Top Banner
DRAFT Technical Report RAILYARD ALIGNMENT AND BENEFITS STUDY Appendix I: Index to Document Library  
29

I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

Jul 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

DRAFT Technical Report  RAILYARD ALIGNMENT AND BENEFITS STUDY 

 

 

 

Appendix I:  Index to Document Library 

  

Page 2: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

Caltrain 09‐05‐13 Electrification Project Delivery Caltrain 9/5/2013 . . . \RAB Background Documents\Caltrain On‐Filehttp://www.caltrain.com/projectsplans/CaltrainModernization/Modernization/PeninsulaCorridorElectrificationProject.html 

CaltrainCaltrain Modernization Program Industry Day Presentation

Caltrain 4/10/2014 . . . \RAB Background Documents\Caltrain On‐File

CaltrainCaltrain‐HSR+Blended+Service+Plan+Ops‐Con‐Appendices ‐‐ Caltrain Electrification Simulation Report LTK (related 2)

Caltrain 3/1/2012 . . . \RAB Background Documents\Caltrain On‐File

http://www.caltrain.com/Assets/Caltrain+Modernization+Program/Blended+System/Caltrain‐HSR+Blended+Service+Plan+Ops‐Con‐Appendices.pdf

CaltrainCaltrain‐HSR+Blended+Service+Plan+Ops‐Con‐Report ‐‐ Caltrain Electrification Simulation Report LTK (related 1)

Caltrain 3/1/2012 . . . \RAB Background Documents\Caltrain On‐Filehttp://www.caltrain.com/Assets/Caltrain+Modernization+Program/Blended+System/Caltrain‐HSR+Blended+Service+Plan+Ops‐Con‐Report.pdf

CaltrainCaltrain Fourth & King Station and Yard Reduction/Removal Feasibility Assessment

Caltrain 10/7/2013

. . . \RABBackground\document\Caltrain\2013‐10‐07_4th‐kingfeasibilityassessment\Drafts\Caltrain\Fourth&KingReductionRemovalStudy/2013‐10‐07_4thkingfeasibilityAssessment\drafts\CaltrainFourth&KingStationandYardReduction/RemovalFeasbilityAssessmentStaffReviewOnly

Caltrain Appendix A ‐ Conceptual Drawings Caltrain Undated . . . \RABBackground\document\Caltrain\AppendixAConceptualDrawings

CaltrainComments on Draft Fourth and King Reduction/Removal Study

Caltrain Undated . . . \RABBackground\document\Caltrain\CommentsonDraftFourthandKingReduction/RemovalStudy

CaltrainAppendix B ‐ Draft Staff Review Only Crew (Deadhead) Cost Methodology 

Caltrain undated. . . \RABBackgroundDocument\Caltrain\AppendixB‐DraftStaffReviewOnlyCrew(Deadhead)CostMethodology

CaltrainAppendix D ‐ Draft Staff Review Only ‐ 4th and King Study: Structural feasibility for mezzanine development over station platforms

Caltrain undated . . . \RABBackgroundDocument\Caltrain\AppendixD‐StructuralAnalysis

CaltrainCaltrain / HSR Blended Service Plan Operations Considerations Analysis (Requested by Stakeholders)

Caltrain 6/1/2013. . . \RABBackgroundDocument\Caltrain\Caltrain/HSRBlendedServicePlanOperationsConsiderationsAnalysis(RequestedbyStakeholders)

Caltrain

Caltrain / HSR Blended Service Plan Operations Considerations Analysis (Requested by Stakeholders) Technical Appendix A: Detailed Simulation Results

Caltrain Undated. . . \RABBackgroundDocument\Caltrain\Caltrain/HSRBlendedServicePlanOperationsConsiderationsAnalysis(RequestedbyStakeholders)TechnicalAppendixA:DetailedSimulationResults

Caltrain Caltrain Capacity Analysis Update Caltrain 8/9/2011 . . . \RABBackgroundDocument\Caltrain\CaltrainCapacityAnalysisUpdateCaltrain Caltrain Corridor San Francisco to Gilroy Caltrain 9/4/2012 . . . \RABBackgroundDocument\Caltrain\CaltrainCorridorSanFranciscotoGilroyCaltrain Caltrain Modernization Program Industry Day Caltrain 4/10/2014 . . . \RABBackgroundDocument\Caltrain\CaltrainModerizationProgramIndustryDay

CaltrainCaltrain Modernization Program ‐ Request for Qualifications (RFQ) from Design‐Build Entities

Caltrain 5/15/2014. . . \RABBackgroundDocument\Caltrain\CaltrainModernizationProgram‐RequestforQualifications(RFQ)fromDesign‐BuildEntities

CaltrainCaltrain North Terminal Study to Support Future Caltrain Operations

Caltrain Undated. . . \RABBackgroundDocument\Caltrain\CaltrainNorthTerminalStudytoSupport FutureCaltrainOperations

CaltrainCaltrain Peninsula Corridor Electrification Program: Project Delivery Strategy 

Caltrain 9/5/2013. . . \RABBackgroundDocument\Caltrain\CaltrainPeninsulaCorridorElectrificationProgramProjectDeliveryStrategy

Caltrain Caltrain Peninsula Corridor Electrification Project Caltrain undated . . . \RABBackgroundDocument\Caltrain\CaltrainPeninsulaCorridorElectrificationProject

CaltrainCaltrain San Francisco Station and Yard Reduction/Removal Feasibility Assessment

Caltrain 11/7/2013. . . \RABBackgroundDocument\Caltrain\CaltrainSanFranciscoStationandYardReduction/RemovalFeasibilityAssessment

 Compiled by CH2M HILL October 2016 Page 1page I-1

Page 3: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

Caltrain Caltrain Storage Concept 01‐28‐13 Caltrain 1/28/2013 . . . \RABBackgroundDocument\Caltrain\CaltrainStorageConcepts01‐28‐13Caltrain Caltrain Strategic Plan: FY2015‐2024 Draft Caltrain 8/1/2014 . . . \RABBackgroundDocument\Caltrain\CaltrainStrategicPlan:FY2015‐2024Caltrain Peninsula Corridor Electrification Project Caltrain 2/1/2014 . . . \RABBackgroundDocument\Caltrain\PeninsulaCorridorElectrification Project

CaltrainPeninsula Corridor Electrification Program: Project Delivery Strategy

Caltrain 9/5/2013 . . . RABBackgroundDocuments\Caltrain\09‐05‐13 Electrification Project Delivery

Caltrain Reduced Yard Option A Caltrain 9/10/2013. . . RABBackgroundDocuments\Caltrain\2013‐10‐07_4th‐king feasibility assessment\AppA‐Railyard_Option_A_Layout‐20120909

CaltrainSan Francisco Station and Yard Reduction/Removal Feasbility Assessment

Caltrain 11/7/2013. . . RABBackgroundDocuments\Caltrain\4th and King Reduction Removal Study\11‐7‐13 4th King Study Board Update

CaltrainComments on Draft Fourth and King Reduction/Removal Study

Unidentified Undated. . . RABBackgroundDocuments\Caltrain\4th and King Reduction Removal Study\2013_10_07_4th‐king feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction

Caltrain Letter to Michael J. Scanlon from Michael BurnsSanta Clara Valley Transportation Authority

10/30/2013. . . RABBackgroundDocuments\Caltrain\4th and King Reduction Removal Study\2013‐10‐07_4th‐king feasibility assessment\VTA Ltr11012013

CaltrainLetter to Mr. Reiskin & Mr. Rahaim re 4th and King Station/Yard Reducation/Removal Feasibility Assessment

Caltrain 11/13/2013. . . RABBackgroundDocuments\Caltrain\4th and King Reduction Removal Study\4th & King Feasibility ‐ Final

CaltrainCaltrain North Terminal Study to Support Future Caltrain Operations

SF Planning Department and Peninsula Corridor Joint Powers Board

Undated. . . RABBackgroundDocuments\Caltrain\4th and King Reduction Removal Study\North Terminal Draft Scope MOU SF Planning

Caltrain Caltrain Moderization Program Industry Day Caltrain 4/10/2014 . . . RABBackgroundDocuments\Caltrain\CalMod Industry DayFINAL_4 9 14

CaltrainCaltrain Moderization Program Electrification Peninsula Corridor Electrification Project

Caltrain 2/27/2014 . . . RABBackgroundDocuments\Caltrain\Caltrain Electrification Project Website

Caltrain Caltrain Ridership Thru 2012 Caltrain 7/4/1905 . . . RABBackgroundDocuments\Caltrain\Caltrain Ridership Thru 2012_recd20140701

Caltrain Conceptual Design ‐ For Discussion Only Option 1H&H Engineering Construction

1/25/2013 . . . RABBackgroundDocuments\Caltrain\Caltrain Storage Concepts 1‐28‐13

Caltrain Strategic Plan FY2015‐2024 Caltrain August of 2014 . . . RABBackgroundDocuments\Caltrain\Caltrain Strategic Plan ‐ DRAFT ‐ August 2014Caltrain Video (raw) Caltrain Undated . . . RABBackgroundDocuments\Caltrain\caltrain1Caltrain Video (converted) Caltrain Undated . . . RABBackgroundDocuments\Caltrain\caltrain1_Simulation Video

Caltrain Caltrain Capacity Analysis Update CaltrainAugust ‐ September of 2011

. . . RABBackgroundDocuments\Caltrain\Capacity+Analysis+Preliminary+Findings+Presentation_09‐2011

Caltrain

Caltrain Moderization Program RFI from Railcar Manufacturers Only Concerning Procurement of Bi‐Level Electric Multiple Unit (EMU) Rolling Stock For The JPB's Operating Train Corridor between San Francisco and San Jose

Caltrain 5/22/2014 . . . RABBackgroundDocuments\Caltrain\EMU RFI 5‐22‐2014

Caltrain

Caltrain Modernization Program RFQ from Design‐Build Entities For Design‐Build of Electrification in the JPB's Operating Train Corridor Between San Jose and San Francisco

Caltrain 5/15/2014 . . . RABBackgroundDocuments\Caltrain\Final RFQ ‐ CalMod Electrification 5‐15‐2014

CaltrainPeninsula Corridor Electrification Project Draft Environmental Impact Report

Caltrain February of 2014 . . . RABBackgroundDocuments\Caltrain\PCEP_DEIR_03_2014

Caltrain HSR Service Planning

Transbary Transit Center (TTC) Shared Platform Use Simulation

Caltrain Dec 18 of 2014 . . . \RABBackground\document\Caltrain HSR Service Planning\TTCSim_19Dec14

 Compiled by CH2M HILL October 2016 Page 2page I-2

Page 4: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

Caltrans Rte 280 As‐builts 04‐207054 ‐ SF 280_18St ‐6St Caltrans . . . \RAB Background Documents\Caltrans\Rte 280 As‐builts On‐File

Caltrans Rte 280 As‐builts 04‐207064 ‐ SF 280_6St ‐3St Caltrans . . . \RAB Background Documents\Caltrans\Rte 280 As‐builts On‐File

Caltrans Rte 280 As‐builts 04‐386004 ‐ SF 280_19St ‐ 18St Caltrans . . . \RAB Background Documents\Caltrans\Rte 280 As‐builts On‐File

