Top Banner
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team
24

ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

Jan 19, 2018

Download

Documents

Pearl Wilkerson

TILC09, Tsukuba April 16-21, Split Quadrupole Concept Design Team Miao Yu- Cooling down analysis Mauricio Lopes- Magnetic center shift Yuri Orlov- 3D design and integration Vladimir Kashikhin- Magnet concept The Quadrupole concept was designed in short period of time by:
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

ILC Main Linac Superconducting Quadrupole

V. Kashikhin for Superconducting Magnet Team

Page 2: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 2

Outline

• Split quadrupole issues • Quadrupole concept• Conductive cooling• Magnetic design• Installation and disassembly• Summary

Page 3: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 3

Split Quadrupole Concept Design Team

• Miao Yu- Cooling down analysis• Mauricio Lopes- Magnetic center shift• Yuri Orlov- 3D design and integration• Vladimir Kashikhin- Magnet concept

The Quadrupole concept was designed in short period of time by:

Page 4: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 4

Splittable Quadrupole Issues

Task from ILC Project Management: Look at the Split Quadrupole conceptual design to provide the quadrupole package installation and replacement outside of a very clean room. Main issues:

• Stable magnetic and mechanical design;• Effective conductive cooling;• Easy installation and disassembly;• Quadrupole+BPM rigid connection;• Magnetic axis stability;• Quench protection.

Page 5: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 5

ILC Quadrupole Specification

Page 6: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 6

Quadrupole Mechanical Concept

It was chosen the quadrupole design with racetrack coils which easy to split in vertical or horizontal direction.

 

Page 7: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 7

Quadrupole Fabrication• Qudrupole laminated yoke consists of two halfes;• Laminations stamped with accuracy 20 microns;•  Long calibrated rods connect two thick side plates and laminations in the solid unit;• Two coils mounted in each half core.•There is an easy assess to provide accurate coil mounting relatively pole and provide the coil frame prestress;• The half units identical and exchangable;• All current leads should be heavily stabilized with extra copper material.

Split plane

Built and Tested Quadrupole Model 1

Page 8: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 8

Quadrupole Wiring SchemeQuadrupole consists of 4 coils.Each coil has 3 sections of NbTi superconductor: one is for quadrupole and two for vertical and horizontal dipoles.There is also heaters in each coil wound from a stainless steel wire.Quadrupole and dipole sections connected in quadrupole and dipole configuration as shown in figure.The connections easy to rearrange for split configuration

Split line

Page 9: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 9

Quadrupole Cooling-Down • The quadrupole will be cooled using conductive

cooling;• Five heat transfer leads will thermally connect quadrupole core and LHe supply line;• The cross-section of leads 50 mm x 10 mm;• Cooling down time for the cryomodule is 30 hours;• During cooling initially the cold He gas goes through supply line and temperature changes from 300 K to 2 K. In such regime the enthalpy of the cold gas between 4.2 K and 300 K is utilized as well;• To cool down 1 kg steel from 300 K to 2 K is needed to evaporate 0.8 liters of LHe;• The quadrupole mass is ~ 280 kg.

Page 10: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 10

Conductive Cooling Animation 

Quadrupole cooled down from 300K to 3.5K in 38 hours.

Page 11: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 11

Magnet Assembly TolerancesCase # Description

0 Standard ML quadrupole. Gradient 54 T/m. No correction coils.

1 Right half of the magnet displaced 40 microns up.

2 1st Quadrant displaced 40 microns up.

3 1st Quadrant displaced 40 microns right and 40 microns up.

4 Coil displaced 100 microns up.

5 Coil displaced 100 microns up and 100 microns right.

N1 40um up

N2 40um up

N3 57um up

N4 100um upN5 140um

1 unit = 1 Gauss= 1um

Magnetic center shift in microns

Page 12: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 12

Quadrupole Blocks  

Half Quadrupole

Quadrupole Assembly

Quadrupole with Cooling Leads

Page 13: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 13

Half Quadrupole with Beam Pipe View

 

Half Quadrupole Yoke

Beam Pipe

Quadrupole-BPM Connection Flange

Quadrupole Supports

Page 14: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 14

Quadrupole with Beam Pipe View 

Page 15: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 15

Quadrupole with BPM 

Page 16: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 16

Cryomodule Cross-Section 

Quadrupole Package

2 Phase He Supply Pipe

Page 17: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 17

Quadrupole with BPM Cross-Section

 

Quadrupole

BPM

Page 18: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 18

Cryomodule Cross-Section 

Page 19: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 19

Quadrupole Side View 

Page 20: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 20

Cryomodule Cross-Section 

Page 21: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 21

Cryomodule Cross-Section 3D View (1)

 

Page 22: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 22

 

Cryomodule Cross-Section 3D View(2)

Page 23: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 23

Quadrupole Final Assembly View 

Quadrupole

Cooling Leads BPMCurrent Leads

Page 24: ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.

TILC09, Tsukuba April 16-21, 2009 24

Summary • The first look at the splittable quadrupole showed this

approach visibility;• Proposed the quadrupole concept with vertical split;• Quadrupole has a conduction cooling from LHe supply pipe;• Quadrupole mounted around beam pipe outside of the clean room;• BPM has tight connection with quadrupole;• Quadrupole bolted to the strong 300 mm diameter He gas return pipe;• Special attention paid on the magnet assembly and mounting tolerances;• Current leads also conductively cooled;• Magnet cooling down time ~ 38 Hours;• The Quadrupole model with split should be built and tested to verify the design.