27 August 2015
Highways Department 6/F, Homantin Government Offices,
Environmental Impact Assessment (EIA) Ordinance, Cap.499
Application for Variation of an Environmental Permit
Project Title: Widening of Tolo Highway/ Fanling Highway
between
Island House Interchange and Fanling
(Application No. VEP-480/2015)
I refer to your above application received on 19 August 2015 for
variation of an environmental permit under Section 13(1) ofthe EIA
Ordinance.
Pursuant to Section 13(5) of the EIA Ordinance, we have amended
the Environmental Permit (EP-324/2008/C). I attach the
Environmental Permit as amended (No. EP-324/2008/D) for your
use.
Under Section 15 of the EIA Ordinance, the amended Environmental
Permit will be placed on the EIA Ordinance Register. It will also
be placed on the EIA Ordinance website
(http://www.epd.gov.hk/eial).
Please note that if you are aggrieved by any of the conditions
imposed in this Permit, you may appeal under Section 17 ofthe EIA
Ordinance within 30 days of receipt of this Permit.
Should you have any queries on the above application, please
contact my colleague Mr. Terence TSANG at 2835 1868.
Yours sincerely,
(Maurice Ye ng)
Princ1 Environmental Protection Officer
for Director ofEnvironmental Protection
Encl. b.c.c. S(RN)3
http://www.epd.gov.hk/eial
-
Environmental Permit No. EP-324/2008/D f.!l!:!l'iii'fiiJ/m$.1j~
EP-324/2008/D
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
Section 10
:El!!V.Afim~f~11!J
cm499~)
m101~
ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE A DESIGNATED
PROJECT
PART A (MAIN PERMIT)
A {l!l (ii'fSJilli.:t~{l!l5t)
Pursuant to Section 10 of the Environmental Impact Assessment
Ordinance (the EIAO), the Director of
Environmental Protection (the Director) grants the Environmental
Permit (No. EP-324/2008) to the Highways
Department (hereinafter referred to as the "Permit Holder" ) on
23 December 2008. Pursuant to Section 13
of the Ordinance, the Director amends the Environmental Permit
based on the Application No. VEP-480/2015.
The amendments, described below, are incorporated into the
Environmental Permit (No.
EP-324/2008/D). This Environmental Permit as amended is for the
construction and operation of the
designated project described in Part B subject to the conditions
specified in Part C.
t~ ~:El!! m~~'!' 1~ 1~ JJu
-
Environmental Permit No. EP-324/2008/D J:ii!:!lffl'iJitt~!M
EP-324/2008/D
- Environmental Monitoring and Audit Manual (March 2000)
[Hereinafter referred to as the "EM&A Manual"]
- Environmental Impact Assessment Executive Summary (March
2000) [Hereinafter referred to as the "EIA Executive
Summary"]
(Register No. AEIAR-037/2000)
(1) liffi~if~i~ cE 73/98 I'IJ&f
-
Environmental Permit No. EP-324/2008ffi f:li!JlWPJiilt~ll!J1
EP-324/2008/D
EP-324/2008/ A)
(6) ~ 20121f.l Fl 31 B~t18"ll1i!J:l'l:~OJ~ (~OJ~~~~:
EP-324/2008/A)
(7) Application for Variation of an Environmental Permit
submitted
on 24 February 2014 (Application No. VEP-429/2014)
(7) ~ 20141f. 2 FJ 24 am:x:B"l~&l1ilm~o:r~'f!ID!i
-
Environmental Permit No. EP-324/2008ill llll:!l'WfiiJlil!$!\i~
EP-324/2008ill
Application Date of List of Amendments Incorporated into Date of
Amendments
No. Application Environmental Permit {~fiT
$~ $~ B-El.~:ttfi~lf1lJmi*JB'9~frr:JJ:lEI BM tfmljj}E BM
VEP-351/2012 4 January 2012 (1) Add item (v) to "Scale and Scope
of 31 January 2012
2012lf. I J=j 4 B Designated Project" in Part B of 20124-1 J=j31
B Environmental Permit No. EP-324/2008
(I) ~~~~fOJm~Jliljj}E EP-324/2008 ~
fill_i'!'g"fiJJEI1'1i't:JJ:l El i'l");l;ll,t~;fil]iB~" tJD AJJ'i
El (v)
(2) Vary Condition 1.7, 2.4, 2.6, 2.9
in Part C of Environmental Permit No.
EP-324/2008
(2) ~&fi~lfllJmJilJIJE EP-324/2008 ~
fill_f~fif:~ 1.7, 2.4, 2.6, 2.9
(3) Vary Figure 4d in Part C of
Environmental Permit No. EP-324/2008
(3) ~&:Ei~~lfllJm~~ljj}E EP-324/2008 ~
fill_B'gl!f:ffil 4d
VEP-429/2014 24 February 2014 (1) Vary Condition 2.8 in Part C
of 17 March 2014
20144-2 J=l 24 B Environmental Permit No. EP-324/2008/A 20144- 3
J=l 17 El
(1) ~&:Ei~~lfllJm~~ljj}EEP-324/2008/ A
C l5B{I#i{if:~ 2.8
(2) Vary Figure 4d in Part C of
Environmental Permit No. EP-324/2008/A
(2) ~&:Ei~lfllJm~~ EP-324/2008/A "ji /.o~ 0c l5BB'91!f:!liil
4d "'~.-~
(;fJ ~~~))!:. -=~d)~
-
Environmental Permit No. EP-324/2008ffi
>!i!:ll'tii'fiiJii!Uillli!1 EP-324/2008ffi
(3) Add Figure 4d(i) in Part C of
Environmental Permit No. EP-324/2008/A
VEP-470/2015 3 March 2015
20151f. 3 Fl 9 B
(3) ~J1i!~iifOTm*i~ EP-324/2008/A
~OA!i(11il4d(i)
(1) Vary Condition 2.5(iv) in Part C of
Environmental Permit No. EP-324/2008/B
27 March 2015
20151f. 3 Fl 27 B
(I) ~&J1i!~iifPTm*i EP-324/2008/B
C i!Bfrfliftj:~ 2.5(iv)
(2) Vary Figure 2d in Part C of
Environmental Permit No. EP-324/2008/B
VEP-480/20 15 19 August 2015
20151f. 8 Fl 19 B
(2) ~&J1i!~iifPTm*i EP-324/2008/B
c i!Bil"lii(11il 2d (I) Vary Figure 4e in Part C of
Environmental Permit No. EP-324/2008/C.
