Top Banner
SEE ADDENDUM (No C ollect C alls) N6833520Q 0185 02-M ar-2020 b. TELEPH O NE NUM BER 732-323-7789 8. O FFER D U E D ATE/LO C AL TIM E 05:00 PM 02 A pr2020 5. SO LIC ITATIO N N UM BER 6. SO LIC ITATIO N ISSU E D ATE A UTHO RIZED FO R LO CA L REPRO DUCTIO N PREV IO US EDITIO N IS NO T USA BLE STA NDA RD FO RM 1449 (REV .2/2012) Prescribed by G SA – FA R (48 CFR)53.212 ( TYPE OR PRI NT) (SIG NATUR E O F C O N TR AC TIN G O FFIC ER ) ADDENDA ARE 26. TO TA L A W AR D AM O U N T (ForG ovt.U se O nly) 23. CODE 10.TH IS AC Q U ISITIO N IS SUCH A DDRESS IN O FFER 17b.CHECK IF REM ITTA NCE IS DIFFERENT A ND PUT BELO W IS CHECKED TELEPHO NE NO . N68335 9.ISSU ED BY 18b.SUBM IT INV O ICES TO A DDRESS SHO W N IN BLO CK 18a.UNLESS BLO CK 7. FO R SO LIC ITATION INFOR M ATIO N C ALL: a. N AM E KEV IN SM ITH 2. C O N TR AC T N O . 3. AW AR D /EFFEC TIVE D ATE 4. O RD ER NUM BER (TYPE OR PRINT) 30b.NA M E A ND TITLE O F SIG NER 30c.DA TE SIG NED 31b. NAME OF CONTRACTING OFFICER 30a.SIG NA TURE O F O FFERO R/CO NTRA CTO R 31a.UNITED STATES OF AMERICA 27a.SO LIC ITATIO N IN C O R PO R ATES BY R EFER EN C E FAR 52.212-1.52.212-4.FAR 52.212-3.52.212-5 AR E ATTAC HED. 25.AC C O U N TIN G AN D APPR O PR IATIO N D ATA 1. R EQU ISITIO N N U M BER 20. AD D ITIO N AL SH EETS SU BJEC T TO TH E TER M S AN D C O N D ITIO N S SPEC IFIED . PA G E 1 O F 46 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30 SO LIC ITA TIO N/CO N TR A C T/O RDER FO R CO M M ER C IA L ITEM S AR E N O T ATTAC HED 27b. C O N TR AC T/PU R C H ASE O R D ER IN C O R PO R ATES BY R EFER EN C E FAR 52.212-4.FAR 52.212-5 IS ATTAC H ED . AD D EN D A AR E AR E N O T ATTAC HED 1 (BLO C K 5),IN C LU D IN G AN Y AD D ITIO N S O R C H AN G ES W H IC H ARE SET FO R TH H ER EIN ,IS AC C EPTED AS TO ITEM S: . Y O U R O FFER O N SOLIC ITATIO N 28.C O N TR AC TO R IS R EQ U IR ED TO SIG N TH IS D O C U M EN T AN D RETURN % FOR: SET ASID E: U N R ESTR IC TE D OR X SM ALL BU SIN ESS 17a.C O N TR AC TO R / CODE FAC ILITY OFFEROR CODE N AVAL AIR W AR FAR E C EN TER -LAKEHURST BLD G 120-1 JO IN T BASE M D L N J 08733 18a.PAY M EN T W ILL BE M AD E BY CODE R ATED O R D ER UNDER D PAS (15 C FR 700) 13a.TH IS C O N TR AC T IS A X 13b.R ATIN G DO -C9 CODE 15.D ELIVER TO C O D E 16.AD M IN ISTER ED BY 12.D ISC O U N T TER MS 11.D ELIVER Y FO R FO B D ESTIN A- TIO N U N LESS BLO C K IS MARKED SEE SC H ED U LE 14.M ETH O D O F SO LIC ITATIO N RFQ IFB RFP X N AVAL AIR W ARFARE C ENTER AIRC R AFT D IV TERENC E A. G HEE 48110 SH AW RO AD , BLD G. 2187, R M 1B45 PATUXENT R IVER M D 20670 TEL: 301-342-8536 FAX: 732-323-7301 FA X: TEL:732-323-2778 SER VIC E-D ISA BLE D VETERAN-OW NED SM ALL BU SIN E SS 8(A) H U BZO N E SM ALL BUSINESS SIZE STAN DARD: $16,500,000 N AIC S: 541380 X O FFER DATED 29.AW AR D O F C ONTRACT:REF. D ELIVER ALL ITEM S SET FO R TH O R O TH ER W ISE ID EN TIFIED ABO VE AN D O N ANY C O PIES TO ISSU IN G O FFIC E.C O N TR AC TO R AG R EES TO FU R N ISH AND EMAIL: TEL: 31c. DATE SIGNED SEE SCHEDULE SCHEDULE O F SUPPLIES/SERV ICES ITEM NO . Q UA NTITY UNIT UNIT PRICE AMOUNT 24. 22. 21. 19. W OM EN -O W NED SM ALL BU SIN ESS (W OSB) ELIG IBLE U N D ER THE W O M EN -O W N ED SM ALL BU SIN ESS PR O G R AM EDW OSB
64

imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

Jun 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

SEE ADDENDUM

(No Collect Calls)

N6833520Q0185 02-Mar-2020b. TELEPHONE NUMBER

732-323-77898. OFFER DUE DATE/LOCAL TIME

05:00 PM 02 Apr 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N683359. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION INFORMATION CALL:

a. NAME

KEVIN SMITH

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

PAGE 1 OF 46OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

1

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARESET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY OFFEROR CODE

NAVAL AIR WARFARE CENTER - LAKEHURSTBLDG 120-1JOINT BASE MDL NJ 08733

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDERDPAS (15 CFR 700)

13a. THIS CONTRACT IS AX13b. RATINGDO-C9

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

NAVAL AIR WARFARE CENTER AIRCRAFT DIVTERENCE A. GHEE48110 SHAW ROAD, BLDG. 2187, RM 1B45PATUXENT RIVER MD 20670TEL: 301-342-8536 FAX:

732-323-7301FAX:

TEL: 732-323-2778 SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS

8(A)

HUBZONE SMALL BUSINESS

SIZE STANDARD:

$16,500,000

NAICS:

541380

XOFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANYCOPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB) ELIGIBLE UNDER THE WOMEN-OWNED SMALL BUSINESS PROGRAM

EDWOSB

Page 2: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS (CONTINUED)

PAGE 2 OF 46

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENTREPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIEDCORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACKPrescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.SCHEDULE OF SUPPLIES/ SERVICES

21.QUANTITY UNIT

22. 23.UNIT PRICE

24.AMOUNT

19.ITEM NO.

