Top Banner
IBM.Test-inside.000-122.v2014-02-17.by.Bharani.101q Number : 000-122 Passing Score : 800 Time Limit : 120 min File Version : 12.5 http://www.gratisexam.com/ Exam Code: 000-122 Exam Name: Power Systems with POWER7 Common Sales Skills -v2
34

IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Jul 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

IBM.Test-inside.000-122.v2014-02-17.by.Bharani.101q

Number: 000-122 Passing Score: 800Time Limit: 120 minFile Version: 12.5

http://www.gratisexam.com/

Exam Code: 000-122

Exam Name: Power Systems with POWER7 Common Sales Skills -v2

Page 2: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Exam A

QUESTION 1A Power 740 customer with 4 cores licensed to AIX is planning to add 4 additional cores and a partition for IBMi. They have sized the new IBM i workload at 1.7 cores and AIX will use the other 6.3 cores. What software willbe necessary to enable this solution'?

A. PowerVM Standard Edition licensed for 8 coresAIX Standard Edition licensed for 7 coresIBM i licensed for 2 cores

B. AIX Enterprise Edition licensed for 6 coresIBM i licensed for 2 cores

C. PowerVM Express Edition licensed for 8 coresAIX Express Edition licensed for 7 coresIBM i licensed for 2 cores

D. PowerVM Standard Edition licensed for 8 coresAIX Standard licensed for 6.3 coresIBM i licensed for 1.7 cores

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 2A customer has let their Software Maintenance (SWMA) expire and needs to activate additional processors ontheir Power 770. What does the customer need to purchase?

A. Additional licenses for the new processors.B. New licenses for the both the existing and new processors.C. After License Fee for both the new and the old processors.D. Additional licenses for the new processors and After License Fee for the existing processors.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 3A sales professional is engaged in a competitive sales situation against a non-IBM solution that is unfamiliar tothem. Which resource should be engaged first?

A. CompeteLineB. Migration Factory

IBM 000-122 ExamC. TCO analysis toolsD. Pre Sales Advisor tool

Correct Answer: ASection: (none)Explanation

Page 3: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation/Reference:Explanation:

QUESTION 4A customer has several dedicated LPARs. The key application in one LPAR temporarily needs moreprocessing power. How can performance be improved?

A. Mirror the LPAR to a second systemB. Add a second LPAR to the applicationC. Change dedicated LPARs to shared LPARsD. Reduce the number of LPARs on the system

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 5Which of the following can be used to provide a basis for proving that Power Systems have a lower cost ofownership than x86 systems?

A. rPerf and CPW measurementsB. Analysis report from the Alinean ToolC. ISV recommendations and lower IBM financing costsD. White papers that illustrate IBM's leadership technology

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 6An existing IBM customer needs to acquire a new Power Systems server with the following characteristics:

- Must support 12 processor cores

http://www.gratisexam.com/

- Must accommodate the largest number of adapters in the system unit- Must fit within 4U of existing rack space

Which of the following should be proposed'?

A. Power 720B. Power 730C. Power 740

Page 4: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

D. Power 750

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 7What energy capability of Power Systems can be used in data centers to restrict server energy consumption,especially in cases where the data center might be nearing the limit of the energy it can provide?

A. Power CappingB. EnergyScale for I/OC. Processor Core NapD. Dynamic Power Saver

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 8What is the minimum HMC model required to manage POWER7 or POWER7+ servers?

A. 7310-CR2B. 7310-CR3C. 7310-CR4D. 7042-CR5

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

"Pass Any Exam. Any Time." - www.actualtests.com 4IBM 000-122 Exam

QUESTION 9A Chief Financial Officer (CFO) has requested a brief review of an IBM Power proposal before providing finalapproval. Which of the following are key topics that should be included in the executive summary?

A. How Power Systems supports customer objectives Acquisition cost Total Cost of OwnershipB. Acquisition cost Listing of software products How Power Systems supports customer objectivesC. Power Systems overview Proposed financing Total Cost of OwnershipD. Power value proposition Acquisition cost Hardware features

Correct Answer: ASection: (none)Explanation

Page 5: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation/Reference:Explanation:

QUESTION 10Which of the following features demonstrate the versatility of Power Systems?

A. Support for RAID-1 thru 5PCIe Gen 2 expansion drawers

B. Choice of AIX, IBM i and LinuxAbility to run Windows in a WPAR

C. Highly efficient partition virtualizationVirtualized I/O with redundancy

D. Support for LDAPSupport for Oracle applications on PowerLinux

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 11Which of the following Power Systems servers offer Capacity on Demand (CoD)?

A. Power 71Y, 7R2B. Power 770, 780, 795C. Power 720, 740, 750D. Power 750, 755, 770

Correct Answer: BSection: (none)Explanation

Explanation/Reference:"Pass Any Exam. Any Time." - www.actualtests.com 5IBM 000-122 Exam

Explanation:

QUESTION 12A prospective customer is running a database application that cannot be upgraded. They plan to replace it witha DB2-based server environment that can scale in the future.