Caltrans Rte 280 As‐builts 14‐207044 ‐ SF 280_Evans ‐ 8St Caltrans . . . \RAB Background Documents\Caltrans\Rte 280 As‐builts On‐File

CaltransRte 280 As‐builts 14‐207044a ‐ SF280_MariposaOH‐ChinaBasinViaduct‐PotreroHillRetaining Wall

Caltrans . . . \RAB Background Documents\Caltrans\Rte 280 As‐builts On‐File

CHSR BPlan_2014_Business_Plan_Final CHSR 4/30/2014 . . . \RAB Background DocumentsCHSR Executed+9+Party+MOU CHSR 1/1/2013 . . . \RAB Background Documents On‐File

CHSR FINAL_Draft_2014_CHSRA Business_Plan CHSR 2/7/2014 . . . \RAB Background Documents On‐Filehttp://hsr.ca.gov/About/Business_Plans/Draft_2014_Business_Plan.html 

CHSR2010_08_05_SF_SJ_Supplemental_AA_Executive_Summary

CHSR August of 2010 . . . \RABBackgroundDocuments\CHSR\2010_08_05_SF_SJ_Supplemental_AA_Executive_Summary

CHSR 2010_08‐05_SF_SJ_Supplemental_AA_Report CHSR November of 2010 . . . \RABBackgroundDocuments\CHSR\2010_08‐05_SF_SJ_Supplemental_AA_Report

CHSRBoard_Meeting_Agenda_Item_4_San_Francisco_to_San_Jose_Supplemental_AA_Rpt_Addendum_Pres_11_1_10

CHSR 10/28/2010. . . \RABBackgroundDocuments\CHSR\Board_Meeting_Agenda_Item_4_San_Francisco_to_San_Jose_Supplemental_AA_Rpt_Addendum_Pres_11_1_10

CHSRBoard_Meeting_Agenda_Item_4_San_Francisco_tp_San_Jose_Supplemental_Alternative_Analysis_Staff_Memo_11_1_10

CHSR 10/28/2010. . . \RABBackgroundDocuments\CHSR\Board_Meeting_Agenda_Item_4_San_Francisco_tp_San_Jose_Supplemental_Alternative_Analysis_Staff_Memo_11_1_10

CHSR Bplan_2014_Business_Plan_Final CHSR dated 2014 . . . \RABBackgroundDocuments\CHSR\Bplan_2014_Business_Plan_Final

CHSRCHSRA_Board_presentation_FINAL_PSF_VERSION_8_5_10

CHSR August of 2010 . . . \RABBackgroundDocuments\CHSR\CHSRA_Board_presentation_FINAL_PSF_VERSION_8_5_10

CHSR Executed+9+Party+MOU CHSR 9/1/2012 . . . \RABBackgroundDocuments\CHSR\Executed+9+Party+MOU

CHSR FINAL_Draft_2014_CHSRA Business_Plan CHSR dated 2014 . . . \RABBackgroundDocuments\CHSR\FINAL_Draft_2014_CHSRA Business_Plan

CHSRLinks to San Francisco to San Jose Project Section Alts Analysis Documents

CHSRA Various 10.16.14. . . \RABBackgroundDocuments\CHSR\LINKSSFtoSJProjectSectionAltsAnalysisDocuments\SanFranciscotoSanJoseProjectSectionAltsAnalysisDocuments

CHSR Letters to CHSR from City of SF CHSRA Various 10.16.14 . . . \RABBackgroundDocuments\CHSR\LINKStoLetterstoCHSRfromCityofSFCHSR PrelimAltsAnalysis_Apr2010 CHSRA 4/10/2016 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010CHSR AA_Exhibits_11_16_09 CHSRA 10/14/2009 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\AA_Exhibits_11_16_09

CHSRAAPublicOpenHouseMeetingsInvitationLetter_9_17_09

CHSRA 9/30/2009. . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\AAPublicOpenHouseMeetingsInvitationLetter_9_17_09

 Compiled by CH2M HILL October 2016 Page 3page I-3

Page 5: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

CHSR AlternativesAnalysisPrimer2_9_29_09 CHSRA 9/29/2009. . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\AlternativesAnalysisPrimer2_9_29_09

CHSR Appendix_A_101_280_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_A_101_280_4_8_10

CHSR Appendix_B_Plan_Profile_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_B_Plan_Profile_4_8_10

CHSR Appendix_C_Typical_Cross_Sections_4_8_10 CHSRA 4/8/2010. . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_C_Typical_Cross_Sections_4_8_10

CHSR Appendix_D_Utilities_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_D_Utilities_4_8_10

CHSR Appendix_E_Scoping_Disposition_4_8_10 CHSRA 4/8/2010. . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_E_Scoping_Disposition_4_8_10

CHSR Appendix_F_Outreach_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_F_Outreach_4_8_10

CHSR Appendix_G_AA_Methods_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_G_AA_Methods_4_8_10

CHSR Appendix_H_SF_Terminal_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_H_SF_Terminal_4_8_10

CHSR Appendix_I_No_Project_Alt_4_8_10 CHSRA 4/8/2010. . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_I_No_Project_Alt_4_8_10

CHSR Appendix_J_18_25_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_J_18_25_4_8_10CHSR Appendix_J_26_33_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_J_26_33_4_8_10CHSR Appendix_J_34_40_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_J_34_40_4_8_10CHSR Appendix_J_41_48_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_J_41_48_4_8_10

CHSR Appendix_J_ROW_1_10_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_J_ROW_1_10_4_8_10

CHSR Appendix_J_ROW_11_17_4_8_10 CHSRA 4/8/2010 . . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_J_ROW_11_17_4_8_10

CHSR Appendix_K_Train_Operations_4_8_10 CHSRA 4/8/2010. . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_K_Train_Operations_4_8_10

CHSR Appendix_L_Cost_Estimates_4_8_10 CHSRA 4/8/2010. . . \RABBackgroundDocuments\CHSR\PrelimAltsAnalysis_Apr2010\Appendix_L_Cost_Estimates_4_8_10

CHSR Proposed Brisbane Yard‐1 CHSR 6/30/2011 . . . \RABBackgroundDocuments\CHSR\ProposedBrisbane Yard‐1

CHSRCalifornia High‐speed Train Project Legend: TJXXXX: Track Leads and Maintenance Facility Plan

CHSRA 6/30/2011 . . . \RABBackgroundDocuments\CHSR\ProposedBrisbaneYard

CHSR Proposed Brisbane Yard CHSR 6/30/2011 . . . \RABBackgroundDocuments\CHSR\ProposedBrisbaneYard

CHSRCalifornia High‐Speed Train Project Legend: TJXXXX: TrackLeads and Maintenance Facility Plan

CHSRA 6/30/2011 . . . \RABBackgroundDocuments\CHSR\ProposedBrisbaneYard‐1

 Compiled by CH2M HILL October 2016 Page 4page I-4

Page 6: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

CHSRSF_SI‐Preliminary_AA_Executive_Summary_4_8_10

CHSR 4/8/2010 . . . \RABBackgroundDocuments\CHSR\SF_SI‐Preliminary_AA_Executive_Summary_4_8_10

CHSRSF_SJ_Preliminary_Alternatives_Analysis_Report_4_8_10

CHSR 4/8/2010 . . . \RABBackgroundDocuments\CHSR\SF_SJ_Preliminary_Alternatives_Analysis_Report_4_8_10

CHSRSF_SJ_Supplemental_Appendix_B_Plan_and_Profiles_8_5_10

CHSR August of 2010 . . . \RABBackgroundDocuments\CHSR\SF_SJ_Supplemental_Appendix_B_Plan_and_Profiles_8_5_10

CHSRSF_SJ_Supplemental_Appendix_C_Typical_Sections_8_5_10

CHSR August of 2010 . . . \RABBackgroundDocuments\CHSR\SF_SJ_Supplemental_Appendix_C_Typical_Sections_8_5_10

CHSRSF_SJ_Supplemental_Appendix_F_Outreach_8_5_10

CHSR August of 2010 . . . \RABBackgroundDocuments\CHSR\SF_SJ_Supplemental_Appendix_F_Outreach_8_5_10

CHSRSF_SJ_Supplemental_Appendix_L_Cost_Estimates_8_5_10

CHSR August of 2010 . . . \RABBackgroundDocuments\CHSR\SF_SJ_Supplemental_Appendix_L_Cost_Estimates_8_5_10

CHSR SFtoSIAA_Errata_Addendum_7_12_10 CHSR . . . \RABBackgroundDocuments\CHSR\SFtoSIAA_Errata_Addendum_7_12_10

CHSRSupplemental_Appendix_M_Maintenance_Facility_8_6_10

CHSR August of 2010 . . . \RABBackgroundDocuments\CHSR\Supplemental_Appendix_M_Maintenance_Facility_8_6_10

CHSR SupplementalAltsAnalysis_Aug2010 CHSR August of 2010 . . . \RABBackgroundDocuments\CHSR\SupplementalAltsAnalysis_Aug2010

CHSRBplan_2014_BP_Comments_April_2014.pdf.alwqlq1

CHSR blank . . . |RABBackgroundDocuments\CHSR\Bplan_2014_BP_Comments_April_2014.pdf.alwqlq1

CHSR CHSRA_Board_presentation_4_8_10 CHSR 4/8/2010 . . . |RABBackgroundDocuments\CHSR\CHSRA_Board_presentation_4_8_10

CHSR California High Speed Rail Business Plan CHSR 2/7/2014 \CHSR Available Onlinehttp://hsr.ca.gov/About/Business_Plans/Draft_2014_Business_Plan.html 

City of Brisbane Traffic and Circulation City of Brisbane 6/1/2013 . . . /RABBackgroundDocuments\CityofBrisbane\4n_TransportationCity of Brisbane Chapter 3 Project Description City of Brisbane 6/1/2013 . . . /RABBackgroundDocuments\CityofBrisbane\Chapter3ProjectDescriptionCity of Brisbane Alternatives City of Brisbane 6/1/2013 . . . \RABBackgroundDocuments\City of Brisbane\5_AlternativesCity of Brisbane Exhibit5‐1_RenewableEnergyGeneralAlternative City of Brisbane undated . . . \RABBackgroundDocuments\CityofBrisbane\Exhibit5‐1_RenewableEnergyGeneralAlternative

City of BrisbaneTable 5‐1 Comparison of Project Scenarios and Alternatives Land Uses

City of Brisbane undated. . . \RABBackgroundDocuments\CityofBrisbane\Table5‐1CpmparisonofProjectScenariosandAlternativesLandUses

City of Brisbane Vision & Executive Summary City of Brisbane 2/1/2007 . . . \RABBackgroundDocuments\CityofBrisbane\Vision&ExecutiveSummary

General Background Info

Draft_Rincon_Hill IFD_Infrastructure_Financing_Plan_Dec_2010 (1)

SF Office of Economic Development

. . . \RAB Background Documents\General Background Info On‐File

General Background Info

Rincon Hill Infrastructure Financing Plan (Keyser Marston)

