8/17/2019 IIQS__MAGAZINES_1423123129
1/102
8/17/2019 IIQS__MAGAZINES_1423123129
2/102
8/17/2019 IIQS__MAGAZINES_1423123129
3/102
/ IIQS1INTEGRITY INNOVATION ACCOUNTABILITY
www.iiqsglobal.org
Book.indd 1 4/21/13 9:02 PM
8/17/2019 IIQS__MAGAZINES_1423123129
4/102
8/17/2019 IIQS__MAGAZINES_1423123129
5/102
/ IIQS3
Let me begin with a quote by Dr APJ Abdul Kalam,“You have to dream before
your dreams can come true“. Easy to dream, but its realization requires inspiration.
Our dream has finally come true through IIQS Magazine & Annual Event. Now the
proud moment has come to unveil IIQS Magazine, “IIQS Annual Insight 2013” in
the glorious function “IIQS Annual Regale 2013”
As you all know, the seeds of IIQS were sown in 1998 and now this great move-
ment is celebrating its 15th anniversary. It is hard to believe that IIQS has achieved
so much within this short time. It is time to take stock of the goals we have set for
IIQS and the progress we have made towards them. I am a great believer in the
importance of setting goals that are high but realistic. Success is a journey, not a
destination.
IIQS Annual Insight 2013 has attempted to chronicle the IIQS path to glory, by
glimpse of the CPD events, matrixes, workshops, articles, achievements, pro-
grammes and cultural events .IIQS Magazine is just like opening the window when
it rains. Enjoy the rains of IIQS through this magazine. Read the articles, events and
enjoy the photographs. Hope IIQS Annual Insight 2013 takes a nostalgic look at the
event of the IIQS in the recent years.
IIQS Annual Regale 2013 is going to be a great event, I wish all the best to the event
team members also, I want to say “thank you” for their untiring efforts to the success
of sponsorship journey. We have been greatly supported by advertising and spon-
sorship partners, who were the glue that held the pages, and I am sure our dream
may not have come true without their support.
IIQS Magazine and Annual Event is the outcome of a glorious teamwork and
combined inspiration. I would like to thank from the bottom of my heart to all the
members and friends for their valuable contribution to bring out this publication.
And special thanks to the Editorial Team who have worked creatively with dedica-tion throughout this journey. This Editorial note will not be complete if I do not
thank the Board of Directors for entrusting me with this work and all their encour-
agement.
We truly hope that our readers enjoy our humble effort.
Sinimol Noushad,BTech, MBA, MRICS, MIS
IIQS Magazine Chief Editor & UAE Publications Lead
Indian Institute of Quantity Surveyors
2013 IIQS
Editor's note
Book.indd 3 4/21/13 9:02 PM
8/17/2019 IIQS__MAGAZINES_1423123129
6/102
Book.indd 4 4/21/13 9:03 PM
8/17/2019 IIQS__MAGAZINES_1423123129
7/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS5
MESSAGES..........................................................................................................................................................(07-13)
VISION / MISSION /MOTTO........................................................................................................ .........................(15)
HISTORY....................................................................................................................................................................(17)
IIQS GLOBAL BOARD OF DIRECTORS..............................................................................................................(19)
IIQS UAE MEMBER COUNCILS................................................................................................................... ........(20)
IIQS MEMBER COUNCILS INDIA AND QATAR.......................................................................................(21-23)
OUR VISION FOR NEXT 5 YEARS......................................................... ..............................................................(25)
CONTINUING PROFESSIONAL DEVELOPMENT (CPD)...................................................... ..................(27-31)
IIQS MATRIX EVENTS................................................................................................................... ..................(33-37)
NETWORKING JOB OPPORTUNITIES........................................................................................................(38-39)
OUTDOOR FAMILY EVENT 2012..................................................................................................................(40-41)
FAMILY DINNER 2012................................................................................ ......................................................(42-43)
IIQS – INDOOR CRICKET 2012.................................................................................................... .................(44-45)
CO, OPERATIVE AGREEMENT WITH AIQS ............................................................................................. ......(47)
ARTICLES............................................................................................................................................................(49-83)
MEMBER'S DIRECTORY.......................................................................................................... ........................(85-89)
GLOBAL RECOGNITION................................................................................................................................. .....(92)
MEMBERS ACHIEVEMENTS ......................................................................................................................... ......(93)
TESTIMONIALS FROM IIQS GLOBAL MEMBERS....................................................................................(96-97)
MAGAZINE AND EVENT COMMITTEE...........................................................................................................(98)
Contents
Book.indd 5 4/21/13 9:03 PM
8/17/2019 IIQS__MAGAZINES_1423123129
8/102
Book.indd 6 4/21/13 9:03 PM
8/17/2019 IIQS__MAGAZINES_1423123129
9/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS7
Greetings to one and all,
I feel humbled and at the same time take great pride in addressing you through the Indian
Institute of Quantity Surveyors (IIQS) yearly magazine in Year 2013.
Neil Armstrong upon reaching the moon had said One small step by a man, one giant leap
for mankind.
This comes true in the case of IIQS, which was started in 1998 by a small group of 8 mem-
bers to help each other through knowledge sharing. From 1998 to 2006, the association
(IQSA) continued their mission within Dubai and helped many professionals to upgrade
themselves professionally. Years 2007 to 2011 were truly remarkable when the effort of this
group started yielding fantastic results. Many of members got the corporate membershipof prestigious global bodies and also many of our members got into the senior positions
in their profession. Also, many of our members completed their master degree in Quantity
Surveying, Construction management and Construction Law etc.
In the milestone year of 2011, IQSA was renamed as Indian Institute of Quantity Surveyors
(IIQS) and successfully incorporated under section 25 of the Companies Act, 1956 on 14
October 2011 in Mumbai, India. Since 2011 onwards, after successful incorporation under
Companies Act in India, we initiated our CPD activities and formation of Member Councils
in India in various cities, namely, Delhi, Mumbai, Hyderabad, Chennai, and Bangalore etc.
Also, within the Gulf region, CPD and formation of Member Council has been initiated in
Doha.
By engaging in the activities of IIQS, the Indian Quantity Surveyors, slowly but surely, are
becoming world class leaders in the field of Contracts & Commercial Management of majorprojects around the world. This became possible due to motivation and guidance provided
by IIQS to these members to enhance their knowledge in Quantity Surveying by acquiring
higher academic qualification in the field of quantity surveying, construction management
and construction law.
Also, one of the major contributions of IIQS toward members’ professional growth is the
regular CPDs (Continuing Professional Development) that IIQS has been organizing on a
regular basis in UAE as well as in many cities in India, such as Delhi, Mumbai, Chennai,
Hyderabad, Bangalore etc. These CPDs allowed our members to enhance their knowledge
in the various disciplines as well as gave them the opportunity to be part of a large network
and get benefitted thereby.
Dear fellow members, let us march forward together with strong courage and moral
principles for greater success in the years to come.
Good luck!
MR. VARUGHESE MATHEW
FRICS, FCIOB, MCIArb,
IIQS Director & Global President
Neil Armstrong
upon reaching the
moon had said
“One small step by
a man, one giantleap for mankind”
Book.indd 7 4/21/13 9:03 PM
8/17/2019 IIQS__MAGAZINES_1423123129
10/102
Indian Institute of Quantity Surveyors
2013 IIQS
IIQS / 8
Indian engineers and
Quantity Surveyors
have played an
important role in
UAE’s
development. All
major and Iconic pro-
jects in this Country
have some imprints
of their minds and
hands
Book.indd 8 4/21/13 9:03 PM
8/17/2019 IIQS__MAGAZINES_1423123129
11/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS9
Indian Institute of
Quantity surveyors
has been an
important body
providing a platformfor engineers and
quantity
surveyors to share
their
professional
experiences.
Book.indd 9 4/21/13 9:03 PM
8/17/2019 IIQS__MAGAZINES_1423123129
12/102
Indian Institute of Quantity Surveyors
2013 IIQS
IIQS / 10
We are proud to
have a shared
purpose with the
IIQS, given our
objectives for
providing
professional
support and
welfare to our
respective
memberships
Book.indd 10 4/21/13 9:03 PM
8/17/2019 IIQS__MAGAZINES_1423123129
13/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS11
It gives me great pleasure to deliver this message to the Indian Institute of Quantity
Surveyors (“IIQS”) on the occasion of their Annual Celebrations in the UAE.
It was impressive to see the IIQS efforts and continuing success in organizing regular
CPD events in order to keep its membership professionally developed continuously.
The Australian Institute of Quantity Surveyors (“AIQS”) which promotes best practice
and advancement of the Quantity Surveying profession, around the globe, encour-
ages such efforts and therefore would applaud the success of IIQS in this area.
Many members of the IIQS are also members of the Australian Institute of Quantity
Surveyors. As the Middle East Representative of the Institute, I have close contacts
with such members and am aware about their keen interest to continue their edu-
cation further and enhance their knowledge in order to provide a professional and
value added service to the construction industry in the UAE, which too needs to be
applauded. IIQS has once again had a very successful year.