Page 3: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 3 of 46

Section SF 30 - BLOCK 14 CONTINUATION PAGE

POINTS OF CONTACT

Government POC: Kevin Smith, [email protected]

Customer POC: TERENCE A. GHEE48110 SHAW ROAD, BLDG. 2187, RM 1B45PATUXENT RIVER MD [email protected]

Contractor POC: TBD

For construction related CLINS, the construction wage rate requirement statue will apply in this solicitation. In accordance with the construction wage rate #MD20200008 will apply. Prior to contract award the most recent wage rate determination will be incorporated.

Page 4: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 4 of 46

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT0001 1 Lot

MODIFICATION OF NATF WIND TUNNELFFPModification of Naval Aerodynamic Test Facility Wind Tunnel in accordance with the (IAW) the embedded Statement of Work (SOW).FOB: DestinationPSC CD: K066

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT0002 1 Lot

MODIFICATION OF NATF WIND TUNNEL - CONSTFFPConstruction in Support of CLIN 0001 Modification of Naval Aerodynamic Test Facility Wind Tunnel in accordance with the (IAW) the embedded Statement of Work (SOW).FOB: DestinationPSC CD: K066

NET AMT

Page 5: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 5 of 46

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT0003 1 EachOPTION OPTION: Balance wind shield

FFPIAW the embedded SOW.FOB: DestinationPSC CD: K066

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT0004 1 EachOPTION OPTION: Balance plenum

FFPIAW the embedded SOW.FOB: DestinationPSC CD: K066

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT0005 1 EachOPTION OPTION: Single fairing support system

FFPIAW the embedded SOW.FOB: DestinationPSC CD: K066

NET AMT

Page 6: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 6 of 46

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT0006 1 EachOPTION OPTION: Assist balance contractor

FFPIAW the embedded SOW.FOB: DestinationPSC CD: K066

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY 0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC / CAGE

Page 7: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 7 of 46

0001 12 mths. ADC 1 NAVAL AIR WARFARE CENTER AIRCRAFT DIVTERENCE A. GHEE48110 SHAW ROAD, BLDG. 2187, RM 1B45PATUXENT RIVER MD 20670301-342-8536FOB: Destination

0002 12 mths. ADC 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

0003 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

0004 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

0005 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

0006 12 mths. AOE 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-19 Incorporation by Reference of Representations and

Certifications. DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

JUN 2016

52.204-22 Alternative Line Item Proposal JAN 2017 52.211-10 Commencement, Prosecution, and Completion of Work APR 1984 52.212-1 Instructions to Offerors--Commercial Items OCT 2018 52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.212-5 (Dev) Contract Terms and Conditions Required to Implement

Statutes or Executive Orders--Commercial Items (Deviation 2018-O0021)

JAN 2020

52.217-4 Evaluation Of Options Exercised At The Time Of Contract Award

JUN 1988

52.217-5 Evaluation Of Options JUL 1990 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation MAY 2018

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014

Page 8: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 8 of 46

52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-16 Approval of Wage Rates MAY 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000 MAY 2014

52.222-26 Equal Opportunity SEP 2016 52.222-30 Construction Wage Rate Requirements--Price Adjustment

(None or Separately Specified Method) AUG 2018

52.222-32 Construction Wage Rate Requirements--Price Adjustment (Actual Method)

AUG 2018

52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

52.228-1 Bid Guarantee SEP 1996 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.233-1 Disputes MAY 2014 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment,

Utilities, and Improvements APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-19 Organization and Direction of the Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -

Alternate I APR 1984

52.236-21 Alt II Specifications and Drawings for Construction (Feb 1997) Alternate II

APR 1984

52.236-26 Preconstruction Conference FEB 1995 52.236-28 Preparation of Proposals--Construction OCT 1997 52.242-14 Suspension of Work APR 1984 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.243-4 Changes JUN 2007 52.244-2 Subcontracts OCT 2010 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Items AUG 2019 52.246-2 Inspection Of Supplies--Fixed Price AUG 1996

Page 9: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 9 of 46

52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-12 Inspection of Construction AUG 1996 52.246-14 Inspection of Transportation APR 1984 52.246-16 Responsibility For Supplies APR 1984 52.246-23 Limitation Of Liability FEB 1997 52.246-25 Limitation Of Liability--Services FEB 1997 52.249-10 Default (Fixed-Price Construction) APR 1984 52.249-10 Alt I Default (Fixed-Price Construction) (Apr 1984) Alternate I APR 1984 52.249-10 Alt II Default (Fixed-Price Construction) (Apr 1984) Alternate II APR 1984 52.249-10 Alt III Default (Fixed-Price Construction) (Apr 1984) Alternate III APR 1984 52.252-5 Authorized Deviations In Provisions APR 1984 52.252-6 Authorized Deviations In Clauses APR 1984 252.204-7006 Billing Instructions OCT 2005 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

DEC 2019

252.213-7000 Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations

SEP 2019

252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION (NOV 2015)

(a) Definitions. Inverted domestic corporation and subsidiary have the meaning given in the clause of this contract entitled Prohibition on Contracting with Inverted Domestic Corporations (52.209-10).

(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.105-2(b) applies or the requirement is waived in accordance with the procedures at 9.108-4.

(c) Representation. The Offeror represents that--(1) It [ ] is, [ ] is not an inverted domestic corporation; and(2) It [ ] is, [ ] is not a subsidiary of an inverted domestic corporation.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

Page 10: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 10 of 46

The Contractor shall be required to (a) commence work under this contract within [TBD] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than [* insert date]. The time stated for completion shall include final cleanup of the premises. *The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

52.211-12 LIQUIDATED DAMAGES -- CONSTRUCTION (SEPT 2000)(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay

liquidated damages to the Government in the amount of _______________________ [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2020)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

Page 11: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 11 of 46

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_x_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C). ___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_x__ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a). ____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Nov 2016) of 52.219-9.

