Top Banner
https://www.gratisexam.com/ C9030-644.ibm Number : C9030-644 Passing Score : 800 Time Limit : 120 min File Version : 1.0 https://www.gratisexam.com/
26

IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

Jun 02, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

C9030-644.ibm

Number: C9030-644Passing Score: 800Time Limit: 120 minFile Version: 1.0

https://www.gratisexam.com/

Page 2: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

Exam A

QUESTION 1Which scenario would provide the best opportunity to justify the RoCE Express feature?

A. Shared memory communication from a distributed Linux application to an MQ Linux guest on a z Systems server.

B. A z/OS WebSphere application that communicates to DB2 running on a z/OS LPAR on a separate z Systems server.

C. CICS to CICS communication between z/OS LPARs within the same z Systems server.

D. A Linux system running MQ on a z Systems server communicating to a z/OS MQ within the same server.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:RoCE Express provides an RDMA capable network adapter providing access to RDMA over Converged Ethernet (RoCE). RoCE provides an optimized networkinterconnect for System z communications. Along with RoCE Express, z/OS provided a new RDMA based solution called Shared Memory Communications overRDMA (SMC-R). SMC-R is a sockets based solution providing transparent access to RoCE for TCP sockets applications over standard Ethernet. The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs (or z/VM guest virtualmachines) using standardized PCIe virtualization (SR-IOV) technology.When RoCE Express is exploited by z/OS with SMC-R, the combined solutions provide two key value points:

Improved latency that can provide improved transaction rates for latency sensitive transactional based workloads, andLower CPU cost for workloads that transfer larger payloads (i.e. analytics, streaming, FTP, big data, data replication, web services, etc.)

References: https://www.ibm.com/developerworks/community/blogs/IBMCommserver/entry/ibm_system_z_10gbe_roce_express_virtualization?lang=en

QUESTION 2A customer is considering upgrading a z114 processor currently used as a standalone coupling facility (CF). The customer wants to upgrade to a z13s 2965-N10,but also wants to install additional capacity on this new z13s for two new LPARs running Linux workloads.

A sizing exercise has determined that the combined CF and Linux workload would total four ICFs, five IFLs, and 600 GB memory. The other systems in thecustomer’s environment are zEX12 servers.

The customer is reviewing the design for factors that will influence the hardware configuration.

Which of the following statements is true for this situation?

Page 3: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

https://www.gratisexam.com/

A. Integrated Coupling Adapter (ICA) cards can be installed in the zEC12 servers to improve performance.

B. The number of available LPARs on z13s may not be sufficient to meet all of the customer’s requirements.

C. The N10 may not provide sufficient InfiniBand slots for coupling links to the other systems in the customer’s sysplex.

D. The memory requirement of the configuration will force the N20 model type to be configured.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Incorrect Answers:A: The IBM Integrated Coupling Adapter (ICA SR), introduced on the IBM z13 and now available on the IBM z13s.

C: Listed below are the minimums and maximums of processor units (PUs) that may be purchased permanently.

D: The IBM 2965 Model N10 supports 64 to 984 GB of memory.

References: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_sm/1/877/ENUS2965-_h01/index.html&lang=en&request_locale=en

QUESTION 3A CICS customer wants to modernize their end-user interface for desktops and mobile platforms (notepads, cell phones, etc.) without having to rewrite theirprograms for each type of device.

Which software solution can IBM offer to satisfy the requirement?

Page 4: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

A. Mobile containers (Docker) to isolate different mobile devices.

B. Rational Developer to move the application presentation logic from CICS to Windows.

C. Mobile OpenStack APIs to connect to applications.

D. IBM MobileFirst as a single tool with output for multiple end-user devices.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:The capabilities of running heterogeneous environments on a System z platform and the IBM MobileFirst framework enable an organization to fully support a mobilestrategy. The mobile environment, representing the System of Engagement, can integrate with existing back-end core transactional services and data on theSystem z platform, representing the Systems of Records. The products that are available within the MobileFirst framework can deliver the runtime environment,mobile device management, security, analytics, and development of the application and data platforms in a mobile environment on the System z platform.

Figure: End-to-end security checkpoints

MEAP server is protected by a security gateway. The mobile client must authenticate and validate credentials upon encountering the gateway.

Note: CICS stands for "Customer Information Control System." It is a general-purpose transaction processing subsystem for the z/OS operating system. CICSprovides services for running an application online, by request, at the same time as many other users are submitting requests to run the same applications, usingthe same files and programs.