27 August 2015
20151f. 8 Fl 27 B
(I) ~&J1i!~iifOTm*i EP-324/2008/C
C liB il"l ~11 Ill 4e
(2) Add Figure 4e(i) in Part C of
Environmental Permit No. EP-324/2008/C
(2) ~J1i!~iifPTm~i~ EP-324/2008/C
~OA!i(11i14e(i)
27 August 2015
20151f.8 Fl27 B
Date
BM Principal Environmental Protection Officer for Director of
Environmental Protection
$~-f*~~~-&
(fl\!il1i!~f:lf.~..f:E~~ hf~:f"f)
-
Environmental Permit No. EP-324/2008/D
f.il!:!!l;if'fiJ]li.J!~lJ/Jt EP-324/2008/D
PART B (DESCRIPTION OF DESIGNATED PROJECT)
B llll~I;f!J!.
[;$:j')EI;f!J!.J1i ~fJ!i"If!J!.lJ'i "]
A major improvement to existing expressways Nature of
Designated
Project
mJEif!Jl.lJ.! El rnl1:1f
Location of Designated n .. :. . 'UJH'
f,;j 'ii= IJtl!;lli
Tolo Highway I Fanling Highway between Island House
Interchange
and Fanling
~i&REJ'M~31Im!*xlli~Wlhll:L~fn~E5tll0!*1lhll
01*
The location ofthe Project is shown in Figure I of this
Permit.
fi!JEif!il.lJ'i El rnfrr:'l1Ui~~*iit-armJJID 0
Scale and Scope of
Designated Project
m~Eif!Jl.lJ.!Eirnmm;fU!ilB
~
The Project mainly consists of the followings:
If!Jl.~~!ilB~~ffl~~%JJi:-
(i) Widening of a 5.7km section ofTolo Highway
and 3.0km section ofFanling Highway between Island House
Interchange and Wo Hop Shek Interchange from the existing
dual3-lane to dual4-lane, including construction of new
vehicular bridges; ~ '"======'====~=====IIA~L~~~
http:JEif!Jl.lJhttp:m~Eif!Jl.lJ
-
Environmental Permit No. EP-324/2008/D
!.li!J.liiffi'i]"jj'fi$jl)d! EP-324/2008/D
(ii) Widening of interchange sections at Island House
Interchange,
Tai Po North Interchange, and Lam Kam Road Interchange
from dual 2-lane to dual 3-lane, including realignment of
various slip roads;
(iii) Improvement to the existing substandard merging
arrangement at the southbound carriageway ofWo Hop Shek
Interchange;
(iv) Modification and reconstruction of highways, vehicular
bridges, underpasses and footbridges; and
(v) Construction ofKau Lung Hang Vehicular Bridge.
(i) ~w.ml1U'il:f%EJ'~~i>f1ili:mnxl1ll!m~~:fixi1ll!m:LFs,
-MH'ii: 5.7 0-JI!.iJoHMR0-n&-.lH~: 3 0-JI!.i'l"l>I)HJ!0n,
El:r~~E=~:fr~llif'Jll!mB.lC%!nli~IZY~7HIIif'Jll!m;
(ii) ~r,m~mcf%EJ'~~~~1ili:mnxl1lem - ::kJ!ljtxl1ll!m** ~0-nX:
l1l J!ml.1 n H!: , El3 ~f:li1~~ :fr~llif'J11!m&.f.&~~E
:=.Jl!:fr~f'Ill!m : ::kJ!ljtxl1li!J&rHT11!mllUEI3~~rr11!
&.f.&IZY~ffli!'L~I~~.f.&%~*nm~~~;
(iii) &~~J1.1tR-~:uxl1li!J&s"lrHTrrll!ml'"~m1M'li1l~
~~F;
http:0-JI!.iJoHMR0-n&-.lH
-
Environmental Permit No. EP-324/2008ffi !.ii!!llW1lJiil!~IJIJ1
EP-324/2008ffi
PART C (PERMIT CONDITIONS)
1 General Conditions
1.1 The permit holder and any person working on the Project
shall comply with all conditions of this
Permit. Any non-compliance by any person may constitute a
contravention of the Environmental
Impact Assessment Ordinance (Cap. 499) and may become the
subject of appropriate action being
taken under the Ordinance.
1.2 The Permit Holder shall ensure full compliance with all
legislation from time to time in force
including without limitation to the Noise Control Ordinance
(Cap. 400), Air Pollution Control
Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap.
358) and Waste Disposal
Ordinance (Cap.354). This Permit does not of itself constitute
~y ground of defense against any
proceedings instituted under any legislation or imply any
approval under any legislation.
1.3 The Permit Holder shall make copies of this Permit together
with all documents referred to in this
Permit or the documents referred to in Part A of the Permit
readily available at all times for
inspection by the Director or his authorized officers at all
sites/offices covered by this
Permit. Any reference to the Permit shall include all documents
referred to in the Permit and also
the relevant documents in the Register.
1.4 The Permit Holder shall give a copy of this Permit to the
person(s) in charge of the site(s) and
ensure that such person(s) fully understands all conditions and
all requirements incorporated by the
Permit. The site(s) refers to site(s) of construction and
operation of the Project and shall mean the
same hereafter.
1.5 The Permit Holder shall display conspicuously a copy of this
Permit on the Project site(s) at all
vehicular entrances/exits or at a convenient location for public
information at all times. The
Permit Holder shall ensure that the most updated information
about the Permit, including any
amended permit, is displayed at such locations. If the Permit
Holder surrenders a part or the
whole of the Permit, the notice he sends to the Director shall
also be displayed at the same
locations as the original Permit. The suspended, varied or
cancelled Permit shall be removed from
display at the Project site(s).
1.6 The Permit Holder shall construct and operate the Project m
accordance with the project
descriptions in Part B of this Permit.
1.7 The Permit Holder shall ensure that the Project is designed,
constructed and operated in
accordance with the information and all recommendations
described in the EIA Report (Register
No: AEIAR-037/2000), the application documents including all
attachments (Application No.