____ (iii) Alternate II (Nov 2016) of 52.219-9.

Page 12: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 12 of 46

____ (iv) Alternate III (Nov 2016) of 52.219-9.

____ (v) Alternate IV (Aug 2018) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2019) (15 U.S.C. 657f).

_X__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)). ____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

_X__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

_x___(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2020) (E.O. 13126).

_x___ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_X__ (28)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

____ (ii) Alternate I (Feb 1999) of 52.222-26. _X__ (29)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212). ____ (ii) Alternate I (July 2014) of 52.222-35. _X__ (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793). ____ (ii) Alternate I (July 2014) of 52.222-36.

_X__ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_x__ (33)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

_x__ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

Page 13: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 13 of 46

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

_x__ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

_x___ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

____ (44) 52.223-21, Foams (Jun 2016) (E.O. 13693).

____ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

____ (ii) Alternate I (JAN 2017) of 52.224-3.

____ (46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____ (47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (48) 52.225-5, Trade Agreements (Oct 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_x__ (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

Page 14: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 14 of 46

____ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

____ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

____ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_x__ (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) (31 U.S.C. 3332).

____ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).

____ (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

_x__ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). ____ (ii) Alternate I (Apr 2003) of 52.247-64. ____ (iii) Alternate II (Feb 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

_____ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).

_____ (2) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

Page 15: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 15 of 46

_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).

_____ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

_____ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(vii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(viii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

Page 16: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 16 of 46

(ix) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(x) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(xi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xiii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).

(xiv) _____ (A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).(xv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xvi) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xvii) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).

(xviii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).

(xix) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).

(xx) (A) 52.224-3, Privacy Training (Jan 2017) (5   U.S.C.   552a ).

(B) Alternate I (Jan 2017) of 52.224-3.(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxiii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

Page 17: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 17 of 46

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within                                                                                               . Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)(a) The Government may extend the term of this contract by written notice to the Contractor within _____[insert

the period of time within which the Contracting Officer may exercise the option]; provided, that the Government gives the Contractor a preliminary written notice of its intent to extend at least ___days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed ___________(months)(years).

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

[insert goals] [insert goals]

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

Page 18: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 18 of 46

(1) Name, address, and telephone number of the subcontractor;(2) Employer's identification number of the subcontractor;(3) Estimated dollar amount of the subcontract;(4) Estimated starting and completion dates of the subcontract; and(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is [insert description of the geographical areas where the contract is to be performed, giving the State, county, and city.]

52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014)(a) Definitions. As used in this clause--“Commercially available off-the-shelf (COTS) item”-- (1) Means any item of supply (including construction

material) that is--(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);(ii) Sold in substantial quantities in the commercial marketplace; and(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same

form in which it is sold in the commercial marketplace; and(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)), such as agricultural products and petroleum

products.“Component” means an article, material, or supply incorporated directly into a construction material.“Construction material” means an article, material, or supply brought to the construction site by the Contractor or

a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place

of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction materials.

“Domestic construction material” means--(1) An unmanufactured construction material mined or produced in the United States;(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.“Foreign construction material” means a construction material other than a domestic construction material.“United States” means the 50 States, the District of Columbia, and outlying areas.(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: [Contracting Officer to list applicable excepted materials or indicate “none”].

Page 19: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 19 of 46

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this

clause shall include adequate information for Government evaluation of the request, including--(A) A description of the foreign and domestic construction materials;(B) Unit of measure;(C) Quantity;(D) Price;(E) Time of delivery or availability;(F) Location of the construction project;(G) Name and address of the proposed supplier; and(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with

paragraph (b)(3) of this clause.(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed

price comparison table in the format in paragraph (d) of this clause.(iii) The price of construction material shall include all delivery costs to the construction site and any

applicable duty (whether or not a duty-free certificate may be issued).(iv) Any Contractor request for a determination submitted after contract award shall explain why the

Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price ComparisonConstruction material description Unit of measure Quantity Price (dollars) *Item 1       Foreign construction material       Domestic construction material       Item 2       Foreign construction material       Domestic construction material      

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.][*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry

certificate is issued)].

Page 20: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 20 of 46

52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JUL 2000)(a) The Contractor shall submit one of the following payment protections:_____________________________________________________________________________________________________________________________________________(b) The amount of the payment protection shall be 100 percent of the contract price.(c) The submission of the payment protection is required within ______ days of contract award.(d) The payment protection shall provide protection for the full contract performance period plus a one-year

period.(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the

Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor andmaterial that signed the escrow agreement.

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)The Contractor shall perform on the site, and with its own organization, work equivalent to at least [insert the appropriate number in words followed by numerals in parentheses] percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) - ALT I (FEB 1995)(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting

the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--[Insert date and time]

(c) Participants will meet at--[Insert location]

52.251-1 GOVERNMENT SUPPLY SOURCES (APR 2012)The Contracting Officer may issue the Contractor an authorization to use Government supply sources in the

performance of this contract. Title to all property acquired by the Contractor under such an authorization shall vest in the Government unless otherwise specified in the contract. The provisions of the clause at FAR 52.245-1, “Government Property”, apply to all property acquired under such authorization.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if

they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its

Page 21: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 21 of 46

quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):https://www.acquisition.gov/far/ or http://www.farsite.hill.af.mil/.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)This contract incorporates one or more clauses by reference, with the same force and effect as if they were given

in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/far/ or http://farsite.hill.af.mil.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

Page 22: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 22 of 46

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

____________________________________________________________

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

____________________________________________________________

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC  TBDIssue By DoDAAC  N68335Admin DoDAAC**  ____Inspect By DoDAAC  ____Ship To Code  ____Ship From Code  TBDMark For Code  ____Service Approver (DoDAAC)  ____Service Acceptor (DoDAAC)  ____

Page 23: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 23 of 46

Accept at Other DoDAAC  ____LPO DoDAAC  ____DCAA Auditor DoDAAC  ____Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

_________________________________________________________________

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)(a) The Government will provide to the Contractor, without charge, one set of contract drawings and

specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall-(1) Check all drawings furnished immediately upon receipt;(2) Compare all drawings and verify the figures before laying out the work;(3) Promptly notify the Contracting Officer of any discrepancies;(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--(1) Large-scale drawings shall govern small-scale drawings; and(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not

Page 24: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 24 of 46

relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

TitleFileDrawing No.

