I KOCC Construction Chemical Applications d...11 9 Kingdom Oasis Contracting Co. Job References
セ@
IKOCC Construction Chemical Applications
セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@
Kingdom Oasis Contracting Co. Job References
1
Location
Jubail
Jubail
Khobar
Dammam
Jubail
Dammam
Dammam
Khobar
Hasa
Jubail
Jubail
Jubail
Qatif
King F. Airport
Ras Tanoura
Ras Tanoura
Ras Tanoura
Khobar
Khobar
Khobar
Khobar
Jubail
Jubail
Jubail
Khobar
Jubail
Jubail
Khobar
Jubail
Dammam
Khobar
Khobar
Unit
M2
M2
M2
M2
M2
Packers
M2
M2
M2
Packers
Foundations
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Packers
LM
M2
Packers
M2
M2
Packers
M2
M2
M2
Job Type
Epoxy Floor Coating
Epoxy Floor Coating
Epoxy Floor Coating
Epoxy Floor Coating
Self-leveling
Crack Injection
Epoxy Floor Coating
Epoxy Floor Coating
Tanks lining
Crack Injection
Foundations Waterproofin
Epoxy Floor Coating
Epoxy Floor Coating
Epoxy Floor Coating
Walls Waterproofin
Epoxy Floor Coating
Self-leveling
Anti-Carbonation
Epoxy Floor Coating
Tanks lining
Self-leveling
Fiber Glass Lining
Crack Injection
Concrete Repair, Crack Inject
Heavy Duty Car Park System
Crack Injection
Walls Waterproofin
Epoxy Floor Coating
Crack Injection
Epoxy Floor Coating
Epoxy Floor Coating
Self-leveling
Self-leveling
Self-leveling
Qty.
1,5007,0001,0004,0002,0001,2001,0007008,0001,0003771,0004,5002,0001,5005,0005,50013,5008,0002502,0003005001,0007,0002,3201,0001,0001,5432,1007801,000
JOB REFERENCE
Contractor
M.M. Al-Harbi & Partners Contracting Co. Ltd.
Al Mulhim Steel Buildings
El-Tawil Contracting
Saudi Icon Constriction
Al Mulhim Steel Buildings
SYSTECH
Al Wefag
El-Tawil Contracting
ACWA L.L.C
Sadim United
Secutronic
Atlas Copco
Al Mutawa Contracting
Rimal for Treading & Contracting
Rezayat Co. Ltd
Rezayat Co. Ltd
Rezayat Co. Ltd
Asmael General Contracting
Al Rashid Treading & Contracting Co.
Ahmed Bin Aif
Ahmed Bin Aif
Saudi Kier Construction
Arabian Consolidated Construction
SHMOUKH AL-BARZ GEN. CONT. EST.
Asmael General Contracting
Khonini International
Saudi Services for Electro-Mechanic Works
Noor Advanced Contracting Company
TEKFEN
Al-Id Trading & Cont. Est
Lizwan Real State
Lizwan Real State
Al Arwanan Contracting company
Batook Chewing Gum Ind. Ltd.
