Top Banner
Date: -24th July 2014. To, The Dep uty Chief Engineer (Roads) City, 1st Floor, Kamar Cooperative Society, Opp. Navjeevan Society, Pathhe Bapurao Road, Grant Road (E), Mumbai. Readymix Concrete Sub: - " AC-115: Strengthening & Improveme nt of various Junctions in Mechanized Mas tic Asphalt in City Division." We M/s. B & R Associates here by give our consent to supply approved Mix of RMC for concrete grade of M-10, M-15, M-20 and M-40 under mutually agreed rates and terms and conditions upto D.L.P. of the above mentioned work to M/s. RPS lnfraprojects Pvt. ltd. Thanking you, Yours faithful ly, For B & R ASSOCIATES PARTNER R?S lnfraprojects Pvt. Ltd. \E-\ Director Regd. Off.: Gr. B- 6/A, Divya Smruti, Link Road, Opp. Toyota Showroom, Malad 0fV) , Mumbai - 400 064. Plant: Survey No.345 C (P), CTS No. 2330/B, Sant Kabir Rd., Konkani Pada, Singte Quarry, Dahisar {E), Mum- 68. Phone : 022- 32617251 I 022- 28082711 . Telefax : 022 - 28818708 . Email : [email protected]
17

~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

Jun 20, 2018

Download

Documents

trinhkhue
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

Date: -24th July 2014.

To, The Deputy Chief Engineer (Roads) City, 1st Floor, Kamar Cooperative Society, Opp. Navjeevan Society, Pathhe Bapurao Road, Grant Road (E), Mumbai.

Readymix Concrete

Sub: - " AC-115: Strengthening & Improvement of various Junctions in Mechanized Mastic Asphalt in City Division."

We M/s. B & R Associates here by give our consent to supply approved Mix of RMC for concrete grade of M-10, M-15, M-20 and M-40 under mutually agreed rates and terms and conditions upto D.L.P. of the above mentioned work to M/s. RPS lnfraprojects Pvt.

ltd.

Thanking you,

Yours faithful ly, For B & R ASSOCIATES

~ PARTNER

R?S lnfraprojects Pvt. Ltd.

\E-\ Director

Regd. Off.: Gr. B- 6/A, Divya Smruti, Link Road, Opp. Toyota Showroom, Malad 0fV), Mumbai - 400 064. Plant: Survey No.345 C (P), CTS No. 2330/B, Sant Kabir Rd., Konkani Pada, Singte Quarry, Dahisar {E), Mum- 68. Phone : 022- 32617251 I 022- 28082711 . Telefax : 022 - 28818708 . Email : [email protected]

Page 2: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

Date:- 24th July 2014.

To,

The Deputy Chief Engineer (Roads) City, 1 st Floor, Kamar Cooperative Society,

Opp. Navjeevan Society,

Pathhe Bapurao Road, Grant Road (E),

2.oo J ~

... ,, Mumbai q,

,.\ ,....(,

Sub: - "AC-115: Strengthening & Improvement of various Junctions in Mechani~-;q:. Mastic Asphalt in City Division." :~_--..

·t~· ;; '-,'

;;;., ~ .......

We M/s B & R Associates hereby give our consent to the effect that we are agr~;liple~ supply RMC Mixes to :Mfs. RPS Infraprojects Pvt. Ltd. For the above mentioned ~P.9~ l ~'s :i code upto D.L.P. of the above subjected work. ·-~,~ ~ ~ ~ ~. ~

11 tn c ~" 17> ::1 {;

We are having the MCGM registered RMC Batch Mix Plant having capacity of ~(j ~;z 5'!. !( ">.. ....... ..1) ttl C)

Cu.M/hr valid till 31.06.2014. The Renewal of registration is under process at M.C.G.~~ l _gi L 1 0 ~ ~ 3 ~ eve . 01 ~ · - :- lil

~§~~~~· During the c~urse of work the supply of the RMC Mixes of approved quality will ~g: .~ ~ :r i made available as and when required, if the above mentioned work is awarded to the~~ ~ ~

1(>0 ~ r-

Terms & Condition will be decided at the time of Commencement of works. :e ~ - }l

Thanking you, zJ. Yours Faithfully, 2~ l> l t'

B & R Associates ~ ! ..... c.J

$-(/) co (.0

-:::=- tv.;Pt-<_tqp., "f}-1? ~ ~ 0 91 u:) ~ => c.J c.J

~ 0 ~ en co "0 N

Authorized Signatory SANJAY KUMAR CHAUBEY 0 0 ~ c 0

40VOCATE & NOTARY :<! N .. ~ u End: Ownership Invoices of mac~~4 GOVT os:: INO'f.