252.251-7000 ORDERING FROM GOVERNMENT SUPPLY SOURCES (AUG 2012) (a) When placing orders under Federal Supply Schedules, Personal Property Rehabilitation Price Schedules, or Enterprise Software Agreements, the Contractor shall follow the terms of the applicable schedule or agreement and authorization. Include in each order:

(1) A copy of the authorization (unless a copy was previously furnished to the Federal Supply Schedule, Personal Property Rehabilitation Price Schedule, or Enterprise Software Agreement contractor).

(2) The following statement: Any price reductions negotiated as part of an Enterprise Software Agreement issued under a Federal Supply Schedule contract shall control. In the event of any other inconsistencies between an Enterprise Software Agreement, established as a Federal Supply Schedule blanket purchase agreement, and the Federal Supply Schedule contract, the latter shall govern.

(3) The completed address(es) to which the Contractor's mail, freight, and billing documents are to be directed.(b) When placing orders under nonmandatory schedule contracts and requirements contracts, issued by the

General Services Administration (GSA) Office of Information Resources Management, for automated data processing equipment, software and maintenance, communications equipment and supplies, and teleprocessing services, the Contractor shall follow the terms of the applicable contract and the procedures in paragraph (a) of this clause.

(c) When placing orders for Government stock on a reimbursable basis, the Contractor shall -- (1) Comply with the requirements of the Contracting Officer's authorization, using FEDSTRIP or MILSTRIP

procedures, as appropriate; (2) Use only the GSA Form 1948-A, Retail Services Shopping Plate, when ordering from GSA Self-Service

Stores; (3) Order only those items required in the performance of Government contracts; and (4) Pay invoices from Government supply sources promptly. For purchases made from DoD supply sources,

this means within 30 days of the date of a proper invoice. The Contractor shall annotate each invoice with the date of receipt. For purposes of computing interest for late Contractor payments, the Government's invoice is deemed to be a demand for payment in accordance with the Interest clause of this contract. The Contractor's failure to pay may also result in the DoD supply source refusing to honor the requisition (see DFARS 251.102(f)) or in the Contracting Officer terminating the Contractor's authorization to use DoD supply sources. In the event the Contracting Officer decides to terminate the authorization due to the Contractor's failure to pay in a timely manner, the Contracting Officer shall provide the Contractor with prompt written notice of the intent to terminate the authorization and the basis for such action. The Contractor shall have 10 days after receipt of the Government's notice in which to provide additional information as to why the authorization should not be terminated. The termination shall not provide the Contractor with an excusable delay for failure to perform or complete the contract in accordance with the terms of the contract, and the Contractor shall be solely responsible for any increased costs.

(d) When placing orders for Government stock on a non-reimbursable basis, the Contractor shall -- (1) Comply with the requirements of the Contracting Officer's authorization; and (2) When using electronic transactions to submit requisitions on a non-reimbursable basis only, place orders by

authorizing contract number using the Defense Logistics Management System (DLMS) Supplement to Federal Implementation Convention 511R, Requisition; and acknowledge receipts by authorizing contract number using the DLMS Supplement 527R, Receipt, Inquiry, Response and Material Receipt Acknowledgement.

(e) Only the Contractor may request authorization for subcontractor use of Government supply sources. The Contracting Officer will not grant authorizations for subcontractor use without approval of the Contractor.

(f) Government invoices shall be submitted to the Contractor's billing address, and Contractor payments shall be sent to the Government remittance address specified below:

Page 25: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 25 of 46

Contractor's Billing Address [include point of contact and telephone number]:_____________________________________________

Government Remittance Address [include point of contact and telephone number]:____________________________________________

5252.201-9500 TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012)(a) The Technical Point of Contact (TPOC) for this contract is:[ TBD(b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order

COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO).

(c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires.

(d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract.

5252.209-9510 ORGANIZATIONAL CONFLICTS OF INTEREST (SERVICES) (NAVAIR)(MAR 2007)(a) Purpose. This clause seeks to ensure that the contractor (1) does not obtain an unfair competitive advantage

over other parties by virtue of its performance of this contract, and (2) is not biased because of its current or planned interests (financial, contractual, organizational or otherwise) that relate to the work under this contract.

(b) Scope. The restrictions described herein shall apply to performance or participation by the contractor (as defined in paragraph (d)(7)) in the activities covered by this clause.

(1) The restrictions set forth in paragraph (e) apply to supplies, services, and other performance rendered with respect to the suppliers and/or equipment listed in Attachment [Insert attachment number]. [Insert either "Task orders issued under the contract" or "The contract"] will specify to which suppliers and/or equipment subparagraph (f) restrictions apply.

(2) The financial, contractual, organizational and other interests of contractor personnel performing work under this contract shall be deemed to be the interests of the contractor for the purposes of determining the existence of an Organizational Conflict of Interest. Any subcontractor that performs any work relative to this contract shall be subject to this clause. The contractor agrees to place in each subcontract affected by these provisions the necessary language contained in this clause.

(c) Waiver. Any request for waiver of the provisions of this clause shall be submitted in writing to the Procuring Contracting Officer. The request for waiver shall set forth all relevant factors including proposed contractual safeguards or job procedures to mitigate conflicting roles that might produce an Organizational Conflict of Interest. No waiver shall be granted by the Government with respect to prohibitions pursuant to access to proprietary data.

(d) Definitions. For purposes of application of this clause only, the following definitions are applicable:(1) "System" includes system, major component, subassembly or subsystem, project, or item.(2) "Nondevelopmental items" as defined in FAR 2.101.(3) "Systems Engineering" (SE) includes, but is not limited to, the activities in FAR 9.505-1(b).(4) "Technical direction" (TD) includes, but is not limited to, the activities in FAR 9.505-1(b).(5) "Advisory and Assistance Services" (AAS) as defined in FAR 2.101.(6) "Consultant services" as defined in FAR 31.205-33(a).(7) "Contractor", for the purposes of this clause, means the firm signing this contract, its subsidiaries and

affiliates, joint ventures involving the firm, any entity with which the firm may hereafter merge or affiliate, and any other successor or assignee of the firm.