With significant success rates at achieving corporate memberships of other profes-
sional institutions such as RICS and AIQS by IIQS members, you have more than
sufficient reasons to celebrate another year’s success and it is a privilege to convey
in this instance, the Institute’s best wishes to the Committee of the IIQS, and also to
IIQS members, their families and friends who would be joining in these celebrations.
Have a wonderful occasion!
Prof. Indrawansa Samaratunga
AIQS Middle East Representative
It was impressive to
see the IIQS efforts
and continuing
success in
organizing
regular CPD events in
order to keep itsmembership profes-
sionally developed
continuously.
Book.indd 11 4/21/13 9:04 PM
8/17/2019 IIQS__MAGAZINES_1423123129
14/102
Indian Institute of Quantity Surveyors
2013 IIQS
IIQS / 12
Message from the Chartered Institution of Civil Engineering Surveyors - UAE Region
It is a source of tremendous satisfaction and pleasure that, on behalf of the CICES
UAE Region, I am able to congratulate the members of the Indian Institute of Quantity
surveyors (IIQS) on the occasion of launching their inaugural IIQS publication, ‘IIQS In-
sight 2013’,. The IIQS has enough reasons to publish such a journal duly documenting
the year’s achievements, due to the sustainability of the membership, the effective and
efficient continuing professional development programme and the record success of
the massive number of IIQS members who gained professional membership with world-
recognized institutions.
We look forward to a continued professional association with the IIQS as one of the lead-
ers among construction professional Institutions in the Arabian Gulf region and once
again we wish you every success on the IIQS journey towards professional excellence.
Dhammika T. Gamage
NDT(Civil Eng.), I Eng., ICIOB, ACIArb, AIQSSL, MRICS, FIIESL, FACostE, FAIQS, FCIn-
stCES
Chairman - Chartered Institution of Civil Engineering Surveyors - UAE Region
IIQS achieved
record successin Contributing in
massive number of
IIQS members who
has gained profes-
sional membership
with world-recog-
nized institutions.
Book.indd 12 4/21/13 9:04 PM
8/17/2019 IIQS__MAGAZINES_1423123129
15/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS13
I am happy to know that the Indian Institute of Quantity Surveyors is celebrating their
15th Anniversary.
IBPC Sharjah is glad to have IIQS under our umbrella and pleased to support IIQS
in all their activities.
I am very impressed with the activities of the IIQS especially the zeal and enthusi-
asm for expanding your wings for the cause of your fraternity, with a vision to share
and develop knowledge among fellow Indian Engineers, Quantity Surveyors, Esti-
mators and Cost Engineers.
On behalf of The Chairman and Board members of IBPC Sharjah, I congratulate
IIQS for their excellent work and on the occasion of the release of their first Annual
Magazine.
I take this opportunity to wish the Management and the esteemed members of IIQS
all the very best and great years ahead.
Sripriyaa
Director General
It was impressive to
see the IIQS efforts
and continuing
success in
organizingregular CPD events in
order to keep its
membership profes-
sionally developed
continuously.
Book.indd 13 4/21/13 9:04 PM
8/17/2019 IIQS__MAGAZINES_1423123129
16/102
ADD
A RELIABLE STEEL FABRICATOR AND ERECTOR INCONSTRUCTIONOIL & GAS AND POWER SECTOR
ARABIAN ENGINEERING AND FABRICATION
PO Box.-4606,Fujairah,UAE , Tel- 09 2233252, Fax 09-2233515
[email protected], [email protected], web site-www.arabian-engineering.com.
Contact-Tony Joseph , Operations Manager-00971-0504848659
CORE ACTIVITIESDesign & EngineeringFabrication & ErectionBlasting And Painting
Industrial Piping & Equipment ErectionProposals and Material Management
Quality Control and System Handover
STRUCTURAL STEELShowrooms & Shopping malls
Ware House & FactoriesHangers and Canopy Structure
Stadia & Labour accommodation
OIL AND POWER SECTORPipe Racks and Pipe Supports
Piping & Spools CS/LTCS
Mechanical Piping & Equipment ErectionElectrical and Instrumentation ServicesProject Management
i
A BIA INEERING AND FABRICATION
PO Box.-46 6,Fuja a ,UAE , Tel- 09 2233252, Fax 09-
[email protected], [email protected], web site-www.
-
M
Coo
a ers aLa
Se ac s a Pi e Supports
iping & Spools CS/LTCS
anica ing & uip EreE trical a Instru entation SeP je g
Book.indd 14 4/21/13 9:04 PM
8/17/2019 IIQS__MAGAZINES_1423123129
17/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS15
Vision
To establish and maintain a high standard of professional competence and integrity
by limiting membership to persons who have prescribed by, or acceptable to, the
Institute and who have satisfied the requirements of training, practical knowledge,
experience and integrity prescribed by the Institute.
Mission
The Mission of the Institute is to ensure professional advancement of Engineering
and Quantity Surveying Professionals in the Property Development and Construction
Industry, so that they can contribute more effectively in the ongoing development
in the construction sector worldwide and particularly in India, as well as to share
their knowledge and experience with the fellow professionals.
Motto
Lighted to Learn & Live
Book.indd 15 4/21/13 9:04 PM
8/17/2019 IIQS__MAGAZINES_1423123129
18/102
Book.indd 16 4/21/13 9:04 PM
8/17/2019 IIQS__MAGAZINES_1423123129
19/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS17
History
Initiated in December 1998, Indian Institute of Quantity Surveyors (IIQS) formerly known as Indian Quantity
Surveyors (IQSA) is a non-profitable professional body registered in India with a vision to share and develop
knowledge among the fellow Indian Engineers, Quantity Surveyors, Estimators, Cost Engineers, Contract Admin-
istrators and other similar professionals.
IIQS was initially started by a few members, however after organizing CPD (Continuing Professional Develop-
ment) events on a monthly basis, the strength started to increase with every meet. IIQS realized that Indian
Engineering degree does not adequately cover the subjects such as Contract Procedure, Finance and Develop-
ment, Project Cost Control, Dispute Resolution, Construction Law, Risk Management etc., which are essentially
required for effective commercial management of the construction contracts at a global level.
Accordingly, a smaller study group was formed with an aim of upgrading skills by enhancing their qualification
by pursuing further studies from internationally accredited universities, as well as arranging regular technical
seminars, wherein industry experts share their knowledge with the members. As a result, over the years, IIQS
has grown and many of its members have been successful in upgrading to post graduate qualification and have
attained professional membership from some of the most respected professional Institutions in India, UK, US,
Australia, etc. Subsequently many members have risen to key positions in their respective fields.
In 2007, IIQS took a giant step by implementing high ethical principles, bylaws and logo. IIQS logo has a burn-
ing candle, which signifies giving light to the world. Our Motto is ’Lighted to Learn and Live’. It is the collec-
tive aim and desire of IIQS that its members become self-motivated and take pride in doing things rightly and
taking decisions based on strong ethical values.
IIQS has monthly seminars, Matrix workshops for young engineers to attain chartered membership with profes-
sional bodies, Annual cricket events with other QS team and RICS teams. In addition, various study groups, CPD
events, mentoring sessions, sports events are actively organized for the benefit of its members. IIQS is closelyassociated with number of International professional bodies such as Royal Institution of Chartered Surveyors,
Australian Institute of Quantity Surveyors, Chartered Institute of Buildings, Chartered Institute of Arbitrators,
AACE International, Institution of Surveyors India etc.
IIQS foresee attaining Chartered status for Quantity Surveyors in India in near future.