References: http://www.redbooks.ibm.com/abstracts/tips1162.html?Open

Page 5: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

QUESTION 4A customer is planning for the installation of a new LinuxONE Emperor processor. The customer specified Balanced Power Plan Ahead (two line cord pairs). Atinstallation time, they advise that they have only been able to provide power outlets for a single line cord pair. They still want the installation to proceed.

What action should the technical specialist take to ensure a proper installation?

A. Advise the customer that the installation cannot proceed until all the configured line cords can be connected.

B. Request the installation engineer to proceed with the installation with a single line cord pair.

C. Request the installation engineer to proceed with the installation of one line cord from each pair to the available power outlets.

D. Create an MES order to remove the Balanced Power Plan Ahead feature until after the installation is complete, then another MES to add the Balanced PowerPlan Ahead feature once the extra power outlets are available.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:References: https://www.ibm.com/support/knowledgecenter/5148-21L/p8haj/hmcinstall.htm

QUESTION 5A customer has two z/OS 2964-N63 z13 machines is a single data center and needs the machines to remain up and running without an unscheduled outage.

Which of the following is considered an element of high availability?

A. Multiple power cords

B. Parallel Sysplex

C. Capacity Planned Event (CPE)

D. On/Off CoD capability

Correct Answer: BSection: (none)Explanation

Explanation/Reference:A sysplex is a collection of z/OS systems that cooperate, using certain hardware and software products, to process work. It is a clustering technology that canprovide near-continuous availability. A Parallel Sysplex is a sysplex that uses multisystem data-sharing technology

A Parallel Sysplex is a cluster of IBM mainframes acting together as a single system image with z/OS. Used for disaster recovery, Parallel Sysplex combines datasharing and parallel computing to allow a cluster of up to 32 systems to share a workload for high performance and high availability.

Page 6: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

References: https://www.ibm.com/support/knowledgecenter/zosbasics/com.ibm.zos.zmainframe/zconc_clusterPlSys.htm

QUESTION 6What is hybrid cloud?

https://www.gratisexam.com/

A. It is a compute cloud that mixes compute nodes with different CPU architectures.

B. It is an laaS cloud that provides instances with different operating systems.

C. It is an architecture that combines public and private clouds.

D. It is an laaS cloud that provides ephemeral storage only.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:A hybrid cloud is an integrated cloud service utilizing both private and public clouds to perform distinct functions within the same organization.

References: https://www.interoute.com/what-hybrid-cloud

QUESTION 7Which of the following is intended to help customers stay current with security and systems integrity fixes and provide Common Vulnerability Scoring System ratingsfor new APARs?

A. Resource Link

B. Fix Central

C. z Systems Security Portal

D. IBM Security zSecure Suite

Correct Answer: CSection: (none)Explanation

Page 7: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

Explanation/Reference:The z Systems Security Portal is intended to help you stay current with security and system integrity fixes by providing current patch data and associated CommonVulnerability Scoring System (CVSS) ratings for new APARs. Security Notices are also provided to address highly publicized security concerns.

References: https://www-03.ibm.com/systems/z/solutions/security_subintegrity.html

QUESTION 8A customer running a z13-N63 model 710 realizes they have an upcoming peak that will last for five days. They will need additional processor capacity plus morememory to support this peak. The machine currently has 256GB of pre-planned memory. They have a Customer Initiated Upgrade (CIU) contract already in place.

Prior to this peak, what should the customer do?

A. Add five temporary processors using On/Off CoD; although the required temporary memory must be ordered and installed by IBM before the peak.

B. Use Capacity for Planned Event (CPE) for both the processors and memory needed.

C. Use CIU to purchase the memory and use On/Off CoD to add temporary processors before the peak.

D. Use On/Off CoD to add the temporary processors and the temporary memory needed before the peak.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Temporary upgradesThree types of upgrades are provided through the following offerings:

On/Off Capacity on Demand (On/Off CoD) -This offering allows you to temporarily add additional capacity or specialty engines due to seasonal activities, period-end requirements, peaks in workload, orapplication testing.Capacity Backup (CBU) This offering allows you to replace model capacity or specialty engines to a backup server in the event of an unforeseen loss of server capacity because of anemergency.Capacity for Planned Events (CPE) This offering allows you to replace model capacity or specialty engines due to a relocation of workload during system migrations or a data center move.

You can order CPE or CBU temporary upgrade records or related entitlements, such as CBU tests, using the CIU application through Resource Link or calling yourIBM sales representative. You can only order an On/Off CoD temporary upgrade using the CIU application through Resource Link.

References: IBM Z Capacity on Demand User's Guide (2017), page 2

QUESTION 9A customer has an IBM z13 and is using z/OS for XML file handling. The customer needs a solution which allows compression of large XML files in DEFLATE fileformat for cross platform data exchange with third parties.