Project
712-C05 (BECHTEL)
Al Fanar Factory
Workshop
Paxxal Factory
Al Fanar Factory
2nd Phase Sanitation
Al Wefag Warehouse
Salsabil Arabia Workshop
SANG Housing (Natl.Guard)
Commercial Building
SADARA
ATLAS Warehouse
Al Taraji Sports Club
UPS Warehouse
380/230 KV Substation
380/230 KV Substation
380/230 KV Substation
Centro Rotana Hotel
Al Rashid Towers
Tank
Warehouse
Mutraiah Housing (BECHTEL)
Commercial Building
Petrokemya ABS (SABIC)
Centro Rotana Hotel
Dev. of Down Stream Industrial
138/115 KV Substation
Retal Squre
Propylene Oxide (SADARA)
Al Reem Tower
Al-Kahmous Food Cort
Al-Kahmous Food Cort
Amiantit Factory
Batook Factory
Dammam
Dammam2,356750
M2
M2
2
Location
Jubail
Jubail
Dammam
Jubail
Khobar
Dhahran
Dammam
Dammam
Hasa
Yanbu
Yanbu
Yanbu
Jeddah
Jeddah
Khobar
Khobar
Khobar
Dammam
Jubail
Jubail
Jubail
Dammam
Dammam
Dammam
Dammam
Dammam
Dammam
Dammam
Unit
M2
Packers
M2
M2
M2
Packers
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
LM
M2
M2
M2
M2
M
M2
M2
M2
Job Type
Walls Waterproofing
Crack Injection
Self-leveling
Concrete Repair
Epoxy Floor Coating
Crack Injection
Epoxy Floor Coating
Self-leveling
Self-leveling
Concrete finishing
Steel fibers technique Epoxy
Floor Coating
Self-leveling
Concrete Repair
Self-leveling
Walls Waterproofing
Epoxy Floor Coating Concrete
Repair
Structural Screed
Polyurethane Flooring System
Self-leveling
Epoxy Floor Coating Concrete
Repair
Structural Screed
Epoxy Floor Coating
Self-leveling
Self-leveling
Epoxy Floor Coating
Joint Sealant
Epoxy Floor Coating
Concrete Repair
Epoxy Floor Coating
Epoxy Floor Coating
Epoxy Wall Coating
Qty.
8202701,120201,2003601,2001,3001,3002,0002,0002,00010,0002,2006,5003,0005,5003,50010,000
10,000
1,0001,76050
1,2001,2001,1004,00011,0003,5008,0002,7001300
JOB REFERENCE
Contractor
Spectrum Engineering Solutions, Inc
Rock drillers foundation
Al-Kawaser united Co
Saudi Binladen Group
BUILD ARABIA CONTRACTING EST.
Azmeel Cont. Company.
Aba Husain For Power & Energy .
Aba Husain For Power & Energy .
Aba Husain For Power & Energy .
Al-Direa Al-Arabie.
Al-Direa Al-Arabie.
Al-Direa Al-Arabie.
Tania Bottled Water Factory
Tania Bottled Water Factory
Saudi Services for Electro-Mechanic
Saudi Services for Electro-Mechanic
Saudi Services for Electro-Mechanic
Saudi Services for Electro-Mechanic
Project
115/13.8 KV Substation
Marriot Hotel
115/13.8 KV Al-Khodariah Substation
Saudi Railway (SAR)
Almajdouie Motors "Changan car"
1085-ARAMCO-SOUTHE DH-HOME
115/13.8 KV Faisaliah Substation
115/13.8 KV Faisaliah Substation
115/13.8 KV Ain Morjan Substation
Saudi Carbonate Factory
Saudi Carbonate Factory
Saudi Carbonate Factory
Turook Al-Hazm
Turook Al-Hazm
DM Housing 380/230 KV Substation
DM Housing 380/230 KV Substation
DM Housing 380/230 KV Substation
DM Housing 380/230 KV Substation
Autism Center
Autism Center
Aryaf Bakeries
Shahini Fridge
Villa
Fire station
Fire station
Sahara Commercial
Almajdouie Steel Industries Factory
Almajdouie Steel Industries Factory
Almajdouie Steel Industries Factory
Al-Ajlan Tower
Al-Ajlan Tower
Basamah Fridge
Jubail Existing 3s Center
Jubail Existing 3s Center
Gulf Icon Contracting
Gulf Icon Contracting
Majd Real Estate
Professional Application Gen. Cont
Asas Al Jubail Contracting Est.
China Railway 18th Bureau Group Co.
China Railway 18th Bureau Group Co.
Professional Application Gen. Cont.
Silicon Trading and Contractig
Silicon Trading and Contractig
Silicon Trading and Contractig
Nawafeth Consulting Group
Nawafeth Consulting Group
Professional Application Gen. Cont
Abdul Latif Jameel Lands Co. Ltd.
Abdul Latif Jameel Lands Co. Ltd.
Jubail 2,300 M2
700 MJubail
3
Project: 380/230 KV Substation
Client: SEC
Main Contractor: National Contracting Co.
Contractor: Rezayat Co. Ltd.
