Top Banner
IHC Hydrohammer® Tim van Erkel Area Sales Manager Renewables
48

IHC Offshore Wind Presentation

Dec 26, 2015

Download

Documents

chinnaiitm

IHC Offshore Wind Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IHC Offshore Wind Presentation

IHC Hydrohammer®

Tim van Erkel �– Area Sales Manager Renewables

Page 2: IHC Offshore Wind Presentation

If it is innovative technology, we build it

Facts IHC MERWEDEFinancial turnover for 2010 EUR 1,1 billion

Staff 3000 + 1500

5 ship yards in The Netherlands, 1 ship yard in China

World wide Service & Manufacturing locations

4 5% of annual is dedicated to R&D

Page 3: IHC Offshore Wind Presentation

3

IHC Merwede : Typical products

Page 4: IHC Offshore Wind Presentation

IHC Merwede: Organisation

Page 5: IHC Offshore Wind Presentation

5

IHC Offshore Wind

IHC Offshore Wind

Page 6: IHC Offshore Wind Presentation

6

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Marine operations & Vessel design

Page 7: IHC Offshore Wind Presentation

Offshore handling systems, Subsea trenching tools, Control systems

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Page 8: IHC Offshore Wind Presentation

8

Engineering: Concept, Basic & DetailProduction: Project Management, Procurement, FabricationIntegration & Installation systems on vesselsCommissioning & Testing

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Page 9: IHC Offshore Wind Presentation

9

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Page 10: IHC Offshore Wind Presentation

10

IHC Offshore WindInstallation & Handling

IHC Handling Systems B.V.

Monopile sealing plug

Page 11: IHC Offshore Wind Presentation

11

IHC Offshore WindBusiness Units in the wind

Consultancy & Engineering

• Vuyk Engineering Rotterdam B.V.

Engineering & Fabrication

• IHC Engineering Business Ltd

• IHC Offshore Systems B.V.

Installation & Handling

• IHC Hydrohammer B.V.

• IHC Handling Systems B.V.

• IHC Sea Steel Ltd

Other services

• From other IHC BU’s

Yards

• IHC Merwede Offshore & Marine

Page 12: IHC Offshore Wind Presentation

12

IHC Offshore WindConcept development

A number of developed concepts by IHC BU’s:• Fully assembled turbines on a jack-up vessel• Jacket installation system• Blade installation tool – 3 blades• Monopile installation• Floating vessel - fully assembled turbine installation

Patent pending

Concepts to be further developedin cooperation with the industry

Page 13: IHC Offshore Wind Presentation

IHC Hydrohammer B.V.�• Established in 1984�• 75 employees ( 2010)�• Locations;

�• The Netherlands, Main office and workshop�• Singapore, Office and workshop�• USA Office�• China & Dubai Dealers and service points

�• Hammer S 30 �– S 2300 KJ�• Sales and Rental projects�• Financial turnover EUR 53 million

Page 14: IHC Offshore Wind Presentation

Onshore

sheets profiles cast in situ concrete

Page 15: IHC Offshore Wind Presentation

Civil Works

Harbour works Bridges Jetties

Page 16: IHC Offshore Wind Presentation

Oil & Gas • Oil & Gas related• Mostly offshore• Deepwater

conductors jackets anchors/templates

Page 17: IHC Offshore Wind Presentation

Special application products

Rock breaking Pile Toe Drive Horizontal driving

Page 18: IHC Offshore Wind Presentation

Piling

The beginning�…�…�…�…�…..

Page 19: IHC Offshore Wind Presentation

RAM

ANVIL

PILE

S - 30S - 40S - 70S - 90S - 120S - 150S - 200S - 280S - 500S - 600S - 800S - 1200 S - 1400S - 1800S - 2000S - 2300

Piling

S-30: 30kJ = 1,5 t (ram) = 3,8 t (weight)S-2300: 2300kJ = 115 t (ram) = 240 t (weight)

Page 20: IHC Offshore Wind Presentation

Cross Section IHC Hydrohammer

Ram

Sleeve

Anvil

Pile

Page 21: IHC Offshore Wind Presentation

Some facts on sizes / forces / speedS 1200 Hydrohammer driving a steel pile:

�• Ram m= 60 tons

�• Ram is lifted up in 1s over 1m drop height

�• Ram accelerates at 2g down in 0,5 s to max speed

�• Ram speed at anvil v = 6,33 m/s = 22,8 km/h

�• Energy E = ½ m*v2 = 1200 kNm

�• Cycle rate is 40 blows/min at full energy

�• Contact time (energy transfer) of ram and anvil ป 4,5 ms�• Speed of shock wave in pile = 5200 m/s or 18720 km/h

Page 22: IHC Offshore Wind Presentation

IHC HYDROHAMMER

�• RATED = KINETIC

�• 100% ENERGY AT ANY BATTER

�• ONE PIECE RAM

�• FORGED STEEL RAM & ANVIL

�• STEEL TO STEEL TRANSFER

�• SHORT STROKE

�• PISTON ACCUMULATERS

�• ACCELERATION 100%

�• CLOSED HAMMER HOUSING

SINGLE ACTING

HYDRAULIC HAMMER

�• RATED = POTENTIAL

�• REDUCED ENERGY ON BATTER PILES

�• MULTIPLE PIECE RAM

�• CAST STEEL PRODUCTS

�• HAMMER CUSHION TRANSFER

�• LONG STROKE

�• BLADDER ACCUMULATERS

�• ACCELERATION 0 20%

�• OPEN HAMMER HOUSING

Main Differences Hydraulic Hammers

Page 23: IHC Offshore Wind Presentation

Renewable energies

• Oil & Gas related• Mostly offshore• Deepwater

mono piles jackets/tripods anchors

Page 24: IHC Offshore Wind Presentation

Piling options Foundations types

Page 25: IHC Offshore Wind Presentation
Page 26: IHC Offshore Wind Presentation

Mono-piles: installed piles incl. metmasts 2000-2009

269

719IHC Hydrohammer

Mono piles Track Record

Mono-piles: installed MW's 2000-2009

667

2148

IHC Hydrohammer

Page 27: IHC Offshore Wind Presentation

Renewables�• IHC Hydrohammer installed 70% of driven piles in Europe

�• IHC Hydrohammer will supply piling equipment to all Chinese Offshore Projects:BIN HAI, SHE YANG, DONG TAI and DA FENG

�• IHC Hydrohammer has the largest Hammer in the rental fleet and world andworking on the WALNEY 2 OWF project. Hammer size 2000 KJ

�• IHC Hydrohammer has the largest Sleeve in the rental fleet and world andworking on the WALNEY 2 OWF project. Diameter 5,5 meter

�• IHC Hydrohammer supplied piling equipment to the largest OWF project underconstruction:GREATER GABBARD (140 Mono Piles) last yearLONDON ARRAY 177 (Mono Piles) this year

�• IHC Hydrohammer works close together withother IHC business units in the OWF marketto provide a wide range of services

Page 28: IHC Offshore Wind Presentation

�• S 1200 Hammer

�• Piles: 7x 5100

�• Contractor: GE Wind Energy

�• Owner/Developer: Airtricity & GE Wind Energy

�• Area: Ireland (East Coast)

�• Installation Vessel: Jumping Jack

�• Turbine: GE 3.6 MW

�• Water Depth: 2 5 meter

ARKLOW BANKS 2003

Page 29: IHC Offshore Wind Presentation

BARROW 2005�• S 1200 Hammer

�• Piles: 30x 4750

�• Contractor: MPI

�• Owner/Developer: Dong Energy

�• Area: United Kingdom (West Coast)

�• Installation Vessel: Resolution

�• Turbine: Vestas V90 (3 MW)

�• Water Depth: 15 meter

Page 30: IHC Offshore Wind Presentation

BELWIND 2009�• S 1200 Hammer

�• Piles: 56x 4072

�• Contractor: Van Oord

�• Owner/Developer: Belwind

�• Area: Belgium

�• Installation Vessel: Svanen

�• Turbine: Vestas V90 (3 MW)

�• Water Depth: 15 37 meter

Page 31: IHC Offshore Wind Presentation

�• S 1200 & S 1800 Hammer

�• Piles: 140x 5100

�• Contractor: Seaway Heavy Lifting

�• Owner/Developer: NPower

�• Area: United Kingdom (East Coast)

