DN FROM 1A UP TO GB REFUSE CENTRE FOYER 1 2 3 4 5 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 LEVEL GA LEVEL GB 30 29 28 planting FACILITIES TURFING planting CORRIDOR PARKING SUCTION TANK FIRE AND WATER PUMP ROOM WET RISER & HOSEREEL RC SUCTION TANK PP SC HT1 - RC ramp (1 : 7) to engineer's detail RC cloumn to engineer's detail RC ramp (laid to fall) to engineer's detail ROAD 7.0m width cement screed (floor hardener) BUILDING MAINTENANCE UNIT (BMU) STAIRCASE 1 STAIRCASE 4 ADMINISTRATIVE OFFICE MOTOCYCLE PARKING 12 150dn STORE 150mm thk brickwall c/w plaster and paint on bothsides 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 PARKING 1 2 3 4 5 6 7 8 9 10 11 12 CONSUMER LV SW. RM TNB TNB SW. TX TNB TX MDF ROOM 12 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 PP SC HT - PP SC CR - TOILET (MALE) TOILET (FEMALE) PP SC HT1 - BMU STORE 150dn CORRIDOR 1000dn planting aluminium frame fixed detail glass window to manuf's detail aluminium frame fixed detail glass window to manuf's detail aluminium frame fixed detail glass window to manuf's detail GENSET ROOM 115mm thk and 1000mm ht brickwall railing with plaster and PP KDQGUDLO 200mm (w) RC scupper drain (laid to fall) to engineer's details concrete tyre stop to architect's detail ROAD 5.0m width cement screed (floor hardener) 200mm wide scupper drain discharge to drain 1000mm (h) x 115mm thk parapet brickwall with 20mm thk plaster and SDLQW RQ ERWKVLGHV DQG PP metal handrail to architect detail's Perimeter concrete drain to engineer's detail (pc drain cover or ms grating all round) PP SC CR - PP SC CR - PP SC HT1 - PP SC HT1 - Roller shutter to manuf's detail PP SC CR - PP SC CR - 50dn 50dn PP SC CR - PP SC CR - PP SC CR - Drain cover to manuf's detail 230mm thk clay brickwall c/w plaster and paint on both sides RC ramp (laid to fall) to engineer's detail Drain cover to manuf's detail PP SC CR - PP SC CR - PP SC CR - PP SC CR - PP SC CR - PP SC CR - up dn up dn rwdp 75dn 75dn 75dn Driveway (concrete imprint) planting ft ft ft rwdp rwdp ft ft ft ft rwdp FCP Fire Control Panel IL 60.80 FLAT ROOF proposed drainage by engr's proposed drainage PROPOSED R.C WALL 93.131 NEW RAMP existing car park on site EXISTING DRAIN EXISTING DRAIN EXISTING DRAIN XCESS ROAD FOR CONTRUCTION BOUNDARY LINE fancing design to architect selection 6100MM BUILDING SETBACK New guard