History
Book.indd 17 4/21/13 9:04 PM
8/17/2019 IIQS__MAGAZINES_1423123129
20/102
Book.indd 18 4/21/13 9:04 PM
8/17/2019 IIQS__MAGAZINES_1423123129
21/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS19
IIQS GLOBAL BOARD OF DIRECTORS
MR. PAUL BANKALA Director & GlobalProfessionalDevelopment Vice Chair
MR SYED ASLAMDirector & Global AuditCommittee Chair
MR. RAMARAO KILARIBoard Member
MR. HIREKERDirector & Global AuditCommittee Vice Chair
MR NAVEEN KUMARDirector &GlobalMembership CommitteeChair
MR.GANESHAN GDirector &GlobalGovernance Committee
Vice Chair
The Man with Wise and
Cautioned Ap- proach
THE CAPTAN
The BindaasMan
The Seasoned Man
The Manof Rules Tough at
Work Softat Heart
Loves Cocktail
of Serious
Work and
Fun
No-Nonsense Task Master
MrPerfect
MrSimple
The GreatAdvisor
The Charmerof IIQS
.Mr Smart
The AdorableProfes-sor
MR FRANKLIN JOSEPHDirector & GlobalGeneral Secretary
MR. E.V. JOHNSON NEILDirector & Global
Vice President
MR. BASVARAJ BETHDirector & GlobalEvent Chair
MR. VARUGHESEMATHEWDirector & Global
President
MR SAJEETH SIDHARTHANDirector & Global
Awarding Committee
Chair
MR.RAMESH PALIKILA Director & GlobalProfessional DevelopmentChair
MR.PAWAN KUMARMAMIDIBoard Member
MR KASI VISWANATHANDirector & GlobalGovernance CommitteeChair
MR. JACOB JOBYDirector & Global Execu-tive Director
MR.DHARMENDARPARDASANIDirector & Global
Vice President
Front Row Left to Right
Back Row Left to Right
Not in Picture
Book.indd 19 4/21/13 9:05 PM
8/17/2019 IIQS__MAGAZINES_1423123129
22/102
Indian Institute of Quantity Surveyors
2013 IIQS
IIQS / 20
UAE Member Council 2012
UAE Member Council 2013
MAHESH BUTANI Abudhabi Representative
RITU SUBODH DASNews Letter
SINIMOL NOUSHADPublication Head
PARTHARAJAN PILLE Matrix Support
BINU C NINAN WebCo-ordinator
PAUL BANKALA General Seceratary
SAJEETH SIDHARTHAN Chairman
MATHEW VARGHESEPast Chairman
JOHNSON NEIL Vice Chairman
DHARMENDAR PARDASANI Vice Chairman
PAVAN MAMIDITreasurer
Mr. MAHESH BUTANI Abu Dhabi CPD Event Lead
MR.GANESHAN GDirector &GlobalGovernance Committee Vice Chair
MR. PAUL BANKALA UAE General Seceratry
MR KASI VISWANATHANDirector & GlobalGovernance Committee Chair
MR SAJEETH SIDHARTHANUAE ME Chairman
GOVINDARAJU RATHODUAE Events Support
MR.PAWAN KUMAR MIMIDIUAE Treasurer
REKHA RAMESHMembershipDevelopmentManeger
SINIMOL NOUSHADUAE Publication Lead
AJITHNews Letter
MR SYED ASLAMUAE Finance & Audit Controller
MR. E.V. JOHNSON NEIL UAE Vice Chair
MR FRANKLIN JOSEPHUAE Sports/Events
MR. BASVARAJ BETH Abu Dhabi Head of Professional& Membership Development MR. RAMARAO KILARI
Web & IT ManagerMR.RAMESH PALIKILA UAE & ME Head of Training/Membership Development
Front Row Left to Right
Front Row Left to Right
Back Row Left to Right
Back Row Left to Right
Book.indd 20 4/21/13 9:07 PM
8/17/2019 IIQS__MAGAZINES_1423123129
23/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS21
Delhi Member Council
Member CouncilsIndia and QatarIIQS India Member Councils were launched in May
2012 and it received a warm welcome from the
professionals in india. First IIQS Member Council was
formed in New Delhi and followed with several Mem-
bers Councils in various metro cities including Mumbai,
Hyderabad, Chennai and Bangalore etc. These
Member Councils are organizing CPD workshops,
seminars etc. periodically in their respective cities.
Quantity surveying profession is still not very well known
in India. However,with passage of time, the industry
has realized the importance of Quantity Surveyors in
construction projects. The construction industry experts
along with some of QS related Professional Institutes
are working together to develop the QS profession in
India.
Member Councils in India are committed to develop
the QS profession and to ensure that members attain
the professional standard of the global standards with
support of IIQS activities.
Mumbai Member Council
IIQS Delhi Member Council Launched In May 2010
under the leadership of Mr. Naveen & successfully
conducted two CPD Events.
Franklin is heading the Mumbai MC with a great sup-
port from the leadership of Mr. Govind Rathod and
Mr .Saleem Merchant and his team from Mumbai.
Mr. Ajith Philips from Dubai presented a CPD topic
on “Bonds, insurance and securities and their impor-
tance in Construction Contracts “in the first CPD. Lat-
er, Mumbai MC conducted two professional CPDs in
2012 and will formalize the MC in 2013.
Book.indd 21 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
24/102
Tel : 04 – 298 3206, Fax: 04 – 298 3207. E-mail: [email protected], Website: www.araruty.com
DEWA/ADWEA/FEWA APPROVED
CONTRACTOR FOR ALL ELECTRI-
CAL INFRASTRUCTURE AND MEP
WORKS.Mr. RameshManaging Director Mob : +971 50 6318961
:+971 55 5971176
DubaiAbu Dhabi Qatar
Tel. : +971 4 2983206Tel. : +971 2 5509678 Tel. : +974-44689123
Fax : +971 4 2983207Fax : +971 2 5509677 Fax : + 974-44689150
E-mail :[email protected] : [email protected] E-mail : [email protected]
Sage Global Engineering LLC is one of the leading companies engaged inCivil Engineering activities and infrastructure development,registered in the
Emirates of Dubai,United Arab Emirates.
We Specialise in Sewerage and Drainage Pipeline, Water pipelines andPumping Stattion Contracting. Our Company has successfully completed
several projects in UAE since inception and are still engaged in several ma- jor projects.
Aspiring for continuous improvement and customer satisfaction the compa-ny acquired its present identity as Sage Global Engineering LLC establishedin the year 2002, The organisazation is one of the pioneers in constructionof Sewerage and Drainage Systems for the city of Dubai and has continu-
ous presence in U.A.E since then.
Book.indd 22 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
25/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS23
Hydrabad Member Council
2. Hyderabad Member Council Leads Data :
Ramesh Palikila is heading the Hyderabad MC with a great
support from the leadership of Mr. Karthikeyan , Executive Di-
rector of Langdon and Seah Cost Consultants and his team
from Hyderabad. IIQS has conducted a professional need
analysis in 2011 with NICMAR students and core QS profes-
sionals. With the results of this analysis and feedback from
NICMAR students and QS professionals, IIQS inaugurated first
CPD event in August 2012 with a successful collaboration with
CIOB( UK) and NICMAR. In March 2013 , Hyderabad MC con-
ducted a professional workshop on “ Post Contract Adminis-
tration “ with support from Aparna Constructions Commercial
team. IIQS Hyderabad MC will do some more developments
soon to help QS professionals with our vision with the help of
NICMAR and Hyderabad construction industry professionals.
Mr. Kumaresh Murthy is leading the Chennai MC with a great
support from his team from Chennai under the leadership of
Mr. Kasi Viswanathan and Mr. Johnson Neil from Dubai.
Mr. Sankar from Langdon and Seah presented a CPD topic
on “ Role of a QS profession in India and value addition to
the industry “ in the first CPD. Mr. P.H. Aravindh Pandian
Senior Advocate , Additional Adv. General of Tamilnadu at-
tended this event as a Chief Guest and his valuable guide-
lines added a great value to this CPD event. Later, Chennai
MC conducted two professional CPDs in 2012 and will for-
malize the MC in 2013.
Mr. Jacob Joby is leading the Bangalore MC with a great
support from his team. Mr. Darshan Tededesai from Gleeds
Hooloomann presented a CPD topic on “ Procurement
Strategies “in the first CPD. Mr.A.N.Prakash has attended this
event as a Chief Guest and his valuable guidelines added
a great value to this CPD event. Currently Bangalore MC is
planning to conduct future CPDs and will formalize the MC
in 2013.
IIQS conducted a need analysis of CPD events in Doha in
November 2012 under the leadership of Mr. Dharmendar
Pardasani and Mr. Ramesh Palikila from IIQS Global Board.
Approximately 40 members attended this event. Mr. K.V.R.
Prasad, Mr.Sandeep , Mr. Avinsah and Dr. Binu Varghese are
currently leading this Doha MC. In February 2013, Doha MC
has conducted first CPD event to from IIQS Matrix forum in
Doha with the help of the above lead members and around
45 members got benefit from this professional event.
Qatar Member CouncilBangalore Member Council
Chennai Member Council
Book.indd 23 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
26/102
Book.indd 24 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
27/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS25
Our vision for next 5 years is: To increase our membership base substantially in India and other Gulf
countries
To create awareness of Quantity Surveying profession in India
To create awareness in Engineering colleges in India that they need to
start the degree courses in Quantity Surveying
To ensure that we continue to organize CPD activities for our members
To ensure that we organize regular social events for our members since
we consider that it is also a core part of our vision to serve our members.
To provide a fully developed website to our members wherein they can ac-cess the CPD notes of all previous seminars and other webinars etc, along
with the full directory of our members.
To certify our members with appropriate membership grades such as MI-
IQS, CIIQS, FIIQS etc.
To ensure that our members follow the ethics of highest standards. This
is being ensured by including ethics as one of the mandatory competencies
for achieving the membership grade.
Most importantly, to give back to the society by engaging in some charity
works
Our vision
Book.indd 25 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
28/102
Book.indd 26 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
29/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS27
Subject Month
“Coping up with Recession” 28 April 2010
“How to make Target Cost Contracts Work” 30 June 2010
“Personal Development & Presentation” 21 July 2010
“Process of Arbitration between Dispute Establishment and Start ofArbitration”
9 August 2010
“Forensic Delay Analysis of Construction Claims” 20 September 2010
“Important Legal Development in UAE in 2010” 2 November 2010“Variations under FIDIC 1999” 28 February 2011
“Dispute Boards in Today’s Construction Disputes” 29 March 2011
“Excellence is Construction Series” 27 April 2011
“Why and how to use standard forms of Construction Contracts” 25 october 2011
“Various Delay Analysis Approaches” 30 November 2011
Continuing ProfessionalDevelopment (CPD)
CPD Events 2010-2011
IIQS CPD Programme
IIQS CPD events are scheduled on monthly basis and it includes a wide range of
activities such as talks and presentations on subjects of contract and commercial
management, construction law, cost planning and management, business manage-
ment, contract practice, contracts administration, procurement and tendering, risk
management etc. IIQS encourages all members to maintain and develop their profes-
sional in the workplace and CPD is one of the recommended way of enhancing the
professional competence through sharing knowledge with other industry professionals
and networking.