Location: Juaymah
Execution Date: May 2015
Material Used: Nitoflor EPU10Nitoflor SL300Nitocote CM210
Quantity: 13,000 M2
CASE STUDY
4
PROJECT BACKGROUND
The Saudi Electricity Company (SEC) plans to construct a bulk supply point in Juaymah, Ras Tanura, Eastern Province, Saudi Arabia.
The purpose of the project is to meet the rise in demand for electricity in the region.
OFFERED SERVICE
Kingdom Oasis Contracting has proposed to apply a complete package of industrial flooring and waterproofing system for the wall
Our scope of work included the preparation of the concrete substrate (walls and floors) to ensure perfect application of the flooring and waterproofing materials
A total of 3 coats have been applied for walls waterproofing, 2 coats of Polyurethane flooring system, and a 3 MM epoxy self-leveling
VALUE TO CLIENT
Our dedicated team of engineers and workers have accomplished all the requested work on time and with top quality to meet SEC expectations.Moreover, all requests from our client have been fulfilled immediately with-out any delay.
PROJECT DETAILS
5
PROJECT PHOTOS
Concrete substrate before surface preparation for Waterproofing
Surface preparation and concrete repair
6
Final coat of Nitocote CM210
PROJECT PHOTOS
Application of first coat
7
PROJECT PHOTOS
Surface preparation for Epoxy Polyurethane application
Application of first coat
8
Final Coat of Nitoflor EPU100
PROJECT PHOTOS
9
PROJECT PHOTOS
Surface preparation for Self-Leveling application
Application of primer
10
PROJECT PHOTOS
Application of Self-Leveling
11
BEFORE & AFTER
12
BEFORE & AFTER
13
Project: SANG Housing Project
Client: National Guard
Consultant: National Contracting Co.
Contractor: Bin Laden – Arabtec L.L.C
Sub-Contractor: ACWA L.L.C
Location: Al – Hasa
Execution Date: March 2014 Material Used: Nitocote EPU Nitomortar TC2000
Quantity: 8,000 M2
CASE STUDY
14
PROJECT BACKGROUND
The Villas Housing Project is a residential development consisting of 5,000 Villas of Type “A and B” (G + 2) including complete Infrastructure Works, located in the Eastern Province of the Kingdom of Saudi Arabia (KSA).
The Villas Housing Site is divided into five (5) developments with a total housing Built up Area of approximately 1.6 million m² and a total site area of around 6 million m².
OFFERED SERVICE
Kingdom Oasis Contracting has offered to apply a concrete protective coat-ing system for sewage water tank to protect the concrete substrate.
Our scope of work included the preparation of the concrete substrate and repairing all the cracks and honeycombs to ensure good quality of protec-tive coatings application.
VALUE TO CLIENT
Our professional engineers and workforce have shown a great deal of com-mitment to deadlines and quality, as the project was delivered to our client within 35 days.
PROJECT DETAILS
15
Concrete substrate before surface preparation
PROJECT PHOTOS
Concrete substrate after grinding & full lining of Epoxy putty
16
PROJECT PHOTOS
Touch up repair between the 1st and 2nd coat
Structure after the application of final coat
17
BEFORE & AFTER
18
Project: AL TARAJY SPORTS CLUB
Client: General Presidency of Youth Welfare
Contractor: : Al Mutawa Treading & General Contracting Co.
Location: Qatif
Execution Date: March 2015 Material Used: Nitoflor EPU10
Quantity: 4,500 M2
CASE STUDY
19
PROJECT BACKGROUND
The project is comprised of unique sport facilities that will raise sporting ability in Saudi Arabia.
With several halls and training grounds that feature modern technologies, the facilities entail a qualitative shift in the Saudi sport landscape.
OFFERED SERVICE
Kingdom Oasis Contracting has proposed a system that includes ce-ment-based repair mortars for honeycombs and a 500 Microns protective coating material suitable for UV conditions.
Our scope of work includes: concrete repair, primer application, and 2 coats of Epoxy Polyurethane.
VALUE TO CLIENT
Client’s main concern was time, hence, we have committed to complete the project within 30 days, and we managed to fulfill this requirement with a high level of quality, which has shown the professionalism and dedication of our highly skilled workers and engineers.