house A to architect's detail gate to STP FOYER MEETING AREA 1 PP SC HT1 - RC planter box with 75mm thk. coping RC staircase to engineer's detail with 1000mm ht ms railing and non slip nosing 5 PP T= 280mm SC PP HT1 - 150dn 100dn WUDUK 50dn 50dn 100dn 50dn 50dn SURAU (F) SURAU (M) PP SC C - PP SC C - SERVICE MAIL BOX PP UXEEHULVHG EROODUG 1000mm (h) x 115mm thk parapet brickwall with 20mm thk plaster and paint on bothsides Perimeter concrete drain to engineer's detail (pc drain cover or ms grating all round) 75dn 75dn 75dn porch to architect's detail Planting WUDUK HR water LIFT LIFT elec. tel./lv matv STAIRCASE 2 up dn tel./lv matv elec. HR water LIFT LIFT LIFT utility up dn STAIRCASE 3 75dn 75dn SECURITY 75dn MAIL BOX 150dn FOYER PP SC HT1 - AREA LIFT LOBBY PP SC HT1 - PP SC HT1 - LIFT LOBBY PORCH PORCH NEW RAMP 40' 6 7 Road 6.0m STP (Sediada) 0.373 ekar TLM 28 29 30 31 32 33 38 37 34 35 36 39 44 43 40 41 42 45 49 46 47 48 51 50 55 52 53 54 57 56 61 58 59 60 63 62 67 68 69 72 71 70 64 65 66 73 74 75 8 TINGKAT BLOK B (126 UNIT) (Telah Diluluskan) 13 TINGKAT (201 UNIT) BLOK A (Sediaada) PROPOSED RAMP Jalan 20' sehala Jalan 20' T L K T L K Jalan 20' sehala Jalan 20' sehala Tempat Letak Kereta Jalan 20' sehala T L K T L K T L K T L K Jalan 30' Tempat Letak Kereta TLM TLM Jalan 20' Sehala Taman Permainan Kanak-Kanak MASUK APARTMENT (RSKU-1.000kp) PANGSAPURI HARGA BEBAS MASUK KAWASAN HIJAU / LANSKAP PUSAT PENGUMPULAN SAMPAH ARAS GA FACILITIES OFFICE CORRIDOR ADMINISTRATIVE ARAS GB AREA 1 MEETING KELUAR Jalan 20' sehala Jalan 20' sehala Jalan 20' sehala Jalan 20' sehala T L K T L K T L K T L K T L K T L K T L K T L K Jalan 20' KELUAR MASUK Lot 6995 7.090 ekar KE TAMAN UKAY BESTARI >>> JALAN HJ. MOKHTAR TAMAN UKAY BESTARI anjakan bangunan 40' anjakan bangunan 20' anjakan bangunan 20' anjakan bangunan 20' anjakan bangunan 20' anjakan bangunan 20' 28 TINGKAT BLOK C (190 UNIT) TAPAK CADANGAN TAPAK CADANGAN KAWASAN [3,077.74 mp. / 28,692.21 mp] x 100 10.72 % (< 60% ) B - PENGIRAAN PERATUSAN KAWASAN PLINTH [LUAS TAPAK BINAAN / LUAS TAPAK CADANGAN] x 100 BIL. UNIT KELUASAN TAPAK KEPADATAN PLINTH 28,692.21 mp. (7.090 Ek) 1 : 1.71 17 UNIT / EKAR TINGKAT A - BLOK B (TELAH DILULUSKAN) PANGSAPURI - BLOK B 8 TINGKAT 126 UNIT C - PENGIRAAN NISBAH PLOT - BLOK B NISBAH PLOT LUAS LANTAI KASAR / LUAS TAPAK CADANGAN 49,243.84 mp. / 28,692.21 