-
Environmental Permit No. EP-324/2008ffi
!.ll!:ll'titfPJli!UiilJIJ! EP-324/2008ffi
AEP-324/2008, VEP-351/2012, VEP-429/2014, VEP-470/2015 and
VEP-480/2015), other
relevant documents in the Register; and the information or
mitigation measures described in this
Permit, and mitigation measures to be recommended in submissions
that shall be deposited with or
approved by the Director as a result of permit conditions
contained in this Permit, and mitigation
measures to be recommended under on going surveillance and
monitoring activities during all
stages ofthe Project. Where recommendations referred to in the
documents of the Register are not
expressly referred to in this Permit, such recommendations are
nevertheless to be implemented
unless expressly excluded or impliedly amended in this
Permit.
1.8 All submissions, as required under this Permit, shall be
rectified and resubmitted in accordance
with the comments, if any, made by the Director within one month
of the receipt of the Director's
comments or otherwise specified by the Director.
I.9 All submissions approved by the Director, all submissions
deposited without comments by the
Director, or all submissions rectified in accordance with
comments by the Director under this
Permit shall be construed as part of the permit conditions
described in Part C of this Permit. Any
variation of the submissions shall be approved by the Director
in writing or as prescribed in the
relevant permit conditions. Any non-compliance with the
submissions may constitute a
contravention of the Environmental Impact Assessment Ordinance
(Cap. 499). All submissions or
any variation of the submissions shall be certified by the
Environmental Team (ET) Leader and
verified by the Independent Environmental Checker (IEC) referred
to in Conditions 2.1 and 2.2
below, before submitting to the Director under this Permit.
1.10 The Permit Holder shall release all finalized submissions,
as required under this Permit, to the
public by depositing copies in the Environmental Impact
Assessment Ordinance Register Office,
or in any other places, or any intemet websites as specified by
the Director, or by any other means
as specified by the Director for public inspection. For this
purpose, the Permit Holder shall
provide sufficient copies of the submissions.
1.11 All submissions to the Director required under this Permit
shall be delivered either in person or by
registered mail to the Environmental Impact Assessment Ordinance
Register Office (currently at
27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong).
Electronic copies of all
finalized submissions required under this Permit shall be
prepared in Hyper Text Markup
Language (HTML) (version 4.0 or later) and in Portable Document
Format (PDF version 4.0 or
later), unless otherwise agreed by the Director and shall be
submitted at the same time as the hard
copies.
1.12 The Permit Holder shall notify the Director in writing the
commencement date of construction of
the Project no later than one month prior to the commencement of
construction of the
-
Environmental Permit No. EP-324/2008/D J:ii!IJt~iiJiil!iji~
EP-324/2008/D
Project. The Permit Holder shall notify the Director in writing
immediately ifthere is any change
of the commencement date of the construction.
1.13 For the purpose of this Permit, "commencement of
construction" does not include works related to
site clearance and preparation or other works as agreed by the
Director.
2 Specific Conditions
Submissions or Measures to be implemented before Construction
ofthe Project
Employment ofEnvironmental Monitoring and Audit (EM&A)
Personnel
2.1 An Environmental Team (ET) shall be established by the
Permit Holder no later than one month
before the commencement of construction of the Pn;>ject. The
ET shall not be in any way an
associated body of the Contractor or the Independent
Environmental Checker (IEC) for the
Project. The ET shall be headed by an ET Leader. The ET Leader
shall be a person who has at
least 7 years of experience in environmental monitoring and
auditing (EM&A) or environmental
management. The ET and the ET Leader shall be responsible for
the implementation of the
EM&A programme in accordance with the EM&A requirements
as contained in the EM&A
Manual of the Project. The ET Leader shall keep a
contemporaneous log-book of each and every
instance or circumstance or change of circumstances, which may
affect the compliance with the
recommendations of the EIA Report and this Permit. The ET Leader
shall notify the IEC within
one working day of the occurrence of any such instance or
circumstance or change of
circumstances. The ET Leader's log-book shall be kept readily
available for inspection by all
persons assisting in supervision of the implementation of the
recommendations of the EIA Report
and this Permit or by the Director or his authorized officers.
Failure to maintain records in the
log-book, failure to discharge the duties of the ET Leader as
defined in the EM&A Manual or
failure to comply with this Condition would entitle the Director
to require the Permit Holder by
notice in writing to replace the ET Leader. Failure by the
Permit Holder to make replacement, or
further failure to keep contemporaneous records in the log-book
despite the employment of a new
ET Leader may render the Permit liable to suspension,
cancellation or variation.
2.2 An IEC shall be employed by the Permit Holder no later than
one month before commencemeni of
construction of the Project. The IEC shall not be in any way an
associated body of the Contractor
or the ET for the Project. The IEC shall be a person who has at
least 7 years of experience in
EM&A or environmental management. The IEC shall be
responsible for duties defined in the
EM&A Manual and shall audit the overall EM&A
performance, including the implementation of
all environmental mitigation measures, submissions required in
the EM&A Manual, and any other
submissions required under this Permit. In addition, the IEC
shall be responsible for verifying the
environmental acceptability of permanent and temporary works,
relevant design plans and
submissions under this Permit. The IEC shall verify the
log-book(s) mentioned in Condition 2.1 ~~"'
-
Environmental Permit No. EP-324/2008/D J'i1;1Jli'ffiJ}mf~ltlf
EP-324/2008/D
of this Pennit. The IEC shall notify the Director by fax, within
one working day of receipt of
notification from the ET Leader of each and every occurrence,
change of circumstances or
non-compliance with the EIA Report and this Permit, which might
affect the monitoring or control
of adverse environmental impacts from the Project. In the case
where the IEC fails to so notify
the Director ofthe same, fails to discharge the duties of the
IEC as defined in the EM&A Manual
or fails to comply with this Condition, the Director may require
the Permit Holder by notice in
writing to replace the IEC. Failure to replace the IEC as
directed or further failure to so notify the
Director despite employment of a new IEC may render the Permit
liable to suspension,
cancellation or variation. Notification by the Permit Holder is
the same as notification by the IEC
for the purpose ofthis Condition.
Management Organization ofMain Construction Companies
2.3 The Permit Holder shall, no later than two weeks before the
commencement of construction of the
Project, inform the Director in writing the management
organization of the main construction
companies and/or any form of joint ventures associated with the
construction of the Project. The
submitted information shall include at least an organization
chart, names of responsible persons
and their' contact details.
