ships under SOLAS Reg.XII/6.3)

EARLY IMPLIMENTATION By MSC circular to be approved by MSC 82

APPLICATION SCOPE

Page 4: IMO Coating KR Pspc

4

The Contents of PSPC (MSC 81/WP.13, Annex 3)

1 PURPOSE2 DEFINITIONS3 GENERAL PRINCIPLES4 COATING STANDARD5 COATING SYSTEM APPROVAL6 COATING INSPECTION REQUIREMENTS7 VERIFICATION REQUIREMENTS8 ALTERNATIVE SYSTEM

ANNEX 1:TEST PROCEDURES FOR COATING QUALIFICATION FOR BALLAST TANK OF ALL TYPES SHIP AND DOUBLE-SIDE SKIN SPACES OF BULK CARRIERS COATING- APPENDIX 1: TEST ON SIMULATED BALLAST TANK CONDITION- APPENDIX 2: CONDENSATION CHAMBER TESTANNEX 2: EXAMPLE OF DAILY LOG AND NON-CONFORMITY REPORTANNEX 3:DRY FILM THICKNESS MEASUREMENTSANNEX 4:STANDARDS REFERENCE TO THE PERFORMANCE STANDARDS ON PROTECTIVE COATINGS

Page 5: IMO Coating KR Pspc

5

DEFINITIONS

- DFT, NDFT- Edge Grinding- Hard coating- Target useful life: 15 years - Technical Data Sheet- GOOD condition

- The coating ability to reach target life 15 yrs : depend on type of coating system, steel preparation, application, coating inspection and maintenance

- Inspection of surface preparation and coating process: shall be agreed between ship owner, shipyard and coating manufacturer

- Coating Technical File(CTF): shall be reviewed by Admin. or RO and be provided on board: Type approval cert. Technical Data sheet, Records of coating application, inspection and repair procedure during construction, procedure for in-service maintenance and repair of the coating system

GENERAL PRINCIPLES

Page 6: IMO Coating KR Pspc

6

COATING STANDARD

Coating system

Job specification

-Rust, grease, dust, salt, oil, etc. shall be removed prior to coating

- Abrasive inclusions embedded in the coating shall be removed

- Selection of coating system: Deck and tank boundaries to withstand repeated heating/cooling

- Coating type:epoxy based system(other type shall comply with test in Annex 1)

- Pre-qualification test: * Epoxy based system shall be tested in accordance with Annex 1 or

equivalent test procedures (e.g. Class B1?)* Documented field exposure results(5 yrs) also acceptable* New coating system shall be tested according to Annex 1

Page 7: IMO Coating KR Pspc

7

Job specification - Stripe coating

There shall be a minimum of two stripe coats and two spray coats, except that the second stripe coat, by way of welded seams only, may be reduced in scope where it is proven that the NDFT can be met by the coats applied in order to avoid unnecessary over thickness. Any reduction in scope of the second stripe coat shall be fully detailed in the CTF.

The application scope of brushmay have a different interpretation according to the personnel knowledge, background and experiences.

A strong necessity for development of a stripe coating tool which is combined two characteristic of roller and brush to improve quality and efficiency of stripe coating

Stripe coats shall be applied by brush or roller. Roller to be used for scallops, ratholes, etc. only.

COATING STANDARD

Page 8: IMO Coating KR Pspc

8

COATING STANDARD

NDFT NDFT 320 Microns with 90/10 rule- max. TDFT -> according to manufacture’s spec.- Gauge type: SSPC-PA2

Current Standard NDFT NDFT 300 Microns with 80/20 rule

i. About 7% of paint material cost increase

Mean 571.92 ㎛ Max. 1,470.00 ㎛ No. of Readings 100 (100%)

STD Deviation 266.06 ㎛ Min. 251.00 ㎛ Reading above 23 (3%)

Coef. of Vari. 46.52 ㎛ High Limit 700.00 ㎛ Reading below 7 (7%)

Low Limit 300.00 ㎛

Sampling test result:DFT measuring based on the Current Standard 2 coats 300 ㎛

ii. Increase application M/H and material cost due to the relatively wider range of DFT than Current Standard

iii. More potential risk for high DFT (may impact on progress)

Page 9: IMO Coating KR Pspc

9

COATING STANDARD

Primary surface preparation

- Blasting and profile: Sa ½ (profile: 30- 75 ㎛) (average?) – ISO 8501-1

* restriction: humidity 85% or above, surface temp. below 3℃ - ISO 8503-1/3* surface cleanliness and roughness profile check before application

- Salt limit(NaCl): ≤ 50 mg/㎡ (ISO 8502-9 Conductivity test)

- Shop primer: * Inhibitor free zinc silicate based or equivalent * Compatibility with main coating system: shall be confirmed by coating manuf.

Page 10: IMO Coating KR Pspc

10

Secondary Surface Preparation(SSP): Steel condition - Edge Grinding

The steel surface should be prepared so that the coating selected can achieve an even distribution at the required NDFT and have an adequate adhesion by removing weld spatter and any other surface contamination in accordance with ISO 8501-3 grade P2.

The amount grinding activitieswill tremendously be increased at block assembly stage.

A strong necessity for development of a grinding tool or process to mitigate the huge burden for labor and progress management.

Edges to be treated to a rounded radius of minimum 2mm, or subjected to threepass grinding or at least equivalent process before painting.

