I&C Status at EDF & Recommendations to IAEA IAEA TWG-NPPIC Meeting 20-22 May 2009 Vienna Patrick Salaün – EDF
Jan 31, 2016
I&C Status at EDF&
Recommendationsto IAEA
I&C Status at EDF&
Recommendationsto IAEA
IAEA TWG-NPPIC Meeting20-22 May 2009
Vienna
Patrick Salaün – EDF
EDF Nuclear Power Plants
EDF Nuclear Power Plants
Studies concerning the I&C Systems
20 - 22 May 2009 IAEA TWG-NPPIC Meeting3
PWR 900 MW series : 34 units 6 CP0, 18 CP1, 10 CP2 unitsConnection to the grid: 1977 - 19883rd ten-yearly outage: 2008 - 2018
PWR 1300 MW series : 20 Units6 P4 / 14 P’4 unitsConnection to the grid: 1985 - 19942nd ten-yearly outage: 2005 - 20133rd ten-yearly outage: 2015 - 2023
PWR 1450 MW (N4) series : 4 unitsConnection to the grid: 1996 - 19991st ten-yearly outage: 2008 - 2010
PWR EPR series : The first unit currently being built
Full series: built after a few years of operation of the first of the series
I&C unlikely to be exactly the same
Nuclear Power Plants at EDF, in FranceNuclear Power Plants at EDF, in France
Approx. 80% of electricity production
GravelinesGravelines
ChoozChooz
CattenomCattenom
NogentNogent
FessemheimFessemheim
St-LaurentSt-Laurent
BellevilleBelleville
BugeyBugey
St-AlbanSt-Alban
CruasCruas
TricastinTricastin
GolfechGolfech
Le BlayaisLe Blayais
CivauxCivaux
ChinonChinon
FlamanvilleFlamanville
PaluelPaluel
PenlyPenly
DampierreDampierre
20 - 22 May 2009 IAEA TWG-NPPIC Meeting4
Nuclear Power Plants at EDF, in United KingdomNuclear Power Plants at EDF, in United Kingdom
From British Energy (part of EDF S.A.)
CGR :
410 MW : 4 UnitsConnection to the grid : 1976 – 1977
520 MW : 2 UnitsConnection to the grid : 1983 - 1985
585 MW : 4 UnitsConnection to the grid : 1983 - 1984
615 MW : 4 UnitsConnection to the grid : 1988 - 1989
PWR 1190 MW : 1 unitConnection to the grid: 1995
PWR EPR series : 7 potential sites
I&C unlikely to be exactly the same Approx. 20% of electricity production
20 - 22 May 2009 IAEA TWG-NPPIC Meeting5
On-going I&C-related activities at the NPP’s, in FranceOn-going I&C-related activities at the NPP’s, in France
Regarding EPR
in Flamanville :
Architecture design validation, Allocation of functions, Safety Assessment …
In UK
Discussion with HSE, NII : EPR I&C Design acceptance
Regarding the 58 existing plants in France
3rd ten-yearly outage for the 900 MW in progress :
e.g. Modernization of the Rod control System : PLCs and FPGA-based modules.
1st ten-yearly outage for the 1450 MW in progress : No I&C modification
3rd ten-yearly outage for the 1300 MW :
Aging & Obsolescence studies : “health” assessment of the current I&C systems (2007-2008)
Plant Performance studies : operation, maintenance, availability, power generation….