mp KESELURUHAN PEMBANGUNAN) - BLOK B KAWASAN B - PENGIRAAN PERATUSAN KAWASAN PLINTH KELUASAN TAPAK [3,844.29 mp. / 28,692.21 mp] x 100 [LUAS TAPAK BINAAN / LUAS TAPAK CADANGAN] x 100 13.39 % (< 60% ) PLINTH BIL. UNIT KEPADATAN 28,692.21 mp. (7.090 Ek) 26.78 UNIT / EKAR TINGKAT A - BLOK C 28 TINGKAT 190 UNIT C - PENGIRAAN NISBAH PLOT - BLOK C NISBAH PLOT LUAS LANTAI KASAR / LUAS TAPAK CADANGAN 70,917.80 mp. / 28,692.21 mp 1 : 2.47 KESELURUHAN PEMBANGUNAN) - BLOK C 'Pemaju dan kontraktor yang dilantik hendaklah memastikan keselamatan, kesihatan dan kebajikan orang-orang lain selain daripada pekerja yang mungkin tersentuh semasa aktiviti pemajuan yang dijalankan sebagaimana yang ditetapkan di bawah Akta Keselamatan dan Kesihatan Pekerjaan 1994 serta peraturan-peraturan yang dibuat dibawahnya, dan Akta Kilang Dan Jentera 1967 serta peraturan-peraturan yang dibuat dibawahnya, dan perlu menyediakan sumber bagi mencapai tujuan tersebut.' 'Seksyen 18. Kesalahan Dengan Maksud Untuk Memperdayakan Prinsipal Oleh Ejen. Seseorang melakukan kesalahan jika dia memberi seseorang ejen, atau sebagai seorang ejen dia menggunakan, dengan niat hendak memperdayakan prinsipalnya, apa-apa resit, akaun atau dokumen lain yang berkenaan dengannya prinsipal itu mempunyai kepentingan, dan yang dia mempunyai sebab untuk mempercayai mengandungi apa-apa pernyataan yang palsu atau silap atau tidak lengkap tentang apa-apa butir matan, dan yang dimaksudkan untuk mengelirukan prinsipalnya. ON SITE DETENTION (355m2) Bilangan Unit 126 Pengiraan Penyediaan Kawasan Lapang Bagi Pangsapuri Perkhidmatan - BLOK A,B & C (Mengikut Garispanduan 'Best Planning Practise') Kiraan Jumlah Isirumah 126 x 5 orang 630 orang 517 Jumlah 2,585 orang Piawaian Penyediaan Kawasan Lapang Kawasan Lapang Yang Diperlukan Kawasan Lapang/ Kemudahan Komuniti Yang Disediakan Perkara Lokasi Luas (mp.) Kawasan Hijau - Kawasan Hijau/ Perimeter Planting Atas Tanah 5,287.70 Jumlah Kecil (Atas Tanah) Peratus Penyediaan : Kawasan Hijau (Atas Tanah) Luas Tapak 5,287.70 mp / 28,692.21 mp X 100 : 18.42 % Menyediakan 2 hektar (4.90 ekar) kawasan lapang bagi 1000 penduduk =2,585 orang x 4.90 ekar 1000 = 12.667 ekar a) Peratus Kawasan Lapang Disediakan = Kawasan Lapang Yang Disediakan Kawasan Lapang Yang Diperlukan X 100 = 4.869 ekar + 1.680 X 100 12.667 ekar = 51.70 % 5,287.70 950 orang BLOK