0

0 ~ •• NO~ !': .,.. ' l• :f. l> 0

~PS 1nfrapro}ects Pvt. L d. l~-¥ ~~~'( Kf.i.?J ~ • • ., ::r. .... ! ,...~

>

~J ~ "0 "J't :.,~ "'~ ~ ~..t ,._ to ...r.

, ··C "' ~ ~'l'• l· :/) U'l ~ , • ~ • ~· ~~ ~ J'q ~ !"") • ~ U"

n;rectot : <.. \ "0'+. :.r.( ,.:y. ~ f ~ i: ::I Cl w • .. ~ . '?P.: ·~:· :. ~.: . ~~ ., c.J --...1

• .. . \ ~ ..... ,;r. h¢) 1.• • • \ ./v .. , . . , - ~· \!\. C . ·.·~ l·., '" A .. • ... '1!1'- ·.-.: .,. ... dv> . •

•)<. ;.::---- ~ .• _ _.. h At,• .c.;~ ' t' 1 ..... )' ... ... J'"i-•• J ~. '.,; \ • . 4 ... . ~•" ~ ......... --u.-.;9~

Page 3: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

( / )

::0 "tJ en 5"' :;o IU

'"0

.2. (!) (")

u; "tJ

~

~

1'_- R l -C E I PT N 0 . . 4 3 8 9 2 8 3

/~~i: . BRIHANMUMBAI MAHANAGAR PALIKA - ., _ _ · V\·fARD

--ROADS &- TRAIT! c DEPARTMENT ··- --· ---Page: -TOTT ___ --· ---·- ..

Receipt/SAP Doc No : 1001815499 Reference No : VENDOR N0 -21411 Received From : M/ S.B&R ACCOCIATES

TOWARDS

Scrutiny Fees 11

..

TOTAL :

( SIX THOUSAND FIFrl RUPEES ONLY )

Date: 24.07. 2014 Collection at: 4170<R CNorth ) Ward )

AtfXJNT (Rs. ) CHQJDD/PO IJr CH/DD/FDOO BANK NAME

6.050.00 ..

6, 050.00

(~---~

Remarks : SCR FEE FOR RMC PLANT AT S. N0.345C( P)CTS N0. 2330/B -- \ J ) --\..._ _____ ...... ReCeived By

Caah Receiving Clerk

Cheque Received Subject to Rual isl:\tlon

-=:~

~

Page 4: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

Q)Al~L.-\ N r,,. l :H:!1a~!1C .

. . ·- \\'ard t'll l/~!l f <lC:i11!:11 JPill.t:n::,·.

'l l '-' l CfP.-\I.Cl~ I~I'OR.\.1 10" O F Clu:.u U{ 'll \lR \I / / "i o. DvChE/ ; l~ ds/£S dld. 2- '1. c·:f I l1

~tru o' m~ .::..; / Or Oucl Englf'·ecr (Ro4dSJi: 5. , i>.Jf'lt i'vdfJ.Jr r;a,.•g~ Bid~ .• 4 - fiG?~ , O~hird atST 0""oor ril'l4! '<OOiJr (6JSl.,,

" ""lil<t!: .1flQJI!~. <rt .'S1 29J)7'5J]; 10.1

Far:15119)37

P k·;l,t' ;} t.T\.'pt 1hc l1'!1 ~" \'·ing a1nOIIlll lf\l n1 b,:~ ~ rcr ttl tl ti' .;.:h:'i:.,,. )lU!:' ,\ '·~ : 1~ un,·cr

'11:•.: ,,; :1·~ r,.!:'' /---1/s: 13-~- JR _ jl.s:>rr/n t-: J fe.>:!.t .l1_r /_ .£! ('j ___ _E'() /' 1Jf1t. &'-t( _C::) -T.89/> j ~kr1-'Y- C) ;ZJ Jrf' /) )~"" 1' 1-

rr /--._..c.....41-t>- ;jo<t ~?=-L/-P..J--~ :76--A.iLl._--.;:L-3-3~/ .J6 I ;1';/l-"j)t:.- f)li) JS r1if), i

R ~.· h.:rclllt'

)lame of the funct ion

Fund Code Dcpl t.Codc Funct ion Cod.:: Cost Centre Cock ·\ c I k ;ld Code

r\ C~l'tlr. l H~;~d

'ale PI l.:ntkt , .,1( .I'' '· rcmkr F.\ 1 I l 01~cr Dcp.t,~ H ~

Legal Charges & S l <1_i i(?.n.:ry_ Ch21 :;.::s

,Quplica~ 13_.::c<:'rt .Scrutinv f-ees

i..:oads (E.S.)

