7/13/2016 1 Meeting with FHWA and WisDOT BTO July 22, 2016 I39/90 Expansion Project Interstate expansion and overview 2016 construction schedule Improvements to area interchanges Rock River bridge project How to stay informed and involved Overview
15

I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

Jul 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

1

Meeting with FHWA and WisDOT BTO

July 22, 2016

I‐39/90 Expansion Project

• Interstate expansion and overview

• 2016 construction schedule

• Improvements to area interchanges

• Rock River bridge project

• How to stay informed and involved

Overview

Page 2: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

2

• Reconstruct and expand 45 miles of I‐39/90 from four to six lanes.

• Reconfigure 11 interchanges.

• Four to eight lanes from WIS 11 (Avalon Rd.) to the WIS 26 interchange in Janesville.

Interstate Improvements

North

• Design schedule: 2012 – 2016

• Construction schedule: 2015 – 2022

• Early LETs: 2013 ITS and WIS 73 (alternate route) reconstruction in 2014

Central

• Design schedule: 2012 – 2017

• Construction schedule: 2014 – 2020

• Early LETs: 2013 ITS and WIS 11 (Racine St.) interchange and US 14 and US 51 alternate route improvements in 2015

South

• Design schedule: 2012 – 2016

• Construction schedule: 2015 – 2020

• Early LETs: 2013 ITS, temporary widening and County G and County BT construction, near Beloit, in 2015

Project Segments

Page 3: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

3

2016 Construction Schedule• I‐39/90 southbound temporary widening, north of Edgerton.

o Replacement of I‐39/90 southbound bridge over E. Church Road.

• Three interchange reconstruction projects:

o US 51 interchange (southbound side), near Stoughton 

o WIS 11 (Avalon Road) interchange, south of Janesville

o WIS 59 interchange near Newville

• Rock River bridges, just south of the WIS 59 interchange

• I‐39/90 expansion between the Rock County line and Knutson Road.

• Temporary widening of I‐39/90 southbound through Janesville area, including WIS 26 and US 14 southbound bridges.

• US 14 and WIS 140 intersection improvements; WIS 140 safety enhancements.

• Hart Road alternate route improvements and Hart Road bridge replacement over I‐39/90.

• Numerous bridge replacements over I‐39/90 in Dane and Rock counties.

• Bridge rehabilitation:

o I‐39/90 northbound bridge over Newville Road, south of the WIS 59 interchange.

o I‐39/90 southbound bridge over Turtle Creek, near County S interchange.

Note: More projects may be added to the 2016 construction schedule.

I‐43/WIS 81 interchangeConstruction: 2019‐2022

Page 4: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

4

County S (Shopiere Road) interchangeCompleted in November 2015

First Diverging Diamond Interchange (DDI) in Wisconsin… set to open November 2016!

WIS 11 (Avalon Road) interchange

Page 5: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

5

WIS 11 (Avalon Road) interchangeConstruction: September 2015 to November 2016

DDI movements at the WIS 11 (Avalon Road) interchange

Page 6: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

6

WIS 11 (Racine St.) interchangeCompleted November 2013

Construction: 2019‐2021

Page 7: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

7

Construction: 2019‐2021

WIS 26 interchange

Page 8: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

8

I‐39/90 and Rock River bridges

• Construction: spring 2016 to fall 2018

• LET cost: $48.4 million– Includes two miles of I‐39/90 mainline, 

WIS 59 interchange and Rock River bridges

• Staged construction

• Pilot project for Queue Warning System

• Prime contractor: Rock Road Companies, Inc. 

• Bridge contractor: Lunda Construction, Inc.

I‐39/90 and Rock River bridges• Extensive outreach and communication to 

boaters and water enthusiasts.

• 13 public/private boat launches along Rock River and Lake Koshkonong with boater safety awareness signs and free informational flyers.

Page 9: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

9

I-39/90 and WIS 59 interchangeConstruction: March – Nov. 2016

Narrated animation video for this interchange at www.i39-90.wi.gov under Resources → Roundabouts.

Page 10: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

10

Page 11: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

11

WIS 59 interchangeConstruction: March 2016 to November 2016

Page 12: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

12

WIS 73/US 51 interchangeCompleted in November 2015

Page 13: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

13

US 51 interchangeConstruction: 2016‐2017

County N interchangeConstruction: 2017

Page 14: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

14

Stay informed and involved!

Sign up for project email updates at www.i39‐90.wi.gov.

John Vesperman, P.E.

Project Chief

[email protected]

Katrina Feltes, P.E.

Project Supervisor

[email protected]

Wayne Chase, P.E.

Project Supervisor

[email protected]

Kim Schauder, P.E.

Project Supervisor

[email protected]

Steven Theisen

Project Communications Manager

[email protected]

Project Field Office

111 Interstate Blvd.

Edgerton, WI 53534

Project contacts

Page 15: I‐39/90 Expansion Project€¦ · 7/13/2016 2 • Reconstruct and expand 45 miles of I‐39/90 from four to six lanes. • Reconfigure 11 interchanges. • Four to eight lanes from

7/13/2016

15

Questions?

www.i39‐90.wi.gov

i39‐[email protected]

Facebook.com/WisconsinI3990Project

(608) 884‐1234