Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 1 Image Acquisition Campaign 2008 Pär Johan Åstrand , Maria Erlandsson JRC, CID Mihaela Fotin, Cherith Aspinall JRC, CID
13

Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Jun 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 1

Image Acquisition Campaign 2008

Pär Johan Åstrand, Maria Erlandsson JRC, CIDMihaela Fotin, Cherith Aspinall JRC, CID

Page 2: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 2

PAC

CID

Roadmap to Image Acquisition Campaign 2008• Selection of Control Zones and Risk Analysis

responsibility PAC (JRC reference FMP 8218) - guidelines• MS Satellite Image Requirements for the 2008 Campaign

responsibility PAC (JRC reference FMP 8433) – letter plus Annex• Delivery of generalised shapefiles, and further details

responsibility CID 31/12template will be sent out as soon as requirements/budget is defined

• Technical and Competitive Feasibilityresponsibility CID January-Februarycommunication and acceptance by MS Administration March 2008

• LIODOTNET training at CwRS KO Meetingresponsibility CID, also contractors to be invited, March 2008including updates, image return etc.

• Image Acquisition Campaign start…indeed already started, 64 autumn sites already open…

Page 3: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 3

HR Imagery; sites/windows• All sites to be defined by shape file • Autumn window

autumn sites opened 64 windows (DE, FR), autumn sites acquired 39

• Winter windowopen/close date to be decided by MS

• Spring, Summer windowsnew naming convention proposed: HR-1, HRVHR , HR+1, HR+2 etc.window length HR to be decided by MS (normal case 3(-4) weeks)1st open date to be decided by MS Admin. If no extraordinary decision (*), JRC will

open all further windows automatically after a 2(-3) week dead period after acquisition

• Radar tripletsto be reduced to a minimum in 2008 Campaignfuture VHR Radar (e.g. TerraSAR-X, COSMO-SkyMed) ?

(*) extraordinary condition see VHR Image Specifications for the CwRS Programme [http://mars.jrc.it/] - notice of 2 weeks required.

OKOK

Page 4: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 4

HR Imagery; 1st come 1st served menuHR Sensor Products GSD [m]

Swath width (at nadir)

Approx Capacity [scenes or km2] in a 1st come 1st served scenario; mean "winners" plus uploaded "loosers"

Proposed role Comments / Constraints

SPOT 2 MSP 3 bands (no SWIR)

20 60 160 ; plus approx 70 ; sum 230

autumn, winter, HR-1, HR+1, HR+2

Old - launched on jan. 22, 1990; SPOT promised 2008 campaign !

SPOT 4 MSP 4 bands (incl. SWIR)

20 60 210 ; plus approx 80 ; sum 290

autumn, winter, HR-1, HR+1, HR+2

SPOT 5 MSP 4 bands (incl. SWIR)

10 60 200 ; plus approx. 50 ; sum 250

autumn, winter, HR-1, HR VHR, HR+1, HR VHR, HR+2

acquisition of SPS PAN and SPOT 5 MSP is possible in same pass

IRS P6 MSP 4 bands (incl SWIR)

23,5 127 - 141 40 ; plus approx. 50 ; sum 90

autumn, winter, HR-1, HR+1, HR+2

Landsat 5 MSP 7 bands 30 183 40 ; plus approx. 60 ; sum 100

autumn, winter, HR-1, HR+1, HR+2

presently suffering low battery problems and is “temporarily” shut down

F2 MSP 4 bands (incl. BLUE)

8 24 10000 km2 ; approx 15 scenes on one window => 45

autumn, winter, HR-1, HR VHR, HR+1, HR VHR, HR+2

capacity depends on off-nadir angle ; fixed orbits means that some areas are never covered ; capacity should be seen together with VHR backup sum 15.000

DMC MSP 3 bands (Landsat 2,3,4 like)

32 325 5 ; plus approx. 5 ; sum 10

autumn, winter, HR-1, HR+1, HR+2

upon request by MS

ALOS - AVNIR2 MSP 4 bands 10 70 unknown HR - archive searches will not be programmedSUM 1015

Page 5: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 5

HR Imagery; 1st come 1st served menuHR Sensor Products

Approx Capacity [scenes or km2] in a 1st come 1st served scenario; mean "winners" plus uploaded

Proposed role Comments / Constraints

SPOT 2 MSP 3 bands (no SWIR)

160 ; plus approx 70 ; sum 230

autumn, winter, HR-1, HR+1, HR+2

Old - launched on jan. 22, 1990; SPOT promised 2008 campaign !

SPOT 4 MSP 4 bands (incl. SWIR)

210 ; plus approx 80 ; sum 290

autumn, winter, HR-1, HR+1, HR+2

SPOT 5 MSP 4 bands (incl. SWIR)

200 ; plus approx. 50 ; sum 250

autumn, winter, HR-1, HR VHR, HR+1, HR VHR, HR+2

acquisition of SPS PAN and SPOT 5 MSP is possible in same pass

IRS P6 MSP 4 bands (incl SWIR)

40 ; plus approx. 50 ; sum 90

autumn, winter, HR-1, HR+1, HR+2

Landsat 5 MSP 7 bands 40 ; plus approx. 60 ; sum 100

autumn, winter, HR-1, HR+1, HR+2

presently suffering low battery problems and is “temporarily” shut down

F2 MSP 4 bands (incl. BLUE)

10000 km2 ; approx 15 scenes on one window => 45

autumn, winter, HR-1, HR VHR, HR+1, HR VHR, HR+2

capacity depends on off-nadir angle ; fixed orbits means that some areas are never covered ; capacity should be seen together with VHR backup sum

DMC MSP 3 bands (Landsat 2,3,4 like)

5 ; plus approx. 5 ; sum 10

autumn, winter, HR-1, HR+1, HR+2

upon request by MS

ALOS - AVNIR2 MSP 4 bands unknown HR - archive will not be programmedSUM 1015

Page 6: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 6

HR Imagery; semi-automated orthorectification•

ortho node

1

ortho node

2

ortho node

x

Keystone server

raw image rectification process final ortho image

Digital Elevation Model

Reference

Imagery

SRS dataprocessing

Page 7: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 7

• Possibility to test the service on 1 site/ contractor in 2008 in an “operational” configuration for interested users (please contact Pär). Then we will request your feedback!