Submission of Updated EM&A Manual
2.4 The Permit Holder shall, no later than two months before the
commencement of construction of the
Project, submit to the Director for approval four hard copies
and one electronic copy of an updated
EM&A Manual for the Project. Before submission to the
Director, the EM&A Manual shall be
certified by the ET and verified by the IEC as conforming to the
information and recommendations
contained in the EIA Report (Register No: AEIAR-037 /2000), the
application documents including
all attachments (Application No. AEP-324/2008, VEP-351/2012,
VEP-429/2014, VEP-470/2015
and VEP-480/2015) and other relevant documents in the Register.
The EM&A Manual shall
include the latest infom1ation on the EM&A requirements for
air quality, noise, water quality,
waste management, cultural heritage and ecological aspects. All
measures recommended in the
approved EM&A Manual shall be fully and properly implemented
according to the requirements
and time schedule(s) set out in the approved EM&A
Manual.
Measures to Mitigate Construction Noise Impact
2.5 To mitigate construction noise impact arising from the
Project, the following temporary noise
barriers shall be erected before commencement of
construction:
(i) 3.5 m and 5.5 m high temporary noise barrier at culvert
construction work area as shown
in Figure 2(a);
-
Environmental Permit No. EP-324/2008/D :l!i!:!ltwfPTiili:~M
EP-324/2008/D .
(ii) 3 m high temporary noise barrier along the northern edge of
Bridge 12 at ground level
and 2 m high temporary noise barrier along the northern edge of
Bridge 12 at bridge level
as shown in Figure 2(b l;
(iii) 2.5 m high temporary noise barrier along Tai Wo Service
Road West and 3.5 m and 7
m high temporary noise barrier along Tai Wo Service Road West
near Tai Hang as shown
in Figure 2(c);
(iv) 7 m high temporary nmse barrier along Tai Wo Service Road
West near Tai Wo
Footbridge work area as shown in Figure 2(d); and
(v) 2.5 m high temporary noise barrier near river diversion work
area as shown in Figure 2(e).
Submission ofLandscape Plan
2.6 The Permit Holder shall, at least two months before the
commencement of construction of the
Project, submit to the Director for approval four hard .copies
and one electronic copy of a
landscape plan(s) showing details of the landscape measures and
compensatory ecological planting,
including boundaries of proposed works areas, trees within the
works areas that require and do not
require removal, compensatory ecological planting of about 5.5
hectares including native
species. The plan shall also include tree transplantation and
compensation arising from the
construction ofKau Lung Hang Vehicular Bridge. The plan(s), of
scale I to 1000 or other
appropriate scale as agreed by the Director, shall include
details on locations, size, number and
species of planting, implementation programme, maintenance and
management schedules. The
submission shall be certified by the ET Leader and verified by
the IEC as conforming to the
information; requirements and recommendations set out in the
approved EIA Report (Register No:
AEIAR-037/2000), the application documents including all
attachments (Application No.
AEP-324/2008, VEP-351/2012, VEP-429/2014, VEP-470/2015 and
VEP-480/2015) and other
relevant documents in the Register.
Measures to Mitigate Ecological Impacts
2. 7 Capture-surveys on the native frog species of Rana
guentheri, tadpoles and fish shall be conducted
within the Ma Wat River Northern Meander, location of which is
shown in Figure 3, before
commencement of construction works of the Project. Any of these
species caught during the
surveys shall be relocated to nearby undisturbed meander or
river channel.
Measures and Submissions to be Implemented during Construction
and Operation of the
Project
-
Environmental Permit No. EP-32~/2008/D l.iiPnfffEJi~lUilt~
EP-32~/2008/D
Measures to Mitigate Traffic Noise Impact
2.8 The Permit Holder shall implement the following mitigation
measures before commencement of
operation of the Project to mitigate the traffic noise impact
arising from the Project:
(i) Construction of noise barriers in accordance with the
details shown in Figure 4a - 4e, 4d(i)
and 4e(i); and
(ii) Provide low noise road surface at both the widened and
reconstructed road
sections covered under the Project.
2.9 The Permit Holder shall deposit five (5) copies of as-built
drawing(s) in I: I 000 scale for the noise
barriers required under Condition 2.8(i) and the requirements in
the EIA Report (Register No:
AEIAR-037/2000), the application documents including all
attachments (Application No.
AEP-324/2008, VEP-351/2012, VEP-429/2014, VEP-470/2015 and
VEP-480/2015), and other
relevant documents in the Register, to the Director before
commencement of operation of the
Project. The drawing(s) shall be certified by the ET Leader and
verified by the IEC to confirm
with Condition 2.8(i) and the requirements in the EIA Report
(Register No: AEIAR-037/2000), the
application documents including all attachments (Application
No.
AEP-324/2008, VEP-351/2012, VEP-429/2014, VEP-470/2015 and
VEP-480/2015), and other
relevant documents in the Register.
Measures to Mitigate Ecological Impacts
2. 10 To compensate for loss of woodlands, the Permit Holder
shall implement ecological compensatory
planting in accordance with the approved Landscape Plan
submitted under Condition 2.6 above
before operation of the Project.
2.11 Work areas as shown in the approved Landscape Plan
submitted under Condition 2.6 shall be
fenced off using physical barriers during the construction stage
of the Project to prevent
encroachment ofadjacent habitats.
2.12 Trees located within the works areas but do not requrre
removal as shown in the approved
Landscape Plan submitted under Condition 2.6 shall be fenced off
during the construction stage of
the Project and retained thereafter.
Measures to Mitigate Visual and Landscape Impacts
-
3
Environmental Permit No. EP-324/2008/D f.iit~~fPJmUI\\1~~
EP-324/2008/D
2.13 All measures recommended in the approved landscape plan(s)
shall be fully and properly
implemented in accordance with the details and programme set out
in the submission.
Measures to Mitigate Water Quality Impacts within Water
Gathering Ground
2. 14 For the part of the Project located within Water Gathering
Grounds, to mitigate construction water
quahty arising from the Project, the following measures shall be
implemented during
construction:
(i) No stockpiling or storage of earth, building materials,
fuel, oil or toxic materials and other
materials which may cause contamination to the Water Gathering
Grounds; and
(ii) Construction plant which causes pollution to the Water
Gathering Grounds due to leakage
of oil or fuel shall be removed from the Water Gathering Grounds
immediately.