(8) "Affiliates" means officers or employees of the prime contractor and first tier subcontractors involved in the program and technical decision-making process concerning this contract.

Page 26: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 26 of 46

(9) "Interest" means organizational or financial interest.(10) "Weapons system supplier" means any prime contractor or first tier subcontractor engaged in, or having a

known prospective interest in the development, production or analysis of any of the weapon systems, as well as any major component or subassembly of such system.

(e) Contracting restrictions.[ ] (1) To the extent the contractor provides systems engineering and/or technical direction for a system or

commodity but does not have overall contractual responsibility for the development, the integration, assembly and checkout (IAC) or the production of the system, the contractor shall not (i) be awarded a contract to supply the system or any of its major components or (ii) be a subcontractor or consultant to a supplier of the system or of its major components. The contractor agrees that it will not supply to the Department of Defense (either as a prime contractor or as a subcontractor) or act as consultant to a supplier of, any system, subsystem, or major component utilized for or in connection with any item or other matter that is (directly or indirectly) the subject of the systems engineering and/or technical direction or other services performed under this contract for a period of [Insert the period of prohibition] after the date of completion of the contract. (FAR 9.505-1(a))

[ ] (2) To the extent the contractor prepares and furnishes complete specifications covering nondevelopmental items to be used in a competitive acquisition, the contractor shall not be allowed to furnish these items either as a prime contractor or subcontractor. This rule applies to the initial production contract, for such items plus a specified time period or event. The contractor agrees to prepare complete specifications covering non-developmental items to be used in competitive acquisitions, and the contractor agrees not to be a supplier to the Department of Defense, subcontract supplier, or a consultant to a supplier of any system or subsystem for which complete specifications were prepared hereunder. The prohibition relative to being a supplier, a subcontract supplier, or a consultant to a supplier of these systems of their subsystems extends for a period of [Insert the period of prohibition] after the terms of this contract. (FAR 9.505-2(a)(1))

[ ] (3) To the extent the contractor prepares or assists in preparing a statement of work to be used in competitively acquiring a system or services or provides material leading directly, predictably and without delay to such a work statement, the contractor may not supply the system, major components thereof or the services unless the contractor is the sole source, or a participant in the design or development work, or more than one contractor has been involved in preparation of the work statement. The contractor agrees to prepare, support the preparation of or provide material leading directly, predictably and without delay to a work statement to be used in competitive acquisitions, and the contractor agrees not to be a supplier or consultant to a supplier of any services, systems or subsystems for which the contractor participated in preparing the work statement. The prohibition relative to being a supplier, a subcontract supplier, or a consultant to a supplier of any services, systems or subsystems extends for a period of [insert the period of prohibition] after the terms of this contract. (FAR 9.505-2(b)(1))

[ ] (4) To the extent work to be performed under this contract requires evaluation of offers for products or services, a contract will not be awarded to a contractor that will evaluate its own offers for products or services, or those of a competitor, without proper safeguards to ensure objectivity to protect the Government's interests. Contractor agrees to the terms and conditions set forth in the Statement of Work that are established to ensure objectivity to protect the Government's interests. (FAR 9.505-3)

[ ] (5) To the extent work to be performed under this contract requires access to proprietary data of other companies, the contractor must enter into agreements with such other companies which set forth procedures deemed adequate by those companies (i) to protect such data from unauthorized use or disclosure so long as it remains proprietary and (ii) to refrain from using the information for any other purpose other than that for which it was furnished. Evidence of such agreement(s) must be made available to the Procuring Contracting Officer upon request. The contractor shall restrict access to proprietary information to the minimum number of employees necessary for performance of this contract. Further, the contractor agrees that it will not utilize proprietary data obtained from such other companies in preparing proposals (solicited or unsolicited) to perform additional services or studies for the United States Government. The contractor agrees to execute agreements with companies furnishing proprietary data in connection with work performed under this contract, obligating the contractor to protect such data from unauthorized use or disclosure so long as such data remains proprietary, and to furnish copies of such agreement to the Contracting Officer. Contractor further agrees that such proprietary data shall not be used in performing for the Department of Defense additional work in the same field as work performed under this contract if such additional work is procured competitively. (FAR 9.505-4)

[ ] (6) Preparation of Statements of Work or Specifications. If the contractor under this contract assists substantially in the preparation of a statement of work or specifications, the contractor shall be ineligible to perform or participate in any capacity in any contractual effort (solicited or unsolicited) that is based on such statement of

Page 27: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 27 of 46

work or specifications. The contractor shall not incorporate its products or services in such statement of work or specifications unless so directed in writing by the Contracting Officer, in which case the restrictions in this subparagraph shall not apply. Contractor agrees that it will not supply to the Department of Defense (either as a prime contractor or as a subcontractor) or act as consultant to a supplier of, any system, subsystem or major component utilized for or in connection with any item or work statement prepared or other services performed or materials delivered under this contract, and is procured on a competitive basis, by the Department of Defense with [insert the period of prohibition] after completion of work under this contract. The provisions of this clause shall not apply to any system, subsystem, or major component for which the contractor is the sole source of supply or which it participated in designing or developing. (FAR 9.505-4(b))

[ ] (7) Advisory and Assistance Services (AAS). If the contractor provides AAS services as defined in paragraph (d) of this clause, it shall be ineligible thereafter to participate in any capacity in Government contractual efforts (solicited or unsolicited) which stem directly from such work, and the contractor agrees not to perform similar work for prospective offerors with respect to any such contractual efforts. Furthermore, unless so directed in writing by the Contracting Officer, the contractor shall not perform any such work under this contract on any of its products or services, or the products or services of another firm for which the contractor performs similar work. Nothing in this subparagraph shall preclude the contractor from competing for follow-on contracts for AAS.

