ideal grid for all 04/12/2015 SLIDE 1
• IDE4L project overview and ANM concept
• Aggregator concept
• Developed functionalities
• Distributed automation system
• Demonstrations
• Conclusions
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE 2
Lab Demo Site
Field Demo Site
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE 4
Lab Demo Site
Field Demo Site Brescia, Italy
ideal grid for all
A2A
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 6
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 7
A2A (LV network)
ASSETS: • 1 Secondary substation
• 10 LV feeders • 5/10 FDs with monitoring equipment
• 1/10 FD with monitor and control
• 10/10 FDs managed by algorithms
USE CASES: • RT monitoring
• Load and production forecaster
• State estimation
• Power control
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 8
A2A (LV network)
Secondary substation involved in the LV test phase
ideal grid for all
A2A
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 9
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 10
A2A (LV network)
LV controllable breakers
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 11
A2A (LV network)
LV – BPL modem
SM PV
SM Load
LV customer
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 12
A2A (LV network)
DVR
STATCOM
PV inverter
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 13
A2A (LV network) • Solar eclipse March, 20th 2015
• Power reduction : 40%-75%
• Voltage reduction: 5 V (worst case)
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 14
A2A (LV network) • Voltage profile:
• 3 LV customers
• 1 week
• 6 samples per hour
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
18
Lab Demo Site
Field Demo Site
Seville, Spain
ideal grid for all
Telvent MV Use cases
• Network real-time monitoring
• Distributed FLISR
Hardware and software
• RTU • Telvent HU_AF + AB_AC
• Signal Generator • Omicrom CMC 353
• GOOSE compatible Switch • Netgear GS105Ev2
• PC tools • IEDs Web Server Connection
• IED Scout
• Wireshark
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 19
Generator Controller&
Wireshark & IED Scout
Triphasic signal generator
Multiple RTU
ideal grid for all
Validation Cabinet
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 20
Telvent
Components
• Light indicators for switch/circuit breakers position
• Configurable fault impedances
• 5 short-circuits testing points
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
21
Lab Demo Site
Field Demo Site
Tampere, Finland
ideal grid for all
TUT Use cases (MV and LV)
• Network real-time monitoring
• State estimation
• State forecast
• Power control (secondary control of congestion management)
• Distributed FLISR
Hardware and software
• RTDS
• Smart meters • Kamstrup Omnipower
• Landis&Gyr E650
• RTU • Monitoring: iRTU (iGrid)
• FLISR: Telvent HU_AF + AB_AC
• Voltage controllers • OLTC: ABB REU615
• DG: ABB Unitrol 1020
• GW: Modbus to IEC61850 (HMS)
• PSAU and SSAU
04/12/2015 SLIDE 22 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all
TUT – State estimation use case 04/12/2015 SLIDE 23
Customer (simulated)Street Cabinet (simulated)
MV/LV substation (simulated)
PDOLTC
CTRL
RTU
Switch
Switch
SM SMPV
CTRL
modbus
850
AC
DC
HV/MV substation (simulated)
PD
OLTC
CTRL
SSAU
61850 MMS client
61850 MMS server
DLMS/COSEM client
LV RT monitoring (step 1)
MV RT mon
MV PC
PSAU
61850 MMS client
61850 MMS server
Wireless
network real time MONitoring (MON)
State Estimation (SE)
Power Control (PC)
Topology Manager (TM)
LV State Forecast (SF)
DG
CTRL
Modbus
850
DG
CTRL
Modbus
850
Telecomm. device
IED
Building blocks
modbus
DLMS/COSEM
61850-MMS
(report)
61850-MMS
(control/substitute)
61850-GOOSE
104
WS
Data flows
FO
PLC
ETH
Wireless
Serial
Plain cable
Physical connections
RTU
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all
TUT – Power control use case 04/12/2015 SLIDE 24
Customer (simulated)Street Cabinet (simulated)
MV/LV substation (simulated)
PDOLTC
CTRL
RTU
Switch
Switch
SM SMPV
CTRL
modbus
850
AC
DC
HV/MV substation (simulated)
PD
OLTC
CTRL
SSAU
61850 MMS client
61850 MMS server
DLMS/COSEM client
LV RT monitoring (step 1)
MV RT mon
MV PC
PSAU
61850 MMS client
61850 MMS server
Wireless
network real time MONitoring (MON)
State Estimation (SE)
Power Control (PC)
Topology Manager (TM)
LV State Forecast (SF)
DG
CTRL
Modbus
850
DG
CTRL
Modbus
850
Telecomm. device
IED
Building blocks
modbus
DLMS/COSEM
61850-MMS
(report)
61850-MMS
(control/substitute)
61850-GOOSE
104
WS
Data flows
FO
PLC
ETH
Wireless
Serial
Plain cable
Physical connections
RTU
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
25
Lab Demo Site
Field Demo Site Barcelona, Spain
ideal grid for all
IREC
04/12/2015 SLIDE 26
PCC to the distribution network (emulated)
Sw
itch
(o
nly
1 s
w)
AC
DCES
CTRL
DER
CTRL
EMUL
CTRL
microGrid (emulated)
AC
DC
uGrid concentrator
Aggregator
PQ Control
XML
Data flows
ETH
Wireless
Physical connections
Control center (conceptual)
Tertiary Control (TC)/Market Agent (MA)
Actual Flexibility Capacity Estimation
Flexibility Activation
DMS
Ask for
flexibility capacity (2)
Flexibility Activation
MATLAB VARIABLES or FILES
DN simulator
MATLAB
SimPowerSystems
or MATPOWER
AC D
C
DC A
C
Grid emulator
GE
so
cke
ts (
MA
TL
AB
or
PY
TH
ON
)
GE
MGMT
Cinergia
protocol
CA (MATLAB)
Allocate CRP control
setpoints among
flexible resources
Read activated CRP
product
Modbus server
(virtual Linux)
string
csv file
EMS
AC
DC
DC
AC
modbus
Send CRP control
setpoints
Ask for
flexibility capacity (1)
Flexibility Activation
Optimization of uGrid operation
Gateway to remote signals
Management of data traffic
Logging
Measured P (optional)
Measured P (optional)
Voltage setpointFlexibility Activation
MATLAB
VARIABLES or
FILES
files
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 04/12/2015 SLIDE 28
IREC – setup 1 ASSETS: • 1 Grid emulator 200 kW
• 1 Interconnection Switch
• 1 Microgrid central controller • Energy management system
• Safety controller
CONTROLLABLE NODES: • Up to 6 DER emulators of 4 kW each