Environmental Monitoring and Audit Requirements
3.1 The EM&A programme shall be implemented in accordance
with the procedures and requirements
as set out in the EM&A Manual of the Project. Any changes to
the EM&A progrmmne shall be
justified by the ET Leader a11d verified by the IEC as
conforming to the requirements set out in the
EM&A Manual and shall seek the prior approval from the
Director before implementation.
3.2 Four hard copies a11d one electronic copy of Baseline
Monitoring Report shall be submitted to the
Director at least two weeks before the commencement of
construction. The submissions shall be
certified by the ET Leader and verified by the IEC. Additional
copies of the Baseline Monitoring
Report shall be provided upon request by the Director.
3.3 Four hard copies and one electronic copy of Monthly EM&A
Reports for the construction stage
shall be submitted to the Director, within 2 weeks after the end
of the reporting month. The
submission shall be certified by the ET Leader and verified by
the IEC before submission to the
Director. Additional copies of the Monthly EM&A Reports
shall be provided upon request by the
Director.
3.4 The actions described in the Event/Action Plans ofthe
EM&A Manual shall be fully and properly
carried out, in accordance with the time frame(s) as set out in
the Event/ Action Plan, or as agreed
by the Director.
3.5 All environmental monitoring and audit data submitted under
this Permit shall be true, valid and
correct.
-
4
Environmental Permit No. EP-324/2008ID 'tii!:ll'iiffiiJli$ilJIJi
EP-324/2008ID
3.6 To ensure a high degree of transparency regarding the
monitoring data and results, all
environmental monitoring and audit data and results and all
submissions and all performance test
data and results required by this Permit shall be made available
by the Permit Holder to the public
through a dedicated web site to be set up by the Permit Holder
under Condition 4.2 below, in the
shortest practicable time and in no event later than 2 weeks
after such information is available.
3.7 Records of measurements and remedial actions taken under
Condition 3.4 of this Permit shall be
logged and kept within 3 working days of the collection of data
or completion of remedial action,
shall be included in the EM&A Reports and shall be available
for inspection on site or as requested
by the Director.
Electronic Reporting of EM&A Information
4.1 To facilitate public inspection of the EM&A Manual,
Baseline Monitoring Report and Monthly
EM&A Reports via the EIAO Internet Website and at the EIAO
Register Office, electronic copies
of these Reports shall be prepared in the Hyper Text Markup
Language (HTML) (version 4.0 or
later) and in Portable Document Format (PDF version 4.0 or
later), unless otherwise agreed by the
Director and shall be submitted at the same time as the hard
copies as described in Condition 3 of
this Permit. For the HTML version, a content page capable of
providing hyperlink of each section
and sub-section of these Reports shall be included in the
beginning of the document. Hyperlinks
to all figures, drawings and tables in these Reports shall be
provided in the main text from where
the respective references are made. All graphics in these
Reports shall be interlaced GIF, JPEG or
PDF format unless otherwise agreed by the Director. The content
of the electronic copies of these
Reports must be the same as the hard copies.
4.2 The Permit Holder shall, within six weeks to the
commencement of construction of the Project, set
up a dedicated web site and notify the Director in writing the
Internet address, where the project
information, all environmental monitoring and audit data and
reports described in Condition 4.1
above, and all finalized submissions and plans required under
this Permit, are to be placed. All
environmental monitoring and audit data and reports described in
Condition 4.1 above shall be
made available to the public via this dedicated web site to be
set up by the Permit Holder in the
shortest possible time and in no event later than 2 weeks after
the relevant environmental
monitoring data and reports is I are collected or become
available, unless otherwise agreed with the
Director. All finalized submissions and plans shall be made
available to the public via this
dedicated web site to be set up by the Permit Holder in the
shortest possible time and in no event
later than 2 weeks after they are deposited with or approved by
the Director as required under this
Permit, unless otherwise agreed with the Director.
-
Environmental Permit No. EP-324/2008/D :f.l1il~iffPJm!1~
EP-324/2008ill
4.3 The Internet website as described in Condition 4.2 above
shall enable user-friendly public access
to the monitoring and project information including the project
profile of the Project, the EIA
report, the environmental permit(s), all environmental
monitoring and audit data and report and all
finalized submissions and plans required w1der this Permit.
Unless otherwise agreed with the
Director, the internet website shall have features capable
of:
(a) providing access to all environmental monitoring data
collected since the commencement of
work;
(b) searching by date:
(c) searching by types of monitoring data; and
(d) hyperlinks to relevant monitoring data after searching;
or otherwise as agreed by the Director.
Notes:
1. This Permit consists of three parts, namely, PART A (Main
Permit), PART B (Description of
Designated Project) and PART C(Permit Conditions). Any person
relying on this permit should obtain
independent legal advice on the legal implications under the
Ordinance, and the following notes are for
general information only.
2. Ifthere is a breach of any conditions ofthis Permit, the
Director or his authorized officer may, with the
consent of the Secretary for the Environment, order the
cessation of associated work until the remedial
action is taken in respect of the resultant environmental
damage, and in that case the Permit Holder
shall not carry out any associated works without the permission
of the Director or his authorized officer.
3. The Permit Holder may apply under Section 13 of the Ordinance
to the Director for a variation of the
conditions of this Permit. The Permit Holder shall replace the
original permit displayed on the
construction site by the amended permit.
4. A person who assumes the responsibility for the whole or a
part of the designated project may, before
he assumes responsibility of the designated project, apply under
Section 12 of the Ordinance to the
Director for a further environmental permit.
5. Under Section 14 of the Ordinance, the Director may with the
consent of the Secretary for the
Environment, suspend, vary or cancel this Permit. The suspended,
varied or cancelled Permit shall be
removed from display at the construction site.
-
Environmental Permit No. EP-324/2008/D f~m~PJlm~~
EP-324/2008/D
6. If this Permit is cancelled or surrendered during
construction or operation of the Project, another
environmental permit must be obtained under the Ordinance before
the Project could be continued. It
is an offence under section 26(1) of the Ordinance to construct
or operate a designated project listed in
Part I of schedule 2 ofthe Ordinance without a valid
environmental permit.