COATING STANDARD

Page 11: IMO Coating KR Pspc

11

SSP – surface treatment

i. Damaged surface of shopprimer and welds: SIS Sa 2½ ( ISO 8501-1) ii. Compatible intact surface of shopprimer: Sweep blasting, high

pressure water washing or equivalent method. (cf. compatible zinc silicate shop primer - cross over with other epoxy coatings: appdx. 1)

iii. Intact shop primer not compatible with the main coat: Sa 2 (70% removal)

Block division, erection procedure, working process should be take into account the limit of the amount of coating damages, erection butts to avoid the application of the blasting after erection.

COATING STANDARD

At block assembly stage

After erectioni. Butts: SIS St 3 or better or Sa 2½ where practicable. (ISO 8501-1)ii. Small damages up to 2% of total area: St 3iii. Contiguous damages over 25m2 or over 2% of the total area of the tank: Sa

2½ (definition of damage, calculation of damaged area?, 순차적인 덧칠로 해결?)

Page 12: IMO Coating KR Pspc

12

COATING STANDARD

SSP - DUSTi Dust grade “1” for dust size class “3” to “5” by means of

adhesive tape test (ISO 8502-3)Ii Dust size classes “1” and “2”: shall be removed if visible

(naked eye)

Sampling of Current Standard for DUST grade

FloorWallCeiling

Dust Size (ISO 8502-3)

0 : Particles not visible under x10

magnification

1 : Particles visible under x10

magnification but not with normal or

corrected vision(usually particles less than

50㎛ in diameter)

2 : Particles just visual with normal or

corrected vision (usually particles between

50㎛ and 100㎛ diameter)

3 : Particles clearly visible with normal or

corrected vision(particles up to 0.5mm in

diameter)

4 : Particles between 0.5mm and 2.5mm

in diameter

5 : Particles lager than 2.5mm in diameter

Page 13: IMO Coating KR Pspc

13

COATING STANDARD

Soluble salt limit ISO 8502-6: Extraction methodology (Bresel only ?)ISO 8502-9: Assessment of soluble salt by conduct metric

≤ 50 mg/m2 of NaCl (Pre-washing is not explicitly required)

A test result for the comparison of the content of Sodium Chloride in Total Dissolved Salt

Page 14: IMO Coating KR Pspc

14

QUALIFICATION OF COATING INSPECTOR

i. NACE CIP(COATING INSPECTOR PROGRAM): LEVEL II, or

ii. FROSIO(NORWEGIAN STANDARD NS 476): LEVEL RED, or

Iii Equivalent as verified by Administration or RO

- Inspection items: Table in para 6.2- Recordings: results from the inspection shall be recorded by the inspector and shall be included in the CTF – daily log and NC report.

No. of Inspector

No of Certified Remarks (FROSIO)

Ship Builder 240 39 (16%) 7 major ship yard in Korea

Paint Maker 507 78 (15%) 6 major paint Maker in Korea

Increased inspection activities for DFT measurement acc. to Annex 3

Increased documentation for provision of CTF.

Increased activity for the test such as dust, soluble salt, profiles, etc.

Other activity for approval of the quality control system

Ship Builder 480 At least, more than two times of the present coating inspectors are necessary to meet the PSPC comparing with the current shipbuilding standards.Paint Maker 1,014

Current Status for Certified Coating Inspector (May, 2006)

Page 15: IMO Coating KR Pspc

15

VERIFICATION REQUIREMENTS

Type Approval, Quality Control and Verification

Administration or R.O

Technical Data Sheet

Type ApprovalTest

Type ApprovalCert.

InspectionReport

CoatingInspection

CoatingTechnical File

Safety ConstructionCertificate

Coating Inspector

Check

Check (How ?)

Review

Issue

Issue

Approve quality control system ? (How ?)

Verify

check

Monitoring

Ship Builder

Ship Owner

CoatingManufacturer

Approve quality control system?)

Paint Test Lab.

Approval of Quality Control System of the ship yards?

Type Approval of Costing System –by a third party (Who can be a third party?)

Preparation of Coating Technical File ?

Who will employ the inspectors ?

Should IACS do direct coating inspection rather than monitoring?

More clarification is needed

Page 16: IMO Coating KR Pspc

16

ANNEX 3

DFT measurements

Note: Arrows of diagram indicate critical areas and should be understood to mean indication for both sides..4 Three(3) gauge readings for each set of primary support members and 2 gauge readings for each set of other members

as indicated by the arrows in the diagram;.5 for primary support members (girders and transverses) one set of gauge readings for 2 to 3 meters run as shown in

figure 3 above but not less than three sets;.6 around openings one gauge reading from each side of the opening;.7 five gauge readings per square meter (m2) but not less than three gauge readings taken at complex

areas (i.e. large brackets of primary support members); and.8 Additional spot checks to be taken to verify coating thickness for any area considered necessary by the coating inspector.

The following verification check points of DFT are to be taken:.1 one gauge reading per 5 m2 of flat surface areas;.2 one gauge reading at 2 to 3 meter intervals and as close as possible to tank boundaries,

but not further than 15 mm from edges of tank boundaries;.3 longitudinal and transverse stiffener members:

One set of gauge readings as shown below, taken at 2 to 3 meters run and not less thantwo sets between primary support members;

Page 17: IMO Coating KR Pspc

17

Evaluation sheet

Items

Expected increase of ship building cost based on evaluation of new performance standards Expected

additional man power

(Area/persons)

RemarksCost

(USD)

Man power(M/H)

Construction schedule

delay (Day)

New facilities

(USD)

Total (USD)

NDFT 320 ㎛ (90/10)

Dust (ISO 8502-3)

Soluble Slat

(ISO 8502-6, 9)

Stripe coating

Edge grinding

(ISO 8501-3, P2)

Secondary surface preparation

Block

Hull

Qualified Inspector

Verification

DFT measurement

(ANNEX 3)

Others (incl. provision of CTF)