Page 8: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

What should be recommended to use as a proof of concept?

A. 10GbE RoCE Express

B. Compression Coprocessor on IBM z Systems processor chip

C. Flash Express

D. zEDC Express

Correct Answer: DSection: (none)Explanation

Explanation/Reference:zEDC is a compression acceleration capability, that enables you to do hardware-based data compression and decompression. It is designed for high-performance,low-latency compression, to reduce processor use, optimize the performance of compression-related tasks, improve disk usage, and optimize cross-platformexchange of data.

The compression format generated and used by zEDC Express is the Request for Comments (RFC) 1951 DEFLATE format, an industry standard that compressesdata using the Lempel-Ziv 1977 (LZ77) and Huffman coding algorithms.

Incorrect Answers:A: In 2013 the IBM zEC12 (zBC12) introduced the 10GbE RoCE Express feature. RoCE Express provides an RDMA capable network adapter providing access toRDMA over Converged Ethernet (RoCE). RoCE provides an optimized network interconnect for System z communications.

References: Reduce Storage Occupancy and Increase Operations Efficiency with IBM zEnterprise Data Compression (February 2015), page 2

QUESTION 10A customer has a z13 server. They plan to use Server Time Protocol (STP) for accessing an external time source (UTC).

Which of the following techniques can be used to get the time information in this scenario?

A. Configuration of a Network Time Protocol (NTP) client on the HMC which accesses an external NTO server.

B. Use of an External Time Reference (9037-002) in an STP mixed Coordinated Timing Network.

C. SE dial out to an external time reference.

D. Edit PR/SM to connect oscillator cards to a tlsdate server.

Correct Answer: BSection: (none)Explanation

Page 9: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

Explanation/Reference:Network Time Protocol (NTP) client supportThe external time source (ETS) function of STP can provide accurate time relative to an external time standard for data processing applications. The ETS functionis only available when an STP-only CTN is configured. The external time source can be configured by dialing out from the HMC to an available time service such asAutomated Computer Time Service (ACTS). Dialing out provides time accuracy for the z Systems timing network only. This function has been generally availablesince January 31, 2007 when STP became generally available.An alternative method to obtain accurate time is from an NTP server. Simple Network Time Protocol (SNTP) client support is added to the Server Time Protocolcode to interface with NTP servers. NTP client support can provide the same time across heterogeneous platforms in an enterprise with a time accuracy of 100milliseconds.

References: https://www-03.ibm.com/systems/z/advantages/pso/stp/ntp.html

QUESTION 11A customer currently has a zEC12 with one book and is upgrading to a z13.Left unchanged, which of the following configuration options will require them to purchase a second z13 CPC drawer?

https://www.gratisexam.com/

A. Six System Assist Processors

B. Two carry forward I/O Drawers and 2 HCA3-O fanouts

C. Ten HCA3-O 12X IFB Links

D. Twenty total processors (combination of PCs, zIIPs and ICFs)

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Incorrect Answers:Not B: When upgrading a zEC12 or a z196 to a z13 server, up to two I/O drawers are also supported as carry forward.

QUESTION 12A customer is currently running several LPARs on a zEC12 with one dominant production LPAR, which consumes most of the CPU capacity. During the TechnicalDelivery Assessment (TDA), the customer mentions the performance of this LPAR is critical to a successful implementation.

What data should the Client Technical Specialist ensure that the customer collect on the zEC12 and the new z13 to verify the performance expectations have been

Page 10: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

met?

A. RMF CPU Reports for a peak week.

B. The total numbers of LPARs configured with the level(s) of z/OS that are active for each LPAR for both the zEC12 and the z13.

C. RMF CPU and Workload Reports for a peak week.

D. CPU MF Counters capturing the cache and memory hierarchy information for the zEC12 and z13.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:When RMF is running in a Processor Resource/Systems Manager (PR/SM) environment in LPAR mode, the Partition Data Report section of the CPU Activity reportprovides data about all configured partitions active at the end of the reporting interval, independent of the operating system running in each partition.

References: https://www.ibm.com/support/knowledgecenter/en/SSLTBW_2.1.0/com.ibm.zos.v2r1.erbb500/partd.htm

QUESTION 13The design of the z13 Systems processor unit (PU) chip has been enhanced over the zEC12.

Which of the following characterizes the improvement?

A. Faster processor cycle time on z13 (5.5 GHz instead of 5.0 GHz on zEC12).

B. Improved cryptographic and compression engine shared over all cores.

C. Larger cache level sizes on z13 compared to zEC12.

D. Up to six active cores per chip on z13 compared to four active cores on zEC12.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Contributing to the additional capacity on the z13 and z13s are numerous improvements in processor chip design, including new instructions, multithreading, andredesigned and larger caches.

