6 juli 2015 Understanding the Tide Crucial for joint management of the Scheldt estuary Marcel Taal, Youri Meersschaut, Gert-Jan Liek IAHR, 29/06/2015
14

IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

Aug 05, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

6 juli 2015

Understanding the Tide Crucial for joint management of the Scheldt estuary Marcel Taal, Youri Meersschaut, Gert-Jan Liek IAHR, 29/06/2015

Page 2: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

July 6, 2015

The Scheldt has been a source of conflict

After request 3rd deepening: development Long Term Vision,

Page 3: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

Safety

July 6, 2015

Better collaboration since 1998

Accessibility

Naturalness

3 objectives

under one condition

Preservation of Physical Characteristics

Page 4: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

July 6, 2015 July 6, 2015

Better collaboration since 1998

- After request 3rd deepening -> development Long Term Vision, with agreement on : * threefold objective: Accessibility, Safety, Nature, * preservation physical characteristics

- Measures agreed on in 2005: treaties, also ‘treaty on collaboration in management and policy’, joint monitoring, research and effect-evaluation

!! Collaboration breaks with 300 year tradition of

conflict over Scheldt !! No (or less) delay!, much faster than 2nd deepening

Page 5: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

July 6, 2015

Joint Research: analyse, explain, communicate

Tidal Range -> agreement on its importance: ‘system integrity on the large scale’

Page 6: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

An attractive indicator / policy objective

Not good for naturalness • Influence on intertidal areas, more energy upstream • Tidal assymmetry and mud import tidal river Not good for accessibility • dangerous currents during springtide • lower levels low water Not good for safety • High waters -> higher dikes • Eroding channels -> extra defences It reflects long term development • Sustainability…! Direct response to measures in geometry (next slide)

Page 7: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

Development Hansweert – Bath in detail

6 juli 2015

1971 2010

2 %

8 %

◘ ◘

Page 8: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

Management options tidal intrusion? • sediment management needed anyway, ‘reversable’

Tide (range)

Area and quality

habitats

Channel size

Sediment supply

Disposal in channels

Disposal on shoals

Sand mining (no disposal)

• But no easy options……

Page 9: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

How to move forward… Dilemma’s

Most prominent challenge in the Sea Scheldt • Hardly any space in the channels upstream Hansweert • Shipping demands, preservation secondary channel

Page 10: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

How to move forward… Dilemma’s

• Tidal intrusion is important (long term objective) • But costs should also help short term objectives Add sediment for extra safety Improve ecological potential

• Still……. ‘what do we want to preserve’ After 10 years we still haven’t elaborated it to morphological objectives

July 6, 2015

Page 11: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

July 6, 2015

What is preservation of physical characteristics?

• Reducing tidal intrusion? • Preservation multiple channel system Western Scheldt?

Large ‘ebb’- and ‘flood’ channels, smaller connecting channels, intertidal shoals and shallow water areas. ?

• Morphology and hydrodynamics supporting all user functions? This will not be the same along the estuary

• How to link short and long term goals….

Page 12: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

Statements and food for thought

• We cannot escape choices from the past, harbours and embankments are there

• The estuary is in transition anyway, isn’t it all about ‘estuarine processes’ and ‘services’???

• Science can’t give the unambiguous answer, but it can and must be central in the debate on the future of our estuary

• Estuaries with one channel and much intertidal area are also regarded valuable?

• Why is loss of secondary channel in Ems-Dollard not regarded as similar big issue?

July 6, 2015

Page 13: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

Questions

Page 14: IAHR2015 - understanding the tides crucial for joint management of the scheldt estuary, taal, deltares, 29062015

6 juli 2015

Ems estuary: Tidal response 1950 - 2010

Estuary: NL / D Tidal river: D