The prospect has asked why anyone would choose Power Systems servers when Intel-based servers cost less.Which of the following is an effective response?

A. DB2 on Power Systems delivers more than ten times the throughput per core than on Intel due toexploitation of SMT.

B. Core for core, Intel-based servers have more expensive DB2 software licensing costs when compared toPower Systems.

C. Power Systems servers offer a lower TCO due to greater processor power, virealization technologies andboth horizontal and vertical growth.

D. Power Systems servers offer superiority in energy-management technologies and use dramatically lessenergy while generating much less heat.

Page 6: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 13A customer with a 15TB data base needs very fast data access to approximately 15% of that data. Whichstorage solution below supports the customer requirements?

A. Solid State Drives in the internal disk baysB. Solid State Drives and SAS disk drives, in an external SAN utilizing Easy-tierC. 900GB SAS disk drives implemented in an external I/O drawer to 2 GX++ bussesD. Solid State Drives and SAS drives mixed internally with virtualized access using VIO Server

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 14Which of the following describes benefits that Power Systems servers might offer to a customer administering agrowing number of Intel-based Linux servers?

"Pass Any Exam. Any Time." - www.actualtests.com 6IBM 000-122 Exam

A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems.B. PowerLinux servers manage both POWER-based and Intel-based Linux servers from a single console.C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER

core.D. PowerLinux servers with SMT4 can execute up to 5 instructions per cycle, reducing the number of servers

needed.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 15An existing Power Systems client has implemented an SAP application with the financial, database and webserving applications on separate POWER5+ servers.

A Power 760 proposal to consolidate all three POWER5+ systems using LPARs has been presented.

The CIO has stated that only the unpredictable performance of the web server justifies replacement. Whatshould the response be?

A. The Power 760 offers Linux web serving for higher performanceB. Split the web server into multiple LPARs for better performance on the new Power 760C. Consolidation onto one Power 760 using dedicated LPARs to support the three environments

Page 7: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

D. Consolidation onto one Power 760 offers the ability to dynamically move virtual system resources to the webserver when required.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 16A customer has a Power 720 with an expansion unit. The disk slots in the CEC and the expansion drawer arefull. The customer wants to add SSD capacity.

Which of the following is the most economical option for the customer?

A. Install an SSD disk riser in the Power 720 CECB. Install PCIe SSD SAS adapter to support SSDs without using disk slotsC. Install a SAS RAID adapter and an optional disk riser in the CEC to support SSDs.D. Install an SSD enablement feature and a second expansion unit on the Power 720 to house the "Pass Any

Exam. Any Time." - www.actualtests.com 7IBM 000-122 ExamSSDs

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 17Which of the following statements is true regarding IBM PowerLinux servers?

A. PCIe adapter cards can be hot-pluggable in the system unit (CEC).B. PowerVM is included at no charge in the initial order of PowerLinux servers.C. Initial cost of acquisition is lower for those customers who will only run Linux.D. Red Hat and/or SuSe distributions are included at no charge in the initial order

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 18Which of the following measures, monitors, and manages electrical and thermal components of IBM servers,storage and networking equipment?

A. Active Energy ManagerB. Tivoli Monitoring DirectorC. Intelligent AC power distribution unitsD. Power Environment Measuring Probe

Correct Answer: A

Page 8: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Section: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 19A CIO has asked for a comparison of the performance between Power Systems servers running AIX and HP-UNIX servers. Which benchmark should be discussed?

A. rPerfB. TPCC. MIPS

"Pass Any Exam. Any Time." - www.actualtests.com 8IBM 000-122 Exam

D. CPW

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 20What is a function found in PowerVM that has no equivalent function in VMware?

A. Remote RestartB. Partition MobilityC. Memory SharingD. Processor virtualization

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 21An AIX customer who has a POWER6 570 with PowerVM Enterprise Edition plans to upgrade to a POWER7+770.

Applications moving from the POWER6 570 to the POWER7+ 770 must remain available.

Which option will support minimal outage to the application environment?

A. Install Smart Cloud Entry on the POWER7+ 770 and use the integrated migration tool to move theapplication into the cloud.

B. Install the POWER7+ 770 and use Live Partition Mobility to move the applications from the POWER6 570.C. Install PowerHA System Mirror on both the POWER6 570 and the POWER7+ 770 and do a failover.D. Perform a disk copy on the POWER6 570 and restore the image on the POWER7+ 770.

Correct Answer: BSection: (none)Explanation

Page 9: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation/Reference:Explanation:

QUESTION 22"Pass Any Exam. Any Time." - www.actualtests.com 9IBM 000-122 ExamA prospective customer who is considering Power Systems has a very small staff and wants to run a CRMapplication. What operating system should be proposed?

A. AIX because of its operational flexibilityB. IBM i because of its operational characteristicsC. Linux because it uses open source managementD. Portable Application Solutions Environment because it supports multiple environments

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 23What is a key benefit of SmartCloud offerings?