Benifits of CPD
• Helps Members to enhance their knowledge
• Networking opportunities
• Providing competitive environment for members
• Helps members in their day-to-day work.
• Enhances presentation skills by providing opportunitiesfor presenting seminars and workshop.
What isCPD?
CPD stands for
Continuing
Professional
Development’
and is the term
that describes
how profes-
sionals maintain
their own com-
petence in the
workplace. CPD
is about learning
and development
that enhances
effectiveness in
professional life.
CPD
Book.indd 27 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
30/102
Indian Institute of Quantity Surveyors
2013 IIQS
IIQS / 28
IIQS Annual GeneralBoard Meeting AGM 2012IIQS Annual General Board Meeting 2012 was held at the API Tower in Dubai on 25 January 2012, wherein the
IIQS Board of Directors were introduced. This well-attended event provided the opportunities for the attendees to
interact in a casual setting. Mr. Varughese Mathew, Director & President of IIQS Global provided a brief overview
of IIQS 2011 accomplishments and discussed IIQS Vision & Mission and some of IIQS new objectives set out for
2012. The event was followed by the Question & Answer Session lead by IIQS Board of Directors.
CPD
Book.indd 28 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
31/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS29
No CPD EVENT2012 & 2013
Speakers Location & Date
1 TOPIC: Question & Answer onTendering, Pre Contract,PostContract, Cost Control
Mr.Varughese Mathew, FRICS, FCIOB, ACIArbMr.Dharmendar Pardasani, M.Sc., FRICS, MCIOB.: Mr. E. V. Johnson Neil, MRICS, MIS, MCIArb.: Mr. Sajeeth Sidharthan, BE, MRICS
API World Tower25th January 2012
2 Session 1: Risk Evaluation
Session 2: Creation of Risk
Mr. Daniel Alcon, BSc, DipArb, FCIArb, MRICS, MACostE
MDRBF, MDBFMr. Gary Beamish Eng.C, C.Eng, C.Env, C.WEM, MICE,MCIWEM, MQSI
API World Tower,
21st February 2012
3 The Paradox of LeanLeadership
Prof: David Bamford, Bsc(Hons),Mphil,Phd,MCMIHonorary senior Research Fellow at Manchester BusinessSchool, University Of Manchester
API World Tower20th March 2012
4 Impact of various Parametersin Costing
Mr. Somnath Mukherjee, Chief Manager Projects- SimplexInfrastructures Limited
API World Tower18th April 2012
5 The Flipside - A Different Wayof Looking at BusinessEnvironments and Strategy
Prof. Christopher Abraham, Head - Dubai Campus, Sr. VicePresident - Institutional Development, S P Jain School ofGlobal Management, Dubai · Singapore · Sydney
Al Futtaim Training Center,22nd May 2012
6 An Overview of ArbitrationProcess from Commence-ment to Enforcement
Mr. Dharmendar Pardasani, MSc, FRICS, MCIOBMr. Kalpesh Sangani, MSc, MRICS, MCIArb
Al Futtaim Training Center,27th June 2012
7 Construction Claims in theGulf
Mr. Guy Elkington, Director – Global Construction Practice,Navigant
Al Futtaim Training Center,19th September 2012
8 Areas of Concern in FIDIC1999
Prof. Indrawansa Samaratunga PhD, DSc.FRICS, FAIQS, FIQS(SL), FCIArb, FCIOB, FCMI, FIAS,FBEng,
Wednesday 7th November2012 at Al Faraa Corporateoffice
9 UAE Constitution-ContractFormation
Mr. Gary Beamish , Eng.C, C.Eng, C.Env, C.WEM, MICE,MCIWEM, MQSI, Joint Managing Partner, M/s. Talos Con-sult FZC
Al Futtaim Training Center,15th January 2013
10 Liquidated Damages – an UAEperspective
Mr. Shah Nawaz CA, Fellow Member of the Institute ofChartered Accountants, Regional Director of Operations –
Johnson Controls International
Al Futtaim Training Center,26th February 2013
11 The secrets behindconstruction contract pricingoptions - understandingwhat›s on the menu”
Mr. Sachin Kerur BEng (Hons) Construction Engineering -The University of Dundee, The College of Law, Guildford andMr. William Marshall from Pinsent Masons: combining theexperience, resources and international reach of McGrigorsand Pinsent Masons
API Tower Auditorium,25th March 2013
CPD EVENTS 2012 & 2013
CPD
Book.indd 29 4/21/13 9:09 PM
8/17/2019 IIQS__MAGAZINES_1423123129
32/102
Indian Institute of Quantity Surveyors
2013 IIQS
IIQS / 30
CPD In Dubai & AbuDhabiIIQS , has successfully organized 12 consecutive CPD events in UAE for year 2012-2013 .CPD Sessions providea great opportunity for our members to enhance their knowledge and skills. The 1st CPD event in Abu Dhabi was
launched on 07 Nov 2012.
IIQS Structured CPD events are lead by experts indusrty speakers. IIQS takes this opportunity to thank all the
speakers and guest for their valuable time and effort for IIQS CPD events..
CPD
Book.indd 30 4/21/13 9:10 PM
8/17/2019 IIQS__MAGAZINES_1423123129
33/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS31
CPD In IndiaThe Dubai Region with many member and Members Council support from India provided a wonderful opportunityto deliver successful CPD seesions in various metro cities in India. This was the important milestone for IIQS and it
is planned in 2013 also, all IIQS Member Councils will continue to organize the CPD events and Matrix workshops
for global members.
CPD
Book.indd 31 4/21/13 9:13 PM
8/17/2019 IIQS__MAGAZINES_1423123129
34/102
Book.indd 32 4/21/13 9:14 PM
8/17/2019 IIQS__MAGAZINES_1423123129
35/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS33
VISION OF IIQS MATRIX EVENTS:To Create a professional environment among all QS community to share the knowledge and experience to enhance
the professional competence as well as to be part of a large professional net work.
IIQS Matrix Events were initiated in 2009 with support of IIQS Board of Directors and lead by IIQS Global Pro-
fessional development Director Mr. Ramesh Palikila. B.Tech, MRICS, ACIArb, MIS. with a basic idea of providing a
knowledge sharing workshops by eminent resource speakers from UAE industry.
Matrix is a one of the IIQS structured training programs to provide a professional platform for Contracts & Com-
mercial Management professionals, Quantity Surveyors & Construction Professionals to plan their professional
development to become Chartered QS of RICS or attain any other professional membership. Since 2009 , through
this Matrix platform, more than 60 QS professionals have attained their Chartered status and have reached to
management positions in Contracts and Commercial fields and are presently working in UAE, Doha,India and other
Countries.
IIQS Matrix EventsStructured Training Programme in Dubai
Matrix
Book.indd 33 4/21/13 9:14 PM
8/17/2019 IIQS__MAGAZINES_1423123129
36/102
IIQS / 34
Matrix Events in 2013Matrix 2013 Events Conducted in UAE ( Dubai and Abu Dhabi)
MATRIX EVENT NO.01/2013
Date : Friday, 14th December 2012Topic : Introduction of Matrix Training Workshops and Self planning to Strike perfectly APC
Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
MATRIX EVENT NO.02/2013
Date : Friday, 24th December 2012
Topic 1 : Matrix Formation, APC Critical Analysis Guidelines and Written Skills
Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
Topic 2 : Business Planning for QS professionals
Speaker : Mr .Franklin Joseph BE,MRICS, MIS - IIQS Director & Global General Secretary
Topic 3 : Contract Practice and Contract Administration
Speaker : Mr .Dharmendar Pardasani MSc, FRICS, MCIArb, MIS,FAIQS - IIQS Director & Global Vice President
MATRIX EVENT NO.03/2013
Date : Friday, 04th January 2013
Topic 1: Over view on QS Core Competencies, Commercial Management and Study Skills
Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
Topic 2 : Design Economics and Cost Planning
Speaker : Mr. Dinesh Dabasia BSc ( Hons),MRICS Associate – Davis Langdon an AECOM company, Abu Dhabi, UAE.
MATRIX EVENT NO.04/2013
Date : Friday, 18th January 2013
Topic 1 : Quantification and Costing of Construction Works
Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
Topic 2 : Client Care for QS professionals
Speaker : Mr. Eswar S.B BSc, Dip, CIPM, MRICS, ACIArb –CEO of 3EG Group – Sharjah- UAE.
Topic 3 : Successful deliver of QS service in an International Projects
Speaker : Mr. Chris Webb MRICS , Associate – Davis Langdon an AECOM company.