SFOED 12/1/2010 . . . \RAB Background Documents\General Background Info On‐File

General Background Info

Final Geotechnical Data Report ‐ Vol 1 & 2 Arup . . . \RAB Background Documents\Geotechnical Info On‐File

General Background Info

Final_Geotechnical_Rpt_Transbay_4‐15_09[1] URS . . . \RAB Background Documents\Geotechnical Info On‐File

General Background Info

Case Studies in SF Mission Bay by Lori Simpson undated . . . \RABBackgroundDocuments\General Background Info\Subsurface Conditions

General Background Info

D+M Mission Bay Reports 10/21/1991 . . . \RABBackgroundDocuments\General Background Info\Subsurface Conditions

 Compiled by CH2M HILL October 2016 Page 5page I-5

Page 7: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

General Background Info

Mission Bay Blk 10‐10A 10/28/2005 . . . \RABBackgroundDocuments\General Background Info\Subsurface Conditions

General Background Info

11x17_Penninsula undated . . . \RABBackgroundDocuments\GeneralBackgroundInfo\11x17Penninsula

General Background Info

2007 RETC Conference Transbay DTX Paper in 2007 . . . \RABBackgroundDocuments\GeneralBackgroundInfo\2007RETCConferenceTransbayDTXPaper

General Background Info

caltrain‐rail‐yard‐h NEWS BLOG 4/30/2013 . . . \RABBackgroundDocuments\GeneralBackgroundInfo\caltrain‐rail‐yard‐hNEWSBLOG

General Background Info

Special Financing Districts_Tim Seufer‐NBS_2014 in 2014. . . \RABBackgroundDocuments\GeneralBackgroundInfo\SpecialFinancingDistricts_TimSeufer‐NBS_2014

General Background Info

Third Street Light Rail CER July of 1999 . . . \RABBackgroundDocuments\GeneralBackgroundInfo\ThirdStreetLightRailCER

Geotechnical Info A Brief History of the South of Market n/a Undated . . . \RABBackgroundDocuments\Geotechnical Info\02_history_s_of_market

Geotechnical InfoProject Plans for Construction on State Highway in SF

Dept of Transportation

9/3/1998 . . . \RABBackgroundDocuments\Geotechnical Info\04‐133174

Geotechnical InfoProject Plans for Construction on State Highway in SF ‐ Fremont St. to Main St

Dept of Transportation

7/1/1997 . . . \RABBackgroundDocuments\Geotechnical Info\04‐191754

Geotechnical InfoProject Plans for Construction on State Highway in SF ‐ Beale Street to Broadway

Dept of Transportation

1/1/1998 . . . \RABBackgroundDocuments\Geotechnical Info\04‐191904

Geotechnical InfoProject Plans for Bridge Removal on State Highway ‐SF at Spear Street

Dept of Transportation

7/24/1992 . . . \RABBackgroundDocuments\Geotechnical Info\04‐191934

Geotechnical Info Bridge Inspection Records Information System 3/6/1995 . . . \RABBackgroundDocuments\Geotechnical Info\34‐0046Geotechnical Info Foundation Plan 1 SFOBB 6/17/2002 . . . \RABBackgroundDocuments\Geotechnical Info\ab01_sfobb

Giants ParkSF Giants Pacific Bell Ballpark_Production  Pile Summary

SF Giants 12/18/1998 . . . \RABBackgroundDocuments\GiantsPark\SFGiantsPacificBellBallpark_ProductionPileSummary

Mayor's Office2014‐06‐23_MEL_280_talkingpts ‐‐ US Conference of Mayors

Mayor's Office (Gillet)

. . . \RAB Background Documents\Mayor's Office On‐File

Mayor's Office 6 23 14 RAB‐CGI ‐‐ Clinton Global InitiativeMayor's Office (Gillet)

. . . \RAB Background Documents\Mayor's Office On‐File

Mayor's Office072914_Walking_Tour Gilette ‐‐ Re‐envisionin I‐280 and the Caltrain Corridor

Mayor's Office (Gillet)

1/10/2013 . . . RAB Background Documents\Mayor's Office On‐File

MTC MTC Transbay Report MTC . . . \RAB Background Documents\MTC On‐File http://onebayarea.org/plan‐bay‐area.html N/A Better Market & Octavia Plan SF Planning  Online Only Available Online http://sf‐planning.org/index.aspx?page=1713 N/A Better Neighborhoods Program Info SF Planning  Online Only Available Online http://sf‐planning.org/index.aspx?page=1699  

N/A Central SoMa Plan SF Planning  Online Only Available Online http://www.sf‐planning.org/index.aspx?page=2557 

N/A DEIR SF Planning 5/1/2014 Online Only Available Online http://sfmea.sfplanning.org/2013.0154E_DEIR.pdf 

N/ADowntown and SoMa Transportation and Public Realm Plan

SF Planning  Online Only Requested

N/A East SoMa Area Plan SF Planning  Online Only Available Onlinehttp://sf‐planning.org/index.aspx?page=1673#legislation 

N/A Eastern Neighborhoods SF Planning  Online Only Available Onlinehttp://sf‐planning.org/index.aspx?page=1673#legislation 

 Compiled by CH2M HILL October 2016 Page 6page I-6

Page 8: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

154

N/A ENTRIPS SFMTA Online Only Available Onlinehttp://sf‐planning.org/index.aspx?page=1673#legislation 

N/A Mission Bay Redevelopment Plans SF Redevelopment Online Only Available Onlinehttp://www.sfredevelopment.org/index.aspx?page=61

N/A Mission Rock Fiscal feasibiltiyGeneral Background

Online Only Available Onlinehttp://sfport.com/modules/showdocument.aspx?documentid=5637 

N/A Mission Rock Project InfoGeneral Background

Online Only Available Online http://sfport.com/index.aspx?page=25 

N/A Notice of Preparation SF Planning 12/1/2013 Online Only Available Online http://sfmea.sfplanning.org/2013.0208E_NOP.pdf

N/A Plan Bay Area MTC 7/18/2013 Online Only Available Online http://onebayarea.org/plan‐bay‐area.html 

N/A Rincon Hill Area Plan  SF Planning  8/1/2005 Online Only Available Online http://www.sf‐planning.org/index.aspx?page=1665 

N/A SF Better Streets Plan SF Planning  12/1/2010 Online Only Available Onlinehttp://www.sf‐planning.org/ftp/BetterStreets/proposals.htm 

N/A SF Bicycle Plan SFMTA Online Only Available Onlinehttp://www.sfmta.com/projects‐planning/projects/2009‐san‐francisco‐bicycle‐plan 

N/A SPUR Article ‐‐ Reimagining the Caltrain Railyards SPUR 2/1/2013 Online Only Available Onlinehttp://www.spur.org/blog/2013‐02‐26/reimagining‐caltrain‐railyards 

N/A Transit Effectiveness Project SFMTA Online Only Available Onlinehttp://www.sfmta.com/projects‐planning/projects/tep‐transit‐effectiveness‐project 

N/A Warriors Arena (Piers 30‐32)General Background

Online Only Requested

N/A Waterfront Transportation Assessment SFMTA Online Only Available Onlinehttp://www.sfmta.com/projects‐planning/projects/waterfront‐transportation‐assessment‐0

N/A Treasure Island Development InfoSF Treasure Island Development Authority

Available Onlinehttp://sftreasureisland.org/approved‐plans‐and‐documents   

N/ATreasure Island Tranportation Implementation Plan

SFCTA Available Online

http://www.sfcta.org/sites/default/files/content/Planning/TreasureIsland/Final%20Treasure%20Island%20Transportation%20Implementation%20Pla%20‐%20Lo%20res.pdf 

Pacific Bell ParkSF Giants Pacific Bell Ballpark_Production Pile Summary

Treadwell&Rollo 12/18/1998 . . . \RAB Background Documents\Giants Park On‐File

Pier 70 Pier 70 Master Plan SF Port Available Online http://www.sf‐port.org/index.aspx?page=218 Pier 70 Pier 70 Project Info SF Port Available Online http://www.sf‐port.org/index.aspx?page=263 

PUC Infrastructure Map/Diagram ‐ Wastewater CollectionSan Francisco Water Power and Sewer

Undated . . . \RABBackgroundDocuments\PUC Infrastructure\16th ST‐1

PUC Infrastructure Map/Diagram ‐ Wastewater CollectionSan Francisco Water Power and Sewer

Undated . . . \RABBackgroundDocuments\PUC Infrastructure\16th ST‐2

 Compiled by CH2M HILL October 2016 Page 7page I-7

Page 9: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

PUC Infrastructure Map/Diagram ‐ Wastewater CollectionSan Francisco Water Power and Sewer

Undated . . . \RABBackgroundDocuments\PUC Infrastructure\7th ST‐1

PUC Infrastructure Map/Diagram ‐ Wastewater CollectionSan Francisco Water Power and Sewer

Undated . . . \RABBackgroundDocuments\PUC Infrastructure\7th ST‐2

PUC Infrastructure Map/Diagram ‐ Wastewater CollectionSan Francisco Water Power and Sewer

Undated . . . \RABBackgroundDocuments\PUC Infrastructure\7th ST‐3 and 16th ST

PUC Infrastructure Map/Diagram ‐ Wastewater CollectionSan Francisco Water Power and Sewer

Undated . . . \RABBackgroundDocuments\PUC Infrastructure\Mission Creed End

PUC Infrastructure Map/Diagram ‐ City DistributionSan Francisco Water Power and Sewer

Undated . . . \RABBackgroundDocuments\PUC Infrastructure\Naturally Occurring Asbestos‐shad

PUC Infrastructure Map/Diagram ‐ City DistributionSan Francisco Water Power and Sewer

Undated . . . \RABBackgroundDocuments\PUC Infrastructure\Water‐yellow and AWSS‐Blue

SF Planning DocsCCSF Railyards Summary Memo_with Appendicies_Feb 2013

SF Planning Dept 2/13/2013 . . . \RAB Background Documents\SF Planning Docs On‐File

SF Planning DocsExample street cross proposal ‐ Four Boulevard Graphics

SF Planning . . . \RAB Background Documents\SF Planning Docs\Boulevard concepts On‐File

SF Planning Docs Old Panhandle Proposal ‐‐ Two Parkway Graphics SF Planning . . . \RAB Background Documents\SF Planning Docs\Boulevard concepts On‐File

SF Planning Docs DTX Spear Loop Option SF Planning . . . \RAB Background Documents\SF Planning Docs\DTX loop track concepts On‐FileSF Planning Docs DTX Steuart Loop Option SF Planning . . . \RAB Background Documents\SF Planning Docs\DTX loop track concepts On‐FileSF Planning Docs 2014‐07‐08_study area Unknown undated . . . \RABBackgroundDocuments\SF Planning Docs\2014‐07‐08_study areas

SF Planning Docs Panhandle linear parkway planSF Planning Department

. . . \RABBackgroundDocuments\SF Planning Docs\Boulevard concepts\old panhandle proposal\old panhandle proposal\Linear parkway plan

SF Planning Docs Caltrain Ridership Spreadsheet 2012 Unknown 1992 ‐ 2012 . . . \RABBackgroundDocuments\SF Planning Docs\Caltrain Ridership