Z13 processor:* L1 cache96 KB I-L1128 KB D-L1 per core* L2 cache

Page 11: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

2 MB I-L22 MB D-L2 per coreL3 cache 64 MB shared

zEC12 processor:L1 cache 64+96 KB/coreL2 cache 1+1 MB/coreL3 cache 48 MB/chip

References:https://en.wikipedia.org/wiki/IBM_zEC12_(microprocessor)https://en.wikipedia.org/wiki/IBM_z13_(microprocessor)

QUESTION 14Which of the following correctly describes the term “RTO”?

A. The time it takes GDPS to recognize an outage and begin its recovery processes.

B. The length of time it takes to recover from an outage and resume normal operations.

C. The data loss time calculated by taking the time of an outage minus the last consistency group time.

D. The time it takes to declare a disaster.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Recovery time objective (RTO) is the length of time that it takes to recover from an outage (scheduled, unscheduled, or disaster) and resume normal operations foran application or a set of applications.

References: https://www.ibm.com/support/knowledgecenter/en/ssw_ibm_i_73/rzarj/rzarjhareqsrecoverytime.htm

QUESTION 15A review of a customer environment provided information that they can support and exploit Flash Express, zEDC Express and SMC-R (RoCE).

What is the minimum combination of hardware and operating system that will exploit the customer’s workload?

A. z13 or z13s with z/OS 2.1

B. z196, zEC12 or z13 with z/OS 2.1

C. z196, z13 or z13s with z/OS 1.13

D. zEC12 or z13 with z/OS 1.13

Page 12: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

Correct Answer: ASection: (none)Explanation

Explanation/Reference:SMC-R needs both hardware and software support.SMC-R requires the following software:* z/OS V2R1 (with PTFs) or higher are the only supported operating systems for the SMC-R protocol. You cannot roll back to previous z/OS releases.

zEDC Express is an optional feature (FC 0420) that is available on z13, zEC12, and zBC12 servers.

Note: From CFCC Level 19 and later, Flash Express can be used.

References: IBM z13 Technical Guide (May 2016), page 511

QUESTION 16A z13 customer has a high number of FICON links. They want to reduce the amount of time required for onsite installation and cabling setup. They minimizedisruptions while isolating the activity from their active system.

How can this be accomplished?

A. Order Fiber Quick Connect feature in combination with the fiber transport systems services form IBM Global Services.

B. Consolidate FICON links using Optica’s Prizm protocol converter.

C. Order a pre-configured PCIe I/O drawer with built-in FICON cabling from the IBM Facilities Cabling Services.

D. Activate High Performance FICON for z Systems (zHPF) to reduce the number of FICON links by reducing the FICON channel overhead.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Under IBM Facilities Cabling Services there is the option to provide IBM Fiber Transport System (FTS) trunking commodities (fiber optic trunk cables, fiberharnesses, panel-mount boxes) for connecting to other z13s, Rockhopper, z13, Emperor, zBC12, zEC12, z114, z196, z10 BC, z10 EC, z9 BC, z9 EC, z890, andz990 servers. IBM can reduce the cable clutter and cable bulk under the floor. An analysis of the channel configuration and any existing fiber optic cabling isperformed to determine the required FTS trunking commodities. IBM can also help organize the entire enterprise. This option includes enterprise planning, newcables, fiber optic trunking commodities, installation, and documentation.

References: https://www-01.ibm.com/support/docview.wss?uid=isg24ccf9769684e672685257f530059a774&aid=1, page 84

QUESTION 17

Page 13: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

A client uses IMS on z/OS to provide central data repositories, or Systems of Record, for front-end applications deployed on a variety of platforms. The client plansto connect a growing number of these front-end applications, or Systems of Engagement, to the Systems of Record.

The Systems of Engagement will use z/OS Connect to connect to the Systems of Record.

Which of the following is a feature provided by z/OS Connect?

https://www.gratisexam.com/

A. Prioritization of incoming requests

B. Controlling and monitoring of user- and API-access to data

C. AES encryption of incoming JSON data

D. Access to the data via REST API

Correct Answer: DSection: (none)Explanation

Explanation/Reference:z/OS Connect EE can help to deliver benefits for an enterprise in two ways.

It provides an intuitive workstation-based tool, the z/OS Connect EE API Editor, that enables a developer, with or without z/OS skills, to create RESTful APIsfrom traditional z/OS based assets. The core business assets that run on z/OS can easily be adapted to the latest mobile and cloud communication techniquesand message protocol formats.Mobile and cloud application developers, inside or outside the enterprise, can incorporate z/OS data and transactions into their applications without the need tounderstand z/OS subsystems. The z/OS resources appear as any other RESTful API.