PROJECT DETAILS
20
PROJECT PHOTOS
Surface preparation & concrete repair
21
PROJECT PHOTOS
Application for Primer
22
PROJECT PHOTOS
Application for first coat
23
PROJECT PHOTOS
Final coat of Nitoflor EPU10
24
BEFORE & AFTER
25
Project: 712-C05
Client: Royal Commission
Consultant: Bechtel
Contractor: M.M. Al-Harbi & Partners Contracting Co. Ltd.
Location: Jubail
Execution Date: November 2014
Material Used: Sikafloor 264, Sikadur P
Quantity: 1,500 M2
CASE STUDY
26
PROJECT BACKGROUND
The scope of work of this project consists of the construction of a new irrigation pumping station, storage tanks and a new telecom exchange building with video head end facility in the north-west corner of sector F2.
The primary infrastructure in sector F3 will also be developed. Works include access roads, drainage, electrical power supply, potable water, sanitary wastewater, irrigation water, telecoms, street lighting, footpaths and landscaping.
OFFERED SERVICE
Kingdom Oasis Contracting has proposed to apply a durable industrial flooringsystem to repair the damaged concrete and enhance its appearance.
Our scope of work included the preparation of the concrete substrate and repairing all the cracks and pinholes to ensure good quality of industrial flooring system application
VALUE TO CLIENT
the client was satisfied from the quality of work we have offered, especially that several contractors were doing mechanical work parallel with the application of the epoxy flooring system and taking into consideration the tight deadline.
PROJECT DETAILS
27
Concrete substrate after grinding & touch-up repair of Epoxy putty
PROJECT PHOTOS
Concrete substrate before surface preparation
28
PROJECT PHOTOS
Touch-up repair on the 1st coat
Final coat
29
BEFORE & AFTER
30
Project: 2nd phase sanitation project
Client: Water Directorate of EP
Consultant: Diwaneyah consulting services
Contractor: SYSTECH
Location: Dammam
Execution Date: January 2015 Material Used: Nitofill WS60, Nitofill UR63 and Nitomortar TC2000 Quantity: 1,200 packers
CASE STUDY
31
PROJECT BACKGROUND
The projects involve the construction of water reservoirs, pipelines, water and sanitation networks and stations.
The first contract entails the operation and maintenance of a water and sanitation project in Dammam at the cost of SR 75.7 million for three years
OFFERED SERVICE
The client was suffering form water leakage in 4 major tanks; however, Kingdom Oasis Contracting offered a permanent solution for the problem.
Our scope of work includes exposing the cracks from where the water is coming and applying a suitable injection system into the concrete to seal all the gaps inside it.
VALUE TO CLIENT
The client was in a process to handover the project; therefore we have assigned our dedicated team of highly skilled manpower to do the job in perfect way and handover the project in time with zero leakage.
PROJECT DETAILS
32
PROJECT PHOTO
Water leakage in floors and walls
Exposing the cracks and inserting the injection packers
33
PROJECT PHOTO
Injecting the water stop resin to stop the water inside the concrete
Injecting the flexible Polyurethane resin to permanently stop the water
34
Project: Al-Rashid Towers
Contractor: Al Rashid Trading & Contracting Company (RTCC)
Location: Khobar
Execution Date: February 2016
Material Used: MasterTop 1205 MasterTop 1200MasterBrace ADH 2200
Quantity: 8,000 M2
CASE STUDY
35
PROJECT BACKGROUND
Convenient and plentiful car parking spaces, the best shopping mall and entertainment facilities in the Eastern Province and a wide range of Restau-rants are all close at hand Driver’s rooms and maid rooms are available.
Al-Rashid Residence, an incomparable retreat is continuing to set unprec-edented standards in luxury and service from the striking beauty and com-fort of its designer, interiors and world-class cuisine.
OFFERED SERVICE
Kingdom Oasis Contracting has offered to apply a durable industrial floorsystem for the parking area, including all road markings and curbstone painting.Moreover, we offered to repair the damaged concrete areas to ensure good finishing of the final coat of epoxy syste
VALUE TO CLIENT
Our professional team of engineers and painters were committed to com-plete the project with the minimum time required and with maximum pos-sible quality.