(f) Remedies. In the event the contractor fails to comply with the provisions of this clause, such noncompliance shall be deemed a material breach of the provisions of this contract. If such noncompliance is the result of conflicting financial interest involving contractor personnel performing work under this contract, the Government may require the contractor to remove such personnel from performance of work under this contract. Further, the Government may elect to exercise its right to terminate for default in the event of such noncompliance. Nothing herein shall prevent the Government from electing any other appropriate remedies afforded by other provisions of this contract, or statute or regulation.

(g) Disclosure of Potential Conflicts of Interest. The contractor recognizes that during the term of this contract, conditions may change which may give rise to the appearance of a new conflict of interest. In such an event, the contractor shall disclose to the Government information concerning the new conflict of interest. The contractor shall provide, as a minimum, the following information:

(1) A description of the new conflict of interest (e.g., additional weapons systems supplier(s), corporate restructuring, new first-tier subcontractor(s), new contract) and identity of parties involved;

(2) A description of the work to be performed;(3) The dollar amount;(4) The period of performance; and(5) A description of the contractor's internal controls and planned actions, to avoid any potential organizational

conflict of interest.

5252.211-9507 PERIOD OF PERFORMANCE (NAVAIR)(SEP 2013)(a) The contract shall commence on [TBD] and shall continue [TBD ]. However, the period of performance may

be extended in accordance with the option provisions contained herein.(b) If DFAR Clause 252.216-7006, "Ordering", is incorporated into this contract, then the period in which the

Government can issue orders under the contract will be extended at the exercise of an option, and extended to the end of that option period.

5252.211-9509 INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL (NAVAIR)(OCT 2005)

The Contractor's Technical Proposal Number [TBD], dated [Enter document date], and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the

Page 28: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 28 of 46

provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification" but the Government's Specification shall take precedence over the Contractor's technical proposal.

5252.211- 9510 CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011)(a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to

identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall:

(1) Not by word or deed give the impression or appearance of being a Government employee;(2) Wear appropriate badges visible above the waist that identify them as contractor employees when in

Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order;

(3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work;

(4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and

(5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative.

(b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer.

(c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees.

5252.215-9524 BASIS FOR AWARD (NAVAIR) (JUL 1998)(a) Award will be made to that responsible offeror proposing the lowest price for supplies or services meeting the

requirements of the solicitation.(b) All proposals will be evaluated for technical acceptability. Proposals that do not conform to the requirements

of the solicitation may be rejected without further evaluation, deliberation or discussion. The low priced, technically acceptable offer submitted by a responsible offeror will be awarded the contract.

5252.243-9505 ENGINEERING CHANGES (NAVAIR)(OCT 2005)(a) After contract award, the Contracting Officer may solicit, and the contractor is encouraged to propose

independently, engineering changes to the equipment, software specifications or other requirements of this contract. These changes may be proposed for reasons of economy, improved performance, or to resolve increased data processing requirements. If the proposed changes are acceptable to both parties, the contractor shall submit a price change proposal to the Government for evaluation. Those proposed engineering changes that are acceptable to the Government will be processed as modifications to the contract.

Page 29: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 29 of 46

(b) This applies only to those proposed changes identified by the contractor, as a proposal submitted pursuant to the provisions of this clause. As a minimum, the following information shall be submitted by the contractor with each proposal:

(1) A description of the difference between the existing contract requirement and the proposed change, and the comparative advantages and disadvantages of each.

(2) Itemized requirements of the contract that must be changed if the proposal is adopted, and the proposed revision to the contract for each such change.

(3) An estimate of the changes in performance costs, if any, that will result from adoption of the proposal.(4) An evaluation of the effects the proposed change would have on collateral costs to the Government such as

Government-furnished property costs, costs of related items, and costs of maintenance and operation.(5) A statement of the time by which the change order adopting the proposal must be issued so as to obtain the

maximum benefits of the changes during the remainder of this contract. Also, any effect on the contract completion time or delivery schedule shall be identified.

(c) Engineering change proposals submitted to the Contracting Officer shall be processed expeditiously. The Government shall not be liable for proposal preparation costs or any delay in acting upon any proposal submitted pursuant to this clause. The contractor has the right to withdraw, in whole or in part, any engineering change proposal not accepted by the Government within the period specified in the engineering change proposal. The decision of the Contracting Officer as to the acceptance of any such proposal under this contract shall be final and shall not be subject to the "Disputes" clause of the contract.

(d) The Contracting Officer may accept any engineering change proposal submitted pursuant to this clause by giving the contractor written notice thereof. This written notice may be given by issuance of a modification to this contract. Unless and until a modification is executed to incorporate an engineering change proposal under this contract, the contractor shall remain obligated to perform in accordance with the terms of the existing contract.

(e) If an engineering change proposal pursuant to this clause is accepted and applied to this contract, an equitable adjustment in the contract price and in any other affected provisions of this contract shall be made in accordance with the "Changes" clause.

(f) The contractor is requested to identify specifically any information contained in its engineering change proposal which it considers confidential and/or proprietary and which it prefers not to be disclosed to the public. The identification of information as confidential and/or proprietary is for information purposes only and shall not be binding on the Government to prevent disclosure of such information. Offerors are advised that such information may be subject to release upon request pursuant to the Freedom of Information Act (5 U.S.C. 552).

5252.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by [the

NAWC AD LKE Procuring Contracting Officer(s) (PCO) or their duly authorized representative.].(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the

accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.

C-TXT-ECMRA REQUIRED ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA) INFORMATION (NOV 2017)

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [TBD] via a secure data collection site. Contracted services, excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment; (2) X, Lease/Rental of Facilities; (3) Y, Construction of Structures and Facilities;

Page 30: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 30 of 46

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom - Telecommunications Transmission (D304) and Internet (D322) ONLY.

(5) S, Utilities ONLY; (6) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address "https://www.ecmra.mil."

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at "https://www.ecmra.mil."

SOWSTATEMENT OF WORK

for theModification of Naval Aerodynamic Test Facility Wind Tunnel

17 July 2019

A new external balance (Government Furnished Equipment (GFE)) is being installed under the test section of the Naval Aerodynamic Test Facility (NATF) wind tunnel in room 1B45 of Building 2187, Patuxent River, MD.

The interior of the NATF test section is 4 ft. high x 4 ft. wide x 8 ft. long.