A. Lowers customer administrative costsB. Reduces the need for data deduplicationC. Provides higher levels of provisioning securityD. Enables multiple companies to share end-user application licenses

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 24What functional characteristic is common between the PureFlex p260 compute node and the Power 720server?

A. Two processor socketsB. Industry standard PCIe slotsC. Accommodates internal disk drivesD. Includes PowerVM Standard Edition

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 25"Pass Any Exam. Any Time." - www.actualtests.com 10IBM 000-122 Exam

Page 10: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Which of the following is a unique competitive strength that the POWER Hypervisor has when compared to x86server hypervisors such as vSphere, Xen, KVM and Hyper-V?

A. POWER Hypervisor is fault-tolerant.B. POWER Hypervisor supports multi-threading.C. POWER Hypervisor requires less total disk space.D. POWER Hypervisor has never had a reported security breach

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 26Systems Director simplifies IT systems administration by reducing which of the following?

A. The frequency of system updatesB. The time to diagnose critical problemsC. The amount of required virtual resourcesD. The number of management tools and interfaces

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 27A pre-sales Technical Delivery Assessment is required for which of the following systems?

A. Power 770, 780, and 795B. Power 760, 770, 780, and 795C. Power 750, 760, 770, 780, and 795D. Power 720, 740, 750, 760, 770, 780, and 795

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 28Which of the following Power Systems design functions allows the system to identify situations

"Pass Any Exam. Any Time." - www.actualtests.com 11IBM 000-122 Examwhich can result in a system outage?

A. Light Path DiagnosticsB. Electronic Service AgentC. First Failure Data Capture

Page 11: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

D. Alternate Processor Recovery

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 29Which of the following models is offered in either a tower or rack-mounted configuration?

A. 710B. 7R2C. 720D. 740

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 30Why would a customer choose a Power Systems Express Server over a non-Express server?

A. Express Servers are delivered faster.B. Express Servers offer Express service and support at no charge.C. Express Servers have fixed configurations and are easier to order.D. Express Servers have a lower list price than equivalently configured build to order systems.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 31How does Instruction Retry help a customer achieve maximum reliability?

"Pass Any Exam. Any Time." - www.actualtests.com 12IBM 000-122 Exam

A. Continually retries a failing instruction until it works properly to preclude an application failureB. Isolates failing instructions and provides an interface for the administrator to enter an alternative instruction

and retry itC. Prevents an application failure by moving the failing application instruction to an alternative server and re-

executing the instruction thereD. Enables an instruction to re-execute if there is an error, to preclude intermittent core errors from causing an

immediate application failure

Correct Answer: DSection: (none)Explanation

Page 12: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation/Reference:Explanation:

QUESTION 32Which tool will help create a strong ROI case for a server consolidation opportunity?

A. The AlineanToolB. Economic Replacement ToolC. Consolidation Discovery and Analysis ToolD. SmartCloud Enterprise Monthly Cost Estimator

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 33A customer needs to run a single Linux application at the lowest cost. The application requires 8 cores and320GB memory Which Power Server should be recommended?

A. POWER7+710B. POWER7+730C. PowerLinux Systems 7R1D. PowerLinux Systems 7R2

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 34A customer needs 2 Power Systems servers, each with at least 12 cores. Which of the following

"Pass Any Exam. Any Time." - www.actualtests.com 13IBM 000-122 Examservers supports this requirement while using the least amount of rack space?

A. Power 710 ExpressB. Power 720 ExpressC. Power 730 ExpressD. Power 740 Express

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 35An IT manager plans to purchase a new Power 770 System with multiple LPARs. This company previously had

Page 13: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

a bad experience with a non-IBM solution that was missing several necessary hardware components when firstacquired. Which resource below emulates an LPAR configuration and validates that the planned partitions arevalid?

A. TechDocsB. InfoCenterC. Workload EstimatorD. Systems Planning Tool

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 36What is a reason that POWER7 technology can provide higher throughput than Xeon x86 technology?

A. POWER7 supports more DIMM slots than x86.B. POWER7 has higher redundancy of registers than x86.C. POWER7 supports more virealization technologies than x86.D. POWER7 supports 4 threads per core, while Xeon supports only 2.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

"Pass Any Exam. Any Time." - www.actualtests.com 14IBM 000-122 Exam

QUESTION 37What is the benefit of using the Active Memory Expansion feature in Power Systems servers?

A. Memory capacity will virtually be doubled.B. Memory will be disk-cached to improve performance.C. Memory will be allocated to an LPAR to improve performance.D. Memory contents are compressed to allow for greater utilization.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 38A system needs 3TB of disk storage, based on plans for expansion The storage manager of the IT departmentwould like to use thin provisioning to make best use of storage space What disk technology would provide thistype of capability?

A. Storwize V7000 with RAID-5B. Dual VIO Server with storage pooling

Page 14: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

C. EXP30 with SAS drives using EasyTierD. Logical Volume Mirroring with RAID-1 on internal SSD

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 39An HMC is required under which circumstances?