PROJECT DETAILS
36
PROJECT PHOTO
Surface preparation
Primer application
37
PROJECT PHOTO
Application of first coat
Touch-up repair & sanding
38
PROJECT PHOTO
Application of final coat
Preparation for arrows and curbstone painting
39
PROJECT PHOTO
Project: Batook Factory
Contractor: Batook Chewing Gum Ind. Ltd.
Location: Dammam
Execution Date: September 2016
Material Used: MasterTop 1230 MasterTop 1200 MasterBrace ADH 2200
Quantity: 750 M2
CASE STUDY
40
PROJECT BACKGROUND
Batook Chewing Gum Industries Limited is a Saudi family owned company committed to providing world class quality chewing gum products and service , Batook's Management System has been registerd to ISO and its Food Safety Management System fulfills the requirements of HACCP & GMP - Hazard Analysis and Critical Control Point & Good Manufacturing Practices .
OFFERED SERVICE
Kingdom Oasis Contracting has offered to apply a durable industrial floor system for the factory .
Our scope of work includes: Concrete repair, Primer application and application of self-leveling
VALUE TO CLIENT
Our professional team of engineers and painters, they did maintenance and repairing flooring, which led to add beauty to the appearance of the plant with high quality
PROJECT DETAILS
41
PROJECT PHOTO
Surface preparation
Concrete repair
42
PROJECT PHOTO
Primer application
Application of Self-leveling
43
PROJECT PHOTO
Application of Self-leveling
44
Project: Almajdouie Motors "Changan car"
Contractor: Build Arabia Contracting Est.
Location: Khobar
Execution Date: November 2016
Material Used: MasterTop 1205 MasterTop 2200 Masterseal GG 470
Quantity: 1,200 M2
CASE STUDY
45
PROJECT BACKGROUND
Opened «ALMAJDOUIE Motor Company», authorized dealer for Changan cars in the Kingdom, its integrated president in the Eastern Province, and her second in the Kingdom after the Riyadh Center, which opened this year. The center is located on the old airport road in Al-Khobar, one of the most main roads in the Eastern Province, a leading standard of modern equipment. It provides all services to customers under one roof, ranging from sales through to after-sales services. It also includes a large storage warehouse to provide spare parts without delay.
And began construction of the «Integrated Changan Center», which covers an area of 3,000 square meters, nearly a year ago, and now the facility overlooking the final-look that will make President lounge, and maintenance department fashionably, and a warehouse for spare parts to provide the necessary reform of the pieces
OFFERED SERVICE
Kingdom Oasis Contracting has offered to apply a durable industrial floor system for maintenance department and a warehouse for spare parts .
Our scope of work includes: Concrete repair, 2 coats of Epoxy system,expansion joint treatment and Road marking
VALUE TO CLIENT
Our professional team of engineers and painters were committed to com-plete the project with the minimum time required and with maximum pos-sible quality, To make the repair shop and a warehouse of spare parts more modern
PROJECT DETAILS
46
PROJECT PHOTO
Surface preparation
Epoxy Coating and Road Marking
47
PROJECT PHOTO
48
Project:Mutrafiah Housing Project, Jubail
Client: SABIC
Contractor: Saudi Kier Construction Limited
Location: Jubail
Execution Date: January 2016
Material Used: Nitocote EP405, Nitoprime 31, and Nitomortar TC2000
Quantity: 300 M2
CASE STUDY
49
PROJECT BACKGROUND
The project is part of a series of ongoing and planned housing projects aimed at achieving SABIC’s strategic of providing Housing Project (HOP) residential units to its Saudi employees.
OFFERED SERVICE
Kingdom Oasis Contracting has offered to apply a concrete protective coat-ing system for water lift station tank to protect the concrete substrate.
Our scope of work included the preparation of the concrete substrate and repairing all the cracks and honeycombs, primer coat and 3 layer of nontoxid epoxy coating with 2 layer of fiber glass to ensure good quality of protective coatings application.
VALUE TO CLIENT
The client needs a high quality protection system for a lift station, therefore we have assigned our dedicated team of highly skilled manpower to do the job in perfect way and handover the project in time.