As part of this effort, the external balance will have a larger turntable than the legacy NATF turntable. The legacy turntable is 17 inches in diameter; the new turntable will be from 36 inches to 40 inches in diameter. This will require the test section floor support structure and floor to be modified.

Statement of Work:The CONTRACTOR shall modify the NATF wind tunnel test section to accommodate the integration of the GFE into the facility.

Item 1: Description of WorkI. The CONTRACTOR shall be responsible for the following:

a. Disconnect NATF wind tunnel facility sections as necessary.i. NAVAIR facility personnel will secure power to and any systems affected

as needed.ii. Any cables/wires/tubing that were disconnected are to be properly labelled

to insure proper re-assembly.iii. Details of NATF wiring are shown in Figs. 1a and 1b.

b. Removal of legacy balance and new balance site preparation. i. Because the lab contains delicate instrumentation, dust must be contained

as much as practicable.ii. The new external balance is estimated to weigh approximately 1,000 lb.

The new concrete floor must be level and designed to support the new balance without appreciable deflection of the floor or balance.

Page 31: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 31 of 46

iii. Removal of old balance and concrete block. The CONTRACTOR shall remove the existing concrete block for the legacy external balance (2 ft X 1.5 ft X 3.33 ft) by first removing 4’X4’existing concrete floor around it. The floor is approximately 6” of rebar reinforced concrete. The legacy balance block is also composed of reinforced concrete. Details of Lab Foundation under the test section are shown in Figs. 2 through 4.

iv. Keep as much as the existing cable trough intact as practicable.v. Fill will be added and a new rebar reinforced concrete slab will be

installed to adequately support the new balance.vi. The new concrete floor will be at existing floor grade after removal of

floor tiles. This will insure that the new balance will be mounted to the floor 36” below the test section floor (wind-side surface).

vii. As much as possible, new rebar should be kept away or below the balance anchor pad locations so that anchors may be drilled without hitting the rebar.

viii. The new floor must be skimmed level.ix. The new floor must be isolated from the existing floor around the

edge:1/2" P.M.F ISO. JOINT. c. The current 1” plywood of both side walls and ceiling will be removed and

replaced with Aluminum on both side walls and ceiling of sufficient structural strength. The glass on both side walls and ceiling need to be re-installed and re-sealed using a manner consistent with the forces encountered during operation of the wind tunnel. If it possible, an option is to be priced to make the windows flush with the wall. Bore a hole to mount Pitot-static probe in the legacy location on the ceiling.

d. Re-seal sidewall doors with new gasket material.e. Modify NATF test section to remove floor structural trusses and modify test

section floor to receive a 36-inch diameter turntable. i. The modifications must be able to with stand the loading of tunnel

maximum speed of 205 ft/s. In addition to any normal loading associated with model installation preparation. E.g., multiple wind tunnel personnel working in the test section.

ii. The current 1” plywood floor will be removed and replaced with an Aluminum floor of sufficient structural strength. The thickness of the floor will be such that the GFE turntable will be of proper height and within level tolerance.

iii. A centerline reference line will be etched or scribed on the test section floor on both sides of the plates(s).

iv. The test section floor shall be level.v. The test section floor shall utilize best wind tunnel practices to minimize

step heights between other sections of the wind tunnel, within the test section, and the test section turntable. The maximum allowable step height is 0.015”.

vi. A mounting bracket for the balance pantograph system shall be attached to the underside of the forward test section. Coordination is required with

Page 32: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 32 of 46

the balance manufacturer to establish the hole pattern and tap size of the balance type make and model and include the manufacturer. .

vii. The test section floor shall incorporate 0.063” pressure tap holes with associated stainless steel tubing. The total number of taps is approximately sixteen (16). The exact location is to be determined but notionally six (6) inches from each sidewall and spaced about one (1) foot apart. In addition, taps shall be placed along the centerline, where possible at the same lateral locations.

viii. Each sidewall and the ceiling shall incorporate 0.063” pressure tap holes with associated stainless steel tubing. The exact location is to be determined but notionally six (6) inches from each edge and spaced about one (1) foot apart. In addition, taps shall be placed along the centerline, where possible at the same lateral locations.

ix. A new support frame shall be incorporated to raise the test section to the necessary height such that the test section floor (windward side) is 36” above the facility concrete floor. The design of the test section support frame will be conducted in collaboration with the external balance manufacturer to insure full balance capability and motion.

x. If the test section doors (two) and roof need to be removed, extra care must be exercised to prevent damage to roof and door glass. The roof and each door (two) weigh approximately 700 lbs not including actuators and the motors. The limit switched will need to be removed before disassembly of the test section. The door actuators need to be disconnected from the test section door controllers. The actuators and motors need to be removed from the roof before removing the roof section.

xi. Design and manufacture a method to install CFE image struts to the test section ceiling.

1. The design shall straddle the existing ceiling window without damaging the window.

2. The design must be able to withstand the maximum tunnel speed.3. If the design incorporates plates, forward and rearward steps to the

test section ceiling shall be mitigated with bevel angles.xii. Any bolts used shall be Grade 8.

xiii. Test Section1. The test section consists of two doors (Sections E and F on Fig. 5)

and a roof (Section G on Fig. 5) affixed to a floor (Section H on Fig. 5). The current test section floor structure is shown in Fig. 6a and 6b.

a. Sections E, and F are approximately 8’ L X 1’ H X 5’ W.b. Section G is approximately 8’ L X 1’ H X 4’ W.c. Section H is approximately 8’ L X 5’ H X 4.5’ W.

2. The doors and roof weigh approximately 700 lbs each.3. The floor section weighs approximately 1,000 lbs.

f. Repair or replace damaged door Carr-Lane toggle clamp CL-150-SPC, see Figs. 7 and 8.

Page 33: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 33 of 46

g. Option: Assist balance contractori. If the balance turntable is not flush with the test section floor (i.e., there is

a step between turntable and balance because the turntable is too high), it may be required:

1. That the diffuser and/or tunnel contraction section would need to be shimmed higher (notionally ¼”).

2. And/or minor machining of the balance to turntable posts to reduce height of the posts and turntable to the alignment with the test section floor.

h. Option: Balance wind shield1. Design, manufacture, and install a three-sided wind shield around

the balance structure to shield from wind tunnel exhaust flow disrupting balance measurements. Forward/upstream side is open.