MATRIX EVENT NO.05/2013
Date : Friday, 08th February 2013
Topic 1 : Communication and Negotiation Skills
Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
Topic 2 : Conflicts Avoidance and Dispute Resolution
Speaker : Mr. Kasi Viswanathan BE,MRICS, CCE , MCIArb, MIS IIQS- Director-Global Governance Committee Chair,
Topic 3 : Design Economics and Cost Planning
Speaker : Mr. Luay Azzam BSc (Hons), FRICS, FAIQS, ACIArb , Executive Director – NEA Consultants , RICS –UAE National Board Member.
Topic 4 : Contract Practice and Contract Administration
Speaker : Mr. Colm O’Suilleabhain BSc, MSc, MRICS, LLM , FCIArb Director –FTI Consulting , Abu Dhabi, UAE.
Book.indd 34 4/21/13 9:14 PM
8/17/2019 IIQS__MAGAZINES_1423123129
37/102
/ IIQS35
Matrix Events in 2013MATRIX EVENT NO.06/2013
Date : Friday, 15th February 2013
Topic 1 : APC- Phase II Guidelines: Presentation Skills for professional Interviews
Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
Topic 2 : Procurement and Tendering
Speaker : Mr. Sajeeth Sidharthan BE,MRICS, ACIArb, MOSE , IIQS- Director-Global Awarding Committee Chair
Topic 3 : Securities, Bonds, Indemnities and Insurances in Construction Contracts
Speaker : Mr. Ajith Philip BE, PGDCM - Contracts Manager – Nakheel Properties Developers
MATRIX EVENT NO.07/2013
Date : Friday, 01st March 2013
Topic 1: Project Financial Control and Reporting
Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
Topic 2 : Managing Variations in Construction Contracts
Speaker : Mr. E V JOHNSON NEIL, MRICS, MIS, MCIArb - IIQS Director and Global Vice President
MATRIX EVENT NO.08/2013
Date : Friday, 08th March 2013
Topic 1: Construction Technology and Environmental services
Topic 2: Health and Safety
Topic 3: Over view and need of Mandatory Competencies for a QS professional
Speaker: Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
MATRIX EVENT NO.09/2013
Date : Friday, 08th March 2013
Topic 1 : Risk Management – An introductory session for QS professionals
Speaker: Dr. Tamil Selvan Mahalingam MBA,PMP,CCE, PhD, Professional Trainer on Project Management ,Cost Management and Quality Man-
agement – 3Fold Institute , Dubai.
Topic 2 : Think Big about QS profession & How a QS can reach to Lead / Management Position? Speaker : Mr. Varughese Mathew FRICS, MCIArb,
FCIOB, CL , IIQS Director – Global President
Topic 3 : Data Management Principles and Best practice Standards of Cost Management
Speaker : Ms. Julie Christie M. Dela Cruz MBA,FRICS, FAIQS - Founder and Chair of Philippine Institution of Certified Quantity Surveyors ( PICQS)
Topic 4: Ethics, Rules and Regulation of RICS - Mandatory Competency for a Chartered QS Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb,
MIS, IIQS Director – Global professional Development Chair
MATRIX EVENT NO.10/2013
Date : Friday, 05th April 2013
Topic : APC – 1 Hour – Special Guidelines to APC candidates
Speaker : Mr .Ramesh Palikila BTech, MRICS, ACIArb, MIS, IIQS Director – Global professional Development Chair
Mock interviews to APC candidates by IIQS team of Assessors
Lead: Mr.Paul Bankala MSc , BE, ICIOB and Mr. Kasi Viswanathan BE,MRICS, CCE , MCIArb, MIS
Book.indd 35 4/21/13 9:14 PM
8/17/2019 IIQS__MAGAZINES_1423123129
38/102
Indian Institute of Quantity Surveyors
2013 IIQS
IIQS / 36
Matrix members and mentors in theStructured Training Programme in Dubai
Mock APC in Interview
Ramesh Palikila addressingthe matrix event
Matrix
Matrix 2009 Matrix 2012
Book.indd 36 4/21/13 9:14 PM
8/17/2019 IIQS__MAGAZINES_1423123129
39/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS37
Professional Events Conducted forNICMAR Students in Hyderabad
Successfull matrix membersRamesh and Jacob Joby atNICMAR Hyderabad
Matrix
NICMAR - QS PG Students
Book.indd 37 4/21/13 9:16 PM
8/17/2019 IIQS__MAGAZINES_1423123129
40/102
Indian Institute of Quantity Surveyors
2013 IIQS
IIQS / 38
NETWORKING AND
IIQS provides a great
platform for networking
opportunities duringthe CPD events as well
as during the social
events. Any relevant
information required
for effectively carrying
out the day to day
works and also for
upgrading professional
qualifications is sharedamong the members.
Any job opportunities
also shared which is
of immense help to
members who have lost
their jobs or are looking
for new opportunities
Book.indd 38 4/21/13 9:17 PM
8/17/2019 IIQS__MAGAZINES_1423123129
41/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS39
JOB OPPORTUNITIES
Book.indd 39 4/21/13 9:18 PM
8/17/2019 IIQS__MAGAZINES_1423123129
42/102
OUTDOOR FA
It was an excellentoutdoor event in
Zabeel Park in
Dubai wherein
many of our
members joined
with their familiesand had a great time
socializing and
playing fun games.
Book.indd 40 4/21/13 9:19 PM
8/17/2019 IIQS__MAGAZINES_1423123129
43/102
MILY EVENT 2012
Book.indd 41 4/21/13 9:21 PM
8/17/2019 IIQS__MAGAZINES_1423123129
44/102
FAMILY DINN
Tis event was attendedby more than 150members. All themembers had amemorable eveningwherein members danced
away to glory, enjoyedfashion show, playedgames, enjoyed lovelyfood. A great evening!
Book.indd 42 4/21/13 9:21 PM
8/17/2019 IIQS__MAGAZINES_1423123129
45/102
ER 2012
Book.indd 43 4/21/13 9:21 PM
8/17/2019 IIQS__MAGAZINES_1423123129
46/102
IIQS-INDOOR
Te IIQS Cricketteam participated inthe annualRICS Cricketevent and brought
laurels for theIIQS!
Book.indd 44 4/21/13 9:22 PM
8/17/2019 IIQS__MAGAZINES_1423123129
47/102
CRICKET 2012
Book.indd 45 4/21/13 9:22 PM
8/17/2019 IIQS__MAGAZINES_1423123129
48/102
The most importantindustry recognizedcertification for theproject managementprofession
(5th Edition)PROJECT MANAGEMENT PROFESSIONALS
EXAM PREPARATION COURSE
“The Most Client Preferred Institute”
Courses Offered in Dubai,Sharjah and Abu Dhabi
Other courses offered: PGMP®, CMQ® /OE®, SIX SIGMA ®,
RMP®, PSP®, CCCM®, CFM®, LEED®, CMA ®
[email protected] www.chicagomti.com
InternationallyRecognized
Highly ExperiencedFaculty
Weekend, Regular andFast-track Batches
Toll Free: 800 2468 Dubai: 04-3547997
Al Mostaqbal
Building Materials Trading LLC
P.O. Box 26743, Dubai – United Arab Emirates
T: 971 4 2894158 │ F: 971 4 2894125Email: [email protected]
Mechanical Engineering Services / MES
P.O. Box 410084
Dubai – United Arab Emirates
T: 971 4 3336427│ F: 971 4 3336428 Email: [email protected]
Book.indd 46 4/21/13 9:22 PM
8/17/2019 IIQS__MAGAZINES_1423123129
49/102
Indian Institute of Quantity Surveyors
2013 IIQS
/ IIQS47
Co-operativeAgreement withAustralianInstitute of QuntitySurveyors (AIQS)
A co- operative agreement was signed with
Australian Institute of Quantity Surveyors on
9th April 2013 in Dubai, whereby IIQS and AIQS
have agreed to collaborate for their respective
CPD’s and other knowledge sharing activities in
the Middle East.
Instead of Memorandum of Understanding a co-operative agreement was singed
Affliation
Book.indd 47 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
50/102
Book.indd 48 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
51/102
/ IIQS49
Head Office Overheads” is not an expression that
is ound in FIDIC Forms o contract, resulting
in requent debate as to why a prolongation
cost claim (especially under FIDIC Forms o
contracts) should include a Head Oice Over-
heads element. ypical expressions such as “o the Site over-
head charges” (FIDIC–4th 1.1(g)(i), FIDIC–1999 1.1.4.3)
and “Contractor’s general overhead costs” (FIDIC–4th 52.3)
ound in FIDIC Forms o contract are generally construed
to mean Head Oice Overheads. Whilst in some parts o the
world they are reerred to as “Home Oice Overheads”, an
accountant would use the expression “General and Admin-
istrative (“G & A”) expenses o the company” in reerring to
the Head Oice Overheads.
In the books o accounts o a Contractor’s Head Oice, the
Overheads (G&A expenses) are generally recorded under the
ollowing heads (which vary rom company to company):-
HEAD OFFICE OVERHEADSREVISIED
BY Prof. Indrawansa Samaratunga
Executive and administrative salaries, allowances & recruitment costs etc.