Feasibility studies (technique, budget, delay) for some important/critical systems (according to the strategic objectives) : in progress
20 - 22 May 2009 IAEA TWG-NPPIC Meeting6
Planning of the 1300 MW ten-yearly outagePlanning of the 1300 MW ten-yearly outage
20.06 20.07 20.08 20.09 2010 2011 2012 2013 2014 2015 2016 2017
Phase 1 Projet DDV
Orientation 2 OVCC 1300
3 Rénov. CCPhase
Stratégique 4 Etudes stratégiques
5 Décisions Directoires J0-18 J0-9
6 Finalisation D J0 J1 J2Généralisation
7 Etudes de Réalisation VD3 e-DIM TTS 12 m. Mini Intégration Parc
8 Cahiers des charges9 ACHATSvalidation lots achats10 Etudes réalisation
REX
Doc Exploit 13 Documentation ExploitationRéalisation14 ASN15 Approb. Modifs logicielles J0-27
Processus 16Déclaration à l'ASN de l'ensemble des modifs
ASN 17 DA disponible18 lettre périmètre du lot J1+12Avis ASN sur
rapport d'examen 19 GPR Orientations Rapport de Sûreté P4 P'420 GPR ThématiquesGPR Réexamen GPR Clôture
21 Réalisations des contrôlesTTS sites et corrections
22 Présentation à l'ASN Etudes CorrectivesContour
J0-12
J0-33
Préparation du Programme
Principes de l'ECOT
Définition du
Clôture Lot suiteGPR Réexamen
Phase réalisation
Examen deConformité
de Réalisation
Lettre EDF DDV
Lettre DPI VD3 1300
Revue M2C
Revue APS M2C
20 - 22 May 2009 IAEA TWG-NPPIC Meeting7
Strategic objectives regarding NPPs at EDFStrategic objectives regarding NPPs at EDF
Achieve maximum plant useful life
Current planned lifetime for existing plants: 40 years
When possible and cost-effective, extension to up to 60 years
Not all plants will be extended beyond 40 years
Maintain safety
Increase plant performance
Increase generation capacity
Improve availability and reliability
Improve operation and maneuverability
Reduce O&M costs
20 - 22 May 2009 IAEA TWG-NPPIC Meeting8
Preparation of a ten-yearly outagePreparation of a ten-yearly outage
The engineering team's basic questions
For the system X, is the "y" ten-yearly outage an ageing limit and the renewal an obligation?
Or with which maintenance conditions is it possible to reach the "y+1" ten-yearly outage?
If the renewal is an obligation, which technological solutions, or amplitude of refurbishment is needed?
To answer these questions a project with two phases is started
Equipment ageing observation phase
Studies to identify the possible scenarios for renovation
Preparation of a global action plan 5 years before outage
20 - 22 May 2009 IAEA TWG-NPPIC Meeting9
The I&C Ageing Observation phase The I&C Ageing Observation phase
Operating experience
Failure rate of modules
Maintenance costs
Generation losses due to equipment
Significant safety incidents and safety-relate events
Visual equipment inspection on-site
Identification of spare parts inventories
Number and sensibility to obsolescence's
Anticipation's study of identified ageing problems
Industrial support of the manufacturer
Study of operating environment of control equipment (ventilation, power supply, cables etc.)
Evaluation of the available margins
20 - 22 May 2009 IAEA TWG-NPPIC Meeting10
I&C Technologies in the NPPs in FranceI&C Technologies in the NPPs in France
Turbine Control
Analog Automation
Logic Automation
Reactor Protection
Control Room Systems
900 1300 N4
Electronic components (REC 70)
Analog electronic components(8720 & 9020 series)
Electromagnetic relays
Electromagn. Relays
Analog electronic components
Conventional panel
Computerized aids
REC 70
Digital eq. (MicroRec)
Digital equipment. (MicroRec)
9020 series
COTS DCS (Micro Z)
DCS (Contronic E)
Specific PLC (SCAP)
COTS PLC (Controbloc)
DCS (Contronic E)
Specific 1E PLC (CS3)
Specific 1E digital system (SPIN)
Specific 1E digital system (SPIN-N4)
Conventional panel
Computerized aids
Computerized CR
Conventional panels (Remote & back-up)
EPR
Digital equipment (P320)
DCS (T2000)
DCS (T2000)
Specific F1A digital system (TXS)
Computerized CR
Conventional panels (Back-up. )
Global initial strategy regarding “critical” I&C systems:
Spare part of components
Long term agreement with the suppliers : competencies and tools
20 - 22 May 2009 IAEA TWG-NPPIC Meeting11
Partial modernization (obsolescence and reliability issues) : Change the automation part (small analog/discrete modules). Keep the instrumentation (1E) and the power modules (gripper coil current generator).
New I&C System :
Computation
(Non-1E system) : COTS
PLCs
networks
Supervisor
Slave cycler
Time constraints (1ms)
FPGA-based modules
Site validation in progress (Tricastin)
900 MW : Rod Control system Modernization900 MW : Rod Control system Modernization
Systèmes extérieurs
RGLCycleurs
RGLChassis Puissance
Supervision LocaleRGL commande
MesuresE.A.