SF Planning Docs CCSF Railyards Summary MemoSF Planning Department

2/13/2013. . . \RABBackgroundDocuments\SF Planning Docs\CCSF Railyards Summary Memo_with Appendices_Feb 2013

SF Planning Docs Central Corridor PlanSF Planning Department

April of 2013 . . . \RABBackgroundDocuments\SF Planning Docs\Central‐Corridor‐Plan‐DRAFT‐FINAL‐web

SF Planning DocsRequest for Proposals for Railyard Alternatives and I‐280 Boulevard Feasibility Study

SF Planning Department

1/29/2014. . . \RABBackgroundDocuments\SF Planning Docs\DTX loop track concepts\Railyard RFP + TJPA correspondence\FA32973‐CP13‐015 Railyard I‐280 RFP

SF Planning Docs

Responses to TJPA comments on Proposed Scope of Services for Railyard Alternatives and I‐280 Boulevard Feasibility Study (responses sent 01/07/2014)

SF Planning Department

4/25/2014. . . \RABBackgroundDocuments\SF Planning Docs\Railyard RFP + TJPA correspondence\NEVER SENT 2014‐01‐07_INTERNAL ‐ comment response on scope of work

SF Planning DocsRailyard Boulevard Feasibility Study TJPA Comments on Draft Request for Proposals

Transbay Joint Powers Authority

1/7/2014. . . \RABBackgroundDocuments\SF Planning Docs\Railyard RFP + TJPA correspondence\TJPA Response to Railyard RFP 1‐7‐2014

SF Planning DocsAppendix A: CHSRA Plans, Profiles, and original Evaluation Matrix materials

California High Speed Rail Authority

8/1/2010. . . \RABBackgroundDocuments\SF Planning Docs\SFCTA Comment Ltr CHSR_Dec 2010\SFCTA_comment_letter_Dec2010_App A‐B_Pt1

SF Planning Docs Appendix D: SFTWG Alternative Alignment Options SFTWG undated. . . \RABBackgroundDocuments\SF Planning Docs\SFCTA Comment Ltr CHSR_Dec 2010\SFCTA_comment_letter_Dec2010_App C‐G_Pt2

 Compiled by CH2M HILL October 2016 Page 8page I-8

Page 10: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

176

177

178

179

180

181

182

183

184

185

186

187

188

189

190

191

192

193

194

SF Planning Docs

California High‐Speed Train San Francisco to San Jose Section Environmental Impact Report/Statement ‐ Additional San Francisco High‐Speed Rail Alternatives

Multi‐Sourced 12/1/2010. . . \RABBackgroundDocuments\SF Planning Docs\SFCTA Comment Ltr CHSR_Dec 2010\SFCTA_comment_letter_to_CHSRA_Dec_01_2010

SF Planning DocsEastern Neighborhoods Transportation Implementation Planning Study Final Report

San Francisco Municipal Transportation Authority

12/1/2011. . . \RABBackgroundDocuments\SF Planning Docs\SFMTA Transportation Planning\00_ENTRIPS_ExecSumm SFMTA

SF Planning DocsFA32973‐CP13‐015 Railyard I‐280 RFP (And related correspondence)

SF Planning  12/1/2010 . . . RAB Background Documents\SF Planning Docs\Railyard RFP & TJPA correspondence On‐File

SFCTA High Speed Rail and Caltrain in San Francisco

San Francisco County Transportation Authority

Oct. 19 of 2011 . . . \RABBackgroundDocuments\SFCTA\SFCTA\Bay‐Area‐Council‐HSR‐101911 (3)

SFCTALetter to Robert Doty re CA High‐Speed Train ‐ SF to San Jose Section Environmental Impact Report/Statement

San Francisco Planning Department

12/1/2010 . . . \RABBackgroundDocuments\SFCTA\SFCTA_comment_letter_Dec2010_App A‐B_Pt1

SFCTAAppendix . . .  SFTWG Alternative Alignment Options Plan/Profile Drawings

SFTWG 12/1/2010 . . . \RABBackgroundDocuments\SFCTA\SFCTA_comment_letter_Dec2010_App C‐G_Pt2

SFCTALetter to Robert Doty re CA High‐Speed Train ‐ SF to San Jose Section Environmental Impact Report/Statement

San Francisco County Transportation Authority

12/1/2010 . . . \RABBackgroundDocuments\SFCTA\SFCTA_comment_letter_to_CHSRA_Dec_01_2010

SFDPW Bridges 462 AGS, Inc. 8/1/1991 . . . \RAB Background Documents\3rd Street Bridge On‐File

SFDPW Bridges 3rd St 1933 Plan 8/1/1931 . . . \RAB Background Documents\3rd Street Bridge On‐File

SFDPW Bridges 3rd St 1999 Retrofit Plan SF BOE 3/1/2001 . . . \RAB Background Documents\3rd Street Bridge On‐File

SFDPW BridgesFourth Street Bridge ‐ Seismic Retrofit and Rehabilitation

SF BOE 3/1/2005 . . . \RAB Background Documents\4th Street Bridge On‐File

SFDPW Bridges75679 and 75679.1 and 75679.2 and 75679.3 B‐9618

1932 ‐ 2007 . . . \RAB Background Documents\SFDPW\Fourth St Bridge Pile Logs On‐File

SFDPW Bridges pile logs_20060928065601 Treadwell&Rollo 12/22/2004 . . . \RAB Background Documents\SFDPW\Fourth St Bridge Pile Logs On‐File

SFDPW BridgesHistoric Property & Architectural Survey, Findings of Effect Reports

8/1/1998 . . . \RAB Background Documents\SFDPW\Third St Bridge_PW Bid 2015 On‐File

SFDPW BridgesDraft Report Geotechnical Study Rehabilitation of Third Street at Channel

Department of Public Works

8/1/1991 . . . \RABBackgroundDocuments\SFDPW Bridges\3rd Street Bridge\0462

SFDPW Bridges Channel Street Waterway at Third StreetDepartment of Public Works

6/16/1933 . . . \RABBackgroundDocuments\SFDPW Bridges\3rd Street Bridge\3rd St 1933 Plan

SFDPW Bridges Retrofit PlansDepartment of Public Works

6/1/1998 . . . \RABBackgroundDocuments\SFDPW Bridges\3rd Street Bridge\3rd St 1999 Retrofit Plans

SFDPW Bridges Seismic Retrofit and RehabilitationDepartment of Public Works

7/21/2000. . . \RABBackgroundDocuments\SFDPW Bridges\4th Street Bridge\Fourth Street Bridge ‐ Seismic Retrofit and Rehabilitation

SFDPW Bridges Email re Pile Lengths n/a October 19 of 2015. . . \RABBackgroundDocuments\SFDPW Bridges\4th Street Bridge\FW Pile lengths for 3rd & 4th St Bridges over Islais Creek

 Compiled by CH2M HILL October 2016 Page 9page I-9

Page 11: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

195

196

197

198

199

200

201

202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

217

218

219

220

221

222

223

SFDPW Bridges Fourth Street Bridge Foundation PlanDepartment of Public Works

7/21/2000 . . . \RABBackgroundDocuments\SFDPW Bridges\Fourth St Bridge Pile Logs\75679

SFDPW Bridges Estimated Pile Tip ElevationsDepartment of Public Works

12/1/2003 . . . \RABBackgroundDocuments\SFDPW Bridges\Fourth St Bridge Pile Logs\75679.1

SFDPW Bridges Addendum 1 ‐ North Approach Piles SF Public Works Dec 29 of 2006 . . . \RABBackgroundDocuments\SFDPW Bridges\Fourth St Bridge Pile Logs\75679.2

SFDPW Bridges Addendum ‐ South Approach PilesMitchell Engineering

Dec 29 of 2006 . . . \RABBackgroundDocuments\SFDPW Bridges\Fourth St Bridge Pile Logs\75679.3

SFDPW Bridges Pile Layout Plan Unknown Not Legible . . . \RABBackgroundDocuments\SFDPW Bridges\Fourth St Bridge Pile Logs\B‐9618

SFDPW BridgesLetter Re Pile Driving Summary ‐ Pit and Pier 2 Piles 4th Street Bridge Rehabilitation

Treadwell & Rollo Dec 22 2004. . . \RABBackgroundDocuments\SFDPW Bridges\Fourth St Bridge Pile Logs\Fourth St Bridge Pile Logs\pile logs_ 20060928065601

SFDPW BridgesLetter Re Pile Driving Summary ‐ Pit and Pier 2 Piles 4th Street Bridge Rehabilitation

Treadwell & Rollo Dec 22 2004 . . . \RABBackgroundDocuments\SFDPW Bridges\Fourth St Bridge Pile Logs\pile logs_20060928065601

SFDPW BridgesAddendum 1 RFP Design Environmental and Construction Support Services for the Third Street Bridge Rehabilitation Project

SF Public Works 8/7/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\Addendum 1 ‐ Final

SFDPW BridgesAddendum 2 RFP Design Environmental and Construction Support Services for the Third Street Bridge Rehabilitation Project

SF Public Works 8/17/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\addendum2

SFDPW Bridges Stair Plan Line 17 ‐ 18 SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR10‐S28‐S31

SFDPW BridgesGeneral Notes ‐ Third Street Bridge Erosion and Damage Repair Project

SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR1‐S1‐S8A

SFDPW Bridges Part F Floor Plan SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR2‐S9‐S11SFDPW Bridges Part A Reflected Floor Plan SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR3‐S12‐S12ASFDPW Bridges Part B Reflected Floor Plan SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR4‐S13‐S13ASFDPW Bridges Part C Reflected Floor Plan SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR5‐S14‐S14ASFDPW Bridges Part E Reflected Floor Plan SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR7‐S16‐S16ASFDPW Bridges Part F Reflected Floor Plan SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR8‐S17‐S25SFDPW Bridges Stair Plan 12 ‐ 17 and 13 ‐ 17 SF Public Works 6/1/2015 . . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\BR9‐S26‐S27A

SFDPW BridgesRFP for Design Environmental and Construction Support Services For The Third Street Bridge Rehabilitation Project

SF Public Works 7/15/2015. . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\FPE16011 3rd Street Bridge Rehabilitation Project RFP ‐ FINAL ‐ 7‐15‐15

SFDPW Bridges Historic Property Survey SHPO/SHWA 8/1/1998. . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\Historic Property & Architectural Survey, Findings of Effect Reports

SFDPW BridgesRFP for Design Environmental and Construction Support Services For The Third Street Bridge Information Meeting

SF Public Works 7/29/2015. . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\Pre‐Proposal Conference Presentation

SFDPW Bridges Sign‐In Sheet SF Public Works 7/29/2015. . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\Pre‐Proposal Conference Sign‐In Sheet

SFDPW BridgesHistoric Evaluation of The Third Street Bridge Over Mission Channel Waterway

SF Public Works 4/24/1985. . . \RABBackgroundDocuments\SFDPW Bridges\Third St Bridge_PW Bid 2015\Third Street Bridge ‐ April 1985 Historic Evaluation