Head Office rent and maintenance. - Insurance.
Utilities, phone/data/fax, postal and bank charges - Travel.Depreciation of company assets. - Bad debts.
Furniture and equipment. - Entertainment.
Stationary and printing. - Pantry expenses.
Professional fees. - Contributions.
Auditing expenses. - Sponsorship fees.
Advertising and marketing (including tendering costs). - Idle resources.
Interest on company borrowings. - Training.
Book.indd 49 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
52/102
IIQS / 50
Tough the total o all these expenses (taken as a percentage o
the company revenue) is usually considered as a suitable basis orthe pricing o tenders and building-up new rates / prices, some o
these expenses are inappropriate or inclusion in the prolongation
cost calculations o a delay claim. Tere is no reason, or example,
why the Employer o the delayed project should bear a part o a
bad debt related to another project o the Contractor. Similarly,
the Employer o the delayed project has no liability to bear any
part o a claims consultant’s ees paid or the preparation o a claim
or another project o the Contractor. Tereore, during an audit o
the books o accounts o the Contractor’s Head Office by the En-
gineer or the Employer’s other Contract Administrators (or by the
Contractor’s Contract Administrators in auditing a Subcontrac-
tor’s books o accounts) in order to veriy whether the Contractor
(or the Subcontractor) has calculated the Head Office Overheadselement o a prolongation cost claim in a air and reasonable man-
ner, the ollowing should be given due consideration:
(a) Capital expenditure (building extensions,
new urniture etc) should be appropriately depreciated.
(b) One-off annual/quarterly expenditure (advertising
costs, audit ees etc.) should be distributed over the
year/quarter and the cost o bulk printing etc.
should be distributed over the relevant period.
(c) Insurance costs and financing costs o projects should
not be included in the Head Office Overheads account.
(Tey should be in the project accounts).
(d) Claims consultancy ees should not be included in the
Proessional Fees head.
(e) Any bad debts written-off under the Head Office Over
heads should be completely removed rom the
calculations.
() Cost o idle resources should be in the project accounts
and not in the Head Office Overheads account. (It is
permissible to allow the cost o some idle resources
such as the asphalt plant o a road works contractor to
be in the Head Office Overheads account).
(g) Cost o an employee (such as a Commercial Manager)
whose time is totally dedicated to a project/projects,
should not be in the Head Office Overhead account, despite being stationed at the Head Office.
(h) Sponsorship ee/parent company ee paid as an annual/
monthly sum o money or as a percentage o the rev
enue could be a Head Office Overhead, but not i it is a
portion/percentage o the profit.
Once the Head Office Overheads account is rationalized in the
above manner (let’s call it the “Rationalized” account), it would be
suitable or prolongation cost calculations.
Where a project completion had been delayed, it is not diffi-
cult or a Contractor to demonstrate (using daily records, photo-
graphs, correspondence etc.) that the cost o his Site Overheadsincreased due to the necessity o:-
• supervision staff to stay longer on Site
• site huts to be maintained or a longer period
• tower crane to be retained on Site longer than
previously planned
• perormance security, insurance etc. to be extended
etc.
Te prolongation o these Site Overheads are maniest and
thereore this part o the claim generally receives ew challeng-
es, but when it comes to the matter o Head Office Overheads,
the impact thereo on the site/project costs is not so obvious andthereore Engineers and Employers ofen have the ollowing ques-
tions, as to:-
• why should there be an increase in the Head Office
Overheads when the project completion is delayed?
• why should any Head Office Overheads be an additional
cost under the contract?
• why should a ormula be used (whereas the Contractor
should demonstrate all costs using records)?
Moreover (unlike or Site Overheads), there are no site records
that can be produced (other than the Head Office books o ac-
counts) to support this part o the claim.
Te answers are ound in the explanation o how the Contractor
sustains his Head Office. Since the Head Office does not have an
individual income/revenue, the cost o sustaining the Head Office
has to be borne by all the projects o the Contractor, by contribut-
ing a proportional sum every month rom their project revenue, in
order to meet the Head Office Overheads. Tereore such contri-
bution is a cost incurred in the execution o the Works (not differ-
ent to paying authority ees, taxes, subcontract/supplier payments,
and any other project expense).
Te resources deployed in the project were expected to generate
revenue and pay to the Contractor’s Head Office a sum o money
(to und the Head Office Overheads) or the duration o the imeor Completion, ollowing which the same resources were expect-
ed to be deployed in other projects to generate revenue in order
to contribute urther money to und the continuing Head Office
Overheads beyond the aoresaid ime or Completion, which was
prevented by the Employer by delaying the project completion,
requiring the said resources to be retained on Site or a prolonged
period o time, resulting in the need to contribute more money
rom the delayed project to sustain the Head Office, which is an
unoreseen additional cost, which is the answer to the second
Book.indd 50 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
53/102
/ IIQS51
question.
Te answer to the first question is that, it is not an increase in
the Head Office Overheads but an increase in the contribution re-quired rom the delayed project to und the continuing Head O-
fice Overheads (though such Overheads may not have increased)
or the prolonged period, because the resources were not released
to generate such contribution rom other projects.
Since there are adequate provisions in FIDIC Forms o contract
entitling the Contractor to additional payment in respect o costs
incurred as a result o a delay caused by the Employer or by those
or whom the Employer is responsible or by an event or which
the Employer assumed the monetary risk, and since Head Office
Overheads contribution is part o such cost, the Contractor would
be in a position to successully argue his Head Office Overheads
claim, provided that it is quantified in an appropriate manner.
Where both parties are agreeable to use an existing ormulasuch as Hudson, Emden, Eichleay or Hank Laan (see the Schedule
at the end o this article), quantiying the Head Office Overheads
claim would be quite simple, but where there is disagreement,
such ormulae cannot be used with FIDIC Forms o contract and
most bespoke orms o contract (or with claims or damages or
breach o contract) due to the necessity to deal with the actual (but
air and reasonable) costs incurred or to be incurred, in addition
to other limitations/weaknesses ound in such ormulae.
It is ideal (but may not be convenient) to have a transparent
method to apportion the Rationalized Head Office Overheads o
a Contractor to all his projects and to recover monthly rom each
project, its due contribution, neither based on the revenue (as is
being practised by some contractors) nor based on the overall ex-
penditure (as practiced by the others), but based on the limited
cost o staff, workers and equipment deployed on the projects (or
in other words, based on the cost o those resources that a Con-
tractor moves rom one project to another and rom which he gen-
erates revenue). I this is practised by Contractors, there would
be no need o ormulae to establish the quantum o Head Office
Overheads element o the claim. Te Contractor can simply pro-
duce proo o the contribution made by the delayed project to-
wards the Head Office Overheads, during the delay period. But the
general practice among Contractors (mainly due to administrative
convenience) is to use either the revenue or the overall expendi-
ture as the basis or the apportionment, thus necessitating the useo a ormula to later assess (or the purpose o a claim) what a air
and reasonable Head Office Overheads contribution should have
been, because the actual contribution made was disproportionate
(and thereore not air and reasonable). Moreover, a Contractor is
at liberty to collect rom any o his projects whatever level o con-
tribution that he preers, in order to und the Head Office Over-
heads (which is the contribution that would be recorded in the
project accounts), but an Employer is required to reimburse only
what the project should have contributed airly and reasonably,
and not what was actually contributed. Such air and reasonable
contribution could either be lower or higher than such actual (but
unair and unreasonable) contribution, and can only be assessedby using a ormula, which is the answer to the third and final ques-
tion, and thereore the use o an appropriate ormula in the as-
sessment o the Head Office Overheads element o a claim should
neither be questioned nor rejected.
Where a necessity arises or the use o a ormula, which is ree
o those shortcomings reerred to in the Schedule given at the end
o this article, the ollowing ormula developed by the author is
available, which is currently being used successully by Contrac-
tors and Consultants in the construction industry:-
where:
H = Actual total overhead costs (G&A
expenses) o the Contractor’s Head Office during the pe-
riod o EO o the delayed project (Rationalized).
CP = “Contract Price o the delayed pro-
ject divided by its original ime or Completion, and
multiplied by the period o EO”
SCP = Sum total o “Contract Price o each
concurrent project divided by its original ime or Com-
pletion, and multiplied by the whole or part period o
EO (o the delayed project) through which it was in pro-
gress”, taking into consideration all projects in progress at
the time, including the delayed project.
Te application o the ormula to a project and its claim, would
demonstrate that the Contractor is not attempting to recover
(rom the Employer o the delayed project), all or most o its Head
Office Overheads incurred during the relevant period, but only a
air and reasonable portion o it, which is the transparency that an
Employer would expect. (Such transparency does not exist when
using Hudson or Emden Formulae). It would also be transparent
to the Contractor that he is not under-recovering on the reim-
bursement o the contribution, airly due rom the delayed project.