A. If partition mobility is requiredB. If dual VIO Servers are requiredC. If PureFlex chassis are being managedD. If System Director is managing virtual resources

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

"Pass Any Exam. Any Time." - www.actualtests.com 15IBM 000-122 Exam

QUESTION 40A prospective customer is about to decide on a strategic server platform and wants to understand the valueproposition of Power Systems as compared to x86 based systems. Which statement is an appropriateresponse?

A. Lowest cost of implementation with non-stop computing capabilitiesB. Systems with the ability to support Unix, Linux and Windows environmentsC. Highest performing servers with the ability to use industry standard parts for lowest cost build to order

configurationD. Full range of servers, operating systems, support, vertical scalability, and virealization technologies from a

single vendor

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 41An existing Power Systems customer wants to run Java programs, and they know that Java is now owned byOracle. The customer has asked how they can run Java programs on a Power Systems server. What is theappropriate response?

A. Java programs need to be compiled to run natively in AIX.B. Java programs run natively in AIX, IBM i and Linux partitions.C. Java runtime licenses can be downloaded from the open source community.D. Workload management subsystems in IBM i run Java programs without the requirement of a separate

Page 15: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

LPAR.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 42When moving an HP-UX based application workload from an HP Superdome onto a Power Systems server,which operating system will provide the easiest transition'?

A. AIXB. IBM iC. Red Hat Enterprise LinuxD. SuSe Linux Enterprise Server

"Pass Any Exam. Any Time." - www.actualtests.com 16IBM 000-122 Exam

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 43The VP of marketing for a clothing distributor explained that the IT department is looking at Hadoop-basedtechnologies to help the company better understand customer buying trends and behavior. What IBM solutionspecifically applies to this type of environment?

A. pureScaleB. BiglnsightsC. SmartCloudD. PureSystems

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 44What is a unique RAS characteristic of Power Systems Enterprise servers compared to Power SystemsExpress servers?

A. Dynamic Processor SparingB. Dynamic Processor DeallocationC. Dynamic Processor Error RecoveryD. Dynamic Service Processor Failover

Correct Answer: DSection: (none)Explanation

Page 16: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation/Reference:Explanation:

QUESTION 45Which Power Systems feature or capability is a significant contributor in TCO analysis?

A. Capacity on Demand capabilityB. Upgrade processes between modelsC. Ability to run multiple operating systemsD. More efficient rack space requirements

"Pass Any Exam. Any Time." - www.actualtests.com 17IBM 000-122 Exam

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 46A prospective customer has a large quantity of x86 servers. What value is gained by consolidating onto PowerSystems servers?

A. Improved VMware reliability and availabilityB. Higher system utilization and lower energy costsC. Improved performance by running Windows in WPARsD. Savings on software since PowerVM is included in the price of Express servers

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 47What solution can be deployed to enable maintenance on a server while ensuring that a mission critical LPARremains operational?

A. Use PowerSC to insure continuous uptime on another server.B. Use PowerVM Enterprise Edition to move the partition to another server.C. Use Active Memory Sharing to enable the LPAR to continue running on the current serverD. Use VMControl Enterprise Edition to suspend and resume the application on the current server.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 48A customer has two production IBM POWER7+ 750s in the same data center. The customer has an applicationin an LPAR that needs to run 24x7. What is required to allow the planned migration of that LPAR to the second

Page 17: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

system?

A. A shared Hardware Management ConsoleOne dedicated core on each Power 750

B. PowerVM Enterprise Edition on both systems"Pass Any Exam. Any Time." - www.actualtests.com 18IBM 000-122 ExamSAN storage accessible to the VIO Servers on each Power 750

C. Systems Director Enterprise EditionA common shared processor pool on each Power 750

D. PowerVM Standard EditionDual system accessibility to virtual SCSI or virtual Fibre Channel

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 49A prospective customer using Itanium-based servers is concerned about the future of Itanium when consideringinvesting in additional capacity.

What should be noted when considering investing in Power Systems?

A. IBM uses Power Systems internally and will continue to invest in Power to support the growth of IBM.B. Major storage vendors are integrating with POWER architecture, providing incentive for IBM to continue

investing in POWER.C. The Itanium roadmap shows convergence with Power Systems in the next 3 years.D. Power Systems have met their technology commitments for 20 years, and now have POWER8 and

POWER9 on the development roadmap.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 50An environment for a popular ISV application used on Power Systems must be sized. Which IBM tool orresource should be used?

A. TechlineB. eConfiguratorC. Facts and FeaturesD. System Planning Tool

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

Page 18: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

"Pass Any Exam. Any Time." - www.actualtests.com 19IBM 000-122 Exam

QUESTION 51A customer is moving a small application from an existing POWER7 server to a new system in a new location.They will be moving an existing 12X I/O drawer to the new server

Which of the following configuration will support a 12X PCI-X expansion drawer?

A. A4-corePower 710B. A 4-core Power 720C. A 6-core Power 730D. A 6-core Power 720

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 52A customer that needs high performance in their servers raises an objection, saying Power System servershave slower memory than x86 servers, and therefore have slower performance.Which of the following is an appropriate response?