SFDPW Bridges Part D Reflected Floor Plan SF Public Works 6/1/2015 BR6‐S15‐S15A

SPUR Location of PUC Infrastructure SFPUC . . . \RAB Background Documents\PUC Infrastructure Requested

SPUR Re‐envisioning I‐280 and the Caltrain Corridor SPUR 1/10/2013 . . . \RABBackgroundDocuments\SPUR\011013_SPUR_Gillian Gillet.pdf

SPUR Taking Down a Freeway to Reknit a neighborhood SPUR June of 2013 . . . \RABBackgroundDocuments\SPUR\I‐280 full.pdf

SPUR Transbay Terminal Improvement Plan SPUR undated . . . \RABBackgroundDocuments\SPUR\transbay_plan_SPUR.pdfTJPA caltrain1_Simulation Video TJPA . . . \RAB Background Documents\TJPA\DTX On‐File

 Compiled by CH2M HILL October 2016 Page 10page I-10

Page 12: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

224

225

226

227

228

229

230

231

232

233

234

235

236

237

238

239

TJPAFinal‐Caltrain‐California HSR Blended Operations Analysis (LTK 2012)

Caltrain 7/4/1905 . . . \RAB Background Documents\TJPA\Rail Ops On‐Filehttp://www.caltrain.com/Assets/Caltrain+Modernization+Program/Documents/Final‐Caltrain‐California+HSR+Blended+Operations+Analysis.pdf 

TJPATransbay Transit Center Program, Dual Mode Locomotive Report, Task 29.12, for the Downtown Extension Project

Parsons Transportation Group

12/7/2007. . . \RABBackgroundDocuments\Caltrain DTX Dual Mode Rep Locomotive\Caltrain DTX Dual Mode Report Locomotive 20071207.pdf

TJPATransbay Terminal Program, Consolidated Rail Operations Report, Task 3.0 for the Downtown Extension Project

Parsons Transportation Group

5/13/2008. . . \RABBackgroundDocuments\Consolidated Rail Operations_2008\Consolidated Rail Operations 20080513.pdf

TJPA Progresss Coordination Drawings Unknown 2/3/2012. . . \RABBackgroundDocuments\Current Progress Drawings\Current Progress Coordination Drawings 20120203.pdf

TJPATransbay Transit Center Program, Preliminary Engineering Report, Executive Summary for the Caltrain Downtown Extension Task 11

Parsons Transportation Group

7/30/2010 . . . \RABBackgroundDocuments\DTX\108276A_ExecutiveSummary073010‐final[1].pdf

TJPA

Transbay Transit Center Program, Cut‐and‐Cover Structures, Preliminary Engineering Design Memorandum Task 8.0 for the Caltrain Downtown Extension Project

Parsons Transportation Group

July of 2010 . . . \RABBackgroundDocuments\DTX\2010‐07‐21 Final RLPA Cut‐andCover Design Memorandum.pdf

TJPA Untitled (Timetable Builder) Unknown Undated . . . \RABBackgroundDocuments\DTX\2011 05 23 Caltrain‐HSR Timetable Builder_for printing.xlsx

TJPA Downtown Rail Extension (DTX) UpdateTransbay Transit Center

5/22/2014 . . . \RABBackgroundDocuments\DTX\CaltrainCHSRA DTX Presentation_052214‐final.pdf

TJPA Downtown Rail Extension (DTX)  ‐ webpageTransbay Transit Center

Undated . . . \RABBackgroundDocuments\DTX\downtown‐rail‐extension_webpage_20131230.pdf

TJPA Alignment Study (untitled document) Unknown Undated . . . \RABBackgroundDocuments\DTX\DTX Alternative Alignment Study_4.pdf

TJPATransbay Transit Center Program, DTX Design Criteria

Transbay Transit Center

May of 2009 . . . \RABBackgroundDocuments\DTX\DTX Design Criteria_Book Rev. 01.pdf

TJPAPreliminary Engineering Plans (In‐Progress Coordination Set) for the Caltrain Downtown Extension

Transit Joint Powers Authority

2/3/2012 . . . \RABBackgroundDocuments\DTX\DTX PE Plans ‐ In‐Progress Coordination Set 03‐19‐20141.pdf

TJPADowntown Extension Project Technical Memorandum

Parsons Transportation Group

7/2/2014. . . \RABBackgroundDocuments\DTX\FOR INTERNAL USE ONLY East Bay Connection Update v2‐final 07‐02‐20131.pdf

TJPADraft Downtown Extension Value Management/Peer Review Assessment Report

Transbay Transit Center

May of 2006 . . . \RABBackgroundDocuments\DTX\Item 11_VM Assessment Report_Draft 05‐03‐06.pdf

TJPA Tunnel Engineering Analysis and Cost ReportICF Kaiser Engineers

May of 1996 . . . \RABBackgroundDocuments\TJPA\1996 Draft EIS EIR Tunnel Analysis\caltrainsanfranc96peni.pdf

TJPALocally Preferred Alternative Report for the Transbay Terminal/Caltrain Downtown Extension/Redevelopment Project

City and County of San Francisco, Peninsula Corridor Joint Powers Board, San Francisco Redevelopment Agency

March of 2003 . . . \RABBackgroundDocuments\TJPA\2003 LPA Report\LPA_Rev3‐21‐03.pdf

 Compiled by CH2M HILL October 2016 Page 11page I-11

Page 13: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

240

241

242

243

244

245

246

247

248

249

250

251

252

253

254

255

TJPA

Transbay Transit Center Program, Administrative Draft for Participating Agencies, Supplemental Drft, Environmental Impace Statement/ Environmental Impact Report

Transbay Joint Powers Authority, Federal Transit Administration, Federal Railroad Administration

8/25/2014. . . \RABBackgroundDocuments\TJPA\2014Admin DEIS‐R for Box Extension\__TJPA SEIS‐EIR Admin Draft 082514.pdf

TJPAAppendix A ‐ Scoping Report, NOP, and Public Comments

Transit Joint Powers Authority

Undated. . . \RABBackgroundDocuments\TJPA\2014Admin DEIS‐R for Box Extension\TJPA SEIS‐EIR 4th Admin Draft 071514_Appendices.pdf

TJPATransit Center District Plan Program Implementation Document

SF Planning Department

5/24/2012 . . . \RABBackgroundDocuments\TJPA\Adopted TCDP Imp Doc 5‐24‐12.pdf

TJPADowntown Rail Extension Project, Transbay Transit Center, Final ‐ Value Management Study

Transit Joint Powers Authority and Lewis & Zimmerman Associates, Inc.

April of 2006 . . . \RABBackgroundDocuments\TJPA\DTX VM Rep 200604\Downtown Rail Extension VM Report.pdf

TJPATransbay Transit Center Program, Preliminary Engineering Report Executive Summary for the Caltrain Downtown Extension Task 11

Parsons Transportation Group

7/30/2010 . . . \RABBackgroundDocuments\TJPA\DTX\108276A_ExecutiveSummary073010‐final[1].pdf

TJPA Staff Report Covering Calendar Item No.:8 Transit Joint Powers Authority

3/20/2008. . . \RABBackgroundDocuments\TJPA\DTX\Item8_DTX‐PE_Phase2_BaselineBudget_all‐revised,%20presented.pdf

TJPACommon Questions and Answers related to the Alternatives Analysis for the San Francisco to San Jose High‐Speed Train Section

Fly California, Federal Railroad Administration

September of 2009 . . . \RABBackgroundDocuments\TJPA\dwg\AlternativesAnalysisPrimer2_9_29_09.pdf

TJPA Appendix A. US 1101 / I‐280 Alignment AnalysisFly California, Federal Railroad Administration

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_A_101_280_4_8_10.pdf

TJPA Appendix B. Plan & Profile DrawingsFly California, Federal Railroad Administration

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_B_Plan_Profile_4_8_10.pdf

TJPA Appendix C Typical Cross SectionsFly California, Federal Railroad Administration

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_C_typical_Cross_Sections_4_8_10.pdf

TJPA Appendix D. Utilities Table HTNB Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_D_Utilities_4_8_10.pdf

TJPA Appendix E. Scoping Comments Disposition TableFly California, Federal Railroad Administration

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_E_Scoping_Disposition_4_8_10.pdf

TJPA Appendix F. Outreach and ScopingFly California, Federal Railroad Administration

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_F_Outreach_4_8_10.pdf

TJPAAppendix G. Technical Memorandum ‐ Alternatives Analysis Methods for Project EIR/EIS

Fly California October of 2009 . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_G_AA_Methods_4_8_10.pdf

TJPA Appendix H. San Francisco Terminal AlternativesFly California, Federal Railroad Administration

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_H_SF_Terminal_4_8_10.pdf

TJPA Untitled DocumentPeninsula Joint Powers and Caltrain

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_J_26_33_4_8_10.pdf

 Compiled by CH2M HILL October 2016 Page 12page I-12

Page 14: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

256

257

258

259

260

261

262

263

264

265

266

267

268

269

270

TJPA Appendix J. Right‐of‐WayPeninsula Joint Powers and Caltrain

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_J_ROW_1_10_4_8_10.pdf

TJPA Untitled DocumentPeninsula Joint Powers and Caltrain

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_J_ROW_11_17_4_8_10.pdf

TJPA Untitled DocumentPeninsula Joint Powers and Caltrain

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_J_ROW_18_25_4_8_10.pdf

TJPA Untitled DocumentPeninsula Joint Powers and Caltrain

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_J_ROW_34_40_4_8_10.pdf

TJPA Untitled DocumentPeninsula Joint Powers and Caltrain

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_J_ROW_41_48_4_8_10.pdf

TJPA Appendix L. Conceptual Cost EstimatesFly California, Federal Railroad Administration

Undated . . . \RABBackgroundDocuments\TJPA\dwg\Appendix_L_Cost_Estimates_4_8_10.pdf

TJPA San Francisco to San Jose Section (map)California High‐Speed Rail Authority

Undated . . . \RABBackgroundDocuments\TJPA\dwg\San Francisco_to_San_Jose‐map.pdf

TJPASummary of the San Francisco to San Jose Preliminary Alternatives Analysis Report

Unknown Undated . . . \RABBackgroundDocuments\TJPA\dwg\SF_SJ_Preliminary_AA_Executive_Summary_4_8_10.pdf

TJPAPreliminary Analysis Report for the San Francisco to San Jose Section

Fly California, Federal Railroad Administration

April of 2010. . . \RABBackgroundDocuments\TJPA\dwg\SF_SJ_Preliminary_Alternatives_Analysis_Report_4_8_10.pdf

TJPADowntown Extension Project Technical Memorandum

Parsons Transportation Group

7/2/2014. . . \RABBackgroundDocuments\TJPA\East Bay Connection Update v2‐final 07‐02‐2014\East Bay Connection Update v2‐final 07‐02‐2014[1][1].pdf

TJPAEvaluation of Large Tunnels in Poor Ground ‐ Alternative Tunnel Concepts For The Transbay Downtown Rail Extension Project

Unknown Undated. . . \RABBackgroundDocuments\TJPA\Eval of Large Tunnels in Poor Ground\2007 RETC Transbay DTX Paper.pdf