7. Any person who constructs or operates the Project contrary to
the conditions in the Permit, and is
convicted ofan offence under the Ordinance, is liable:
(i) on a first conviction on indictinent to a fine of$ 2 million
and to imprisonment for 6 months;
(ii) on a second or subsequent conviction on indictment to a
fine of $ 5 million and to
imprisonment for 2 years;
(iii) on a first summary conviction to a fine at level 6 and to
imprisonment for 6 months;
(iv) on a second or subsequent summary conviction to a fme of $1
million and to imprisonment for
1 year; and
(v) in any case where the offence is of a continuing nature, the
court or magistrate may impose a
fine of$ 10,000 for each day on which he is satisfied the
offence continued.
8. The Permit Holder may appeal against any condition of this
Permit under Section 17 of the Ordinance
within 3 0 days of receipt ofthis Permit.
9. The Notes are for general reference only and that the Permit
Holder should refer to the EIA Ordinance
for details and seek independent legal advice.
Environmental Permit No. EP-324/2008/D
:Eimrf0JmU\ii5/R EP-324/2008/D
-
Environmental Permit No. EP-324/2008/D Uafi'iJHM
EP-324/2008/D
Widening of Toto Highway/Fanling Highway between Island
House
Interchange and Fanling
cti~~~g~~~~n~~~~~~z~~~~~0~ , ~~0 nt~~r~)
Location Plan - flr.irlll
Figure 1 Ill -
Environmental Permit No.
EP- 324/200810
~:tjl~PJfM~5df
EP-324/2008/D
-
Environmental Permit No. EP-324/2008/D J.UiffiiJ318J!
EP-324/2008/D
3.5 m high vertical barrier
53 m high barrier
Environmental Permit No: EP- 324/2008/D
JB:tJl~o.rmuu~ EP-324/2008/D
Project
Investigation Assignment for
Widening ofTolo Highway/FanJing
Highway between Island House
Interchange and Fanling
Title
Proposed Locations of
Purposed-Built Noise Barriers
During Construction
Figure 2a lll2a
-
Environmental Permit No. EP-324/2008/0 Jlli.UfiiJIIIIM
EP-324/2008/D
Environmental Permit No: EP- 324/2008/D
Jfl~~orm11~ EP-324/2008/D
Project
Investigation Assignment for
Widening of Tolo
3 m high vertical barrier at ground Jevelfor bridge foundation
and substructure & Highway/Fanling 2 m high vertical barrier at
bridge level for bridge superstructure work
Highway between Island House
Interchange and Fanling
Title
Proposed Location'> of
Purposed-Built Noise Barriers '
During Construction -i). Figure 2b if 2b
-
Environmental Permit No. EP-324/2008/D JIJJDTiiJif
EP-324/2008/D
.. -' .- . \
2.5 m hip vertical barrier '\. - - - '\ \ \. \
\
-
Environmental Permit No: EP- 324/2008/D
I.R~m:orm11~ EP-324/2008/D
Project
Investigation Assignment for
Widening ofTolo
Highway/Fanling
Highway between Island House
Interchange and Fanling
Title
Proposed Locations of
Purposed-Built Noise Barriers
During Construction
Figure 2c lll2c
-
Environmental Permit No. EP-324/2008/D JfilffiiJifiiJ.
EP-324/2008/D
-""' . .....:, If: r ~~! ~ ---- ~;. .. ....-.-. -~ ~ , _
-..~~}.~- ,: ; -:.' -- --~~-~~~~
" . ...~~,, . ,. . .. ..:! ,..;_-:
-~~r----r-........-~---,-,----"". -, .,.,..._r~~. '- r
...,-""- !'~'!"'::.'l:.~l-1: , ...... " ",,.;e.of.:.:;_.: ..
,.-;-; V ~ 11 - . ........_": , ':1'\,:..,~~ ... ~ ...~.4' t)-1 -
--- .. - - ...'1...~-::::;. - ... .-....!-;.
"""';.:~-l~z:~~-......~.::-:.~-:.:~..::~~~ ...-uc:a ...,::c
.:1.r:~.~:~~--~;q:~~sf:JE?Ei~~l!;~h~~~~.~,--
Environmental Permit No: EP- 324/2008/D
J.I!JlwfDJ~lUiii9Ji EP-324/2008/D
Project
Investigation Assignment for
Widening of Tolo Highway/Fanling
Highway between Island House
Interchange and Fanling
Title
Proposed Locations of
Purposed-Built Noise Barriers
During Construction
Figure 2d 1112d
http:",,.;e.of
-
Environmental Permit No. EP-324/2008/D :f61il'iiJilllllli!
EP-324/2008/D
Environmental Permit No: EP- 324/2008ill
~~iff1iJliil&fiilili EP-324/2008/D
~
Project
Investigation Assignment for
Widening of Toto
Highway/Fanling
Highway between Island House
Interchange and Fanling
Title
Proposed Locations of
Purposcd-Built Noise Barriers
During Construction
Figure 2e il2e
-
Environmental Permit No. EP-324/2008/D JtiUfiiJilllll!
EP-324/2008/D
.......
Legend:
~ Part ofMa Wat River
Notthcrn Meander to be
Filled, at which capture
survey for the native fiog
species ofRww gul?rllheri.