Since the pace o the project (ast track, slow paced etc.) has been
actorized through the CP component, a ast-track project (whereit is very likely that the Contractor’s highest paid Project Director
and most o the brand new equipment are deployed) would need
to contribute proportionally higher than a slow-paced project,
which is a air distribution o Head Office Overheads that cannot
be criticized. Also a weighting has been introduced (to multiply by
the ull or part period o EO through which a concurrent pro-
ject was in progress) in order to avoid unair apportionment to a
project which was not concurrent through the ull period o EO.
(Such actorization and/or weighting to ensure a air apportion-
H X
CP
Additional Payment dueSCP
Book.indd 51 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
54/102
IIQS / 52
HUDSON FORMULA:-
where :
HO/P = the percentage o head office overhead cost
and profit allowed in the ender
Author’s Comments:-
(a) Tis ormula does not comply with the actual cost require-
ment o FIDIC Forms o contract (or o claims or damages
or breach o contract) due to the ollowing reasons:-
Te actual Head Office Overheads percentage could either
be more or less (at the time o delay/EO) than that included
in the ender.
Te average-per-week interim assessment is a departure
rom the actual.
(b) Tere is no transparency as to:-
whether the Contractor is attempting to recover all or most-
o the Head Office Overheads rom the Employer o the de-
layed project.
whether the other concurrent projects o the Contractor are also
sharing the Head Office Overheads in a air and reasonable man-
ner.
whether the Contractor is over-recovering/under-recovering
on the Head Office Overheads contribution o the delayed project.
EMDEN FORMULA:-
where :
h = head office percentage arrived at by dividing the total
overhead cost and profit o the Contractor’s organiza
tion as a whole, by the total turnover.
c = contract sum
cp = contract period in weeks
pd = period o delay in weeks
Author’s Comments:-
ment cannot be ound in Hudson, Emden, Eichleay or Hank Laan
Formulae). Since actual costs are taken into consideration, thisFormula can be used in claims under FIDIC Forms o contract
and since a transparent method o air apportionment is used, this
Formula would be acceptable to both Contractors and Employ-
ers. For the same reasons, this ormula should still be acceptable
as a means o assessment o Head Office Overheads element o a
prolongation cost claim at arbitrations and litigations even where
the Form o contract is not FIDIC, and also where a claim is or
damages or breach o contract.
One would wonder why the Author’s Formula takes into con-
sideration the period o Extension o ime (EO) rather than
the period through which the delaying event continued. (It is not
all the monetary aspects o the delay claim that should be calcu-
lated or the period o actual delay! Cost o prolongation o theSite Overheads or instance, should be calculated or the period
o actual delay whereas financing charges in respect o reduced
revenue should be or the period when the Contractor actually
suffers rom such reduction (i.e. probably afer 2 months o the
occurrence o the actual delay, given 28 days or certification and
28 days or payment. Likewise, financing charges or the late re-
lease o first moiety o Retention Money should be or the periodrom original date or completion to the end o the EO, whereas
in respect o the second moiety it should be a year later. Tus each
kind o prolongation cost is incurred during a different period o
the project time line). Head Office Overheads element should be
calculated or the period when the Contractor was unable to gen-
erate revenue rom other projects using his resources which were
unoreseeably retained in the delayed project, which is the same
period or which EO was determined.
A refined version o the ormula could be developed by using an
S-Curve distribution instead o the linear distribution adopted or
the CP actor but the necessity to use calculus and probable non-
availability and/or unacceptability o the inormation required by
such a version may pose administrative difficulties/impossibilitiesin its application or most projects. For this reason, parties to con-
tracts consider the linear distribution to be adequate in order to
arrive at a air assessment o the Contractor’s Head Office Over-
heads contribution that should be reimbursed as part o a prolon-
gation cost claim .
HO/P
X
ContractSum
XPeriod of Delay(weeks)
100Periodof Delay(weeks)
hX
cX pd
100 cp
Schedule.
Book.indd 52 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
55/102
8/17/2019 IIQS__MAGAZINES_1423123129
56/102
IIQS / 54
THE THEORY
A lot o standard “build only” construction contracts (e.g. FIDIC
Red Book) are significantly amended to transer an unreasonable
quantum o risk to the Contractor. During my proessional tenure
in Europe, Middle-East, Arica & ar-East I’ve had extensive de-
bates with several proessionals about this issue. Te general view
o the Employer’s representatives is that there is more financial
certainty in terms o the project budget. Te view o the Contrac-
tor’s is that they have to price more risk into the tender and, at the
end o the process.
Tere are logical arguments rom both sides; however, the real-
ity is that a balance should be struck between what risks should
be transerred to the Contractor and what should be retained by
the Employer. Te allocation o risk associated with unoreseeableground conditions is a case in point.
Example
Rock Excavation (Part o Unoreseeable Ground Conditions)
As a result o the various legal/contractual problems arising rom
“ground conditions” claims, the Employers have, around the
world, amended the standard orms o Contract to transer this
risk completely to the Contractor.
Tis is a sample clause rom a “build only” public sector con-
tract that I encountered which defines an unoreseeable event as
ollows:
“A condition, circumstance or occurrence is unoreseeable i an
experienced Contractor tendering or the Works could not have
reasonably oreseen it on the Designated Date, having inspected
the Site and its surroundings and having satisfied itsel, insoar
as practicable and taking into account any inormation in con-
nection with the Site provided by the Employer, as to all matters
concerning the Site, including its orm and nature and its geotech-
nical, hydrological and climatic conditions.”
In the D&B contract, the risk transer or unoreseeable events
appears to be ar more onerous or the Contractor. Having said
that, it remains to be seen how contractually effective the latterwill be taking into account the act that, generally, the Contractor
receives a geotechnical report rom the Employer or D&B pro-
jects as well. It is a generally accepted opinion that a similar clause
in the ICE 5th edition (FIDIC was originally based on the ICE
orm o Contract) is not very effective, contractually/legally, due
to the ollowing reasons:
Pre-ender investigations that the Contractor may want to car-
ry out are limited by the time available.
I the Employer has provided the Contractor with a reasonable
UNREASONABLERISK TRANSFERNOT ALWAYS BENEFICIALFOR THE EMPLOYER
BY N.M.Raj
Book.indd 54 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
57/102
/ IIQS55
geotechnical report, it will be impractical or the Contractor to
double check the inormation with his own site investigations.It would also be unreasonable to expect the potential Contrac-
tors to dig boreholes all over the site.
Case Study - Disadvantages o otal Risk transer to the Con-
tractor
Let us consider a practical example to illustrate the disadvan-
tages associated with total risk transer with respect to ground
conditions.
Example:
Te Employer has issued a tender or a D&B project which re-
quires the Contractor to price or the risk associated with unore-
seeable ground conditions. Let us assume that there are our Con-
tractors bidding or the project; three local Contractors that arehighly reputed/financially secure (Contractors 1, 2 and 3) and one
Contractor (Contractor 4) that is new to the market (with limited
financial resources), desperate to tender/win a project. Let us also
assume that the geotechnical report is not very comprehensive
and contains errors which may not be picked up by contractors
that do not have local experience.
Contractors 1, 2 and 3 will study the geotechnical report
supplied by the Employer, utilise their in-house expertise, lo-
cal knowledge o the ground conditions and make a considered
“guesstimate” o the risk associated with ground conditions such
as ingress o groundwater, excavation in rock etc. It is impossible
to make an accurate assessment, so, let us assume that the Con-
tractors have priced the risk as ollows (based on their interpreta-
tion o the geotechnical report and experience):
1) Contractor 1 - € 60 million.
2) Contractor 2 - € 55 million
3) Contractor 3 - € 63 million
Now, let us assume that Contractor 4 has only included an
amount o € 20m or the risk associated with ground conditions.
Now, it does not matter whether the said Contractor under-esti-
mated the risk due to 1) calculations based on errors contained
within the geotechnical report (which could be disputed by the
Client) 2) on purpose or 3) by way o an error. Situations like thisdo happen (quite ofen) in a competitive tendering environment,
especially during a recession.
Te above scenario could have the ollowing outcomes:
1) Scenario 1 - Contractor 1 or 2 or 3 wins the project (Assuming
that the overall price is still lower than Contractor 4’s tender
price) or
2) Scenario 2 - Contractor 4 wins the project as a result o his
lower estimate or the risk item and/or his overall price when
compared to the other Contractors.
LET US ANALYSE THE TWO SCENARIOS:
Scenario 1
Based on this scenario, i the Contractor had to spend say €
30m to overcome ground condition problems, the Employer has
lost circa € 25m - 33m. In the unlikely event that the cost associ-
ated with this risk amounts to more than the winning Contractor’s
tender estimate, the Employer would have benefited rom the risk
transer obligation. However, it is not prudent to assume, beore-
hand, that the commercial outcome would definitely be better or
the Employer i the Contractor carried the entire risk. Tis is due
to the act that the Employer could have, at pre-tendering stage,
hired additional experts to analyse/interpret the tender geotech-nical report and make a “guesstimate” which could, in most cases,
be superior to the Contractor’s tender estimate due to relatively
higher availability o time.