A 201 201 x 5 orang 1,005 orang = Kawasan Lapang + Kemudahan Awam Kawasan Lapang Yang Diperlukan X 100 Komuniti Yang Disediakan x 100 BLOK PANGSAPURI BLOK B BLOK C 190 190 x 5 orang APARTMEN (RSKU - 1,000 kp) : 60 UNIT) (PANGSAPURI HARGA BEBAS :130 UNIT) B - PENGIRAAN PERATUSAN KAWASAN PLINTH KAWASAN [LUAS TAPAK BINAAN / LUAS TAPAK CADANGAN] x 100 [2,545.47 mp. / 28,692.21 mp] x 100 8.87 % (< 60% ) PLINTH KELUASAN TAPAK BIL. UNIT KEPADATAN 28,692.21 mp. (7.090 Ek) 28.33 UNIT / EKAR TINGKAT A - BLOK A (SEDIADA) PANGSAPURI - BLOK A 13 TINGKAT 210 UNIT - PENGIRAAN NISBAH PLOT - BLOK A NISBAH PLOT LUAS LANTAI KASAR / LUAS TAPAK CADANGAN 59,728.00 mp. / 28,692.21 mp 1 : 2.08 KESELURUHAN PEMBANGUNAN) - BLOK A TANGKI 'HOSE REEL' JENIS PEMBANGUNAN HARGA BEBAS & RSKU FASILITI / KEMUDAHAN AWAM ARAS / LOKASI 1. PEJABAT PENGURUSAN 2. SEKURITI 3. BILIK MESYUARAT 4. SURAU 5. DEWAN SERBAGUNA 6. TAMAN PERMAINAN KANAK-KANAK 7.SURAU 8. PEJABAT 9. KOLAM RENANG ARAS BAWAH ARAS BAWAH ARAS BAWAH ARAS BAWAH ARAS 12 ARAS 12 & 13 ARAS 13 ARAS 12 & 13 ARAS 13 i - KAWASAN LAPANG BLOK A,B & C (ARAS TANAH) BLOK A, B & C PERATUS (%) B - JADUAL KEPERLUAN RUANG TEMPAT LETAK KERETA 5,287.70 mp (1.307 ekar) 18.43 (1.307 MP) A - JADUAL KIRAAN ASAS PERANCANGAN / DENSITY (BLOK A,B & C) KESELURUHAN (A,B & C) 201 + 126 + 190 1. JADUAL PENGIRAAN KEPADATAN UNIT PER EKAR = 73 UNIT/EKAR 7.090 EKAR (28,692.21mp) 2. JADUAL KIRAAN KAWASAN PLINTH KESELURUHAN (A,B & C) 2,545.47 mp + 3,077.74 mp + 3,844.29 mp 28,692.21 mp x 100 = 33% (<60%) 3. JADUAL KIRAAN NISBAH PLOT KESELURUHAN (A,B & C) 59,728.00 mp + 49,243.84 mp + 70,917.80 mp 28,692.21 mp = 1: 6.03 683.6 ii - PENGIRAAN KAWASAN LAPANG MENGIKUT ARAS BLOK C - (PANGSAPURI HARGA BEBAS) TINGKAT RUANG LEGAR ARAS GA-GB ARAS 1-5 ARAS 6-11 ARAS 12 ARAS 13 ARAS 14-25 KEGUNAAN KAWASAN TANAH LIF LOBI RUANG LEGAR LUAS LANTAI Pð 18.5 -80/$+ Pð 167.5 18.5 65.0 451.1 67.2 493.4 18.5 262.0 120.8 67.2 310.6 156.9 269.1 67.2 689.4 837.5 2003.9 1493.2 459.4 3474.6 LIF LOBI RUANG LEGAR LIF LOBI RUANG LEGAR LIF LOBI RUANG LEGAR TAMAN PERMAINAN DEWAN SERBAGUNA LIF LOBI TAMAN PERMAINAN KOLAM RENANG LIF LOBI RUANG LEGAR ARAS 26 LIF LOBI RUANG LEGAR ARAS 27 LIF LOBI RUANG LEGAR PLANTING BOX 67.2 470.6 476.9 67.2 556.3 562.6 18.5 PLANTING BOX 167.5 - - BILIK PERSALINAN 1017.8 PEJABAT 76.7 SURAU 67.2 493.4 6949.2 PLANTING BOX PLANTING