i KINGSGROVE TO REVESBY RAIL QUADRUPLICATION INNOVATIONS IN DESIGN AND CONSTRUCTION OF THE OVERBRIDGES Gillian Sisk BEng (Hons) PhD CEng MIEI Sally Cox BEng (Hons) CEng FICE Naomi Stone BEng (Hons) CEng MIET MIRSE Wednesday 6 April 2011
16

ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

Jul 23, 2015

Download

Business

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

KINGSGROVE TO REVESBY RAIL QUADRUPLICATION

INNOVATIONS IN DESIGN AND CONSTRUCTION OF THE OVERBRIDGES

Gillian Sisk BEng (Hons) PhD CEng MIEI

Sally Cox BEng (Hons) CEng FICE

Naomi Stone BEng (Hons) CEng MIET MIRSE

Wednesday 6 April 2011

Page 2: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Project Team

Page 3: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

King Georges Road

Kingsgrove

Salt Pan Creek

RevesbyPadstow

Narwee

Riverwood

Page 4: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Design – KGR Overbridge

Page 5: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

King Georges Road – Southbound Bridge

Page 6: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

King Georges Road – Northbound Bridge

Page 7: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Key Construction Challenges

Rail corridor – limited available track possessions Key Arterial route – 5 lanes to remain open all time Pedestrian access on both sides of the bridge and access

to the station Ethane Gas Pipeline - EGP Limited workspace in a densely populated urban

environment Existing bridge structures – limited existing drawings Utilities – both at road level and at track level Tight construction program

Page 8: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

The challenge

Ethane Pipeline Constrained Site

Operational RailwayTraffic

Page 9: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Five Lanes Open

1

Median

•Piling

•Cintec Anchors

•Headstock

•Surfacing

Page 10: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Five Lanes Open

2

Northbound

•Piling

•Cintec Anchors

•Headstock

•Surfacing

Page 11: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Five Lanes Open

3

Southbound

•Piling

•Cintec Anchors

•Headstock

•Pre-cast beams

•Surfacing

Page 12: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Five Lanes Open

4

Reinstate Median

•Reinstate turning lanes

•Install signals

Page 13: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Page 14: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Utilities

Ethane GP

Electrical

Water

Gas

Comms

Railway Power

Signalling

Comms

Services

Page 15: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Tight Construction Programme

Page 16: ICWES15- Kingsgrove to Revesby Rail Quadruplication - Innovations in Design and Construction of the Overbridges. Presented by Dr Gillian Sisk, Sinclair Knight Merz, Sydney AUST Ms

i

Conclusion

Bridge was delivered on time No unplanned impact on rail and road operations High quality product