IRRIGATION & FLOOD CONTROL DEPARTMENT (IFCD), MANIPUR Estd. in May, 1976 Assured Irrigation in the state with Water Resource Projects Managing Flood Control Works Also creates Potential for: a. Raw Water for Water Supplies b. Hydel Power Committed for:
17
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IFCDflood

IRRIGATION & FLOOD CONTROL DEPARTMENT (IFCD), MANIPUR

Estd. in May, 1976

Assured Irrigation in the state with Water Resource Projects

Managing Flood Control WorksAlso creates Potential for: a. Raw Water for Water Suppliesb. Hydel Power

Committed for:

Page 2: IFCDflood

SCHEMES UNDER FLOOD MANAGEMENT

WORKS

[email protected]

Page 3: IFCDflood

The hill and valley of Manipur are traversed by many rivers/streams of Manipur river basin and Barak river sub-basin.

The undulating topography coupled with deforestation in the catchment area of the rivers lead to accelerated draining of water by the rivers thereby endangering the river bunds.

The consequences are frequent devastation of Flood resulting heavy loses in terms of socio-economic value and even life.

Flood in Manipur

Page 4: IFCDflood

• Activities of emergency Flood Fighting Works are taken up as normal work under the State fund.

• Due to inadequate fund under State Plan all the Flood Management Programme (FMP) Works could not be taken up under State Plan.

• The department has been taking up the FMP works under State Plan and Centrally Sponsored Schemes like, AIBP (Brahamaputra Board), SPA, NEC etc.

Page 5: IFCDflood

ANTI-EROSION AND FLOOD CONTROL SCHEMES UNDER AIBP(BRAHMAPUTRA BOARD)

Districts Number of Schemes

2007-08 2008-09 2009-10 2010-11 Total

Imphal (E) 3 - - 1 4

Imphal(W) 3 - - 2 5

Thoubal 6 - - 3 9

Bishnupur - - - 1 1

Senapati - - - 1 1

Ukhrul - - - - -

Chandel - - - 1 1

Churachandpur

- - - 1 1

Tamenglong - - - - -

Total:- 22

Total Cost: Rs. 109.09 Cr

Page 6: IFCDflood

ANTI-EROSION AND FLOOD CONTROL SCHEMES UNDER SPA

District Number of schemes

2008-09 2009-10 2010-11 Total

Imphal (E) 3 5 3 11

Imphal(W) 4 2 3 9

Thoubal 1 12 8 21

Bishnupur - 1 6 7

Senapati - 6 9 15

Ukhrul - 5 4 9

Chandel - 6 3 9

Churachandpur

- 3 8 11

Tamenglong - 3 5 8

Total : 100

Total Cost: Rs. 120.00 Cr

Page 7: IFCDflood

ANTI-EROSION AND FLOOD CONTROL SCHEMES UNDER NEC

DistrictNumber of scheme

2009-10 2010-11 Total

Imphal (E) 1 - 1

Imphal(W) - - -

Thoubal - 1 1

Bishnupur - - -

Senapati - - -

Ukhrul - - -

Chandel - - -

Churachandpur - 1 1

Tamenglong - - -

Total : 3

Total Cost: Rs. 9.13 Cr

Page 8: IFCDflood

Schemes Under JnNURM

Improvement of Nambul River FrontEnvisages beautification and channelisation of Nambul River from Khwai Hump Bridge to Keisampat Bridge.Estimated Cost:- Rs. 14.13 croreDate of Start:- 21-01- 2011.Physical Progress:- 49 %Finanial Progress:- Rs. 3.84 crore.Targetted Date of Completion:- 31 – 05 – 2012.

Page 9: IFCDflood

NAMBUL RIVER (under JnNURM) BEFORE EXECUTION

Page 10: IFCDflood

NAMBUL RIVER (under JnNURM) DURING EXECUTION

Page 11: IFCDflood

RCC WALL ABOVE BORE PILES AT THOUBAL RIVER( TYPICAL WORK OF S P A )

Page 12: IFCDflood

NAGA WALL AT BARAK RIVER, SENAPATI DISTRICT(TYPICAL WORK UNDER S P A )

Page 13: IFCDflood

RR MASONRY RETAINING WALL DURING CONSTRUCTION AT KOITE STREAM, CHURACHANPUR DISTRICT

( TYPICAL WORK UNDER N E C )

Page 14: IFCDflood

CC RETAINING WALL AT IMPHAL RIVER, IMPHAL EAST( TYPICAL WORK UNDER A I B P )

Page 15: IFCDflood

RR MASONRY RETAINING WALL AT NAMBUL RIVER, IMPHAL WEST

( TYPICAL WORK UNDER S P A )

Page 16: IFCDflood

SYSTEMS OF MONITORING

• The physical and financial progress for CSS schemes are monitored by Central Agencies.

• At the present scenario and law and order problems of the state, the District authorities takes a significant role at the implementation of schemes/projects

• From time to time the District authorities helps the department in controlling problems related to law & order, Land disputes or any untoward incidents that affects on the implementation of Schemes.