tadpole.;; and fish ~hal l be
carried out before
commencement of
construction works ofthe
Projecr
Environmental Permit No: EP- 324/2008/D
lli~~OJm~~ EP-324/2008/D
Location of Ma Wat
River Northern
Meander as referred in
Condition 2. 7
Figure 3 il3
-
Environmental Permit No. EP-324/2008/D JIIUiiJIB.!M
EP-324/2008/D
IS ~AND HOUS IN Tf R( II ANG(
ICK..O HA'C)V't
Pro~Title:
I~~-:
Ftgure 4a:
4a:
Widening ofTolo Highway/Faoling Highway between Island House
Interchange and Fanling
~s~g~~~wmz~~~-~~~~~I~
Layout of Noise Barriers
lfifiDJI*III
LEGEND: -- UMITOFWOPYSAREA
SR 1 NOISE SENSffiVE RECB V ER
V'>=-o- VEP11CAl NOISE BARRIER 2m V3.::....o-- VER'TlCAL
NOISE BARRIEP 3t'n V4 ~ VEP11CAl NOISE BAPRIER 4nl
V~ VEPTlCAL NOISE BAP =>IEP 4.5rn
V~ VERTICAl NOISE BARRIER 5m vo ~ V ERllCAL NOIS!: BAPRIEP
6m
V7:.....o- VEPTlCAl NOISE SAPPIER 7m V8 ~ VERllCAL NOISE BARPIEP
8m
c4 ~~ c~
c~
c4 c~
QCl CIO.. C1D
TYP!: t:lf2
CANTllEVEP NOISE BARRIER FACING FANUNG BOUND (CloJ
CANTlLEVEO NOISE BARRIER FACING KOWLOON BOUND !Clb)
CANTILEVER NOISE BARRIER (Y SHAPED j
CANTlLEVER NOISE BARRIER FACING FANUNG BOUND (C2o) CANTlLEVER
ROAD SIDE BARR1B:> CA'?.RIAGEWAY (Cl) CANTILEVER ROADSIDE
BARRIEP CAPRIAGEWAY (C2)
h=~
,..lOtS!: B.ARRII!R
tr CIY ""YPe
t tot2 &A.RRI!R
Environmental P ermit No: E P- 324/2008/D
~0Jiifti1M : EP-324/2008/ D
-
Pm~YJ.tle:
I~gM:
Flgure4b:
11 4b:
Widening ofTolo Highway/Fanling Highway between Island House
Interchange and Fanling
MR5~gM~~awewz~~~-~~~~-~MI~
Environmental Permit No. EP-324/2008/D Jfi~WfiiJI&III!
EP-324/2008/D
LEGEN D :
SR1 .
V~
V~
V4 ~
V~
V~ vo ~
V~
V8 ~
C .!____j,___ ----,-
!=~ c~
~ Cl .
c~ '
4:. "'-.
"'}~ Cl, C l a,.ClD TYPf. UOt~
LJMIT O F WOPI .S AREA
NOISE SENSITJVE PECBVEP
V !:'RTJCAL NOISE BARRIER 2rrl
V EI
-
Environmental Permit No. EP-324/2008/0 !fiU!fiiJmlll!
EP-324/2008/ 0
LEGEND: UMIT O F WOPKS AREA
SR1 . NOISE SENSffiVE '?ECBV ER
V~ V t:PTlCAL NOISE BARRIER 2m
V~ VOTJCAL NOISE BARRIER 3rn V4.:...a-- V EPTlCAL NOISE BAPPIE?
4m V~ VERTlCAl NOISE BAPPIEP 4.5m
V~ VERTlCAl NOISE BARRIER 5m V6 ~ V !:RTlCAl NOISE BARRIEP
6m
V7:......o- V E
-
Environmental Permit No. EP-324/2008/0 J.IJ.UfiiJ EP-324/2008/D
NAM. lol "
tr----.., :--~-----.:--- : ; 1 ... , ,;_ .- .. '# ~ . , : r . ,'
/ .---.._.....~ '-, \ '~ ...-.... ~:..,,' ,',' ..,r
' . __ _ _ _. ,.. ,' I
'---- .-~ ... ~ ----..""'"".. Kau Lung Hang Vehicular
LEGEND: ---- UMIT O F WO?rS AREA
SR1 NOISE SENSffiVE RECEIVER
V?=--o- V EPTICAl NOISE BARRIER 2m V3=-o- VE!ffiCAL NOISE
SAPPIER 3rn V 4 ~
V~
V~
vo --&--V7=----o-V8 ~
c~
c~
c~
c~
c~
c~
tJ
Cl C1Q.C10
iYPf! t JOISI!!
VERllCAL ~OISE BAPP.IEP 4m
V ERTICAl NOISE BARRIEP 4.5m
V EPTlC AL NOISE BARRIEP Sm
VERTICAl NOISE SAPPIER 6m
VEPTICAL NOISE BAPPIEP 7m
VEPTICAl "'IOSE SAPPIER 8m
CANTILEVE0 NOISE BARRIER FAC ING FANUNG BOUND (C1o l
CANTILEVER NOISE 8APRIE? FACING KOWlOON BOUND (Cl b )
CANTILEVER NOISE BARRIER (Y SHAPED I
CANnLEVEP NOISE BARRIEP FACING FANLING BOUND {C2ol CANTILEVER
POAD SIDE BA.~;?!CP CAP~IAGEWA (Cll
CANTILEVER ROAD SIDE BAPPICP CARRIAGEWAY (C2)
~ytL ~ C2""YPI! C1Y~
JOISI!! BARR'IS UOSf!SAR~~
ProjnTitle.
Ifi~lM
Figure 4d
lll4d
Environmental Permit No: EP-324/2008/D Widening ofTolo
Highway/Fanling Highway between Island House Interchange and
Fanling
~~~g~~-~~wmz~~~-~~~m~Mifi ~DJif8ll!: EP-324/2008/D
Layout of Noise Barrlen;
l'alifW.III
-
Environmental Permit No. EP-324/2008/D JIIJJUfiiJII
EP-324/2008/D
A B I ' CVErmEAn OVERHEA"
C/1d LE S CABLES
1 I/11I II :
\ c9 I I 6/J) .I '. \
I
\ ,____ OVERHE AJ 1\dLE
Pro_t.ct Title
I@~M
FJ.gUre 4d (i)
Ill 4d (i)
. -- ' ' ' / -~ , -r--~ ', / CL EA RA.NlE PIVEL OPE ' /
-r-r-',,,~l---~ .:c 1 T ~, ,/T ~ ... ---T ~-~~-l ---~ F E I()()
..... -D l E,
I l.t"lj 1 1 t
~ ;. ROAD LE VEL . I I
I I
A'
..... I
3r
!TYP l
I
Widening ofTolo Highway/Fanling Highway between Island House
Interchange and Fanling
Ma5~g~~ti-~..WS.Z~~~-~MI~W~MaMI@
Layout of modified noise barrier NB43
liGi!5c~1'4ilfDUl NB43 :iflimlll
I I
13
Environmental Permit No: EP- 324/2008/D
~iiJiiftliM : EP-324/2008/D
- -
-
Environmental Pcrrnjt No. EP-324/2008/D ft&tDJH~
EP-324/2008/D
~
Project Title
Ifi;g;ffl}
Figure 4e
lll4e
' 'v~
WO HOP SHEK INTERCHANGE
1...~
NOISE BARRIER ~ BY OTHER ...- r~
r:\u
Widening ofTolo Highway/Fanling Highway between Island House
Interchange and Fanling IEnvironmental Permit No: EP-324/2008/D
!jjff{~E]'~M'f}IT}t!Jf&5(~at:Wf6.Hit:LrdJB'gDIt~i}i& I
*>Hiti}d~Ifi Jlljjl~OJiiftii!m: EP-324/2008/D
Layout of Noise Baniers
~=gf/1f~lll
LHifND LIMIT Of WOI!l(S Allt.t.