BOX 126 PLANTING BOX PLANTING BOX 16,560.90 JUMLAH KESELURUHAN Kawasan Lapang : : b) Penyediaan Kawasan Lapang BLOK PEMBANGUNAN BLOK A SEDIADA DISEDIAKAN 93 465 BLOK B BLOK C TLK JUMLAH KESELURUHAN 98 TLM UNIT 805 201 203 190 517 TLM TLK 94 213 TLM TLK 94 213 16 127 16 127 DIPERLUKAN DISEDIAKAN TLM TLK LOKASI PUSAT 514 PENGUMPULAN 854 208 SAMPAH UNIT (>10%) (BAWAH TANAH) (BAWAH TANAH) ** Jumlah peratus bagi kawasan lapang dikira berdasarkan keluasan keseluruhan tapak iaitu 7.090 ekar PERKHIDMATAN ON SITE DETENTION (267m2) BLOK 'A' 13 TINGKAT RUMAH PANGSA UNIT KEDIAMAN - JENIS 'A' = 800 ka.per JENIS 'B' = 800 ka.per JENIS 'C' = 800 ka.per JENIS 'D' = 1616 ka.per JENIS 'E' = 1285 ka.per JENIS 'F' = 1161 ka.per DENGAN KEMUDAHAN TINGKAT BAWAH TINGKAT 1 - 12 - KEDAI = 8 UNIT - SURAU / MADRASAH = 1 UNIT - TNB / TELEKOM = 1 UNIT - UNIT KEDIAMAN = 201 UNIT BLOK 'B' 8 TINGKAT RUMAH PANGSA ( KOS SEDERHANA ) UNIT KEDIAMAN - JENIS 'A' = 1020 ka.per TINGKAT BAWAH ( KOS SEDERHANA ) JENIS 'B' = 930 ka.per JENIS 'C' = 1000 ka.per - TEMPAT LETAK KERETA = 70 UNIT - UNIT KEDIAMAN = 126 UNIT TINGKAT 1 - 7 BLOK 'C' 5 TINGKAT RUMAH PANGSA ( KOS SEDERHANA ) (PINDAAN) UNIT KEDIAMAN - JENIS 'A' = 1050 ka. per TINGKAT BAWAH JENIS 'B' = 1050 ka. per - TEMPAT LETAK KERETA = 42 UNIT - UNIT KEDIAMAN 3 BILIK = 80 UNIT TINGKAT 1 - 4 - UNIT KEDIAMAN 3 BILIK = 10 UNIT - SURAU = 1 UNIT PELAN TATATUR YANG TELAH DILULUSKAN (PT.4992) ( DALAM PEMBINAAN ) (KEKAL) ( DALAM PEMBINAAN ) (KEKAL) BLOK 'A' 13 TINGKAT RUMAH PANGSA UNIT KEDIAMAN - JENIS 'A' = 800 ka.per JENIS 'B' = 800 ka.per JENIS 'C' = 800 ka.per JENIS 'D' = 1616 ka.per JENIS 'E' = 1285 ka.per JENIS 'F' = 1161 ka.per DENGAN KEMUDAHAN TINGKAT BAWAH TINGKAT 1 - 12 - KEDAI = 8 UNIT - SURAU / MADRASAH = 1 UNIT - TNB / TELEKOM = 1 UNIT - UNIT KEDIAMAN = 198 UNIT BLOK 'B' 8 TINGKAT RUMAH PANGSA ( KOS SEDERHANA ) UNIT KEDIAMAN - JENIS 'A' = 1020 ka.per TINGKAT BAWAH ( KOS SEDERHANA ) JENIS 'B' = 930 ka.per JENIS 'C' = 1000 ka.per - TEMPAT LETAK KERETA (DALAM) = 59 UNIT JUMLAH UNIT KEDIAMAN PELAN TATATUR YANG TELAH DIPINDA/DITAMBAH ( DALAM PEMBINAAN ) ( KEKAL) ( TELAH SIAP ) (KEKAL) BLOK 'C' 28 TINGKAT SELANGORKU (12 TINGKAT) HARGA BEBAS (28 TINGKAT) UNIT KEDIAMAN - JENIS 'D' = 1,000 ka.per UNIT KEDIAMAN - JENIS 'A' = 2277.6 ka.per = 126 UNIT (LUAR) = 82 UNIT - UNIT KEDIAMAN = 3 UNIT JUMLAH UNIT KEDIAMAN = 201 UNIT - JENIS 'B' = 1739.4 ka.per - JENIS 'C' = 1128.1 ka.per - JENIS 'D' = 1667.3 ka.per TINGKAT 6 - 11 - UNIT KEDIAMAN = 42 UNIT TINGKAT 6 - 11 - UNIT KEDIAMAN = 60 UNIT - PENTHOUSE = 3871.8 ka.per TINGKAT 12 (FACILITI) - DEWAN SERBAGUNA - TAMAN PERMAINAN KANAK-KANAK - PEJABAT TINGKAT 13 (FACILITI) - TAMAN PERMAINAN KANAK-KANAK - SURAU - KOLAM RENANG TINGKAT 14 - 25 - UNIT KEDIAMAN = 84 UNIT TINGKAT 26 - 27 (PENTHOUSE) - UNIT KEDIAMAN = 4 UNIT DUPLEX TINGKAT BAWAH = PEJABAT PENGURUSAN ( GA - GB ) = SEKURITI = BILIK MESYUARAT = SURAU (LUAR) = 12 UNIT = TLK (DALAM) = 30 UNIT (10 UNIT OKU) TINGKAT 2 - 5 = TLK (DALAM) = 372 UNIT TINGKAT 1 ( 1A - 1B ) = TLK (DALAM) = 85 UNIT (75 UNIT NORMAL) = TLM (DALAM) = 23 UNIT ( DALAM CADANGAN ) (PINDAAN) ( KOS MEWAH ) (LUAR) = 75 UNIT = 190 UNIT - UNIT KEDIAMAN = 126 UNIT TINGKAT 1 - 7 KOMPONEN GUNATANAH (ekar) LUAS % PETUNJUK : PANGSAPURI 8 TINGKAT (BLOK B) - Telah Lulus 0.667 9.40 KAWASAN HIJAU/ LANSKAP 2.398 33.76 JALAN DALAMAN,TLK 2.184 30.79 JUMLAH KESELURUHAN 7.098 100.00 A. KEDIAMAN KH 143 24 PANGSAPURI 13 TINGKAT (BLOK A) - Sediada 0.628 8.85 201 UNIT 'HOSE REEL TANK' - - RUMAH PENGAWAL - - - - 368 - - RP 0.221 3.11 PANGSAPURI (BLOK C) (PINDAAN) TANGKI STP 0.244 3.44 1 (ekar) LUAS % 0.760 10.71 1.307 18.43 2.799 39.47 7.090 100.00 126 190 0.628 8.87 201 UNIT 0.005 0.07 0.012 0.16 2 1 520 - - 0.950 13.39 0.436 6.14 1 DILULUSKAN PINDAAN B. KEMUDAHAN SECTION B-B (BLOK C) LEVEL GA LEVEL 1A LEVEL 2A LEVEL 3A LEVEL 4A LEVEL 5A LEVEL 6 LEVEL 7 LEVEL 8 LEVEL 9 LEVEL 10 LEVEL 11 LEVEL 12 LEVEL 13 LEVEL 14 LEVEL 15 LEVEL 16 LEVEL 17 LEVEL 18 LEVEL 19 LEVEL 20 LEVEL 21 LEVEL 22 LEVEL 23 LEVEL 24 LEVEL 25 LEVEL 26 LEVEL 27 RETAIL PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING AREA ENTRANCE STUDY ROOM ENTRANCE LIVING AREA STUDY ROOM LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR LIVING & DINING AREA YARD MAID & UTILITY MASTER BEDROOM DRY KITCHEN WET KITCHEN CORRIDOR CORRIDOR P A N G S A P U R I H A R G A B E B A S TEMPAT LETAK KERETA (PANGSAPURI HARGA BEBAS & APARTMENT (RSKU) APARTMEN (RSKU : 1,000 kp) 6 TINGKAT MULTILEVEL CAR PARKING BLOK RUMAH HARGA BEBAS (130 UNIT) BLOK RUMAH SELANGORKU (60 UNIT) LEVEL 28 KOLAM TAKUNGAN 0.735 10.65 1 - - - KEMUDAHAN - 5 TINGKAT (DILULUSKAN) - 28 TINGKAT (PINDAAN) CARIS/CAELY/030018/ 13 - 02(KM) SKALA : 1 : 500 UTARA KIBLAT