DMA
e/s DMA+LC
Supervision LocaleRGL position
Supervision LocaleRIC
(dans ESPs)CP0 : 4 cycleursCPY : 6 cycleurs
S. de CdeSIPKITRelayage
RPRTurbine /
GCT
Réseauinter-automateéternet redondé
DMA+LC LT
fil à fil
fil à fil(commande)
Armoire deMaintien
CycleurCycleur
CycleurCycleur
CycleurCycleur
modbus/ RS485(supervision, recalage)
relais
GF X
GM
BM
GF Y
GF Z
e/s LT
RGLPosition
passerelle
dispositif mobile
paramétrage localautomate ou cycleur
RGLPilotage
fil à fil
(dans ESPs)
« passerellesécurisée »
20 - 22 May 2009 IAEA TWG-NPPIC Meeting12
1300 MW : Reactor Protection, Rod Control & Nuclear Instrumentation Systems 1300 MW : Reactor Protection, Rod Control & Nuclear Instrumentation Systems
Context :
Increase in Performance : more sensors, more computation power…
Some aging & EMI problems
Modernization studies for the 3 systems on progress:
RPS :
Partial modernization at modules level :
« Clone of MC 6800 » and increase in clock rate
New FPGA-based modules with functions implemented in VHDL
Partial modernization at computation level with a (1E) COTS : keep the global architecture, the I/0 racks and the cabling
RCS :
Total modernization : a new I&C Systems
NIS:
Partial modernization at modules level
Partial modernization at computation level : keep the I/0 racks and cabling
20 - 22 May 2009 IAEA TWG-NPPIC Meeting13
1300 MW : Logic Automation - Controbloc1300 MW : Logic Automation - Controbloc
Context :
New functionalities may be added, but not enough margin
No problem (aging, obsolescence…) for the next ten years
Some improvement at the system level can be considered (reliability…)
Studies in progress
Addition of new I&C systems (PLCs):
Connection to the existing (proprietary) Controbloc : development of a “bridge”
interface between the existing CAD tool and the CAD tool of the new PLC
Anticipation of a possible modernization at the next ten-yearly outage (at the interface/connector level)
Re-design of some modules (FPGA-based solution to be considered)
Development of a validation tool for logic application, with a high coverage rate
20 - 22 May 2009 IAEA TWG-NPPIC Meeting14
1300 MW : Analog Automation1300 MW : Analog Automation
Turbine control system
µREC : Obsolescence, modification for power generation improvement
Renovation of the system
REC 70 : Long term agreement OK, modification for power generation uprate
Choice between modification/renovation
General Control system :
9020 : long term agreement OK, functional improvement
Modification may need to change the system
µZ : long term agreement OK, functional improvement
Modification of the application only
20 - 22 May 2009 IAEA TWG-NPPIC Meeting15
Control Room modernization – Enhancement of the exploitationControl Room modernization – Enhancement of the exploitation
1300 MW Control Room Modernization
Supervision : new supervisor, improvement of the alarm management…
Monitoring : digital recorders, Core 3D_monitoring…
Human factor impact
INTEP Projects : modern Information Technologies Integration
EPO project : Smart applications to support operation and diagnosis
E.g. : use of wireless sensors for monitoring activities (e.g. : vibration data collection)
TELL Me project : Smart help for field operations
E.g. : tagging-out and lining-up for outage
R&D-A Project : New solutions for outage management and maintenance/logistics preparation
E.g. audio& video monitoring, shared real time information (dashboards)
20 - 22 May 2009 IAEA TWG-NPPIC Meeting16
Studies Focusing on FPGA TechnologyStudies Focusing on FPGA Technology
Context :
Microprocessor-based system are more & more complex : no more dedicated to industrial domains
Needs for suitable I&C products
FPGA (or ASIC) might be a cheaper, simpler solution than PLC (µProcessor)-based solutions
For new products as well as for replacing specific components/modules of I&C systems
IEC 62566 : a new standard for Complex Electronic Components (incl. FPGA)
Available in 2011
R&D studies, in the IEC 62566 context :
Cloning a component : « 6800 IP » suitable for 1E application
« FPGA-based » modules
Develop a method for the qualification of FPGA-Based technology
Recommendationsto IAEA
Recommendationsto IAEA
Items to be considered
20 - 22 May 2009 IAEA TWG-NPPIC Meeting18
Items to be considered for Maintaining the current I&C SystemsItems to be considered for Maintaining the current I&C Systems