II l.l

2:::iOOOOOOOO 2003..J-WOOO ·\ \ bciO \\

l ·ode )\, <'.

i ' ·.i I :.~PI) .~ 'il~( l!i'l))\

'· 101 00! 01 •hl'OOOO(l

' l OSu~ ~n,l

.1.Ji0800-! QQ 140..)02600

Detai Is of Cao;h / I)~

l'\amc of 13<u~!.. 8ranch

·\!l1(\\IJ1( I!(·, j

')

?~Jd / ~-;;J"" t. ,_,.

.\(,t ~UI11 ih.:::d P·p·-.H.I C11,trgc"

t 'n,k '·· i ! (JSI ~ 1 f;Ji

\l, ,c _f{l..!c~ip : ~ 1.!( 1;.:1 '•·Jnn

R:ghr !n Jnf<'h:-t:·gc-.. !- !o: ;~~--~

l'ctJ.\!1:- I!02;(;!(J;

I lfJSf'•:•it::;;

J . - .

L C.i> \ l . Dcp. ,\. ::,_!)_ .;.;\J! Dti .?; :•J

!?. ! C!ltH::.:..·~

--··- _ .... ..:._ ·-0t~r)0~k;7~~!'g~s _.!_•IOio:.\100 -- - ·----·--· -· ·--· -- - ·· ---

\ il lt1l!l1i i(' 1

l bC~tJ/-_ ~

You are rt•qucstcd 10 comnH;nicate Receipt 'o\o. [)oc~:mcnt '-:o. w this office.

· c'}j' cdqi{~)~-rr :,: RPS lnfraprojects Pvt. ltd.

Director

0 01~ , _? •'

. /' /

Page 5: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

.SCHWING STETTER (INDIA) PVT L TO . 620/ 621, Nirmal Life Style, Corporate Centre, 6th floor, LBS Marg, Mulund (W), Mumbai - 400080.

Tel : 91-22-2562 4863 / 64, 3071 8300 • Fax : 91-22-2562 4865/ 66 Email : rriumbai@ schwingstetterindia.com '

Ref: SSI/ M/ 2014/075

SER/CAL/CR/01

CALIBRATION CERTIFICATE

~ICHWIII' llLJ Stetter Date: 15.04.2014

We hereby certify that the M1 Concrete Batching Plant bearing M/c

Sr.No. M1 800_ supplied by us to M/s. B & R Associates, was calibrated* on

09.03.2014 by our Service Engineer Mr. Vinay ~ishra in presence of Mr. Shiv

(8898313822) and the calibration details are enclosed herewith. We certify that all

the &parameters are well within the tolerance limit.

Place: Mumbai. Date: 15.04.2014.

Encl: Calibration Details

*Calibrated by the Calibrated weights arranged by customer.

eg. Off. ~nd works: F-71, Sipcotlndustrial Park,lrungattukottai Sriperumbudur Taluk, Kancheepuram District. Tamil Nadu · 602 105. • Tel. : 044-4710 8100 Email : [email protected] Branches- New Delhi, Hyderabad, 8angalore. Kolkata, Ahmeddabad. Pu~e. Cochin. Chandigarh, Nagpur, Sural.

. 0 ~

Page 6: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

SCHWING STETTER (INDIA) PVT L TO llfliCHWIIIC liLJ Stetter

. . 620/ 621, ·Nirmal. Life Style, Corporate Centre, 6th floor, LBS Marg, Mulund (W), Mumbai - 400080. Tel : 91-22-2562 4863 / 64, 3071 8300 • Fax: 91-22-2562 4865 / 66, Email: [email protected]

Ref: SSI/M/2014/075 Date: 15.04.2014

Plant Detai.ls

Customer Name Address

Batching Plant M<?.cit:i

Batching Plant Sl. No

Max. Weight Used For Calibration of Aggregate Weigher

Max. Weight used For Calibration of Cement Weigher

Max. './'Jeight used For-Ca!ibratio:-: of Water Weigher

Max. Weight Used For Calibration of Admixture Weigher

Calibration date

Next Due Date for calibration*

M/s. B & R Associates. LP.Singte Q'Jarry,

: Sant Kabir Road, : Kokani Pada,Dahisar (E)-Mumbai.

. """' • lVI I

: BP 800

: 2500 kg

:600 kg

: 250 kg

: 10 kg

: 09.03.2014.

: 08.06.2014.

