Top Banner
IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1
22

IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Dec 18, 2015

Download

Documents

Cory Caldwell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

IFE-CASC.EU project

Forum with market partiesParis – 18th June 2013

1

Page 2: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Welcome and Agenda

• 9:30 - 10:00 - Welcome of participants • 10:15 - Project presentation • 10:30 - Presentation of CASC.EU• 10: 45 - Proposed evolutions for the yearly and

monthly allocations • 11:10 - Proposed evolutions for the daily and

intraday allocations • 11:30 - Feedback from market parties • 12:30 - 14:00 Lunch

2

Page 3: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Project presentation• Context and background

• Over the last 2 years, RTE, REE and CASC.EU have been working for the integration of IFE LT auctions in CASC.EU platform following ACER recommendations (FWGL-CACM and cross-regional roadmaps presented at Florence Forums)

• After the 10th IG meeting of this SWE-ERI, TSOs requested to Regulatory Commissions, and Ministries where relevant, the needed comfort for the project and sent a detailed project description

• A MoU between CASC-RTE-REE was signed in 15th April 2013

3

Page 4: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Main goals of the project• Foreseen scenario :

Transfer of the IFE Yearly and Monthly auctions to

CASC-EU, Current situation in IFE

PTR Annual auction: REE

PTR Monthly auction: RTE

PTR Daily auction: RTE

PTR ID auction: REE

Situation in IFE in 2014

PTR Annual auction: CASC.EU

PTR Monthly auction: CASC.EU

PTR Daily auction : RTE

PTR ID auction: REE

• Daily Auction will be replaced by Day Ahead Market Coupling SWE-NWE

4

Page 5: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Planning 15th April 2013: MoU signature. May 2013: Information towards Market Participants (MP), NRAs and

other TSOs. June 2013:

Launch of Public Consultations on LT and ST Auction Rules (3 weeks)

IFE Users’ Forum (18th June) Comments on the two set of Rules (during the consultation period)

July 2013: Submission of final IFE LT and ST Auction Rules to the NRAs (Spanish Ministry and CRE), for their approval

Foreseen Go live for December 2013 Auction, subject to NRA approval

5

Page 6: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Evolutions of long-term auctions

• Yearly and monthly auctions on IFE will be no longer covered by IFE rules all references to long-term auctions have been removed by IFE rules 3.0

• Yearly and monthly auctions on IFE will be covered by a new version of the Harmonized Auction Rules (HAR v2.0)

• Public consultation is now open (until 21st June for HAR 2.0, 25th June for IFE rules 4.0)

6

Page 7: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

7

Page 8: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

• The HAR deals with the Allocation of PTRs– Only one Declaration of Acceptance (DoA) on HAR dealing with the

Allocation; no DoA for Nomination – The DoA will be signed by CASC and the Participant

• DoA for nomination will be covered in local regulation (Spanish Operational Procedure 3.1 and I/E Rules in France)

• The HAR are issued for an unlimited period

• Some border specificities

HAR - Auction Rules structure

8

Page 9: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

HAR - Participation requirements

• Signature of the Declaration of Acceptance (DoA)

• Financial Guarantees : Business Account Entitlement

9

Page 10: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

• Any entity will be entitled for all Yearly and Monthly auctions if it is active on the Electricity Market in at least one control area

For Spain:• Certificado del Operador del Sistema-Sujeto del

Mercado issued by REE

HAR - Participation requirements

UIOSI, Transfer and Resale mechanisms can be used by Participants even if they cannot nominate the PTRs bought

10

Page 11: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

HAR - Financial Guarantees

Cash deposit – Business Account (no more bank guarantees for LT PTRs on IFE).

The Credit limit to be awarded of capacity should cover :

•Monthly product: full amount•Yearly product: 2/12th of the total amount

•Amounts are blocked•Invoicing/self-billing : 5 working days of M+1

11

Page 12: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

For France-Spain, an aggregation of Yearly and Monthly Held Capacities

Sent at 16:00

HAR – Programming authorisations

12

Page 13: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

UIOSI mechanism is applied on all Country Borders.

For France-Spain border :– Marginal price of the specific daily auction

Same as today in IFE rules

–Positive day-ahead spot market spread in the affected period in the same direction, in case of cancellation of the daily auction

HAR - UIOSI

13

Page 14: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

•Held capacities are firm, except for Force Majeure and Safety of the system. Firm after sending PA, except for Force Majeure.For France-Spain, compensation based on day-ahead spread + two caps:•On the day-ahead market spread values •On the monthly total amount of compensations

•Exchange Programs are firm, except for Force MajeureCompensation is based on initial price.

HAR - Firmness

14

Page 15: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Transfer mechanism for exchanging Yearly/Monthly Capacities between Participants with notification to TSOs

Resale of Yearly Capacities in a Monthly Auction

HAR - Secondary Market

15

Page 16: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

HAR - Secondary Market• Bulletin Board : to exchange proposals for transfer among

partiesPrototype of the Bulletin board (please not that below examples of the screens might be different in the production environment)

16

Page 17: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Evolutions of short term auctions

• Yearly and monthly auctions will be no longer covered by IFE rules 4.0 all references to long-term auctions have been removed

• Public consultation is now open (until 25th June)

17

Page 18: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Main improvements• New definitions:– Auction Administrator, Contestation Period, Intraday

Product, Offered Capacity and Rules for Capacity Allocation by Explicit Auctions

• Cancellation of some definitions due to:• IFE rules v4.0 perimeter: Monthly Product, Resale

Notification, Reseller definitions, Secondary Market Operator, Secondary PTR markets, Transfer Notification and Transferor definitions, PTR Holder and PTR Transfer.

• Text improvements and clarifications: CNE and CRE, Ministerio de Industria, Turismo y Comercio, Ministerial Order, Beneficiary, Force Majeure and Reduction Coefficient.

18

Page 19: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Main modifications• To cover the new rule’s perimeter (only daily

and intraday timeframes)– Art 1.02, 1.03, 2.03, 2.06, 4.01, 4.04, 6.03, 7.01 and 7.02

• Improvement and clarifications on the text on:– Bank Guarantee nature, amount, modification and

invocation (art. 3.02)– Entitlement conditions (art. 3.04)– Suspension and withdrawal of Entitlement process (art. 3.05) – Other general text improvements

19

Page 20: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Main modifications• Articles no longer needed in IFE rules v4.0

– Article 2.07: As firmness of exchange programs is covered in local contracts / regulation

– Section VI on Secondary PTR Market, as is dealt in HAR rules– Articles 7.01 and 7.04 (to cover only daily/intraday timeframes)

• Articles updated due to new terms:– Auction Administrator (art. 1.05, 2.02, 3.02, 3.04, 4.02, 6.02, )– Offered Capacities (art. 2.04)

• New article 9.04 on Intellectual property.• Improved description on Payment conditions and

Payment Incident (art. 7.02)• Resale and Compensations concepts (art. 7.01) were

eliminated 20

Page 21: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

Appendixes updates• Appendix 1: Minor modifications

• Appendix 2: Now covers both TSOs. New conditions for Bank Guarantees. New model of letter of invocation of Bank Guarantee.

• New Appendix 3 on Downgraded Mode: modifications to cover only daily and intraday timeframes.

• Appendix 4: contact details updated.

• New Appendix 5: new appendix for listing the functions of Auction Administrator and their splitting between TSOs.

• Old Appendices 3, 5, 6, 7 from IFE Rules v3.0 have been deleted

21

Page 22: IFE-CASC.EU project Forum with market parties Paris – 18th June 2013 1.

OPEN DISCUSSION

22