PROJECT DETAILS
50
PROJECT PHOTO
Surface preparation
Primer application
51
PROJECT PHOTO
Installing the Fiberglass
Applying the 1st coat
52
PROJECT PHOTO
Applying the 2nd coat
53
Project: Site Development of
Downstream Industrial
Client: Royal Commission
Contractor: Khonaini International Co.LTD
Location: Jubail
Execution Date: February 2016
Material Used: MasterInject 1335,
MasterInject 1320, MasterBrace ADH 2200
Quantity: 2,320 packers
CASE STUDY
54
PROJECT BACKGROUND
There is no doubt that the advanced infrastructure of Jubail is the corner-
stone which has allowed the various industrial, commercial and social sec-
tors to establish themselves through integrated action. Jubail infrastructure
has the capability to operate continuously without failure of power or sup-
plies in any of its existing facilities while meeting community requirements
at modern and high living standards where all the necessities of life and
tourist and recreational facilities are available, which are the most import-
ant characteristics of any city looking to enter the bright future
The Royal Commission is working to upgrade and increase the capacity of
such infrastructure while paving the way for the private sector to participate
in the development and growth into the horizons of the 21 st century.
OFFERED SERVICE
The client was suffering from water leakage in 9 major Valve chamber and 6 lift station, however, Kingdom Oasis Contracting offered a permanent solution for the problem.
Our scope of work includes exposing the cracks from where the water is
coming and applying a suitable injection system into the concrete to seal
all the gaps inside it.
VALUE TO CLIENT
The customer needs a high quality protection system for the lift station and valve chambers from the leakage, so we have appointed a specialized team of highly skilled manpower to do the job in an ideal way with the minimum time required and with zero leakage.
PROJECT DETAILS
55
PROJECT PHOTO
Water leakage in floors and walls
Exposing the cracks and inserting the injection packers
56
PROJECT PHOTO
Injecting the water stop resin to stop the water inside the concrete
Injecting the flexible Polyurethane resin to permanently stop the water
57
Project: Amiantit Factory
Contractor: Al Arwanan Contracting company
Location: Dammam
Execution Date: September 2016
Material Used: Nitoflor SL1000
Nitoprime 31 Nitomortar TC2000Nitoflor TF1000Thioflex 600
Quantity: 2,356 M2
CASE STUDY
58
PROJECT BACKGROUND
The Saudi Arabian Amiantit Company (Amiantit) was established in1968 in Dammam in the Kingdom of Saudi Arabia to manufacture pipes for the local market. Since then, Amiantit has grown and developed into a major diversified industrial group with operations spanning the globe.
Today, Amiantit markets a wider range of pipe products than any other pipe manufacturer, and provides a total solution to customers fluid transfer needs, designed to optimise the applied technology and costs.
OFFERED SERVICE
Kingdom Oasis Contracting has offered to apply a 1 MM epoxy self-leveling, a durable industrial floor system for the factory .Moreover, we offered to repair the damaged concrete areas
using epoxy screed to ensure good finishing of the final coat of epoxy system.
VALUE TO CLIENT
Our technical team has made a great effort to repair the floors and settle them in an excellent way to ensure a good quality of the application of industrial flooring system
PROJECT DETAILS
59
PROJECT PHOTO
Surface preparation
Concrete repair
60
PROJECT PHOTO
Primer application
Application of Self-leveling
61
PROJECT PHOTO
Application of Self-leveling
Joint treatment
62
BEFORE & AFTER
63
64
Project:Tania Bottled Water Factory
Client: Tania Bottled Water
Contractor: Turook Al-Hazm
Location: Jeddah
Execution Date: November 2016
Material Used: Nitoflor SL3000, Nitoprime 31
Renderoc HS XTRA , Nitoprime Zincrich and
Nitomortar TC2000
Quantity: 10,000 M2 floor & 2200 M2 tank
CASE STUDY
65
PROJECT BACKGROUND
Tania is a fully Saudi company; origin, formation & management constructed in Jeddah Industrial City 2 in Saudi Arabia.