TJPA Chapter 2: Description Of The Project Alternatives Unknown Undated . . . \RABBackgroundDocuments\TJPA\FEIS EIR Chapter 2\FEIS_Ch2.pdf

TJPAPreliminary Engineering Plans for the Caltrain Downtown Extension

Transbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\00 Cover.pdf

TJPATransbay Joint Powers Authority Contract No. 03‐02‐DTX Engr‐001, Transbay Transit Center Program, Caltrain Downtown Extension Project

Transbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\01 General.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/18/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\02 Civil.pdf

 Compiled by CH2M HILL October 2016 Page 13page I-13

Page 15: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

271

272

273

274

275

276

277

278

279

280

281

282

283

284

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\03 Utilities.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\04 Track.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\05 Structural.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\06 Tunnel.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\07 Architectural.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\08 Mechanical.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\09 Electrical.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\10 Corrosion Control.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\11 OCS.pdf

TJPA Untitled Document Caltrain Unknown . . . \RABBackgroundDocuments\TJPA\Final PE Drawings 20100716\12 OCS Reference Set.pdf

TJPA Untitled DocumentTransbay Joint Powers Authority, Parsons

7/16/2010. . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20100811\Replacement Plans 20100811\Replacement Plans 20100716.pdf

TJPATransmittal Sheet RE Caltrain Downtown Extension (DTX) Final Preliminary Engineering Plans (Task 11)

Parsons Transportation Group

8/10/2010 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20100811\Transmittal.pdf

TJPALetter to Brian Dykes RE: California High‐Speed Rail Program Management

PB 8/27/2010. . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\CHSRA PMT Review Comments 20100827 Letter.pdf

TJPA (Screen Shot re DTX Preliminary Engineering) Unknown Undated. . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\DTX PE 30% file listing from Susan 20140620.jpg

 Compiled by CH2M HILL October 2016 Page 14page I-14

Page 16: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

285

286

287

288

289

290

291

292

293

294

295

296

TJPA Construction StructuresTransbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\S‐2001.pdf

TJPA Transbay Joint Powers Authority, ParsonsTransbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\S‐2002.pdf

TJPA Structure General Arrangement PlanTransbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\S‐3001.pdf

TJPA Typcial Section Cut and CoverTransbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\S‐6001.pdf

TJPA Typical Sections and Detail Cut and CoverTransbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\S‐6002.pdf

TJPA Typcial Section Cut and CoverTransbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\S‐6003.pdf

TJPATrack Plan and Profile and Structural Type Interface ‐ Key Map

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3000.pdf

TJPATransbay Transit Center Program Caltrain Downtown Extension

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3003.pdf

TJPATrack Plan and Profile Sta 141+00 plus Sta 150+50 sheet 2 of 11

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3004.pdf

TJPATrack Plan and Profile Sta 150+50 plus Sta 160+00 sheet 3 of 11

Transbay Joint Powers Authority, Parsons

4/13/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3005.pdf

TJPATrack Plan and Profile Sta 160+00 plus Sta 169+50 ‐ sheet 4 of 11

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3006.pdf

TJPATrack Plan and Profile Sta 160+00 plus Sta 169+50 ‐ sheet 5 of 11

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3007.pdf

 Compiled by CH2M HILL October 2016 Page 15page I-15

Page 17: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

297

298

299

300

301

302

303

304

305

306

307

308

309

TJPATrack Plan and Profile Sta 169+50 plus 179+00 ‐ sheet 6 of 11

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3008.pdf

TJPATrack Plan and Profile Sta 169+50 plus 179+00 ‐ sheet 7 of 11

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3009.pdf

TJPATrack Plan and Profile Sta 179+00 plus Sta 188+50 ‐ sheet 8 of 11

Transbay Joint Powers Authority, Parsons

4/13/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3010.pdf

TJPATrack Plan and Profile Sta 188+50 plus Sta 198+00 ‐ sheet 9 of 11

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3011.pdf

TJPATrack Plan and Profile Sta 198+00 plus Sta 207+50 sheet 10 of 11

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3012.pdf

TJPATrack Plan and Profile Sta 207+50 to Sta 217+00 sheet 11 of 11

Transbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Plans\TR‐3013.pdf

TJPALetter to Brian Dykes re Transbay Center Train Level Configuration Approval

California High‐Speed Rail Authority and Caltrain

9/29/2010. . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Train Level Configuration Approval Letter 20100929.pdf

TJPATransmittal Sheet re Caltrain Downtown Extension (DTX) Updated Preliminary Engineering Report including Updated Track Plan & Profile Plans

Parsons Transportation Group

4/22/2011 . . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Transmittal.pdf

TJPATransbay Transit Center Program Updated Preliminary Engineering Report for the Caltrain Downtown Extension Task 11

Parsons Transportation Group

4/22/2011. . . \RABBackgroundDocuments\TJPA\Final PE Drawings Update 20110422\Updated PE Report 20110422.pdf

TJPATransbay Terminal/Caltrain Downtown Extension/Redevlopment Project FEIS/FEIR Mitigation Monitoring and Reporting Program

Unknown 11/29/2007 . . . \RABBackgroundDocuments\TJPA\FRA\FRA RODAppendixA_Transbay‐Program‐MMRp.pdf

TJPA Memorandum of AgreementCaltrain, Transbay Terminal/Redevelopment Project

June of 2014 . . . \RABBackgroundDocuments\TJPA\FRA\FRA RODAppendixB_MOA‐and‐Amendment‐1.pdf

TJPA Record of DecisionFederal Railroad Admininstration

8/4/2010 . . . \RABBackgroundDocuments\TJPA\FRA\Transbay Box ROD‐FRA_8‐4‐10.pdf

TJPA Letter to Michael Scanlon re Record of DecisionFederal Transit Administration

2/8/2005 . . . \RABBackgroundDocuments\TJPA\FTA\Transbay‐DTX‐Redevel_FTA ROD_2005.pdf

 Compiled by CH2M HILL October 2016 Page 16page I-16

Page 18: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

310

311

312

313

314

315

316

317

318

319

320

321

322

323

324

325

326

327

328

329

330

331

TJPA

Transbay Terminal Program Administrative Draft Right of Way Technical Memorandum Loop Alternative Task 29.9.2 for the Downtown Extension Project

Parsons Transportation Group

August of 2007. . . \RABBackgroundDocuments\TJPA\Loop Study\2007 Aug.Admin.Draft Right of Way Tech Memo Loop Alt. Task 29.92.pdf

TJPATransbay Terminal Program Draft Loop Concept Study Report Task 29.11 for the Downtown Extension Project

Parsons Transportation Group

10/1/2007 . . . \RABBackgroundDocuments\TJPA\Loop Study\2007‐10‐01 Draft Loop Concept Study Report.pdf

TJPATransbay Terminal Program Loop Concept Summary Report Task 29.11 for the Downtown Extension Project

Parsons Transportation Group

5/12/2008 . . . \RABBackgroundDocuments\TJPA\Loop Study\2008‐05‐12 Loop Concept Summary Report.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I \Figures\2‐1.pdf

TJPA Appendix A: GlossaryParsons Transportation Group

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Appendices\Appendix A_Glossary.pdf

TJPA Project Memorandum Jacobs Associates 1/30/2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Appendices\Appendix B_FLAC.pdf

TJPA Appendix C Unknown Undated . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Appendices\Appendix C_STAAD.pdf

TJPA Appendix D Project Memorandum Jacobs Associates 1/25/2008. . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Appendices\AppendixD_Settlement Memo.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\3.3.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\3‐1.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\3‐2.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\3‐4.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4.4.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐1.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐10.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐11.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐12.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐2.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐3.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐5.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐6.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐7.pdf

 Compiled by CH2M HILL October 2016 Page 17page I-17

Page 19: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

332

333

334

335

336

337

338

339

340

341

342

343

344

345

346

347

348

349

350

351

352

353

354

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐8.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\4‐9.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\5‐1.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\6‐1.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\6‐2.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\6‐3.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\6‐4.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\7.3.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\7‐1.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Figures\7‐3.pdf

TJPATunnel Conceptual Design Report Table of Contents

Parsons Transportation Group

January of 2008. . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\Final_Tunnel_Conceptual_Design_Report.pdf

TJPATransbay Terminal Program Tunnel Conceptual Design Report Volume I Main Report for the Downtown Extension Project

Parsons Transportation Group

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol I\TCD Cover_Volume I.pdf

TJPATransbay Terminal Program Tunnel Conceptual Design Report Vol II Conceptual Design Drawings for the Downtown Extension Project

Parsons Transportation Group

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_00.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_01.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_02.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_03.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_04.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_06.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_08.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_09.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_10.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_11.pdf

 Compiled by CH2M HILL October 2016 Page 18page I-18

Page 20: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

355

356

357

358

359

360

361

362

363

364

365

366

367

368

369

370

371

372

373

374

375

376

377

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_12.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_20.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_21.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_22.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_23.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_24.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_25.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_26.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_27.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_30.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_31.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_33.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_34.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Vol II\TCD Drawings\TCD_35.pdf

TJPASummary Opinion of Probably Unescalated Construction SID Excluding Owner Contingency

Jacobs Associates 7/30/2007. . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Volume III\3918 Caltrain DTX 2‐Track Alt 2007 Estimate Update.r0.pdf

TJPATransbay Terminal Program Tunnel Conceptual Design Report Volume III Cost Estimate Details for the Downtown Extension Project

Parsons Transportation Group

January of 2008 . . . \RABBackgroundDocuments\TJPA\NATM‐SEM Analysis\Volume III\TCD Cover_Volume III.pdf

TJPA Preliminary Engineering ReportParsons Transportation Group

7/30/2010. . . \RABBackgroundDocuments\TJPA\PE Rpt Executive Summary\Preliminary Engineering Report Executive Summary 201000730.pdf

TJPA Grade Separation Tunnel Unknown Undated. . . \RABBackgroundDocuments\TJPA\Proposed Grade Separation Tunnel\DTX Future Grade Separation Tunnel Stub Conceptual Plans.pdf

TJPA Tunnel Stub Plan and Profile Unknown Undated. . . \RABBackgroundDocuments\TJPA\Proposed Grade Separation Tunnel\Fourth & Townsend Station Refinement and Tunnel Stub Plan & Profile ‐ 36' Platform 2014‐04‐18.pdf

TJPAMemo Re Caltrain Downtown Extension Project Task 29.07

Transit Joint Powers Authority

6/13/2007 . . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\072262.pdf

TJPAMemo Re Downtown Extension Project Task 29.07 Loop Track Tunnel Study

Transit Joint Powers Authority

10/22/2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Task 29.07 Approval memo.pdf

TJPAMemorandum re Task 29.07 Loop Track Study Report

Transit Joint Powers Authority

10/19/2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Task 29.7 Draft Tunnel report Disposition Memo 10‐19‐07.doc

TJPACaltrain Downtown Extension Loop Track Tunnel Study Report Task 29.07

Parsons Transportation Group

10/1/2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Transmittal 10‐3‐2007.pdf