* I) provided that the plant is well maintained as per maintenance schedule and

cleaned on a daily basis, II) As per IS 4926 once in every three months the weigher shall be calibrated for the full working Range

~g . Off. And works: F-71, Sipcot Industrial Pari\, lrungattukottai SriperumbudurTaluk, Kancheepuram District. Tamil Nadu • 602 105. • Tel. : 044-4710 8100 Email: [email protected] Branches - New Delhi, Hyderabad, Bangalore. Kolkata, Ahmeddabad, Pune. Cochin. Chandigarh, Nagpur, Sural.

0 v

Page 7: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

... -' .. . _ ....

---· B RI HAN ;,t: U ~'l BA I f·ViAH AN AGA RP ALI Kf\

No : D)' . C!-::·Ens ./ lf (;q /R.ds./P!g . of _ 8 OCT Z013 ().~,, ... .::: ~· ,,.. -D:·.;:r· o=J i. ;; ..... ~-;: · f:( ~1

P.::r~ : ;-·:aa- Ga.--cJG.:_ ... ,7:1.1; 4'r fl~or: Df."lhi,C .BEST 0:?::-r.;, G/Jc1t~':.IP3[ (Easi), Mumba1· ·100 0?5 .

..._,/ TrJ, M/s. B&.R Associates, Gr. 8-6/A, Divya Smruti

~ .~

I

Lin~ ~e>c·d, Opp. Toyota showre;::;;.. iVla ia:::l r··.~:;,

f'-1ur.ooa i- 400064

Sub : Ren e·vvn i c.f Hegis~·-;:.ci::m of R.M .C. p lant o f M/s. P.. & q Ass<x' ,:~:·.;:,, situated X• ~;·.J-:-'j2'y no. 3 45C(P), CTS No . 2330i3, of Village Da.-·.s.:v .. Sant Kab:r Rd., Kon k<J:~i Pada, Shingte Quarry, Dahisi.ir(f), · i'·L;;i:;:;, .. 4 00068 w i::h V;CG~.t,.

Ref: l )RMC p!ant O\vners c:pplication for renewal of reg;strac:o:: ui:;n ;-4:· dtd . j\~:! :'"eceived by ~his office on 19.C3 .2013 .

2)"1nis o•fi:::c r e~·~·is ! :: i ·~ n !e::ter u/no . Dv .C '1 .E./ 3'18 / Rds. t:l<~ .. ct. 17 .04 .2013.

3)Reply received f--om f.A./s . B&R Associates u/no. Nil, dtd.23 .05 . ~:~)·. ::: 4)7rr:: appr:-wr:i o:' Ch .E. (Rds. & Tr .) I Dir. (E.S.&?.) for va: -

cons i-::lerz..-ci.)n s o~·, the report of RMC Plant of M/s. fv1ah<lV'( Ro. ~ · ·

Infrasr ·ucLre Pvt Ltd. situated at Wi=lda:a.

By di;ect:ons t:-.:s •S

~: !;:!;,:: c 1-:. '<:-. 8 8l R. Assoc: ~:-·; ::~:::.:::;t·:::C: on survey no. 3£15C (P), CTS No. 23? C 'P, ,

r" ·, .. : ·=-,E. , .. -~- ,,. 7 - C.::1 r ·.·,.h; - 0 -! ''1'\ ~ ka n' Pada C.h·ng"e " ~ ... r, o-n· '"a.-t F1 -·· , ... ,_.,~: ~Ja 1 . ., . .• _ .... n ' -~'J.' · ' '-· , ~'"''' • , ~ l1 L -cUu: / . L ::1 ;;:. 't.-, ,

for t~·e pc·riod upto 30.06 .2014 .

'~ou are perm! tte~ to supply R.eady IV1ix concrete to r"lunicip.al works dur!ng thi .:;

1) T'1:,t the batching plant aiong with all accessories, equipments a11d

l r- \ "-·)

·c.:Oora'COry sha!! be ~nainta i ned i ·: work ing conditio n fo r the entire perio.:.

:. ~.'-':-.a~::; shtra Pollution ~o;o ~r::i 8oar::i to operate ?,.r'~.C . plant snaii b1,

obtain furthe1 <ev ali·jatic.:·,

E E: .(e. P.)v\i.S.'R ' f'Jo•tr 1//c:~o be'.,nnci 07 .10.2013, ~l!u r i cioal iic~11sr• ·Jj":.· -~'' ··:

wi1<ch secu1ity deposit c f ~.s.i:.: r.,j(j/ - eac:.., obtained towc:-d5 ti'le sar·.·,;.:: wili

be fc:-feited .

