Page 1: IHEA Robina Hospital Chiller Plant Optimisation

Robina Hospital Chiller Plant OptimisationSeptember 2015

Page 2: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 2

• Facility Overview• Project Motivations• Evaluation & Assessment• Optimisation Process• Results

Robina Hospital Chiller Plant OptimisationTable of Contents

Kieran McLeanBusiness DevelopmentSiemens Ltd.

Page 3: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 3

Robina Hospital Chiller Plant OptimisationFacility Overview

Robina Hospital is the 6th largest hospital in Queensland with 364-beds anda suite of inpatient and outpatient services.

The facility has undergone constant expansion over the past 15 years:

• 2000 – Constructed as a private hospital offering some public services• 2002 – Acquired by QLD Government• 2007 – Stage 1 expansion adding 25 beds• 2012 – Stage 2 & 3 expansions doubling number of beds

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 4: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 4

Robina Hospital Chiller Plant OptimisationChilled Water System – 2007

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

AX Building Chiller Plant1x Air-Cooled Chiller

Original Central Chiller Plant3x Reciprocating Water Cooled Chillers

(768kWr)

Page 5: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 5

Robina Hospital Chiller Plant OptimisationChilled Water System – 2012

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

AX Building Chiller Plant1x Air-Cooled Chiller

Original Central Chiller Plant3x Reciprocating Water Cooled Chillers

(768kWr)

Link between Chiller Plants

New Central Chiller Plant3x Centrifugal Water

Cooled Chillers (2500kWr)

Page 6: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 6

Robina Hospital Chiller Plant OptimisationChilled Water System – 2012

Facility Served by 3x Chiller Plants operating in the following modes:

• Low Load – 2x older plants serve entire facility• Normal – new plant serves entire facility• Independent – all 3 plants operate independently of each other

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 7: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 7

Robina Hospital Chiller Plant OptimisationChilled Water System – 2012

Control Strategies

• Constant Volume Primary Pumps• Constant Volume Condenser Water Pumps• Variable Volume Secondary Pumps with Pressure Reset

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 8: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 8

Robina Hospital Chiller Plant OptimisationProject Motivations

1. Simplification of Chilled Water System Operation

2. Improve facility energy efficiency

3. Reduce maintenance requirements of 3x Chiller Plants

4. Improve Humidification Control of Operating Theatres

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 9: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 9

Robina Hospital Chiller Plant OptimisationEvaluation and Assessment

•Two projects were initially being considered:1. Mechanical upgrade to improve Dehumidification2. Energy Optimisation Project focusing on Chiller Plant

•Demand Flow™ provided possibility of addressing both issues

•Robina Hospital engaged Siemens to complete a detailed feasibilitystudy to further understand chilled water network and benefits ofDemand Flow™

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 10: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 10

Robina Hospital Chiller Plant OptimisationEvaluation and Assessment – Chilled Water Sub-Systems

The five major energy consuming sub-systems of the Chilled Waternetwork are:

1. Chillers2. Chilled Water Pumps3. Condenser Water Pumps4. Cooling Tower Fans5. Air Handing Units

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Demand Flow optimises the performance of all energyconsuming sub-systems holistically.

Page 11: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 11

Robina Hospital Chiller Plant OptimisationEvaluation and Assessment – Challenges

•15 years of modifications to the chilled water network

• Identifying all system bypass water

• Water quality issues from old plant being transferred into new

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 12: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 12

Robina Hospital Chiller Plant OptimisationEvaluation and Assessment – Findings

• 22% reduction in chilled water plant consumption

• 3.3 year payback period guaranteed (energy savings only)

• 22% Internal Rate of Return

• Redundancy of 2 inefficient chiller plants

• Improvements in humidification control possible

• No Chiller Variable Speed Drives required

• Significant water quality improvements

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 13: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 13

Robina Hospital Chiller Plant OptimisationOptimisation Process

• 3 month project implementation period (July – September)

• Installation of:• Variable Speed Drives for Condenser Water Pumps• Cooling Tower Isolation Valves• High accuracy differential pressure and temperature sensors

• Commissioning of:• Demand Flow control algorithm• 12 months system fine tuning

• Continuous supply of chilled water critical for operating theatres and MRI

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 14: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 14

Robina Hospital Chiller Plant OptimisationOptimisation Process – Demand Flow™ Commissioning

ChillersOptimised pressure andtemperature setpoints.

Increased operating times atchiller ‘sweet-spot’.

PumpsVariable speed control of allchilled water and condenserwater pumps.Removes system bypassesto reduce excessive pumpingenergy.

Cooling TowersOptimised cooling tower flow,variable speed fan controland staging.

Page 15: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 15

Robina Hospital Chiller Plant OptimisationResults – More than Energy Savings!

• Plant Consolidation

• Facility Reliability Improvements

• Chilled Water System Efficiency

• Energy Savings & Greenhouse Gas Emission Reduction

► FacilityOverview

► ProjectMotivations

► Evaluation &Assessment

► OptimisationProcess

► Results

Page 16: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 16

Robina Hospital Chiller Plant OptimisationResults – Plant Consolidation

• Single Chilled Water Plant Benefits:

• Water Savings – no longer requiredcooling towers for reciprocating plant

• Maintenance Savings – other 2 plants nolonger require maintenance

• More efficient low load performance

• Simplified system operation

Page 17: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 17

Robina Hospital Chiller Plant OptimisationResults – Facility Improvements

• Improved humidification control of operating theatres

• Increase in deliverable plant capacity

• Effective management of chiller lift

• Eliminates refrigerant flow issues at low load conditions

Page 18: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 18

Robina Hospital Chiller Plant OptimisationResults – System Efficiency Improvement

Source: "All Variable Speed Chiller Plants", ASHRAE Journal, September 2001

0.57.0

0.65.9

0.75.0

0.84.4

0.93.9

1.03.51

1.13.2

1.22.9

1.32.7

Standard CodeBased Chiller Plants

New Technology,

All-Available Speed

Chiller Plants

High-Efficiency,Optimized

Chiller Plants

Older

Chiller

Plants

Chiller Plants with Repairable Design orOperational Problems

Excellent Good Fair Needs Improvement

Pre-Optimization(Annual Average 0.93 kW/Ton)

(Annual Average System COP 3.8)

Post-Optimization(Annual Average 0.66 kW/Ton)

(Annual Average System COP 5.3)

kW/ton *

COP *

(Annual Average)

* Includes Chiller,Pumps and CT FansCombined

Page 19: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 19

Robina Hospital Chiller Plant OptimisationResults – First 8 Months of Savings

• 26% Saving in Chiller Plant Consumption

• 676,216 kWh saved (85% of annual target)

• Reduction of 554 Tonnes of CO2 emissions

• Anticipated payback of 2.5 – 3 years aheadof a 3.3 year guarantee

Page 20: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 20

Demand Flow™Case Study – Robina Hospital

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15

Cumulative Target vs. Actual Savings (kWh)

Cumulative Target Cumulative Actual Annual Target

Page 21: IHEA Robina Hospital Chiller Plant Optimisation

11-09-2015Page 21

Kieran McLeanDemand Flow – Business Development

Maree McKayService Director – Robina Hospital

Any Questions?

Robina Hospital Chiller Plant OptimisationContact page