They have many offices and branches and they liaise with many partners and clients around the Kingdom to guarantee delivering Tania water to their customers around KSA.
The Project aims to cover water supply in Western Region of Saudi Arabia
OFFERED SERVICE
Kingdom Oasis Contracting has proposed to apply Self Leveling industrial flooring System and Concrete Repair for 6 underground Water Tanks wallsOur scope of work included the preparation of the concrete subs trate to ensure perfect application of the flooring materials and application of honeycombs concrete repair
VALUE TO CLIENT
our Client was looking for a Durable solution for the concrete floors and damaged water tanks . Kingdom Oasis Contracting provided These solutions and implemented them with their highly proffesional team on the fastest time possible.
PROJECT DETAILS
66
PROJECT PHOTO
Concrete substrate before surface preparation
Concrete substrate after grinding & touch-up repair of Epoxy putty
67
PROJECT PHOTO
Application Of Primer
Application of Self-Leveling
68
PROJECT PHOTO
Tank Walls before Conctrete Repair
Saw Cut and Extent of Concrete Removal
69
PROJECT PHOTO
Priming , Cleaning Reinforcement & Concrete and Repair Application by hand
70
PROJECT PHOTO
71
PROJECT PHOTO
72
PROJECT PHOTO
73
Project: Saudi Carbonate Factory
Client: Saudi Carbonate Co.LTD
Contractor: Al-direa Al-Arabie
Location: Yanbu
Execution Date: January 2017
Material Used: Dramix 3D (80/60BG),
Nitoflor FC150, Nitomortar TC2000
Quantity: 2000 M2
CASE STUDY
74
PROJECT BACKGROUND
Saudi Carbonate Company Limited being the major calcium carbonate supplier in KSA that was licensed to produce Calcium Carbonate (CaCO3) .
OFFERED SERVICE
Our scope of work includes Concrete finishing using Steel fibers technique & application of Two Coats of high build Epoxy Flooring system .
VALUE TO CLIENT
The Client was expected the Concrete floor to have a minimum Possible tolerance and smoothness , whcih was completely delivered by our Professional team of engineers and technician while meeting the required time frame .
PROJECT DETAILS
The Project is an extension to the current Factory , as it was required to meet the increase in demand in Saudi market .
75
PROJECT PHOTO
Fixing Formwork , all auxiliary reinforcement , and Polyethylene Sheets
Casting and finishing Concrete mixed with steel fibers
76
PROJECT PHOTO
Casting and finishing Concrete mixed with steel fibers
Applying Curing Compund and Saw-Cutting the Joints
77
PROJECT PHOTO
Surface preparations by grinding & touch up repair
Applying the first Coat of Epoxy
78
PROJECT PHOTO
touch up repair and sanding
Application of final coat of Epoxy
79
PROJECT PHOTO
Project:Propylene Oxide Plant - SADARA Project
Client: SADARA
Contractor: TEKFEN
Location: Jubail
Execution Date: January 2015
Material Used: Nitoill WS60, Nitoill UR63, and Nitomortar TC2000
Quantity: 1,543 packers
CASE STUDY
80
PROJECT BACKGROUND
The Sadara project is world scale chemical project being constructed in
Jubail Industrial City in Saudi Arabia.
Foster Wheeler will accompany the Dow and Saudi Aramco mega
jointventure Sadara Chemical Company with engineering, procurement
and construction management works for a propylene oxide (PO) unit at
Jubail Industrial City/Saudi Arabia. The unit will be part of a world-scale,
fully in-tegrated chemicals complex, one of the largest of its kind in the
world.
OFFERED SERVICE
The client was suffering form water leakage in Sump tanks; however,
Kingdom Oasis Contracting offered a permanent solution for the problem.
Our scope of work includes exposing the cracks from where the water is
coming and applying a suitable injection system into the concrete to seal
all the gaps inside it.
VALUE TO CLIENT
The customer has been experiencing water leakage problems in expansion joints and walls, so we have appointed a dedicated team of highly skilled manpower to do the job in an ideal manner with minimum time required and zero leakage.