~R1 .~ ..-o~Sr st11\ltrvt fiErovrP
V1 ~~illiUl>OD!S( fl ,.
Vl NIOPOSD~f!JICAl IIQIS( "" p
V-4 ~ Yl'ltiCAlloDIS AAl ~ ~- 'HlVH
YS PROPOf.D 1."'f.AlIIOIS[ A ~1! .lt ,. Vi PROI'OV,O
;1tiC-l!IOIS Alii! p k V7 ~~li(AI.
"((lS[, ... . c ,.
'11 ~{O~IUICALlll$f 11All p ...
eta HQI>O~O (I NOISI IIMUI:fR f.AU!Ifli 'A"\IN\1 ll
e\b M~OUO (1 NOIS~AA:!II1A 1Nt; l.OwLOO>i
en ~~~ C I IO\IISt IA!tl!:rlt 1'1' SIIAfi(OI
C1a. ~IICl,.~IA"!!:tlt
A~Wi'i llOUO.'O
Cl l'ltOPOS0 ,(I ROD SJD1 !1
-
Environmental Permit No. EP-32~/2008/D ftgtfCJi{fijt,t
EP-324/2008/D
P1-oject Title
r~;gw
Figun~ 4e(i)
Ill 4e(i)
Widening ofTolo Highway/Fanling Highway between Island House
Interchange and Fanling I Environmental Permit No:
EP-324/2008/D
lli5c~151'8'1!.Bw-t~m:~5t~~~t!l1.!f7.Hit:Lrdln&~~~ 1~~~~MI~
1lB:fjl~DJmta~: EP-324t2oo8tn
Proposed Bus-Bus Interchange Layout Plan ~ii1~ff~M
FigureApplication No. VEP~480/2015 $~~~~ Document in the
Register: (1) Agreement No. CE 73/98 Investigation Assignment for
Widening ~t;r,flll-J:r'l'g:X:{tf : of Tolo Highway/ Fanling Highway
between Island House Interchange and Fanling: -Environmental Impact
Assessment Report (March 2000) .b. [Hereinafter referred to as the
"EIA Report"] /' ~' --~ t~o\))\~ -.' ~
FigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureWidening
of Toto Highway/Fanling Highway between Island House Interchange
and Fanling cti~~~g~~~~n~~~~~~z~~~~~0~, ~~0 nt~~r~) Location Plan
-flr.irlll Figure 1 Ill -Environmental Permit No. EP-324/200810
~:tjl~PJfM~5df EP-324/2008/D FigureFigureFigure.. -' .-. \ 2.5 m
hipvertical barrier '\.---'\ \ \. \ \ -
FigureFigure....FigureFigureFigure....... FigureIS~AND HOUS IN Tf
R( II ANG( ICK..O HA'C)V't Pro~Title: I~~-: Ftgure 4a: 4a: Widening
ofTolo Highway/Faoling Highway between Island House Interchange and
Fanling ~s~g~~~wmz~~~-~~~~~I~ Layout of Noise Barriers lfifiDJI*III
LEGEND: --UMITOFWOPYSAREA SR 1 NOISE SENSffiVE RECB VER
V'>=-o-VEP11CAl NOISE BARRIER 2m V3.::....o--VER'TlCAL NOISE
BARRIEP 3t'n V4 ~VEP11CAl NOISE BAPRIER 4nl V~VEPTlCAL NOISE
BAP=>IEP 4.5rn V~VERTICAl NOISE BARRIER 5m vo ~VERllCAL NOIS!:
BAPRIEP 6m V7:.....o-VEPTlCAl NOISE Pm~YJ.tle: I~gM: Flgure4b: 11
4b: FigureFigure~FigureFigureFigureFigurePro_t.ct Title I@~M
FJ.gUre 4d (i) Ill 4d (i) . --' ' ' / -~ , -r--~', / CL EA RA.NlE
PIVEL OPE ' / -r-r-',,,~l---~.:c 1 T ~, ,/T ~ ... ---T ~-~~-l ---~
F E I()() ..... -D l E, I l.t"lj 1 1 t ~ ;. ROAD LE VEL . I I I I
A' ..... I 3r !TYP l I Widening ofTolo Highway/Fanling Highway
between Island House Interchange and Fanling
Ma5~g~~ti-~..WS.Z~~~-~MI~W~MaMI@ Layout of modified noise barrier
NB43 liGi!5c~1'4ilfDUlNB43 :iflimlll I I 13 Environmental Permit
No: EP-324/2008/D ~iiJiiftliM : EP-324/2008/D~ Project Title
Ifi;g;ffl} Figure 4e lll4e ' 'v~ WO HOP SHEK INTERCHANGE 1...~
NOISE BARRIER ~ BY OTHER ...-r~ r:\u Widening ofTolo
Highway/Fanling Highway between Island House Interchange and
Fanling IEnvironmental Permit No: EP-324/2008/D
!jjff{~E]'~M'f}IT}t!Jf&5(~at:Wf6.Hit:LrdJB'gDIt~i}i&I
*>Hiti}d~Ifi Jlljjl~OJiiftii!m: EP-324/2008/D Layout of Noise
Baniers ~=gf/1f~lll FigureP1-oject Title r~;gw Figun~ 4e(i) Ill
4e(i) Widening ofTolo Highway/Fanling Highway between Island House
Interchange and Fanling I Environmental Permit No: EP-324/2008/D
lli5c~151'8'1!.Bw-t~m:~5t~~~t!l1.!f7.Hit:Lrdln&~~~1~~~~MI~
1lB:fjl~DJmta~: EP-324t2oo8tn Proposed Bus-Bus Interchange Layout
Plan ~ii1~ff~M Figure