If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia
17

If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Dec 16, 2015

Download

Documents

Alban Hines
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

If we don’t use the Quantm system we won’t get the best alignments

Queensland Department of Main Roads, Australia

Page 2: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Problem

• Constructing a new road or rail, or realigning an old is expensive, with costs very sensitive to the alignment.

• The least cost solution of following the natural surface, is often impossible as the alignment must satisfy geometric, environmental and social constraints.

Page 3: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Current Practice

• Largely intuitive, and the weakest link is the planner’s capacity to consider all the data and constraints.

• Contractors can usually reduce costs by 5 – 10% when a project goes out to tender for design and construct by adjusting the alignment.

• Contingency allowances also add substantially to bids.

Page 4: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Agency Attitudes

• Agencies know they are not extracting the greatest value from their data, but do not realize the extent of the shortfall.

• Government agencies have accepted this status quo because of the uncertainties involved.

Page 5: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Status Quo

• Agencies do not locate alignments as precisely as possible because the data quality does not justify the precision; whilst the quality of the alignments does not justify spending more on better data.

• When current practice cannot make the best use of existing data, it is hard to justify paying more for better data.

Page 6: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

History

• The Quantm system is the product of CSIRO, the Australian Government Research Agency.

• The system was developed specifically to address the complex issues of route alignment planning.

• Quantm Ltd was established in early 2000 to commercialise the software.

Page 7: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Quantm

• The Quantm system is designed to locate alignments to within centimetres horizontally and vertically.

• It is a planning tool for route selection not a CAD system that is concerned with engineering design.

• The system can optimize horizontally and vertically whilst accommodating both broad based and localised issues.

Page 8: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Data

• Terrain

• Geometry

• Geology

• Unit costs

• Linear features

• Special zones

Page 9: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Construction

• Bridges

• Fill and Shallow Cuts– Culverts– Retaining walls

• Deep Cuts

• Tunnels

Page 10: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Structure of the Software

Page 11: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Modes of Operation

• Optimization - starting with fixed end points, bearings and grades, and searching the entire study area.

• Refinement - starting with an existing alignment and conducting a concentrated search in its vicinity.

Page 12: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Benefits

• Robust and Extensible

• Fast

• Flexible

• Reliable

• Scaleable

Page 13: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Performance

• Cost millions of alignments while searching for low cost solutions.

• 10km of road takes one or two minutes for each solution accepted, compared with a week for a CAD operator.

• Quantm clients have documented alignment construction cost savings of as much as 30%.

Page 14: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Toowoomba - Plan

Page 15: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Toowoomba - Profile

Page 16: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.
Page 17: If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Implications for Data

• The magnitude and consistency of the cost reductions are beginning to change the way the road agencies view the quality, scope and timing of their data collection.

• Quality data can now provide an immediate payback by giving agencies lower cost routes and a better grasp of the contractor’s costs, thereby reducing substantially the allowance for contingencies.