Top Banner
Status Report Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 [email protected] 1
13

Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 [email protected].

Dec 26, 2015

Download

Documents

Cameron Short
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 1

Status Report

Ian Bird

LHCC Referees’ meeting; CERN, 11th June 2013

March 6, 2013

Page 2: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 2

Main points• Several countries stated that the goal of aiming to fit within

constant budgets would be appreciated- But concern that equipment renewal must fit within this as well as

capacity expansion• Misunderstanding of current situation?

• Some discussion on desirability of seeking funding asap to retain key personnel in various countries as EC funds come to an end- Problem is that H2020 unlikely to provide funds before at least 1

year (likely 18 months) from now

• Chair of RSG will work together with MB to try and improve the requirement/scrutiny/pledge process prior to October RRB – to reflect experience and adapt better to budget and procurement timescales

March 6, 2013

Page 3: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 3March 6, 2013

CPU Disk Tape

Situation following April 2013 RRB – RSG report

Page 4: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 4March 6, 2013

Tier 0 CPU Tier 0 Disk Tier 0 Tape

Tier 1 CPU Tier 1 Disk Tier 1 Tape

Tier 2 CPU Tier 2 Disk

Page 5: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 5March 6, 2013

+34 PB/yr

+363 kHS06/yr

Page 6: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 6

MSS access

March 6, 2013

Data written TB/month

Data read TB/month

Page 7: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 7

Data transfers

March 6, 2013

Page 8: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 8

Resource use

March 6, 2013

Page 9: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 9

CERN@Wigner• CPU & disk servers installed

- Currently: ~5000 cores; ~few PB disk

• All fully tested• Will be put in production as part of the Agile

Infrastructure- Managed by Openstack as part of lxbatch

(SLC6 deployment is being done this way)- With new release of Openstack

• WAN connections (2x100 Gb/s) in production since February

March 6, 2013

Page 10: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 10

EMI and EGI-Inspire ended• CERN groups – integrated into a new team

- Brings together ES and GT- Involved in: EUDAT, iMarine, CRISP, HelixNebula- Group size will decrease by 50% over one year

• Sections- Operations and Liaison- Monitoring Infrastructure - Information and Data

• Programme of work set (partly) in conjunction with experiments- Try and keep some level of flexibility to address priorities

March 6, 2013

Page 11: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

[email protected] 11

Long term thinking• Vision paper for discussion with EC and

EIROforum • User Forum paper – guide the direction of future

infrastructures by the science communities• Data preservation – see Jamie’s talk• Research Data Alliance• Software investment – optimise how we use

CPUs/storage/networks

• None of this is HEP-specific!

March 6, 2013

Page 12: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

ACAT 2013; [email protected] 12

A Future e-Infrastructure for Science?

19th May 2013

Page 13: Ian Bird LHCC Referees’ meeting; CERN, 11 th June 2013 March 6, 2013 Ian.Bird@cern.ch1.

ACAT 2013; [email protected] 13

An e-Infrastructure system

19th May 2013

Networks, Federated ID management, etc.

Grid for

community

Grid for

community

CCS for

community

CCS for

community

Application software tools and services

Cloud Resource(s)

Data Archives

HPC Facilities

Col

labo

rativ

e to

ols

and

serv

ices

Sof

twar

e in

vest

men

t

Managed services – operated for research communities

Individual science community operated services

Key principles:• Governed & driven by science/research communities• Business model: Operations should be self-sustaining:

- Managed services are paid by use (e.g. Cloud services, data archive services, …)- Community services operated by the community at their own cost using their own

resources (e.g. grids, citizen cyberscience)

• Software support – open source, funded by collaborating developer institutions