A. Memory is buffered in Power Systems, so the memory speed is irrelevantB. The slower memory speed in Power Systems is offset by faster memory bussesC. Power Systems have a large cache system which reduces the need for fast, expensive memoryD. Power Systems consistently have higher benchmark results than x86 due to a balanced approach to

performance

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 53A customer has very unpredictable short workload increases. Which automated capability of Power 770, 780and 795 servers would satisfy this need?

A. Trial Capacity on DemandB. Utility Capacity on DemandC. Elastic Capacity on DemandD. Capacity Upgrade on Demand

"Pass Any Exam. Any Time." - www.actualtests.com 20IBM 000-122 Exam

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

Page 19: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

QUESTION 54A company has HP and Dell servers installed. The company wants to consolidate all the existing ERP solutionsto SAP or to Oracle ERP Suite on a single sewer. An RFP has been issued and must be answered.

What key strategy should be considered when answering the REP?

A. Present AME as a significant performance advantage.B. Consider a three tier approach with Web, application and database on different sewers.C. Focus on reliability, availability, scalability and I/O bandwidth of Power Systems sewers.D. Suggest IBM Systems Director VMControl for consolidated management of different applications on Power

systems.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

http://www.gratisexam.com/

QUESTION 55A customer needs to attach an expansion drawer to the POWER7+ 760. What is required to do this?

A. A GX++ bus adapterB. A PCIe Gen 2 adapterC. A VIO Server adapterD. A Converged Network Adapter (CNA) multifunction card

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 56A customer is interested in a Cloud solution. Since this is a new project they are looking for technical servicesto help insure a successful implementation. Which IBM organization should be engaged to provide the service?

"Pass Any Exam. Any Time." - www.actualtests.com 21IBM 000-122 Exam

A. TechlineB. Lab ServicesC. The TigerTeamD. Infrastructure Services Group

Correct Answer: B

Page 20: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Section: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 57A customer is concerned that the Power 720 cannot be used in distributed retail locations due to physical spaceconstraints.

Which of the following is an appropriate response?

A. IBM offers a slim-line 22U rack to minimize the space occupied by the Power 720.B. The Power 720 comes in a tower model with minimal space requirements.C. The Power 720 is available in special 15 inch desktop model with an included monitor.D. The Power 720 has a special retail environment with reduced space due to the elimination of the second

Power Supply.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 58A customer with a single Power Systems Express server want to use virtualization technology including LivePartition Mobility.

What is the minimum required to achieve this goal?

A. An additional Power Systems sewer and PowerVM Enterprise Edition on both systemsB. An additional Power Systems Enterprise server and any PowerVM Edition on both systemsC. An additional Power Systems Express sewer and PowerVM Express Edition on source and target systemsD. PowerVM Enterprise Edition with Live Partition Mobility on source and target partitions of the single Power

Systems sewer

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

"Pass Any Exam. Any Time." - www.actualtests.com 22IBM 000-122 Exam

QUESTION 59A financial corporation is running their core Windows applications on several x86 servers. Due to headlinesregarding attacks on banks they are considering migrating onto a more secure platform.

Why should this corporation consider moving onto Power Systems servers?

A. Running windows applications on Power Systems decreases external threats.B. PowerSC software will improve security on the Power Systems platform.C. Power Systems servers offer security packages optimized for the financial industry.

Page 21: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

D. Automatic intrusion detection and prevention are embedded in the POWER Hypervisor.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 60A customer calls and states that they have a 20-year old midrange IBM system running only home-grown RPGII applications. They plan to migrate their applications to a new Power Systems server, but find the operatingsystem choices confusing.

Which operating system below is the most likely choice to lead the opportunity?

A. AIXB. IBM iC. Red Hat Enterprise LinuxD. SuSe Linux Enterprise Server

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 61A customer needs to decrease energy costs in their data centers. How can Power Systems servers support thisrequirement?

"Pass Any Exam. Any Time." - www.actualtests.com 23IBM 000-122 Exam

A. Power Systems servers can be mounted in energy efficient 42U racks.B. Power Systems enable the use of turbo mode to control thermal trends.C. Power Systems use the advanced functions of the HMC to cap energy usage.D. Power Systems can use System Director plug-ins to limit energy consumption.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 62A customer needs a Power Systems server to be initially configured with 8 active cores and 256GB of memory,and upgrade at a later date to 16 cores and 512GB of memory. Which model supports these requirements atthe lowest cost?

A. Power 710B. Power 720C. Power 730D. Power 740

Page 22: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 63A customer has an 18-core POWER7 750 with 512GB of memory. The customer anticipates 100% growth inthe next year and needs to add capacity. The customer has requested a proposal by the end of the week.

What is the next step in determining how much capacity needs to be added?

