IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators and Other Participants 2:10 – 2:30 PM Oklahoma City
10

IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

Jan 18, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

IGSHPA Technical Conference & Expo October 29–30 2007

Jim Bose OSU/IGSHPA

High Performance Housing and Energy Rating

Discussions on Appraisers, Evaluators and Other Participants

2:10 – 2:30 PM Oklahoma City

                       

       

Page 2: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

800 Sq Ft $1.63 / Sq Ft / Yr 1665 Sq Ft $0.55 / Sq Ft / Yr

3400 Sq Ft $0.47/ Sq Ft / Yr 5400 Sq Ft $0.62 / Sq Ft / Yr

Annual Utility Costs/Consumption

Conventional (gas & Electric) 73 kWh/m73 kWh/m22/yr/yr

72 kWh/m72 kWh/m22/yr/yr 113 kWh/m113 kWh/m22/yr/yr

1960

Page 3: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

Construction Date

Building Size

Sq Ft – M2

Total Utilities

$/Sq Ft/Yr – kWh/m2/yr

1 1960 ST 800 - 74 1.63 - ?

2 1974 KG 1322 - 123 1.27 - ?

3 1973 LE 1850 - 172 1.04 - ?Conversion to GSHP 2006

1850 - 172 0.64 - ?

4 2001 JB 5746 - 534 0.62 - 113

5 2002 RD 3400 - 316 0.47 - 72

6 2003 LM 1665 - 154 0.55 - 73

Utility Costs of Conventional and GSHP

Page 4: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

ConventionalConventional Variable Air Volume (VAV) Building Variable Air Volume (VAV) Building15,000 Sq. Ft.15,000 Sq. Ft.

1.32 $ / sf / yr1.32 $ / sf / yr

Page 5: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

Geothermal BuildingGeothermal Building20,000 Sq. Ft.20,000 Sq. Ft.

0.55 $ / sf / yr0.55 $ / sf / yr

Page 6: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

Dallas / Ft. Worth Area: 301,000 sq ftDallas / Ft. Worth Area: 301,000 sq ft

Annual Cost: $0.60 / Sq Ft Annual Cost: $0.60 / Sq Ft

donpenn.comdonpenn.com

Page 7: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

GEO

4 - Pipe

4 – Pipe

Thermal Storage

Installation Costs for Centennial – $6.8 Million

Installation Costs for Wakeland - $6.7 Million

Don Penn

Page 8: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

ConventionalConventional Variable Air Volume (VAV) Building Variable Air Volume (VAV) Building15,000 Sq. Ft.15,000 Sq. Ft.

1.32 $ / sf / yr1.32 $ / sf / yr

Page 9: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.

Geothermal BuildingGeothermal Building20,000 Sq. Ft.20,000 Sq. Ft.

0.55 $ / sf / yr0.55 $ / sf / yr

Page 10: IGSHPA Technical Conference & Expo October 29–30 2007 Jim Bose OSU/IGSHPA High Performance Housing and Energy Rating Discussions on Appraisers, Evaluators.