 Compiled by CH2M HILL October 2016 Page 19page I-19

Page 21: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

378

379

380

381

382

383

384

385

386

387

388

389

390

391

392

393

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figure\5‐5.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\1‐1.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\3.5.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\3‐1.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\3‐2.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\3‐4.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\3‐7.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\3‐8.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5.9.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐1.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐10.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐11.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐2.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐3.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐4.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐6.pdf

 Compiled by CH2M HILL October 2016 Page 20page I-20

Page 22: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

394

395

396

397

398

399

400

401

402

403

404

405

406

407

408

409

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐7.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\5‐8.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6.5.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐1.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐10.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐11.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐12.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐13.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐14.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐15.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐16.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐17.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐18.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐19.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐2.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐20.pdf

 Compiled by CH2M HILL October 2016 Page 21page I-21

Page 23: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

410

411

412

413

414

415

416

417

418

419

420

421

422

423

424

425

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐3.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐4.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐6.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐7.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐8.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures\6‐9.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Figures3\‐3.pdf

TJPA Final Loop Track Study Report Table of ContentsTransit Joint Powers Authority

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Final Loop Track Study Report.pdf

TJPAFinal Loop Track Tunnel Study Report Vol I Main Report

Parsons Transportation Group, Arup & Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume I\Loop Cover_Volume I.pdf

TJPA Loop Study Conceptual EstimateParsons Transportation Group, Jacobs

4/12/2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume II\DTX Conceptual Estimate Loop Study Alt 1.pdf

TJPA Loop Study Conceptual EstimateParsons Transportation Group, Jacobs

4/12/2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume II\DTX Conceptual Estimate Loop Study Alt 2 Phase 1.pdf

TJPA Loop Study Conceptual EstimateParsons Transportation Group, Jacobs

4/18/2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume II\DTX Conceptual Estimate Loop Study Alt 2 Phase 2.pdf

TJPA Loop Study Conceptual EstimateParsons Transportation Group, Jacobs

4/12/2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume II\DTX Conceptual Estimate Loop Study Alt 3.pdf

TJPA Final Loop Track Tunnel Study Report Volume II

Parsons Transportation Group, Arup & Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume II\Loop Cover_Volume II.pdf

TJPAPreliminary Construction Cost Estimate Detals and Schedules

Parsons Transportation Group, Arup & Jacobs

September of 2007. . . \RABBackgroundDocuments\TJPA\Rail Ops Rep Loop Analysis 20071004\Final Report Oct 2007\Volume II\Table of Contents_Volume II.pdf

TJPACaltrain Downtown Extension and Transbay Ridership Analysis Final Report

Cambridge Systematics, Inc.

November of 2008. . . \RABBackgroundDocuments\TJPA\Rail Ops\Cambridge Systematics TIC Caltrain Ridership Forecase (1ded08(.pdf

 Compiled by CH2M HILL October 2016 Page 22page I-22

Page 24: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

426

427

428

429

430

431

432

433

434

435

436

437

438

439

440

441

442

TJPA Overall Track Plan & ProfileTransbay Joint Powers Authority, Parsons

1/14/2011 . . . \RABBackgroundDocuments\TJPA\Rail Ops\DTX Configuration under blended or dual mode.pdf

TJPACaltrain/California HSR Blended Operations Analysis

Caltrain March of 2012. . . \RABBackgroundDocuments\TJPA\Rail Ops\Final‐Caltrain‐California HSR Blended Operations Analysis.pdf

TJPAPassenger Operations Analysis for the Downtown Extension Project

Parsons Transportation Group

10/9/2007. . . \RABBackgroundDocuments\TJPA\Rail Ops\Passenger Operations Analysis_TJPA Format_2007‐10‐09 Issue.pdf

TJPASupplemental Draft Rail Operations Report for the Downtown Extension Project

Parsons Transportation Group

10/2/2006. . . \RABBackgroundDocuments\TJPA\Rail Ops\Supplement_20Draft_20Rail_20OperationsReport_10_02_2006.pdf

TJPADTX Alternatives Developed Since 2004 Environmental Document

Parsons Transportation Group

Undated. . . \RABBackgroundDocuments\TJPA\Summary of DTX Alternatives\DTX Alternatives Studied since 2004.pdf

TJPATransbay Terminal Improvement Plan Working Paper 2B:

Simon Martin, Richard Rogers Partnership, Ove Arup & Partners

October of 2000. . . \RABBackgroundDocuments\TJPA\Summary of DTX Alternatives\Previous Alternatives Analysis (Draft 6‐29012).pdf

TJPALetter re Peninsula Corridor Electrification Draft Environmental Impact Report

TJPA 4/18/2014 . . . \RABBackgroundDocuments\TJPA\TJPA comments on Caltrain Electrification EIR 4‐18‐14.pdf

TJPA DTX Phase 2 TunnelTransbay Transit Center

Undated. . . \RABBackgroundDocuments\TJPA\TJPA DTX Presentations (from P&W)\Final DTX P3 presentation_131114_p13.pdf

TJPA DTX Phase 2 4th & Townsend Underground StationTransbay Transit Center

Undated. . . \RABBackgroundDocuments\TJPA\TJPA DTX Presentations (from P&W)\Final DTX P3 presentation_131114_p14.pdf

TJPA DTX Phase 2 Emergency Exit/Ventilation StructuresTransbay Transit Center

Undated. . . \RABBackgroundDocuments\TJPA\TJPA DTX Presentations (from P&W)\Final DTX P3 presentation_131114_p15.pdf

TJPADTX Phase 2 Accommodates Future Grade Separation Tunnel Connection

Transbay Transit Center

Undated. . . \RABBackgroundDocuments\TJPA\TJPA DTX Presentations (from P&W)\Final DTX P3 presentation_131114_p16.pdf

TJPA DTX ElementsTransbay Transit Center

Undated. . . \RABBackgroundDocuments\TJPA\TJPA DTX Presentations (from P&W)\Final DTX P3_presentation_131114.pdf

TJPA Upgrade on the Downtown Rail ExtensionTransbay Transit Center

2/13/2013. . . \RABBackgroundDocuments\TJPA\TJPA DTX Presentations (from P&W)\Item8_Rail‐Presentation‐2‐14‐13.pdf

TJPA Transit Center District Plan

SF Planning Department, SF Redevelopment Agency

November of 2009 . . . \RABBackgroundDocuments\TJPA\Transbay Terminal District Plan\Transit Center District Plan.pdf

TJPA Final Eis/Eir Distribution ListCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_ApxAB.pdf

TJPA Appendix . . .  Glossary/AcronymsCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_ApxC.pdf

TJPA Appendix D: Agency LettersCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_ApxD.pdf

 Compiled by CH2M HILL October 2016 Page 23page I-23

Page 25: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

443

444

445

446

447

448

449

450

451

452

453

454

455

456

457

458

TJPA Appendix E: BibliographyCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_ApxE.pdf

TJPA Appendix F: Urban Form ProgramCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_ApxF.pdf

TJPA Appendix G: Memorandum of AgreementCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_ApxG.pdf

TJPA Chapter 1: Purpose and Need for the Project Unknown Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_Ch1.pdfTJPA Chapter 3: Transportation Analysis Unknown Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_Ch3.pdfTJPA Chapter 4: Affected Environment Unknown Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_Ch4_I.pdfTJPA Chapter 4: Affected Environment 4.17 Unknown Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_CH4_II.pdf

TJPAChapter 5: Environmental Consequences and Mitigation Measures

Unknown Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_CH5_I.pdf

TJPAChapter 5: Environmental Consequences and Mitigation Measures 5.14

Unknown Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_CH5_II.pdf

TJPAChapter 5: Environmental Consequences and Mitigation Measures 5.16

Unknown Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_CH5_III.pdf

TJPA Chapter 6: Financial AnalysisCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_CH6.pdf

TJPA Chapter 7: CEQA Findings of SignificanceCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_CH7.pdf

TJPA Chapter 8: Final Section 4(f) EvaluationCaltrain, Revelopment, Transbay Terminal

Undated . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_CH8.pdf

TJPATransbay Terminal/Caltrain Downtown Extension/Redevelopment Project Vol I

FTA, City & County of SF, Caltrain, SFRA

March of 2004 . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_Summary.pdf

TJPATransbay Terminal/Caltrain Downtown Extension/Redevelopment Project Vol II

FTA, City & County of SF, Caltrain, SFRA

March of 2004 . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_Vol_II.pdf

TJPATransbay Terminal/Caltrain Downtown Extension/Redevelopment Project Vol III

FTA, City & County of SF, Caltrain, SFRA

March of 2004 . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\FEIS_Vol_III.pdf

 Compiled by CH2M HILL October 2016 Page 24page I-24

Page 26: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

459

460

461

462

463

464

465

466

467

468

469

470

471

472

473

474

475

476

477

TJPA Locally Preferred Alternative Report

City and County of San Francisco, Peninsula Corridor Joint Powers Board, San Francisco Redevelopment Agency

March of 2003 . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\LPA_Report_Rev3‐21‐03.pdf

TJPA Notice of PreparationTransit Joint Powers Authority

Undated. . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\NOP‐of‐a‐SEIS‐EIR‐on‐the‐Transbay‐Transit‐Center‐Program1.pdf

TJPA SPUR Comments Unknown October of 2002 . . . \RABBackgroundDocuments\TJPA\TTC Final EIS EIR\SPUR EIS Comments_10‐2002.doc

TJPA Train Platform Level Zone 2Tranbay Joint Powers, Pell Clark

10/31/2012. . . \RABBackgroundDocuments\TJPA\TTC FRA Sign Off\13‐09‐05 Caltrain‐TJPA Trainbox Geometry Pkg_ for FRA Signature.pdf

TJPA Train Platform Level Zone 2Tranbay Joint Powers, Pell Clark

10/31/2012. . . \RABBackgroundDocuments\TJPA\TTC FRA Sign Off\13‐09‐05 CHSRA‐TJPA Trainbox Geometry Pkg_for FRA Signature.pdf

TJPA Recommended Track SchematicTransit Joint Powers Authority

9/9/2010 . . . \RABBackgroundDocuments\TJPA\TTC Platform Layout Discussion\DTX_RECOMMENDED_9‐3‐10.pdf

TJPA Meeting MinutesTransit Joint Powers Authority

9/3/2010. . . \RABBackgroundDocuments\TJPA\TTC Platform Layout Discussion\Meeting‐140.0‐TTC_Platform_Layout_Discu_[2]_.htm

TJPA TTC Track ConfigurationTransit Joint Powers Authority

8/27/2010. . . \RABBackgroundDocuments\TJPA\TTC Platform Layout Discussion\rev0_Sheet‐DTX_Recommeded‐_FIG‐no_Bkgrd_2_,pdf

TJPA DTX Track SchematicTransit Joint Powers Authority

8/26/2010. . . \RABBackgroundDocuments\TJPA\TTC Platform Layout Discussion\Schematics_for_8‐26‐2010_TJPA‐CHSRA‐PCJPB_Meeting[1].pdf

TJPA Building Section at Grid Line 13Transit Joint Powers Authority

8/27/2010 . . . \RABBackgroundDocuments\TJPA\TTC Platform Layout Discussion\SKA‐1030‐R2.pdf