A. Conduct a study to determine how much processor, memory and disk storage is currently utilized.B. Use the AME tool to determine if additional cores and memory can be added to the existing system.C. Activate Trial Capacity on Demand processors to determine how much processing capacity will be needed.D. Engage the Benchmark Center to simulate the anticipated growth so the correct upgrade can be

determined.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:"Pass Any Exam. Any Time." - www.actualtests.com 24IBM 000-122 Exam

Explanation:

QUESTION 64A customer needs to add 768GB of memory and 18 cores to their PureElex environment in a single node.Which model supports these requirements?

A. p260B. p360C. p460D. p560

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 65Which of the following demonstrates the versatility of Power Systems Express servers?

A. Capacity on Demand processors can be configured for workload growth.B. Commercial and compute-intensive workloads can run on the same server hardware.C. Each server can be configured as a rack mount, deskside or PureFlex node and supports AIX, Linux and

IBM i.D. Offered as commercial servers and technical workstations that are specifically designed to provide

maximum performance.

Page 23: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 66What is the function of the Flexible Service Processor (FSP)?

A. Enables the virtualization layer fault toleranceB. Enables system analysis in case of an application failureC. Automates the implementation of Operating System updatesD. Logs the status of Power Systems components for reporting back to IBM in the event of a failure

"Pass Any Exam. Any Time." - www.actualtests.com 25IBM 000-122 Exam

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 67Other than Linux as the only supported operating system, which of the following is a true statement about thePowerLinux 7R2 servers?

A. HMC is requiredB. No Solid State Drive supportC. Expansion drawers supported on one modelD. Only PowerVM Standard Edition is supported

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 68What is an advantage of PowerVM compared to VMware VSphere?

A. PowerVM can support as many as 20 LPAR5 per core while VMware can support only 10 virtual machinesper core.

B. PowerVM can virtualize processor, storage and networking resources while VMware virtualizes onlyprocessor and storage.

C. PowerVM offers 2-way Live Partition Mobility for both Red Hat and SuSe while VMware can only provide 1-way mobility with vMotion.

D. PowerVM can dynamically reallocate processor, memory storage and I/O while VMware is limited onlyto"hot-add" of processor and memory.

Correct Answer: DSection: (none)Explanation

Page 24: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation/Reference:Explanation:

QUESTION 69When upgrading a POWER6 570 to a POWER7+ 780. Which of the following can be re-utilized?

A. Memory and DisksB. PCIe Gen2 adapters and disks

"Pass Any Exam. Any Time." - www.actualtests.com 26IBM 000-122 Exam

C. Disks and PCIe Gen 1 adaptersD. Memory and PCIe Gen 2 adapters

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 70Where can customers find details of IBM plans and commitments for future investment, support anddevelopment for Power Systems?

A. Roadmaps and Executive Briefing CenterB. Power Systems Redbooks and White PapersC. Published investment levels in Power Systems, AIX and IBM iD. Presentation on Power Systems growing share of the UNIX market

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 71What is a benefit of purchasing a new Power Systems Express Server IBM Edition packages, compared tocustom configured systems?

A. Half of the initial memory is priced at no additional charge.B. It is a fixed, pre-configured IBM hardware and software offering.C. A qualified ISV software solution is being sold as part of the solution.D. Half of the initial processor core activations are priced at no additional charge.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 72Why should customers keep the Software Maintenance Agreement for IBM software up-to-date?

A. It cannot be re-instituted if it expires.

Page 25: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

B. It provides automated fix updates via CHARM."Pass Any Exam. Any Time." - www.actualtests.com 27IBM 000-122 Exam

C. It provides software support and upgrade protection.D. It provides standard 7x24 defect and non-defect support.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 73What is an appropriate response to a customer who has a switched SAN environment, is adding a newapplication, and wants to match connection bandwidth to disk I/O requirements?

A. There are 4Gb, 8Gb, and 16Gb HBAs available to match the performance requirementsB. The 16Gb converged network adapter connects to all switched networks and devices and auto senses for

optimal speed.C. The 32Gb Pole Gen2 adapter auto senses the switch speed and provides the best performanceD. The integrated Multifunction adapter auto senses and matches the transmission speed of the SAN up to

16Gb.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 74An ISV intends to offer their ERP as a cloud service to their clients. The requirements for the environment are:

- Provides the largest possible number of partitions in no more than 8U of physical rack space.- Includes software to assist with automatic provisioning of new environments.

In addition to offering all supported operating systems, which of the following designs supports the ISVrequirements?

A. One 48-core POWER7+ 760 sewerSmartCloud Entry Edition

B. Two 32-core POWER7+ 750 serversSmartCloud Enterprise Edition

C. Two 36-core POWER7+ 760 serversSmartCloud Entry Edition

D. Four 32-core POWER7 + p460 PureElex compute nodesSmartCloud Enterprise Edition"Pass Any Exam. Any Time." - www.actualtests.com 28IBM 000-122 Exam

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

Page 26: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation:

QUESTION 75A prospective customer has been told that their order volumes will fit on either a 16-core Power 750 or a 16-core Power.

740. The customer must minimize their 3-year expenditures while their business is expected to double duringthat time.

What key difference between the two models should be part of their decision?