Obsolescence and Ageing of I&C equipment (analog equipment, digital equipment, cabling, connectors…)
Management of spares, long-term storage, verification
Approaches to facilitate replacement : E.g., portability of applications on “easily” replaceable platforms
Understanding of ageing mechanisms and factors, in particular for current integrated circuits and electronic boards
Estimation / Extension of remaining lifetime (obsolescence, aging mechanisms…)
Long-term management of I&C expertise
Ageing workforce, inadequate existing documentation, new digital technologies tend to become obsolete rapidly…
Identification and documentation of key knowledge, including I&C design basis
Means to retrieve, structure and use documented knowledge for new generation
Guidance for Maintening existing I&C Systems
20 - 22 May 2009 IAEA TWG-NPPIC Meeting19
Safety Related Issues to be considered - 1Safety Related Issues to be considered - 1
Regulatory uncertainties regarding “new” technologies
ASICs / FPGAs : for replacement, for new I&C systems
Wireless technologies : May avoid / limit need for new cabling for additional monitoring measurements. Could be used to assist and integrate the work and actions of local teams
Data communication networks (including fieldbus)
Cyber-security
Guidance for a safe use of new technologies
Safety evaluation of COTS I&C equipment
I&C platforms, “smart” devices… (we are at the limits of the acceptable complexity)
What is common to, and can be shared by, all / most countries?
What can be shared with other safety-aware industries?
Common requirements and assessment criteria : international consensus to be reached (regulatory requirements)
20 - 22 May 2009 IAEA TWG-NPPIC Meeting20
Safety Related Issues to be considered - 2Safety Related Issues to be considered - 2
Evaluation of the overall impact of I&C modernization on plant safety
New technologies may introduce new failure modes
The limits are nearly reached in term of complexity (architecture, components…)
Diversity may increase complexity
New technologies may also have beneficial effects
E.g., improved equipment reliability, improved fault tolerance
Representation of digital systems in probabilistic models
Realistic consideration for assessment of software (system + application) : Verification and Validation (tests) as complementary tools
Realistic consideration of software common cause failures
20 - 22 May 2009 IAEA TWG-NPPIC Meeting21
Items regarding Improvement of Plant Performance (1)Items regarding Improvement of Plant Performance (1)
Power uprate
New technologies for reduction of uncertainties in measurements to increase power output while maintaining safety margins
Improved plant availability
I&C equipment critical to plant availability
Identification
Dependability assessment
Evaluation of effects on plant availability
Reduction of likelihood of human errors
Improved fault tolerance
Improved actuator lifetimes
Improved diagnostics
20 - 22 May 2009 IAEA TWG-NPPIC Meeting22
Items regarding Improvement of Plant Performance (2)Items regarding Improvement of Plant Performance (2)
Improved equipment reliability
Identification of wear & ageing mechanisms, and of I&C contribution
Predictive, condition-based equipment maintenance, early fault detection
Practical operation & maintenance decision aids from raw information
Additional information for improved equipment reliability
Improvement of thermal efficiency
Detection of thermal losses
Reduction of operation & maintenance costs
Fleet monitoring, remote access to information by centralized experts
Information System, aids aimed at each local Operation Branch (Control, Maintenance, etc)
Homogeneous control room systems
20 - 22 May 2009 IAEA TWG-NPPIC Meeting23
Optimization of Costs and Uncertainties of I&C ProjectsOptimization of Costs and Uncertainties of I&C Projects
Guidance for good utility requirements
Guidance for analogue - digital transition
Guidance to minimise costs and uncertainties of I&C modernisation projects
Guidance for evaluation of costs, risks, benefits of different I&C modernization options
Including maintenance of statu-quo
Over the remaining lifetime of the plant
Consideration also of capital budget and license renewal constraints