Scenario 2
As mentioned earlier, Contractor 4’s “eagerness” to win the project
and generate turnover may well be reason why he under priced the
risk item and/or the tender in general. Now, as soon as Contractor
4 realises that the cost associated with this particular risk item is
significantly exceeding or will significantly exceed his tender al-
lowance, he is very likely to adopt an adversarial “claims” oriented
stance and walk away rom the project when he realises that Em-
ployer will not “pay up” unless an award is given via arbitration/
litigation. Tis is because Contractor 4 simply does not have the
resources to finance the project by expending his own cash which,
in turn, would become the subject o a claim/dispute and remain
unresolved/unpaid or years.
Te Employer stands to lose a lot in this scenario as well due to
issues related to an incomplete project, legal dispute with Contrac-
tor 4 and the necessity to procure another Contractor to finish
the job.
It is clear rom the above that the Employer does not really ben-
efit rom the above scenarios.
So, what is the best way to manage this risk?
A suggested method to manage this risk whilst optimising theEmployer’s budget is as ollows:
1) Carry out a detailed ground investigation study along with a de-
tailed risk assessment review o the problems associated with
excavation in rock, ground water conditions et al.
2) Based on the same, establish a “Medium” and “worst” case sce-
nario in terms o monetary risk associated with ground con-
ditions. Tis ground investigation exercise should be more
Book.indd 55 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
58/102
IIQS / 56
detailed than the normal tender geotechnical reports in that a
detailed technical and commercial assessment should also beprocured by the Employer.
3) Based on the “Medium” case scenario, insert various types o
Ground condition risk as items in the tender bill o quanti-
ty e.g. rock as remeasurable items in the bill o quantity or
the Contractor to price, rates or resources associated with
ground water risk etc. Te Employer’s representative should
also be contractually obliged to provide adequate supervi-
sion/management o these items by using an independent
geotechnical expert (more inormation below).
4) Te aorementioned items in the bill o quantity should orm an
integral part o the overall tender sum; otherwise, the Contrac-tor may “load” the rates and recover, at the Employer’s expense,
disproportionate sums i the quantity increases significantly.
Te most important question the Employer should ask himsel
is this: “I the Contractor can price the unoreseeable risk, whycan’t I do it with the help proessional expertise? Why should I be
at the mercy o the Contractor’s guesstimate?”
Case Study - Conclusion
Te Employer could allow an internal budgetary contingency o
say € 65 million and ensure that the costs associated with the rock
excavation (i required) is managed and recorded properly. Te
additional costs associated with the same could be unded rom
the aorementioned contingency. In all likelihood, the additional
costs associated with this risk would be lower than the internal
contingency. Tereore, the Employer would have saved money
and as the old saying goes “a penny saved is a penny earned”.
N.M.Raj Is The Managing Partner Of Prime Consulting And An Internation-
ally Renowned Claims/Contracts Specialist (FIDIC & Other Contracts) With
More Than 20 Years Of Commercial/Claims Management Experience
Book.indd 56 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
59/102
/ IIQS57
RESPONDEN’S PROFILES
Survey respondents were invited rom various sectors o the con-
struction industry, including clients, consultants, contractors,
suppliers, subcontractors and legal firm. Majority o the respond-ents wererom contracting companies, they contributed to 38%
o the response. 29.0% o the respondents were rom client’s side
and another 29% wererom consultants. 2% o the response was
romeach legal and subcontractor firm.
In terms o total experience in UAE, majority o respondents
(40%) were well experienced and areworking in UAE or more
than 15 years. 24% o the respondents have experience o about
10 to 15 years. 26% o the respondents have experience o about
5 to 10 years.
KEY RISKS ASSOCIAED WIH HE APPLICAION OF HE
BESPOKE CONRAC
Nearly 50% o the respondents are using FIDIC based bespokecontracts showing the wide implementation o bespoke orm o
contracts by clients in the UAE. 29 % o the respondents are us-
ing FIDIC 1987 Redbook and 17 % o the respondents are using
FIDIC 1999 Red book.
Article 246 o the UAE ederal Law No. 5 o 1985 (the Civil
Code) states that the contract must be perormed in accordance
with its contents and in a manner consistent with the require-
ments o good aith. But most o the bespoke orms o contract
incorporatestrict application o time bar clauses and condition
HOW TO AVOID RISK
ASSOCIATED WITH USE OF
BESPOKE CONTRACTS IN UAE
BY Mathew Varughese
Book.indd 57 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
60/102
IIQS / 58
precedent clauses,which is identified as one o the main cause o
disputes in construction contracts.From the survey it wasound that there are majorrisks associated
with the application o the bespoke contracts, some o them are
as ollows.
75% o the respondents believed that client uses bespoke orms o
contract to transer unrealistic risk to the contractors
59% o the respondents agreed that strict application o time bar
clauses and condition-precedent clausesisone o the major causes
o dispute in bespoke contracts
From the above, this act is established that the substantial risks
are transerred to Contractors through bespoke orms in UAE and
thereore it is essential to assess such risks at the tender stage to
price /manage them efficiently by listing the risks and getting it
reviewed by qualified proessionals, so that these can be managedeffectively throughout the contract duration.
CONRACUAL AND LEGAL KNOWLEDGE
OF PROFESSIONALS
Te UAE legal system is based on the civil law system and as such
the primary source o law is a statutory code.
An attempt was made to know how much the respondents are
amiliar withthe civil code pertaining toconstruction matters.
About 75% o the respondents were amiliar with UAE civil code
It is reasonable to expect that industry practitioners have basic
legal knowledge. However,by increasing the use o bespoke orm
o contract, wherein the client is transerring additionalrisks to
the Contractor, the contractor’s staff should have adequate legal
knowledge to oresee such situations and manage the risk prop-
erly. 55% o the respondents believed that court system in UAE
doesn’t have sufficient capacity to manage major construction dis-
putes. Tis was in line with the finding o Stephen (2010) who
stated that, “the court system o Abu Dhabi has little real capacity
to manage major, complex, construction disputes. Presently the
only real alternative to litigation in the UAE is via commercial ar-
bitration whether pre agreed or via an ad - hoc reerence”.
Majority o the proessionals involved in projects in UAE are
mainly rom common law background and not rom civil law
background. ime is o the essence” and “ime at large” adopted
by FIDIC is not a civil law concept and also “Penalty clauses are valid and subject to judicial control o the court”. About 60% re-
sponse shows that they are amiliar with this concept.
A common law lawyer would first rely on the terms o the con-
tract and then on the implied terms and will ask question “to what
the parties did agree”, whereas a civil law lawyer would rely on the
terms o the contract itsel and then on the corresponding rules
provided by the civil code. About 84% response shows that they
are amiliar with this concept as well.
However, about 65% o the participants o the survey stated that
lack o legally qualified staff is one o the main causes o dispute in
UAE construction industry and the staff needs to have more legal
knowledge to administer the contract properly.
CREAE A BEER UNDERSANDING OF HE VARIOUS
BESPOKE FORMS OF CONRACS USED IN UAE.
A question was asked to the participant that why Contractors ac-
cept bespoke orms o contract instead o standard orms o con-
tract? Majority o the respondents believed that the ollowing are
the possible reason or the contractors to accept bespoke orms.
1. It is dictated by the Client, no choice but to accept
Book.indd 58 4/21/13 9:23 PM
8/17/2019 IIQS__MAGAZINES_1423123129
61/102
/ IIQS59
2. Imposed on them otherwise excluded rom the
tender process3. Nothing wrong with the bespoke Contract as the
Contractor can price or his risks in any orm o contract
4. Tere is also huge competition in the market or works
5. Most o the clients are either government
departments or organizations controlled
by government who have their own standard
bespoke contracts.
95% o the survey respondents were o the opinion that use o be-
spoke orms o contract is a common practice in UAE. About 65%
o the respondents o the survey believe that it is not air or clients
to change the standard orm o contracts to protect their own in-
terest. About 51% o the proessionals participated in the surveydo not believe that the clients legal team make sure that all o the
intended bespoke provisions are enorceable under UAE civil law.
About 67% o the proessionals participated in the survey con-
sider that the high competition in the market or works is the rea-
son why contractors accept bespoke contract instead o standard
orms o contract.
GENERAE DISCUSSION AMONG PROFESSIONAL FOR A
BEER LEGAL FRAMEWORK
Te disputes in construction sector o UAE are increasing in terms
o number and amount. Even though there are number o ways to
settle the disputes such as negotiation, mediation, arbitration, liti-
gation etc. most o the parties go or negotiation / amicable settle-
ment, ew o the companies only enter into arbitration or litigation
due to uncertainty o the outcome.
About 65% o the respondents believed that UAE civil code pro-
vision related to construction law is inadequate to settle all dis-
putes in UAE and thereore about 84% think that there is a urther
need to develop construction law in UAE to make clarity on vari-
ous issues such as delayed or non-payment, set-off, settlement o
disputes etc.
About 50% o the respondents believe that some action has to
be taken to prevent the disputes recurring time and again in UAE
construction Industry. Tese actions are,
1. A specific body o construction related law has to be
developed, similar to construction Act in UK, which
would bevery effective
2. More clarity is required or the law position on
Condition Precedent / Prevention issues.
3. Appointment o legally qualified persons to ensure
that any amendments to FIDIC contracts