References: https://www.ibm.com/support/knowledgecenter/en/SS4SVW_2.0.0/com.ibm.zosconnect.doc/overview/what_is.html

QUESTION 18What product provides a web-based framework for accessing and managing a z/OS system form an http-based web browser?

A. z/OSMF

B. TKE

C. IBM Cloud orchestrator

D. HMC

Page 14: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

Correct Answer: ASection: (none)Explanation

Explanation/Reference:z/OSMF provides a web-based interface that allows you to manage various aspects of your z/OS systems through a browser at any time, from any location.

Incorrect Answers:B: IBM provides the Trusted Key Entry Workstation (TKE) as a means for ensuring secure creation and management of key material and for managing the cryptoadapters on the host.

D: A Hardware Management Console (HMC) is an appliance used to manage Power Systems servers. In particular, it may be used to create or change virtualmachines (LPARs), including dynamically altering the hardware assigned to an LPAR (add and remove) without rebooting the operating system running in theLPAR.

An HMC can be used via either an X-Windows graphical user interface (GUI) or an SSH command line interface (CLI).

References: https://www-03.ibm.com/systems/z/os/zos/features/zosmf/

QUESTION 19A customer is planning to upgrade to a z13s and requires an external time source.

Which option is a valid external time source for the z13s?

A. Support Element

B. 9037 Sysplex Timer

C. NTP server

D. Dial-out modern

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Network Time Protocol (NTP) client supportThe external time source (ETS) function of STP can provide accurate time relative to an external time standard for data processing applications. The ETS functionis only available when an STP-only CTN is configured. The external time source can be configured by dialing out from the HMC to an available time service such asAutomated Computer Time Service (ACTS). Dialing out provides time accuracy for the z Systems timing network only. This function has been generally availablesince January 31, 2007 when STP became generally available.An alternative method to obtain accurate time is from an NTP server. Simple Network Time Protocol (SNTP) client support is added to the Server Time Protocol

Page 15: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

code to interface with NTP servers. NTP client support can provide the same time across heterogeneous platforms in an enterprise with a time accuracy of 100milliseconds.

References: https://www-03.ibm.com/systems/z/advantages/pso/stp/ntp.html

QUESTION 20Which is the maximum z13 configuration that a single z/VM 6.4 LPAR can support?

A. 64 logical processors and 2TB memory

B. 32 logical processors and 512GB memory

C. 141 logical processors and 10TB memory

D. 128 logical processors and 4TB memory

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Up to 64 logical processors per z/VM imageUp to 1 TB of real storage (memory) per LPAR (z/VM image) and more than 1 TB of total virtual memory in use by guests.

References: https://www.ibm.com/support/knowledgecenter/en/SSB27U_6.3.0/com.ibm.zvm.v630.hcpa0/servers.htm

QUESTION 21A customer has a production site in location A and a disaster recovery (DR) site in location B. They require tape data to be available in the event of a disaster withinfour hours.

Sites A and B are 2000 miles (3200 kilometers) apart.

What can they implement to satisfy this requirement?

A. IBM TS77xx tape grid function

B. IBM GDPS function

C. IBM DS8xxx disk mirroring function

D. IBM Recovery Services

Correct Answer: ASection: (none)Explanation

Page 16: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

Explanation/Reference:Incorrect Answers:B: GDPS is a multi-site or single-site end to end application availability solution that provides the capability to manage remote copy configuration and storagesubsystems (including IBM TotalStorage Enterprise Storage Server), to automate Parallel Sysplex operation tasks and perform failure recovery from a single pointof control.GDPS helps automate recovery procedures for planned and unplanned outages to provide near-continuous availability and disaster recovery capability. With GDPS,you can have total confidence that your key business applications will be up and running when your employees, partners and customers need them.

QUESTION 22Which feature provides automatic discovery for FICON disk and tape control units attached to a z/OS LPAR?

https://www.gratisexam.com/

A. HyperPAV

B. zDAC

C. zHPF

D. MIDAW

Correct Answer: BSection: (none)Explanation

Explanation/Reference:z/OS discovery and auto-configuration (zDAC) is a function, exclusive to z196 and z114 (with FICON Express8S, FICON Express8, and FICON Express4), thatautomatically performs a number of I/O configuration definition tasks for new and changed FICON disk and tape control units that are connected to a FICONDirector. It is designed to help simplify I/O configuration of zEnterprise CPCs running z/OS, and to help reduce complexity and setup time. We suggest usingFICON Dynamic Channel Management (DCM in z/OS) to help manage performance.