Tajuk Projek : PINDAAN Pemaju : KOMPONEN GUNATANAH (ekar) LUAS % PETUNJUK : PANGSAPURI 8 TINGKAT (BLOK B) - Telah Lulus 0.760 10.71 KAWASAN HIJAU/ LANSKAP 1.307 18.43 JALAN DALAMAN,TLK 2.799 39.47 JUMLAH KESELURUHAN 7.090 100.00 A. KEDIAMAN KH 126 Jabatan Perancang Bandar Majlis Perbandaran Ampang Jaya : 190 PANGSAPURI 13 TINGKAT (BLOK A) - Sediada 0.629 8.87 201 UNIT 'HOSE REEL TANK' 0.005 0.07 RUMAH PENGAWAL 0.012 0.16 2 1 520 - - RP - PANGSAPURI HARGA BEBAS :130 UNIT 0.950 13.39 CAELY (M) SDN. BHD. Lot 2661, 3rd Mile, Jalan Maharaja Lela, 36000 Telok Intan, Perak Darul Ridzuan CHUAH CHIN LAI NO KP: 600213-08-5642 Pemilik Tanah (Pemegang Amanah/No: 2858/2010): AZMI BIN GHAZALI NO KP: 590801-08-6637 Skala : PERMOHONAN KEBENARAN MERANCANG BAGI PINDAAN PELAN SUSUNATUR YANG TELAH DILULUSKAN, NO. RUJUKAN : [RUJ.BIL.(20) MPAJ 11/5/316, BERTARIKH 29 MAC 2003], MELIBATKAN PINDAAN : DARIPADA : 1) BLOK A (PANGSAPURI KOS SEDERHANA) 13 TINGKAT - 201 UNIT 2) BLOK B (PANGSAPURI KOS SEDERHANA) 8 TINGKAT - 143 UNIT 3) BLOK C (PANGSAPURI KOS SEDERHANA) 4 TINGKAT - 24 UNIT KEPADA : 1) BLOK A (PANGSAPURI KOS SEDERHANA) 13 TINGKAT - 201 UNIT 2) BLOK B (PANGSAPURI KOS SEDERHANA) 8 TINGKAT - 126 UNIT 3) BLOK C (PANGSAPURI) 28 TINGKAT : 190 UNIT - PANGSAPURI HARGA BEBAS 28 TINGKAT (TERMASUK 2 TINGKAT PENTHOUSE) - 130 UNIT - APARTMEN (RSKU - 1,000 KP) 12 TINGKAT - 60 UNIT YANG MENGANDUNGI: 1) RUANG TEMPAT LETAK KERETA SERTA KEMUDAHAN PENYELENGGARAAN (ARAS TANAH) 2) 6 TINGKAT RUANG TEMPAT LETAK KERETA BERTINGKAT (ARAS TANAH HINGGA ARAS 5) 3) KEMUDAHAN SURAU, DEWAN DAN KOLAM RENANG (ARAS 12 HINGGA ARAS 13) 4) BESERTA KERJA-KERJA INFRASTRUKTUR DAN LANDSKAP DI ATAS SEBAHAGIAN LOT PT 4992 (LOT LAMA 6995), KG. PASIR TAMBAHAN, MUKIM ULU KELANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN. UNTUK : KISMAJAYA SDN. BHD DAN CAELY (M) SDN. BHD JALAN TEKNOLOGI, PJU 5, Email : [email protected] / [email protected] TEL: 03-6142 2122, HP: 019-6007903, FAX: 6142 6122 NW-3-15, COVA SQUARE, SELANGOR DARUL EHSAN. 47810 KOTA DAMANSARA, PETALING JAYA, NW-3-15, COVA SQUARE, PETALING JAYA, 47810 KOTA DAMANSARA, JALAN TEKNOLOGI, PJU 5, SELANGOR DARUL EHSAN. - APARTMEN (RSKU - 1,000 kp) : 60 UNIT PANGSAPURI 28 TINGKAT (BLOK C) c a r i s p l a n 2 0 1 6 TANGKI STP 0.436 6.14 1 KISMAJAYA SDN. BHD. PERSIARAN GREEN HILL, 30450 IPOH, PERAK DARUL RIDZUAN. NO. 52B,