i KINGSGROVE TO REVESBY RAIL QUADRUPLICATION INNOVATIONS IN DESIGN AND CONSTRUCTION OF THE OVERBRIDGES Gillian Sisk BEng (Hons) PhD CEng MIEI Sally Cox BEng (Hons) CEng FICE Naomi Stone BEng (Hons) CEng MIET MIRSE Wednesday 6 April 2011
i
KINGSGROVE TO REVESBY RAIL QUADRUPLICATION
INNOVATIONS IN DESIGN AND CONSTRUCTION OF THE OVERBRIDGES
Gillian Sisk BEng (Hons) PhD CEng MIEI
Sally Cox BEng (Hons) CEng FICE
Naomi Stone BEng (Hons) CEng MIET MIRSE
Wednesday 6 April 2011
i
Key Construction Challenges
Rail corridor – limited available track possessions Key Arterial route – 5 lanes to remain open all time Pedestrian access on both sides of the bridge and access
to the station Ethane Gas Pipeline - EGP Limited workspace in a densely populated urban
environment Existing bridge structures – limited existing drawings Utilities – both at road level and at track level Tight construction program