Incorrect Answers:A: Parallel Access Volumes (PAV) is the concept of using multiple devices or aliases to address a single ECKD disk device.

C: The zHPF is an enhancement of the FICON channel architecture.

D: Modified Indirect Data Address Words (MIDAWs) are a channel programming capability of the IBM System z9 processor.[1] The MIDAW facility is an extensionto the pre-existing Indirect Data Address Word (IDAW) channel programming capability, providing support for more efficient FICON channel programs.

References: FICON Planning and Implementation Guide (March 2012), page 18

Page 17: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

QUESTION 23A customer wants to protect large quantities of data being transmitted from their z Systems processor to one of their subsidiaries.

Which is the strongest algorithm supported on the z13 hardware to enable this?

A. AES-256

B. DES

C. TLS

D. Triple-DES

Correct Answer: ASection: (none)Explanation

Explanation/Reference:The CP Assist for Cryptographic Function (CPACF) offers the full complement of theAdvanced Encryption Standard (AES) algorithm and Secure Hash Algorithm (SHA) with the Data Encryption Standard (DES) algorithm.

AES data encryption is a more mathematically efficient and elegant cryptographic algorithm, but its main strength rests in the option for various key lengths. AESallows you to choose a 128-bit, 192-bit or 256-bit key, making it exponentially stronger than the 56-bit key of DES.

Even Triple DES (3DES), a way of using DES encryption three times, proved ineffective against brute force attacks.

References:IBM z13 Technical Guide (May 2016), page 24https://info.townsendsecurity.com/bid/72450/what-are-the-differences-between-des-and-aes-encryption

QUESTION 24What is the correct purpose of the IBM Security suite of solutions?

A. It is designed to help users administer mainframe security, monitor for threats, audit usage and configurations, and enforce policy compliance.

B. Its solutions are designed to discover and classify sensitive data, detect vulnerabilities, and ensure the privacy and integrity of enterprise data.

C. It collects and monitors data not only from the mainframe, but also from sources such as security devices, network devices, firewalls, operating systems andapplications to provide a unified view of security and compliance risks.

D. It helps organizations administer and define authorized users according to policies, make access control decisions and create security log records.

Correct Answer: ASection: (none)Explanation

Page 18: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

Explanation/Reference:Analytics, mobile, social, and cloud computing all have one thing in common: They need a platform that has a deeply integrated security stack. This is where IBM zSystems excel. To help counter the many threats to your business in the current world, including hackers looking to penetrate your systems and government-backed attacks, z Systems offers a platform with layers of defense to protect your customer data, intellectual property, and your reputation.You can no longer just wrap security around the system; you must build security into the system. The IBM z13 is a new system that is designed for analytics,mobile, social, and cloud computing with built-in security.

References: Ultimate Security with the IBM z13, IBM Redbooks Solution Guide, page 1

QUESTION 25A client wants to add the Live Guest Relocation (LGR) feature to their z Systems environment.

Which of the following actions would implement the basis for this capability?

A. Enabling Single System Image (SSI) on z/OS v2.1+

B. Applying the latest APAR to z/VM v5.4+

C. Enabling Single System Image (SSI) on z/VM v6.3+

D. Enabling Security Server on z/OS

Correct Answer: CSection: (none)Explanation

Explanation/Reference:With z/VM 6.2, the z/VM Single System Image (SSI) cluster is introduced. SSI is a multisystem environment in which the z/VM member systems can be managedas a single resource pool. Running virtual servers (guests) can be relocated from one member to another within the SSI cluster using the new VMRELOCATEcommand.

References: http://www.vm.ibm.com/perf/reports/zvm/html/620lgr.html

QUESTION 26A financial institution has completed a Proof of technology study with Blockchain, running on a z13s in a Secure Server Container LPAR. This institution isconcerned that Blockchain will not be able to handle the number of proposed customers.

What would be used to determine if this solution can satisfy their current and future requirements?

A. Eagle engagement

B. RACEv assessment

C. Benchmark evaluation

Page 19: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

D. High Performance Technical Computing Centre analysis

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Incorrect Answers:A: Since 2007, the Eagle Team has worked with hundreds of customers, around the world, helping them examine the cost differences between System z anddistributed options.

B: RACEv assessment concerns cost.

QUESTION 27What is the maximum amount of memory and IFLs on a two-drawer LinuxONE Rockhopper?

