IAEA General Conference 2013 Nuclear Operating Organizations cooperation Forum Strengthening the effectiveness of operating organizations EDF’s EPR TM lessons learned EDF / Areva Philippe Leigné – EDF Generation & Engineering Division Daniel Turon – Areva Construction Division IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 1
27
Embed
IAEA General Conference 2013 General Conference 2013 ... (specification, method statement ... Full prefabrication No more welding nor inspection in situ
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
IAEA General Conference 2013 Nuclear Operating Organizations cooperation Forum
Strengthening the effectiveness of operating organizations
EDF’s EPRTM lessons learned
EDF / Areva
Philippe Leigné – EDF Generation & Engineering Division
Daniel Turon – Areva Construction Division
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 1
Background
Experience feedback process
Lessons learned example
Conclusion
Agenda
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 2
Background Experience feedback process
Lessons learned example
Conclusion
Agenda
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 3
EDF’s NUCLEAR FLEET
Powerful, competitive, low CO2 emissions
The demands of a zero error safety culture
EDF Group: the world’s No. 1 nuclear power operator □ 485.5 TWh generated
□ France: 58 PWRs* at 19 sites
• 404.9 TWh generated: 74.8% of production
• €2.7bn invested in maintenance
□ United Kingdom: 14 AGRs**, 1 PWR* at 8 sites
• 60 TWh generated
□ USA: 5 PWRs* via CENG (49.99% EDF stake) at 3 sites
Building the future □ 3 PWRs under construction
• 1 in France: Flamanville
• 2 in China: Taishan (30% EDF stake)
□ 1 PWR project in the United Kingdom:
• 2 reactors at Hinkley Point
• Authorizations granted
• Design approved by safety authorities
• Final Investment Decision not yet taken.
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 4
* Pressurized water reactor
** Advanced gas-cooled reactor
AREVA and EDF’s long story in NPP projects
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 5
AREVA and EDF involved in design and construction of
more than100 units worldwide : Experience of adapting to a diverse range of licensing
frameworks
Experience of end to end process : Owner/Operator organization,
Project management,
Licensing,
EPC,
Fuel,
Waste,
Operation & maintenance,
Training (Initial, Continuing and advanced),
Decommissioning.
AREVA and EDF participate in international Working
Groups, aiming to harmonize nuclear safety approaches and
practices (IAEA, EU, EUR, …)
AREVA and EDF’s worldwide engagement in EPR Projects
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 6
EDF-Framatome N4 Siemens KONVOI
Feedbak of experience From 58 + 17
reactors in operation
Evolutionary
design concept
Increase nuclear safety More competitive
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 7
Design derived from French N4 and German Konvoi series.
EPR = European (Evolutionary) Pressurised water Reactor
4 independent safety trains
Air Plane Crash shelter
Made with very thick concrete
structure
EPR : some design features to enhance safety
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 8
Core melt stabilisation system
Digital Instrumentation & Control system
Computerised Man Machine Interface
In-containment water storage
+ passive cooling system
EPR : some design features to enhance safety
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 9
Background
Experience feedback process Lessons learned example
Conclusion
Agenda
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 10
Experience Feedback - Overview
Goal
Avoid repetition of problems encountered on in-progress EPR Projects,
Inform about good practices and engineering choices.
Method
Establish a continuous improvement culture across organizations,
Implement a process which quickly defines, assesses applicability and
implements project Lessons learned.
Targeted users
All EPR Projects.
Sharing for mutual benefit
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 11
AREVA and EDF have joined forces to optimize experience feedback and
continuous improvements.
Regular technical meetings are organized :
Topics are defined in advance (ex: liner, pools, pre-stressing,…),
Design, Construction, and Time-Schedule aspects are discussed.
The goal is to improve the overall performance of nuclear new builds. Reduce
uncertainty and risks for the investors.
IAEA General Conference – Septembre 2013 – Nucmear Operator Organizations Cooperation Forum 12
Experience Feedback - Overview
Flamanville 3 Taishan 1&2 Olkiluoto 3 Hinkley Point C Future EPR
Lessons learned process
Capture Lessons Learned
Launch investigation on critical topics (top-down process)
Encourage LL implementation in the database (bottom-up process)
Analyze LL
Sorting of LL by leader entities, by impact (cost, schedule, constructability)
Analysis (relevance, applicability to other projects)