�• Installation Vessel: HLV Stanislav Yudin

�• Turbine: Siemens 3,6 MW

�• Water Depth: 4 37 meter

GREATER GABBARD �– 2009/2010

Page 32: IHC Offshore Wind Presentation

Mono Piles�• S 1400 Hammer�• Piles: 50x 4700�• Contractor: GeoSea N/V�• Owner/Developer: Dong Energy�• Area: United Kingdom (West Coast)�• Installation Vessel: Goliath�• Turbine: Siemens 3,6 MW�• Water Depth: 19 23 meter

Substation Jacket�• S 500�• Contractor: VSF

WALNEY I 2010

Page 33: IHC Offshore Wind Presentation

Jiangsu Rudong 2010�• S 800 Hammer

�• Equipment prepared for 5100 mmMono Piles

�• Joint Venture between:

�• Project: September/October 2010

�• ZPMC manufactured Mono Piles and TransitionPieces for Greater Gabberd in Europe

Page 34: IHC Offshore Wind Presentation

Jiangsu Rudong 2010

Page 35: IHC Offshore Wind Presentation

Sleeve:Anvil 4300

Sleeve:Anvil 4300

+ Anvil Ring

Sleeve:Anvil 5500

+ Anvil Ring

Sleeve:Anvil 5500 +

Cone shaped follower

Sleeve:Synchronical

pile driving

Pile diameter: <4300m

Pile diameter: Up to 5200mm

Pile diameter: Up to 6500mm

Pile diameter: 6500-7500mm

Pile diameter: >7500mm

Hydrohammer:S-800 / S-1400

Hydrohammer:S-800 / S-2000

Hydrohammer:S-1400 / S-2000

Hydrohammer:S-2000 or bigger

Hydrohammer:S-2000 or bigger

Page 36: IHC Offshore Wind Presentation

M1

M2

M3

Ratio [M2 / M1]

=0

=0

=0

=0=0

=0=0

Before After

[M2 / M1] << 1 [M2 / M1] ~ 1 [M2 / M1] >> 1

Before After

Before After

INFLUENCE OF SIZE OF ANVIL

Page 37: IHC Offshore Wind Presentation

SINGLE SOLID ANVIL

�“UFO�” Design to reduce weight

High energy transfer efficiency

STANDARD FLAT NEW UFO

ENERGY TRANSFER

Page 38: IHC Offshore Wind Presentation

Solid forged anvil/ram

Page 39: IHC Offshore Wind Presentation

noise in air = noise under water ?

Page 40: IHC Offshore Wind Presentation

18 dB(A) reduction can bring us to acceptable levels

Noise reduction:

Page 41: IHC Offshore Wind Presentation

Forward actions underwater sound mitigation methods

1 Scale testing in IHC basin, double walled vacuum shell Completed at IHC yard October 2009, noise reduction 20-40dB

2 Open water test with live hammerCompleted March 2010

3 Full size shellFEED started January 2010Design drawings completed April 2010.

Page 42: IHC Offshore Wind Presentation

NRS around the pile, water depth 6m

Page 43: IHC Offshore Wind Presentation

60

80

100

120

140

160

180

31,5 12

5500

2000

8000

Frequency [Hz]

dB(lin)

1µP

zonder bescherming = 163.6dB(lin)

reductie scherm = 140.5dB(lin)

reductie bellen binnen = 137.5dB(lin)

achtergrond =124.4dB(lin)

Open water test: Noise Reduction Screen

Page 44: IHC Offshore Wind Presentation

Forward actions underwater sound mitigation methods

1 Scale testing in IHC basin, double walled vacuum shell Completed at IHC yard October 2009, noise reduction 20dB

2 Open water test with live hammerDouble wall air bubbles March 2010 27 dB(lin)Single wall air bubbles July 2010 20 dB(lin)

3 Full size shellFull sized NRS Started January 2010Design drawings completed April 2010.

4 Upcoming projectsRunder Tisch August 2011Flow RWE September 2011

5 Handling NMSHandling Concepts NMS Joined forces IHC Merwede

Page 45: IHC Offshore Wind Presentation

Handling Concepts NMS Joined forces IHC Merwede

Page 46: IHC Offshore Wind Presentation

NMS Pre-piling Frame

Page 47: IHC Offshore Wind Presentation

Our market position

well founded !

Page 48: IHC Offshore Wind Presentation

www.ihchydrohammer.com

Thank you for your attention