A. 3TB memory and 15 IFLs

B. 2TB memory and 10 IFLs

C. 2TB memory 20 IFLs

D. 4TB memory and 20 IFLs

Correct Answer: DSection: (none)Explanation

Explanation/Reference:LinuxONE Rockhopper (MT 2965) is an entry point for enterprise-grade Linux computing that offers many of the same features as LinuxONE Emperor. LinuxONERockhopper is available with up to 20 configurable processors, runs at a 4.3 GHz commercial processor speed, supports hundreds of virtual servers in a singlefootprint, boasts a multi-level cache subsystem, 4 TB of memory, and an I/O subsystem that supports the following I/O features: Flash Express, zEDC Express,10GbE RoCE Express, Crypto Express5S, FICON Express16S, FICON Express8S, and OSA-Express5S, with 2 Lxx models.

Note: The Integrated Facility for Linux (IFL) is a processor dedicated to Linux workloads on IBM Z and expressly designed to reduce costs.

References: https://www-01.ibm.com/common/ssi/cgi-bin/ssialias?infotype=OC&subtype=NA&htmlfid=897/ENUS2965-L20&appname=totalstorage

QUESTION 28Which type of workload is most likely to offer the highest consolidation ratio (number of x86 cores/ number of IFLs0 when migrating from x86 servers onto a z13?

Page 20: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

https://www.gratisexam.com/

A. Database

B. Java

C. Protocol serving

D. Data intensive

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 29A customer is planning to permanently.

Which capacity offering shall be used?

A. Capacity for Planned Event (CPE)

B. Customer Initiated Upgrade (CIU)

C. Capacity Backup (CBU)

D. On/Off Capacity on Demand (On/Off CoD)

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Use Customer Initiated Upgrade (CIU) for permanent upgrades

Incorrect Answers:A: Use Capacity for Planned Event (CPE) for temporary upgradesC: Use Capacity BackUp (CBU) for temporary upgrades

Page 21: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

D: On/Off Capacity on Demand (On/Off CoD) for temporary upgrades

References: IBM z13 Technical Guide (May 2016), page 313

QUESTION 30A technical specialist is concerned how the FICON Express8S channels are performing on a z13. They want to model the 8S channels to 16S.

Which tool supports this analysis?

A. zTPM

B. zBNA

C. zSCON

D. zCP3000

Correct Answer: DSection: (none)Explanation

Explanation/Reference:The zCP3000 VM Extract Utility (CP3KVMXT) reads CP Monitor data and generates an Enterprise Data File (EDF) of system and workload related measurementsfor input into zCP3000. It supports VM running as native or in a partition. It can be used to model interactive VM workloads or workloads under guest operatingsystems such as Linux.

Note: FICON Express16S features provide a new standard for transmission of data over 16 Gbps links by using 64b/66b encoding. The new standard that isdefined by T11.org FC-FS-3 is more efficient than the current 8b/10b encoding.

Incorrect Answers:A: zTPM (Tivoli Performance Modeler) is a productivity tool designed to let you build a model of a z/OS based system, and then run various "what if scenarios".zTPM uses simulation techniques to let you model the impact of changes on individual workload performance.

B: zBNA can be used to analyze client-provided System Management Facilities (SMF) records to identify jobs and data sets that are candidates for zEDCcompression, across a specified time window, typically a batch window.

C: zSCON is used for OEM Server Consolidation onto System z.

References: https://www-03.ibm.com/support/techdocs/atsmastr.nsf/WebIndex/PRS718

QUESTION 31What is the maximum number of zIIP specialty engines eligible to be installed on a z13-N30 with ten (10) CPs?

A. 20 zIIPs

Page 22: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

B. 10 zIIPs

C. 5 zIIPs

D. 10zAAPs and 10 zIIPs

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 32The client is upgrading their zEC12 to a z13 with FICON Express 16S channels. They are not planning to make any changes to the SAN environment nor theattached OEM storage devices.

What should the Technical Sales Specialist recommend, if anything, to ensure that this will be a supported environment?

A. Contact all storage vendors to verify what changes are required.

B. Consult the IBM System Storage Interoperation Center (SSIC) tool.

C. Nothing. If it works on zEC12, it will work on z13.

D. Contract the IBM Migration Factory for an analysis of the planned environment.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Incorrect Answers:D: The IBM Systems Lab Services Migration Factory is an experienced group of migration consultants with proven expertise to help clients design, build, and deliversuccessful migrations to IBM platforms.

References: https://www-304.ibm.com/systems/support/storage/ssic/interoperability.wss

QUESTION 33A client has ordered a z13s that will soon be shipping form the IBM manufacturing facility to their new data center location. Due to construction delays, the box willnot be physically installed for 90 days after shipment.

Based on the planned installation date, when will the standard warranty period for the z13s begin?

A. The day after the installation date.

Page 23: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

B. It varies by region from 45 to 75 days after shipment.

C. 30 days after the installation date.

D. 30 days after shipment.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:An IBM part or feature installed during the initial installation of an IBM machine is subject to a full warranty effective on the date of installation of the machine.