• Further analysis and testing to be done on VHR data during 2008.

SRS dataprocessing

Ancillary dataSensor

SRTM or local DEMLPIS ortho coverage (WMS or local access)

SPOT 5

SRTMLandsat coverage

SPOT 2,4Landsat

HR Imagery; semi-automated orthorectification

Page 8: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 8

VHR Imagery; sites/windows• Efficient sizes (*) • Ratio 1:3 QB:IK (*) • Window length VHR to be decided by MS (normal case 6(-8)

weeks)• Window will be adapted to fit satellite pass• Backup window closes after dedicated prime has acquired

(*)• Backup window opens 20 days after dedicated prime• All windows can have MSP component (VHR or HR)

(*) see VHR Image Specifications for the CwRS Programme [http://mars.jrc.it/]

Page 9: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 9

VHR Imagery; Dedicated sensors menuVHR Sensor Products GSD [m] Swath (at

nadir)

Approx Capacity [km2] in a Dedicated scenario

Proposed role Comments / Constraints

IKONOS PAN, MSP (4 bands), PANMERGE

0.83.2

11,3 120.000 PRIME efficient site 30x30, but may be larger up to 40x60km ; max. off-nadir angle 37 deg

QUICKBIRD PAN, MSP (4 bands), PANMERGE

0,62,4

16,5 30-40.000 PRIME to be within 1 fragment 14 km max width, efficient size 12x30km ; max. off-nadir angle 37 deg

EROS A PAN 1,8 14 10.000 BACKUP (*) efficient site 13x25km (or longer) ; max. off-nadir angle set to 18,5 deg

EROS B PAN 0,7 7 30.000 BACKUP (*) efficient site 26x28km ; max. off-nadir angle set to 30 deg ; geom acc test ongoing

SPOT5 SPS PAN supermode

2,5 60,0 25.000 BACKUP (*) acquisition of SPS PAN and SPOT 5 MSP is possible in same pass

F2 PAN, MSP (4 bands), PANMERGE

2 24 5.000 BACKUP (*) resolution at off-nadir angle 30deg approx 3m ; will be restricted to reach geom acc. threshold; capacity should be seen together with HR backup sum 15.000WorldView1 PAN 0,5 17,6 10.000 BACKUP (*) preferrably on QB site for efficiency ; needs to be tested for geometric accuracy

SUM PRIME 150.000SUM BACKUP 80.000(*) - can be programmed in conjunction with HR (SPOT 5, F2) to obtain MSP component

Page 10: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 10

VHR/HR Imagery; how to increase capacity, reduce costs?• VHR Prime capacity approx. 150.000 km2• VHR Backup capacity 80.000 km (plus EROS B)• HR capacity approx 1000 scenes / campaign

• How to increase capacity?increase VHR window lengthslide VHR windowsmore extensive use of backup; allowing a lower planned dedicated success rateHR capacity sufficient?

• How to reduce costs?develop control method using PAN only as VHR primeless HR windowsflexibility of backup?

Page 11: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 11

Some information• JRC will download source HR/VHR directly from Image Providers in Campaign 2008• F2 orthocorrection modules;

– ERDAS Imagine 9.1 (fix 32472 that adds a geometric modelling for F2)– PCI Geomatica 10 (with patch 10031 which includes critical enhancements for the F2 modelling)– SIPOrtho, Prodigeo, Socet set

• EROS B orthocorrection modules;PCI Geomatica 10.1.1 , ERDAS LPS, Socet Set

• ALOS; AVNIR-2 orthocorrection module; PCI Geomatica v 9.1 onwards

• Wv1 orthocorrection… PCI, ERDAS ? (waiting confirm by Eurimage, and test by CID)

Page 12: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 12

• thank you !

Page 13: Image Acquisition Campaign 2008 - fega.es€¦ · Roadmap to Image Acquisition Campaign 2008 • Selection of Control Zones and Risk Analysis responsibility PAC (JRC reference FMP

Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 13

VHR Type window

PRIM

E

DEDICATED SENSOR IKONOS or QUICKBIRD IKONOS QUICKBIRD

BACKUP N Y Y

DEDICATED BACKUP SENSOR n/a

F2 (BUNDLE or PANMERGE); EROS A,B (PAN); SPS (PAN)

F2 (BUNDLE or PANMERGE); EROS A,B (PAN); WORLDVIEW1 (PAN); SPS (PAN)

DEDICATED BACKUP HR SENSOR IN VHR WINDOW i.e. HRVHR window

n/a SPOT5 MSP (if dedicated backup sensor is ≠ F2)

SPOT5 MSP (if dedicated backup sensor is ≠ F2)

EXTENSION possible if no prime only possible if no prime, no backup

only possible if no prime, no backup

BA

CK

UP

VHR type of window - CwRS Campaign 2008