A. The Power 750 can be upgraded to 32-cores.B. The Power 740 has a 3-year hardware warranty.C. The Power 740 can be upgraded to a Power 750.D. The Power 750 has superior processor virtualization capabilities.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 76Which scenario can be improved by the addition of Solid State Drives (SSDs)?

A. Disk capacity 80% full1 low I/O utilization, high processor utilizationB. Large number of low capacity disks, low I/O and processor utilization, 10% hot dataC. Small number of large capacity disks, low memory utilization, high processor utilizationD. Small number of large capacity disks, low memory and processor utilization, 10% hot data

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 77A company is running older-technology servers with increasing maintenance costs. The IT manager wants atechnology refresh but cannot secure any additional budget. Which approach

"Pass Any Exam. Any Time." - www.actualtests.com 29IBM 000-122 Examcan overcome this objection?

A. A TOO comparison of installed servers and new serversB. A large discount on a mixture of new and used technologyC. Deferred payment plans with an IBM Global Finance leaseD. Used equipment from IBM with a lease from IBM Global Finance

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

Page 27: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation:

QUESTION 78Rack mounted Power Systems Express Servers are offered in which of the following models?

A. Power 710 and 7200 onlyB. Power 710, 720, 730, 740 onlyC. Power 710 720, 730, 740,750 onlyD. Power 710, 720. 730, 740, 750, 755, 770 only

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 79What are key elements of a TOO analysis in support of a proposed POWER7+ server consolidation project ofolder POWER6 servers?

A. Security and business continuity costsB. Existing server hardware and administrative costsC. Hardware maintenance and software licensing costsD. Software upgrades and virtualization education costs

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 80What is the function of Live Partition Mobility?

"Pass Any Exam. Any Time." - www.actualtests.com 30IBM 000-122 Exam

A. The ability to provide reliable failure detection and automated recovery of partitionsB. The ability to relocate an application from one partition to another without restartingC. The ability to dynamically reconfigure a logical partition, without the need to shut downD. The ability to move active logical partitions from one system to another without downtime

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 81The customer wants to place a mission critical Linux application on an x86 server. Which statement should beused to encourage the customer to place the application on their existing Power 770 server?

A. Light path diagnostics will ensure availability of the Power System server.

Page 28: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

B. VMware on the Power System server will ensure a high degree of utilization.C. IBM System Director can control resources to allow for longer periods between maintenance.D. Capacity on Demand on the Power System server allows for growth without interrupting normal operations.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 82An IT manager is concerned that all components required for a working system are included in the pricequotation. Which resource insures that all the features required for a working system are priced?

A. eConfiguratorB. Workload EstimatorC. Systems Planning ToolD. Technical Delivery Assessment

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 83"Pass Any Exam. Any Time." - www.actualtests.com 31IBM 000-122 ExamWhich energy management capabilities of Power Systems will help a government customer that needs toreduce energy usage by 10%?

A. POWEP7 servers are Energy Star certified, and consume at least 10% less energy than POWEP6 servers.B. Optional features monitor the system, dynamically deactivate what is not required, and report on energy

consumed.C. The HMC monitors system features, enabling the customer to deactivate components based on energy

usage reporting.C D. Intelligent Power Distribution Units can be ordered to support different energy consumptionrequirements set by the customer.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 84A customer has purchased a remote site to become the fail over location for disaster recovery.

The customer currently uses SAN Volume Controller (SVC) technology in their data center and will usePowerHA Enterprise Edition to provide for fail over.

In addition to a Power Systems server, what storage will be most easily integrated into the environment?

Page 29: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

A. StorwizeV7000B. System Storage DCS3700C. Exp30 Ultra SSD I/O DrawerD. System Storage DS3500 Express

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 85Which of the following statements about Elastic (On/Off) Capacity on Demand (COD) is true?

A. It can only be used for non-production workloads.B. It provides reserved processor pools for inactive cores.C. It provides on/off memory days for every processor ordered.

"Pass Any Exam. Any Time." - www.actualtests.com 32IBM 000-122 Exam

D. It is included without charge on Power 770, 780, or 795 orders.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 86Which of the following key element should be included in an executive summary?

A. A mini-business caseB. Three years TOO and key milestonesC. How the proposal addresses stated business requirementsD. Acquisition cost, the installation time-line, and services provided

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 87Which of the following describes a key business benefit that Systems Director VMControl can provide to acustomer with multiple Power Systems servers?

A. Offers an easy-to-use web-based interlace with a point and click tool to manage LPARs from a singlescreen.

B. Provides an industry-standard tool with the flexibility to address multiple systems in a network as thoughthey were a single machine.

C. Reduces the total cost of ownership in a virtual environment by decreasing management costs andimproving utilization across the network.C D. Provides a simple interlace where business goals and policies can be used to determine infrastructure

Page 30: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

virtualization and performance metrics.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 88An insurance company has been losing money due to payments made on fraudulent claims. What product willhelp identify fraudulent claims?