References: https://www-01.ibm.com/common/ssi/cgi-bin/ssialias?subtype=ca&infotype=an&supplier=877&letternum=ENUSZG15-0001

QUESTION 34Which IBM z Systems technology is the foundation of the IBM Bluemix-based Blockchain service High Security Business Network (HSBN)?

A. Hyperedger Fabric

B. Docker

C. KVM

D. Secure Service Container

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Blockchain is based on the industry standard Open Linux Foundation Hyperledger.

References: https://www.digitalmarketplace.service.gov.uk/g-cloud/services/862468845018056

QUESTION 35A z Systems Client Technical Specialist has a customer running z/OS 1.12 on a zEC12 machine. They want to get pricing for an upgrade to z/OS 2.2 for their newlypurchased z13 machine.

Which of the following can provide pricing for the z/OS operating system?

A. The IBM Washington System Center (WSC)

B. The Poughkeepsie Product Assistance Center (PPAC)

C. IBM Customer Service (ICS)

Page 24: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

D. z Systems Digital Techline Center (zDTC)

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 36A customer is experiencing z/OS performance problems on their z13 while the system is taking a memory dump. Which chargeable z Systems feature couldprovide relief for this problem?

A. Flash Express

B. Simultaneous Multithreading

C. Single Instruction Multiple Data

D. zEnterprise Data Compression

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Typical simultaneous multithreading (SMT) implementations allow workloads from different control programs to use a compute core concurrently, but with variablecore capacity gains and thread execution slowdowns. The new IBM z13 platform implements SMT differently. At any point in time, a single control programmanages the entire core, giving each workload more repeatable core capacity for processing.

References: http://www.redbooks.ibm.com/abstracts/redp5144.html?Open

QUESTION 37A customer has recently upgraded to a z13 processor. As part of the migration process, the LPAR image profiles ware copied form the old processor to the z13.

After the upgrade, transactions on the production z/OS environment continue to run well; however, in the development z/OS environment, transactions are nowtiming out.

What tool should the technical specialist use to help the customer resolve this problem?

A. zTPM

B. zBNA

C. zPCR

Page 25: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

D. zSoftcap

Correct Answer: CSection: (none)Explanation

Explanation/Reference:IBM's Processor Capacity Reference (zPCR) is a PC-based productivity tool under Windows. It is designed to provide capacity planning insight for IBM System zprocessors running LPAR configurations with various workload environments under z/OS, z/VM, and Linux. Capacity results are based on IBM's LSPR datasupporting all IBM System z processors.

Incorrect Answers:A: zTPM (Tivoli Performance Modeler) is a productivity tool designed to let you build a model of a z/OS based system, and then run various "what if scenarios".zTPM uses simulation techniques to let you model the impact of changes on individual workload performance.

B: zBNA can be used to analyze client-provided System Management Facilities (SMF) records to identify jobs and data sets that are candidates for zEDCcompression, across a specified time window, typically a batch window.D: zSoftCap is PC-based tool that will evaluate the effect on IBM Z processor capacity when migrating to newer levels of software, including z/OS, z/VSE, CICS andIMS. zSoftCap assumes that the hardware configuration remains constant while the software version or release changes.

References: https://www-01.ibm.com/support/docview.wss?uid=tss1prs1381

QUESTION 38Which type of coupling link allows two z13 machines to connect at the maximum distance apart?

A. Infiniband HCA2-0 LR 12X

B. Infiniband HCA3-0 LR 1X

C. Infiniband HCA3-0 12x

D. Integrated Coupling Adapter

Correct Answer: BSection: (none)Explanation

Explanation/Reference:The HCA-O LR fanout supports InfiniBand 1x optical links that offer long-distance coupling links. With direct connection, the supported unrepeated distance3 is upto 10 km (6.2 miles), and up to 100 km (62 miles) with z Systems qualified DWDM.

Incorrect Answers:A: HCA2-C: A 12x InfiniBand copper cable of 1.5 meters (4.92 ft) to 3.5 meters (11.4 ft) is used for connection to the IFB-MP card in the I/O drawer.C: HCA3-O (12x IFB) maximum cable length is 150 meters.

Page 26: IBM.PracticeTest.C9030-644.v2018-02-15.by.Richard...The IBM System z13 introduces the capability to share (virtualize) the 10GbE RoCE Express feature among multiple (up to 31) LPARs

https://www.gratisexam.com/

D: Integrated Coupling Adapter is designed to drive distances up to 150 m.

References: IBM z13 Technical Guide (May 2016), page 156

https://www.gratisexam.com/