1 An Initial Review of Project Reporting in the Context of Complexity Antoniadis D.N. (Senior Project Manager & Research Student UK) 1 st st ICEC & IPMA Global Congress ICEC & IPMA Global Congress on Project Management and 5 on Project Management and 5 th th World Congress on Cost Engineering, Project World Congress on Cost Engineering, Project Management & Quantity Surveying Management & Quantity Surveying Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 – 26, 2006 26, 2006 Edum-Fotwe F.T. (Loughborough University UK) Thorpe A. (Loughborough University UK) The speaker D.N. Antoniadis Senior Project Manager with a Project Management Consultancy, UK. Currently doing a part time PhD in Project Management at Loughborough University, with an MSc in Project Management and over 20 years experience in Construction Project and Programme Management. Worked, at various management levels, for Client organisations and Contractors before becoming a Consultant. Led also a number of change initiatives including the setting up of three Programme Offices. 1 st st ICEC & IPMA Global Congress ICEC & IPMA Global Congress Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 – 26, 2006 26, 2006 What I will talk about: In reviewing ‘Project Reporting in the Context of Complexity’ I will talk about: What are the issues with Reporting How do these occur What can be done Challenges for the future 1 st st ICEC & IPMA Global Congress ICEC & IPMA Global Congress Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 – 26, 2006 26, 2006 Why Complexity? Einstein said: “You cannot solve the problem with the same kind of thinking that gives rise to the problem1 st st ICEC & IPMA Global Congress ICEC & IPMA Global Congress Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 – 26, 2006 26, 2006 What are the issues with Reporting? In Reporting the Project team has to deal with intricate problems that involve: People issues Organisational related issues Technology related issues, and Process related issues All dealing with interconnections and interactions of structures, systems and people 1 st st ICEC & IPMA Global Congress ICEC & IPMA Global Congress Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 – 26, 2006 26, 2006 How do these issues occur? - 1 Reciprocal interdependencies Bi-directional flow of information, based on the formula (n 2 -n) {where n=number of info nodes} Filtering The message is in the wrong language The medium(s) used 1 st st ICEC & IPMA Global Congress ICEC & IPMA Global Congress Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 – 26, 2006 26, 2006
3

ICEC-IPMA Apr2006 prsnt v00 - danton-progm...experience in Construction Project and Programme Management. Worked, at various management levels, for Client organisations and Contractors

Oct 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ICEC-IPMA Apr2006 prsnt v00 - danton-progm...experience in Construction Project and Programme Management. Worked, at various management levels, for Client organisations and Contractors

1

An Initial Review of Project Reporting in the Context of Complexity

Antoniadis D.N.

(Senior Project Manager & Research Student

UK)

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

on Project Management and 5on Project Management and 5thth World Congress on Cost Engineering, Project World Congress on Cost Engineering, Project

Management & Quantity SurveyingManagement & Quantity Surveying

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

Edum-Fotwe F.T.

(Loughborough University

UK)

Thorpe A.

(Loughborough University

UK)

The speaker

D.N. Antoniadis

Senior Project Manager with a Project Management Consultancy, UK.

Currently doing a part time PhD in Project Management at Loughborough

University, with an MSc in Project Management and over 20 years

experience in Construction Project and Programme Management.

Worked, at various management levels, for Client organisations and

Contractors before becoming a Consultant.

Led also a number of change initiatives including the setting up of three

Programme Offices.

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

What I will talk about:

In reviewing ‘Project Reporting in the

Context of Complexity’ I will talk about:

What are the issues with Reporting

How do these occur

What can be done

Challenges for the future

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

Why Complexity?

Einstein said: “You cannot

solve the problem with the

same kind of thinking that

gives rise to the problem”

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

What are the issues with Reporting?

In Reporting the Project team has to deal with intricate problems that involve:

� People issues

� Organisational related issues

� Technology related issues, and

� Process related issues

All dealing with interconnections and interactions of structures, systems and people

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

How do these issues occur? - 1

Reciprocal interdependencies

Bi-directional flow of information, based

on the formula (n2-n) {where n=number of info nodes}

Filtering

The message is in the wrong language

The medium(s) used

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

Page 2: ICEC-IPMA Apr2006 prsnt v00 - danton-progm...experience in Construction Project and Programme Management. Worked, at various management levels, for Client organisations and Contractors

2

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

Company

Report

A

Other

dept.

Company

Report

B Others

Project Reporting

process

Project Team

Report

Pockets of

info

manipulation

Individual

reports

Vacuum filter

Company

Report

A

Other

dept.

Company

Report

BOthers

Project Reporting

process in reality

Project Team

Report

Pockets of

info

manipulation

Individual

reports

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

How do these issues occur? - 2The Continuous process of Reporting

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

m=medium, n=noise, f=filter,

e=error, I=interconnection

e=encoder, d=decoder, m=medium,

n=environment, p=project team

Legend

Subscripts

How do these issues occur? - 3

When requests from various parties are not coordinated nor

standardised

The frequency of reporting does not fit the systems available,

nor the timetable

The systems used do not minimise/reduce duplication of effort

The boundaries are not regulated

The interconnections and their critical factors are not

appreciated, nor understood

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

It is the regulation of the boundaries, the minimisation of the influencing factors and the software systems used that control the level of reporting complexity in projects. The levelof complexity increases:

What can be done? 1

� Define properly the standard PM Structures

� Identify the boundaries

� Manage the boundaries using the tools and ensure

consistency and frequency of good communication

� Describe what is required - use the tools PEP and

PCH

� When building up the PCH, allow for flexibility, do

not assume that every project is the same

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

� Reduce the number of different tools (avoid spreadsheets)

� Reduce duplication of effort in reporting,

� Adjust the frequency of reporting to the

requirements

� Identify the stakeholder requirements and provide

training on reading the report(s),

� Finally, reporting is not just a contractual obligation.

It is about the 5 Ts: ‘Trust, Truth, Tolerance,

Thoughtfulness and not going over the Top’.

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

What can be done? 2

Page 3: ICEC-IPMA Apr2006 prsnt v00 - danton-progm...experience in Construction Project and Programme Management. Worked, at various management levels, for Client organisations and Contractors

3

Challenges for the future?Challenges for the future?

“The observer and the observed cannot be independent.

The act of observing disturbs the system’ Niels Bohr.

� The act of reporting is an observation upon the project

� The reporting disturbs the project resulting in:

� 99% syndrome, or ‘prisoner’s dilemma’, or ‘is not me gov’

� We have to review reporting and develop the processes,

technologies, systems, and behaviours, which will enable

us to move away from the above.

� We need more information about information

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

ClosingClosing

Baccarini, D.:Complexity consists of

many varied interrelated parts and can be

operationalized in terms of

differentiation and interdependency

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

11stst ICEC & IPMA Global CongressICEC & IPMA Global Congress

Ljubljana, Slovenia April 23 Ljubljana, Slovenia April 23 –– 26, 200626, 2006

“… to understand the actual we must contemplate the possible” Dawkins R. ‘The extended phenotype’ p.2

Contact Details: Dimitris Antoniadis

Tel. No.: (++)44 7754 522 049

Email: [email protected]

Or [email protected]

Website: www.danton-progm.co.uk