2. Shield must be transparent.3. Shield panels must be able to be removed, ideally via fasteners, to

gain access to the balance.i. Option: Balance plenum

1. Design, manufacture, and install a structure able to maintain and with stand a plenum pressure equivalent to the test section operating at maximum speed (205 ft/s).Plenum must be transparent.

2. Plenum panels must be able to be removed, ideally via fasteners, to gain access to the balance.

j. Option: Single fairing support systemi. A single fairing support system shall be designed, manufactured, or

acquired to support a full-span model. ii. The support system shall incorporate a pitch mechanism that shall be

continuously variable from -10 to +40 degrees with accuracy of at least 0.05 deg. and a resolution of at least 0.02 deg. Physical limit switches shall prevent model motion beyond this range of angles.

iii. The magnitude of the design ranges shall be -/+ 35 lbs in drag, -/+ 20 lbs in side force, and -/+ 60 lbs in lift.

iv. The magnitude of the design ranges shall be -/+ 10 ft-lbs in rolling moment, -/+ 25 ft-lbs in pitching moment, and -/+ 10 ft-lbs in yawing moment.

v. Expected model maximum mass is 30 lbs.vi. Strut fairing shall be provided.

1. It is not expected that the fairing will be yawed to the flow. Thus a pantograph system is not necessary.

vii. An image strut system shall be provided to allow for tare and interference corrections.

k. Model motion actuator must interface/connect with and be controlled by the balance computer.

Item 2I. Acceptance

Page 34: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 34 of 46

a. A complete acceptance plan for hardware components and factory-built components shall be provided for approval 6 weeks prior to Factory Acceptance.

II. Installation and Site Acceptance a. The CONTRACTOR shall be responsible for supervising and/or conducting on

site all activities regarding the NATF wind tunnel facility modification. The CONTRACTOR shall provide an installation and site acceptance plan two weeks prior to Notice To Proceed (NTP).

b. The acceptance tests shall include a demonstration of facility operation equal or better than the legacy operation. I.e., the maximum facility speed, freestream turbulence, range of fan operation in blade pitch and RPM, operation of test section door, and physical sectional step heights.

c. The wind tunnel’s test section air speed, freestream turbulence, and dynamic pressure need to be certified before and after modification. The certification will be used to maintain a relationship between test section dynamic pressure, contraction nozzle pressure ring differential pressure, and the speed controller. If the certification sloes between the test section and nozzle differential pressure, calculated before and after the move, vary by more than 1% the reason for the change needs to be investigated and solved. Similarly, if freestream turbulence varies by more than a percent difference from the pre-modification measurement of 5%, the reason for the change needs to be investigated and solved.

d. The maximum speed shall not vary by more than 1 ft/s before and after modification without the reason for the change investigated and solved.

e. The test section certification will be conducted at five locations as depicted in Fig. 9. Probe locations 4 and 5 will remain fixed while the center probe will be moved manually to locations 1, 2, and 3. The data from probe locations 4 and 5 will be used to correlate the data from the other locations. The test section will be certified from 25 ft/s to 200 ft/s in increments of 25 ft/s. Certification data will also be taken at a minimum speed of 10 ft/s and the maximum speed that has traditionally been 205 ft/s. The Pitot-static probes will be moved manually through the wind tunnel false wall.

f. Turbulence intensity will be measured at 50 kHz sampling rate for 1 s at the test section center position from 25 ft/s to 200 ft/s in increments of 25 ft/s.

g. The alignment of the wind tunnel will be based on the test section floor table. The test section shall be level longitudinally and laterally within 0.001 in/ft. The other tunnel sections shall be aligned based on perpendicular and horizontal planes from the test section floor. The air intake and exhaust planes shall be within 0.005 in/ft from perpendicular reference plane (lateral and vertical axis) of the test section floor. The center of each section must be aligned with either a piano wire or other agreed upon method to the test section floor and centered on the tunnel centerline. There shall be no discontinuities between test section, bell mouth nozzle (two sections), first diffuser. Discontinuities will be measured by NAVAIR personnel before and after modification. Discontinuities after re-assembly which are larger than before modification/disassembly shall be deemed unacceptable.

h. Limit switches shall be re-set and re-aligned after re-assembly to insure satisfactory operation.

Page 35: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 35 of 46

i. All systems (e.g., wind tunnel doors, speed control instrumentation) are to operate the same as before facility modification.

III. Documentation a. Any electronic copy of installation, stress/load report, and assembly drawings of

the modification shall be provided. Drawings must include all mechanical, electrical, and system layouts.

IV. Warranty a. CONTRACTOR shall warrant the performance to the stated requirements for a

minimum of one year from the date of final acceptance at the NAVAIR’s site. Warranty shall cover all costs of repair including, but not limited to, materials, labor, travel, etc. to repair any manufacturer’s defects as required and allow NAVAIR acceptance of such repairs.

b. Any damage caused to the facility or associated instruments and equipment by the CONTRACTOR through accident or negligence shall be repaired at no cost to the Government.

V. System Cost a. Note : Please include an itemized cost breakdown (including optional items);

including any and all additional costs

Page 36: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 36 of 46

Fig. 1a: Conduit Layout

Page 37: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 37 of 46

Fig. 1b: Conduit Layout

Page 38: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 38 of 46

Fig. 2: Foundation Plan

Page 39: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 39 of 46

Fig. 3: Pedestal Details

Page 40: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 40 of 46

Fig. 4: Floor Details

Page 41: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 41 of 46

Fig. 5: Schematic of NATF wind tunnel sections.

Page 42: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 42 of 46

Fig. 6a: Test Section Floor Details

Page 43: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 43 of 46

Fig. 6b: Test Section Floor Details

Page 44: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 44 of 46

Fig. 7: Carr-Lane CL-150-SPC Toggle Clamp and Angle Mount.

Page 45: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 45 of 46

Fig. 8: Damaged Carr-Lane CL-150-SPC Toggle Clamp and Angle Mount.

Damaged due to overload. Part deformed.

Page 46: imlive.s3.amazonaws.com Government...  · Web view(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1)

N6833520Q0185

Page 46 of 46

Fig. 9: Test Section Cross-Section Probe Location