"Pass Any Exam. Any Time." - www.actualtests.com 33IBM 000-122 Exam

A. CognosB. PowerSCC. Hadoop databaseD. SmartCloud Orchestrator

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 89A customer has limited rack space but needs a PCI-X card to be included in the base configuration. Whichsystem would satisfy this request?

A. POWFR7 720B. POWER7 730C. POWER7 740D. POWER7 750

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 90Due to changes in management structure, a Power customer is questioning the cost effectiveness of PowerSystems servers as compared to HP ProLiant servers.

Which response addresses the issue?

A. Power Systems servers typically have a lower software cost.B. Power Systems servers typically have a lower environmental cost.C. Power Systems servers typically have a lower total cost of ownership.D. Power Systems servers typically have a lower total cost of acquisition.

Correct Answer: C

Page 31: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Section: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 91"Pass Any Exam. Any Time." - www.actualtests.com 34IBM 000-122 ExamWhich product will enable higher quality services and improved security capabilities for a customer with an AIXenvironment?

A. PowerSCB. AIX Security AdvisorC. PowerVM EncryptionD. Cryptographic Coprocessors

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 92A customer has a Power 570 server with a 3582 Tape Library and LTQ-4 drives. The customer is buying aPower 740 server and wants the highest performance tape drive which will enable him to write tapes that canbe read on the Power 570.

Which of the following will perform that task?

A. 3573 with LTO-4B. 3573 with LTO-5C. 3573 with LTO-6D. 3582 with LTO-6

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 93Which statement describes how Active Memory Mirroring contributes to RAS?

A. Corrects multiple single-bit errors to keep memory from failingB. Disables failed memory from the system configuration at startupC. Protects the hypervisor code and its components from a memory failureD. Detects and reports memory errors that might be developing before they cause a outage

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

Page 32: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

Explanation:

"Pass Any Exam. Any Time." - www.actualtests.com 35IBM 000-122 Exam

QUESTION 94A prospective customer is considering a Dell x86 server running Windows, VMware, and WebSphere versus aPower System running IBM i, AIX, PowerVM and WebSphere.

Which value proposition favors IBM in this situation?

A. Running an all IBM solution guarantees the highest performance.B. When ordering all the components from IBM, a significant package discount is applied.C. IBM can provide the entire hardware and software stack and is a single source for support if needed.D. All the components are provided by IBM and are available in a single, integrated, pre-installed package.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 95Why is a Power System 760 an excellent platform for server consolidation?

A. Reduces costs since the Power 760 includes PowerCare vouchers.B. Supports more virtual machines per unit of rack space than other servers.C. Growth can be obtained using the processor and memory CUoD features.D. Improves efficiency by combining workloads onto a server capable of scaling to 64 cores

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 96In which situation would PowerHA Enterprise Edition be a fit for a customer environment?

A. To integrate with Tivoli Site ManagerB. To provide for local application failoverC. To assist with intra-site disk duplicationD. To reduce recovery time to a disaster recovery site

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

"Pass Any Exam. Any Time." - www.actualtests.com 36IBM 000-122 Exam

Page 33: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

QUESTION 97What is the value of a pre-implementation Technical Delivery Assessment for a customer?

A. The assessment is performed by IBM Lab Services to ensure solution design quality.B. The assessment ensures that system administration requirements are consistent with customer

expectations.C. The assessment maximizes customer satisfaction by creating a checklist of actions designed to reduce risk.D. The assessment creates a report detailing the education and services needed to ensure maximum system

performance.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 98Which software product ships with the Business Intelligence Solution Edition pre-installed and tested on Power710 through Power 740 servers?

A. SPSSB. CognosC. InfoSphereD. Business Objects

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 99A prospect has 10 Dell servers with Microsoft Windows and SQL Server installed. They plan to move to PowerSystems with DB2 and have asked for guidance on how their applications might be ported.

How can the IBM Migration Factory provide support?

A. Provide a benchmark system to stress, tune and test the application to be moved "Pass Any Exam. AnyTime." - www.actualtests.com 37IBM 000-122 Exam

B. Provide head-to-head sizing comparison data and detailed analyses of competitive weaknessesC. Deliver a preliminary analysis, a detailed assessment, a plan with estimated costs, and deployment and

testingD. Provide on-site training and skill transfer to enable the customer to convert their applications to Power

Systems.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 100

Page 34: IBM.Test-inside.000-122.v2014-02-17.by.Bharani · 2019-10-05 · IBM 000-122 Exam A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems. B.

A customer wants a Power Systems server because of the I/O performance and reliability needed to support anOracle database. Which operating system should be recommended?

A. AIXB. IBM iC. Oracle LinuxD. Red HatLinux

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 101When comparing PowerVM to VMware, what differentiating statement can be made?

A. PowerVM supports direct attached storage where VMware cannot.B. PowerVM can share processor resources between partitions where VMware cannot.C. PowerVM has Live Partition Mobility where VMware can only move stopped partitions.D. PowerVM has dual VIO Servers where VMware has only a single I/O virtualization module.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

http://www.gratisexam.com/