TJPA Train Platform Level Hybrid Option Illegible Illegible . . . \RABBackgroundDocuments\TJPA\TTC Platform Layout Discussion\SKA‐1034‐R1_100903[1].pdf

TJPA Track Configuration 1/2 B HybridTransit Joint Powers Authority

7/29/2010 . . . \RABBackgroundDocuments\TJPA\TTC Platform Layout Discussion\SSK‐045_Config_Hybrid_2.pdf

TJPA Options 1‐2‐3‐4 SimulationsTransbay Transit Center

Undated. . . \RABBackgroundDocuments\TJPA\TTC Platform Layout Discussion\TTC_Options_summary_9‐2‐2010.pdf

TJPATransbay Terminal Program, DTX Loop Track Cost Report, Task 29.11 for the Downtown Extension Project

Parsons Transportation Group

5/14/2008. . . \RABBackgroundDocuments\TJPA|DTX Loop Track Cost Report_2008\DTX Loop Track Cost Report 20080514.pdf

TJPALocally Preferred Alternative Report for the Transbay TerminallCaltrain Downtown Extension/Redevelopment Project (2003)

Caltrain / JPB / TJPA 

6/25/1905 . . . RAB Background Documents\TJPA\2003 LPA Report On‐File

TJPANOP ‐ TTC Program Supplemental Draft EIS/EIR (March 2013)

TJPA  3/1/2013 . . . RAB Background Documents\TJPA\2014Admin DEIS‐R for Box Extension On‐File

TJPATTC Program Supplemental Draft EIS/EIR (Aug 25, 2014)

TJPA  8/25/2014 . . . RAB Background Documents\TJPA\2014Admin DEIS‐R for Box Extension On‐File

TJPA Dual Mode Locomotive Report TJPA 12/7/2007 . . . RAB Background Documents\TJPA\Caltrain DTX Dual Mode Rep Locomotive On‐File

TJPAConsolidated Rail Operations Report DTX

TJPA 5/13/2008 . . . RAB Background Documents\TJPA\Consolidated Rail Operations On‐File

 Compiled by CH2M HILL October 2016 Page 25page I-25

Page 27: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

478

479

480

481

482

483

484

485

486

487

488

489

490

491

492

493

494

495

496

497

498

TJPA Caltrain‐HSR Timetable Builder TJPA 5/23/2010 . . . RAB Background Documents\TJPA\DTX\Ridership On‐File

TJPATTC Caltrain Ridership Forecast (Cambridge Systematics )

TJPA 12/1/2008 . . . RAB Background Documents\TJPA\DTX\Ridership On‐File

TJPA TTC Ridership by Mode by Hour TJPA 8/5/2010 . . . RAB Background Documents\TJPA\DTX\Ridership On‐File

TJPATransbay Terminal / Caltrain Downtown Extension / Redevelopment Project Final EIS‐EIR ‐ Chapter 2 (2004)

Caltrain / JPB / TJPA 

6/26/1905 . . . RAB Background Documents\TJPA\FEIS EIR Chapter 2 On‐File

TJPA Transbay Terminal District Plan TJPA . . . RAB Background Documents\TJPA\Transbay Terminal District Plan On‐File

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 05.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 07.pdf

TJPA Tunnel Conceptual Design ReportTransit Joint Powers Authority

January of 2008 32.pdf

TJPA Loop Track Tunnel Study ReportTransit Joint Powers Authority, Jacobs

September of 2007 3‐6.pdf

TJPA Caltrain DTX Interim Dual Mode Study TJPA On‐File

TJPACaltrain DTX Interim Dual Mode Study ‐ Excerpt Track Schematics

TJPA On‐File

TJPAConsolidated Rail Operations Report for the Downtown Extension Project (2008)

TJPA  6/30/1905 On‐File

TJPA Passenger Operations Analysis TJPA 10/9/2007 On‐FileTJPA Rail Operations Report – Loop Analysis TJPA 8/1/2007 On‐FileTJPA Supplement Draft Rail Operations Report TJPA 10/2/2006 On‐File

TJPATechnical Memorandum re TTC Platform Layout Discussion ‐ Rail Operations (2013)

TJPA  7/5/1905 On‐File

Transbay DTX

Evaluation of Large Tunnels in Poor Ground ‐ Alternative TunnelConcepts for the Transbay Downtown Rail Extension Project (2007)(2007 RETC Conference Transbay DTX Paper)

TJPA  6/29/1905 . . . RAB Background Documents\General Background Info On‐File

Transbay DTX

Caltrain San Francisco Downtown Extension Project Conceptual Design and Draft EIS/EIR ‐ Tunnel Engineering Analysis and Cost Report (1996)

Caltrain / JPB / TJPA 

6/18/1905 . . . RAB Background Documents\TJPA\1996 Draft EIS EIR Tunnel Analysis On‐File

Transbay DTX Current Progress Drawings TJPA  2/6/2012 . . . RAB Background Documents\TJPA\Current Progress Drawings On‐File

Transbay DTXDraft Downtown Extension Value Management / Peer Review Assessment Report (URS)

TJPA 5/1/2006 On‐File

Transbay DTX DTX Design Criteria TJPA 5/1/2009 On‐File

 Compiled by CH2M HILL October 2016 Page 26page I-26

Page 28: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

499

500

501

502

503

504

505

506

507

508

509

510

511

512

513

514

515

516

517

518

519

520

521

522

523

Transbay DTX DTX Loop Track Cost Report (2008) TJPA  6/30/1905 On‐File

Transbay DTX Final PE Drawings TJPA  7/27/2010 On‐FileTransbay DTX Final PE Drawings Update 05.22.11 TJPA  4/22/2011 On‐File

Transbay DTX Final PE Drawings Update 08.11.10 TJPA  8/11/2010 On‐File

Transbay DTX FRA ROD on Trainbox FRA 8/4/2010 On‐File http://www.fra.dot.gov/eLib/Details/L03201Transbay DTX FRA RODAppendixA_Transbay‐Program‐MMRP  FRA 11/1/2007 On‐FileTransbay DTX FRA RODAppendixB_MOA‐and‐Amendment‐1 FRA 7/1/2010 On‐FileTransbay DTX FTA ROD on Project FTA 2/1/2005 On‐FileTransbay DTX Loop Concept Study DRAFT TJPA 11/1/2007 On‐File

Transbay DTXLoop Concept Summary Report for the Downtown Extension Project (2008)

TJPA  5/1/2008 On‐File

Transbay DTX Loop Cost Report TJPA 5/1/2008 On‐File

Transbay DTXNATM/SEM Analyses for San Francisco's Transbay Extension Tunnel (2008)

TJPA  6/30/1905 On‐File

Transbay DTXNOP‐of‐a‐SEIS‐EIR‐on‐the‐Transbay‐Transit‐Center‐Program1

TJPA 4/1/2013 On‐File

Transbay DTXPreliminary Engineering Report Executive Summary for DTX

TJPA 7/30/2010 On‐File

Transbay DTX Presentation to Bay Area Council SFCTA 10/19/2011 On‐File

Transbay DTXProposed Grade Separation Tunnel (plan and profile drawing)

TJPA  On‐File

Transbay DTXReport of the Inter‐agency Transbay Working Group

Inter‐agency Transbay Working Group

6/28/1905 On‐Filehttp://www.sf‐planning.org/ftp/CDG/docs/railyards/Transbay_IWG_Report.pdf  

Transbay DTXSF Stakeholders Technical Working Group (SFTWG) Comment Letter (Infraconsult)

SFTWG / SFCTA 12/1/2010 On‐File

Transbay DTX Summary of Study of DTX Alternatives TJPA  On‐File

Transbay DTXTJPA Staff Recommendation of Baseline Budget for Phase 2 TTCP $3B (including Funding Plan)

TJPA 3/1/2008 On‐File

Transbay DTX Transbay Transit Center EIR/E TJPA Available Online http://transbaycenter.org/documents/final‐eiseir 

Transbay DTXTransbay Transit Center FRA Sign‐off (September 5,2013)

TJPA / FRA 9/5/2013 On‐File

Transbay DTXTransit Center District Plan (TCDP) Financing Strategy

TJPA On‐File

Transbay DTXTTC Cut‐and‐Cover Structures Preliminary Engineering Design Memorandum

TJPA 7/1/2010 On‐File

Transbay DTXTTC Preliminary Engineering Report Executive Summary

TJPA 7/1/2010 On‐File

 Compiled by CH2M HILL October 2016 Page 27page I-27

Page 29: I: to Document Librarydefault.sfplanning.org/Citywide/...DRAFT-AppendixI.pdf · feasbility assessment\drafts\2013‐10‐17_TA comments‐Draft Fourth and King Reduction Caltrain

SF Railyards I‐280 Analysis ‐‐ Reference Documents

1

A C D E F G H

Library Folder Document Name Publishing Agency Document Date On‐File Location Status URL if Online

524

525

526

527

528

529

530

531

532

533

534

535

536

537

538

539

540

Transbay Redevelopment

Transbay Redevelopment Project Area Design For Development

SF Redevelopment Agency & Planning Dept

10/1/2003 . . . \RABBackgrounddocuments\Transbay Redevelopment\01_TOC+Introduction

Transbay Redevelopment

Project Background (document untitled) Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\02_Setting

Transbay Redevelopment

Landuse Framework Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\03_Land Use Framework

Transbay Redevelopment

Urban Form Framework Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\04_Urban Form Framework

Transbay Redevelopment

Streets and Public Space Framework Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\05_Streets and Public Environment

Transbay Redevelopment

Folsom Boulevard Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\06_FolsomBlvd

Transbay Redevelopment

Main/Beale Precinct Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\07_Main_Beale Precinct

Transbay Redevelopment

Mixed‐Use Historic District Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\08_Mixed Use Historic

Transbay Redevelopment

Terminal Hub Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\09_Terminal Hub

Transbay Redevelopment

Transbay Redevelopment Project Area Design for Development

Unknown Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\Covers

Transbay Redevelopment

Boundary MapSan Francisco Redevelopment Agency

Undated . . . \RABBackgrounddocuments\Transbay Redevelopment\Redevelopment Boundary

UCSFFinal Initial Study and Mitigated Negative Declaration

UCSF Dec. 19 of 2008 . . . \RABBackgroundDocuments\UCSF\UCSF 19A_MitNegDec_Final

UCSF Planning UCSF 19A_MitNegDec_Final UCSF . . . \RAB Background Documents\General Background Info On‐File

UCSF Planning UCSF 2014 LRDP UCSF Online Only Available Onlinehttp://www.ucsf.edu/about/cgr/current‐projects/lrdp 

UCSF Planning UCSF Mission Bay Master Plan UCSF Online Only Available Onlinehttp://campusplanning.ucsf.edu/physical/missionbayplan.php 

USGSUS Geological Survey ‐ San Francisco North Quadrangle

US Department of the Interior

The year 2012 . . . \RABBacgroundDocuments\USGS\CA_San_Francisco_North_20120515_TM_geo

USGSUS Geological Survey ‐ San Francisco South Quadrangle

US Department of the Interior

The year 2012 . . . \RABBacgroundDocuments\USGS\CA_San_Francisco_South_20120515_TM_geo

 Compiled by CH2M HILL October 2016 Page 28page I-28