PROJECT DETAILS
81
PROJECT PHOTO
Water leakage in floors and walls
Exposing the cracks and inserting the injection packers
82
PROJECT PHOTO
Injecting the water stop resin to stop the water inside the concrete
Injecting the flexible Polyurethane resin to permanently stop the water
83
PROJECT PHOTO
84
Project: Almajdouie Steel Industries
Contractor: Silicon Trading and Contracting
Location: Dammam
Execution Date: April 2017
Material Used: MasterBrace ADH 2200
Mastertop 1200Mastertop 1210Mastertop 1205Mastertop 1241MasterSeal GG 470
Quantity: - Epoxy Floor Coating 11,000 M2
- Self-leveling 4,000 M2 - Joint Sealant 3,500 M
CASE STUDY
85
PROJECT BACKGROUND
Al Majdouei Steel Industries is a leader in the trailers industry.It has been a leader in the field of production with about 200 trailers a month. The engineering sector, supported by state-of-the-art technology, conducts testing, product performance tests and quality, and implements R & D strategy.The company has grown to meet the growing demand in the Middle East and Africa, offering diverse products such as trailers, pipe conveyors, cement containers, fuel tanks, low trailers and refrigerators.The plant was the first to introduce the third axis on trailers in the Gulf region to enhance its specifications and efficiency.
OFFERED SERVICE
Kingdom Oasis Contracting has offered to apply a 1 MM epoxy self-leveling, a durable industrial floor system for the factory, and a 600 Microns epoxy floor coating.Moreover, we offered to repair the damaged concrete areas and expansion joint using epoxy screed to ensure good finishing of the final coat of epoxy system.
VALUE TO CLIENT
The concrete surface was highly permeable and our technical team has made a great effort and used an innovative techniques to overcome this permeability issue to complete the project within 45 days in order to meet the client expectation
PROJECT DETAILS
86
PROJECT PHOTO
Surface preparation
87
88
PROJECT PHOTO
Concrete repair
PROJECT PHOTO
Primer application
89
90
PROJECT PHOTO
Application of Self-leveling
91
PROJECT PHOTO
Application of Self-leveling
PROJECT PHOTO
Application of Scratch Coat
Application of Epoxy Coat
92
PROJECT PHOTO
Epoxy Floor Coating
93
94
BEFORE & AFTER
Project: Jubail 1 3s Center - Workshop
Contractor:ALJ Lands -Tatweer Jameel
Location: Jubail
Execution Date: November 2017
Material Used: Nitomortar TC2000
Nitoprime 31 Nitoflor SL2000 Nitoflor FC140 Thioflex 600 GG
Quantity: Epoxy Wall Coating 700 M2
Self-leveling 2,300 M2Joint Sealant 500 M
CASE STUDY
95
PROJECT BACKGROUND
Abdullatif Jameel is supported in the Saudi market through a wide network of strategically distributed sales and maintenance centers throughout the Kingdom to provide peace of mind to its customers wherever you are.
Abdul Latif Jameel Land Is the real estate development department in Saudi Arabia, that department is a multi-faceted business type that includes activities starting from the repair and renovation of existing buildings, and one of them is the repair and renovation of Jubail 1 3s Center - Workshop
OFFERED SERVICE
Kingdom Oasis Contracting has offered to apply a 2 MM epoxy self-leveling, and a 400 Microns epoxy Wall coating.Moreover, we offered to close the edges of the tiles by full lining repair to ensure good finishing of the final coat of epoxy system.
VALUE TO CLIENT
As KOCC alywas aims to add value to their client and meet their requirment, we have shown our flexibilty by dedicationg two technical teams to work in two diffrent shifts to accelerate the operations, devided the workshop area to three zones not to interrupt the client maintenance activities.
PROJECT DETAILS
96
PROJECT PHOTO
Surface preparation
97
PROJECT PHOTO
Floor repairing
98
PROJECT PHOTO
Primer application
99
PROJECT PHOTO
Application of Self-leveling
100
PROJECT PHOTO
Application of Self-leveling
101
PROJECT PHOTO
Application of Road Marking
102
PROJECT PHOTO
Application of Road Marking
103
BEFORE & AFTER
104
BEFORE & AFTER
105