Page 8: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

. -- . ... .... ;

Rs . .i.S,OOO/- taken towards the S<!me vd: b-e fcrfeited .

oil::re 3nJ co:~f ··rr.atior. or t~1c sa;:·e shc::li! !::::: oi:l~ained fror.t MCG'-~. T:-1 t. .·2n.

the TD &, Pa<;swo:d of 5/I.C/\DA & VTS Systern of Rt•1C P!ant shoc.- .J Ol: c; :ven

- ~ ""l" t·rr>cn··""d ,..,epa·•,..,.....,n,. "<)r <·,r r..~l/t·,..,g •he c:;r-ADf..\ & VTS SY" ' i ' m ,, ,..;!·,, ..... _. ~-··\,···~ '-' ._ tl·~ ·ll..i ...., ........... • • -_1 ''- _;;~ __ ,,,_, ...... ,

<::s ;w:· ;f':e circu l;3r :10. OS u/no. Dy.Ch.E ./79/Rds./p!g ., dtd . 15 . 02. ;~0 13 .

2; R.f'1 .C. Producer:> shou:d give ~Go prioriry to M.C.G.M. works. If fai lure is

r.o1.iccd in this respect, the R.M .C. F'lcnt v- ·;·be dcregistercd .

. , -· /

;:G! •_:;e Jmm:c·pai i'10rks, tests me:.ltonecJ in the list cttached t;lcy·,:J 'llltll their

period shall be cJrr :eu c •-t in ~he plant laboratory and recon~ to Litat effect

•.· <l: ')(\ '' : 09crly •ncir .~virc:i ~r'~~ s~·own to the visiting s~aff. T!ir:: ccpy C)f :V:TL's

r.:- _ ...... 0~ concrete c.-ade M-~-:; I«. :;b-:;vc :.;hou:d be subm itted :·c t-r; ii;: office

0 ~ --,,c :J' od'-C"' c: sha,• be respons 'ble to sup::;.y the Ready Mixed Co; •cret-= to the

(0:- . :,C~ O' <; C' \Vh0'1l ~1p h o•; is<. :_, ec~ 'ett·~~ :·')r SUpply, t ill tt">t? COi~ ,-; t~t·o,~ of' that

\

. ' : tw Droduce1s sh3il t nil ow wi! ·r:~st; i •cLo:;s q1ven to them f:-om t 'n'c ~-o Ume by '.

~ 1 C .G .M.

s i '•;J ;)OZOiof1a cerneilt sha!i be u-~:;c .,. ::.'y o~ t~e r.11x supplied t -: ,_,._,. :P•.H-:icipal

1 ' L ,_, /

w:;·;rc;_ fiy-as~ S'lcl I ~e ~· c;ed "or :re specified C.C.Road works c!S () E:I the

· ,. ;__, _:..: ·· ·; !Jk! ~~ <-':·0 ,, , 1·::: ... a'- ,.c::;.,r.:;, ·,cs stwuld be got C2iifJJ,,rec1 every

v:·'"'·· :.~rd, \:ltrficctc :o ·:: . ~l~ .::ffcc: s,•o ,.:d : .• ~ avciiable for inspe~:.: ~-! ~;:; ,·,s:ting

n: ftu.:rs .

·:-·1<2 <:c.cess, leacing t0 the p:;;:r.t snou:G be maintained in gcoc

co~1dition 1 during the period of c;pp• oval .

r·~otcrable RPS Infra projects Pvt. ltd.

: 1 · Tt1e ;:wange.ment for keepin:; :-ecor jc; etc., shall be made .vi:h proper .

Page 9: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

-

supply ing specified mix of spncrete confi rming to latest I.S. specifications.

The RMC producers sha ll employ minimum one Civil Engineer on producers.

They will additionally· empioy adequate number ·of trained Plant Operator,

Laboratory Technician, one full : ir:1e mechanic and skilled labourers . The RMC

rroducer's Engineers should be experienced and well conversam with the

concrete mix design procedure. Th:~ RMC Producers not employing such

q~1alified Engineers shall not be aile-wed t o commence wi th the work. The

oc.~;;;lified Engineer sha!l oe ava;'ab c on plant throughout the oe~iod o;

t-x ~~ C.l>Cion of the wo rk. In add ir-i:'r: '-, lt:is. RMC prodt:ce>r·<; r"n'W r~·"i'· -~ .. , r ·'

[:H~incer duri ng t he execut::)>, o• ~ .c · .10rk on site, whr.n0.vcr r<n .· ., ..

14; Cement shall be tested a~ i'-1..;r ~ip"li testing laboratory or any aQprove n.

Tes~ir.g Laboratory as me~:ioned 1n. TABLE - I condit ions for the Ready Mix

F' :-ociucers, preferab ly :Jefo;t~ :ts :..se. In case the cement test results are not

2:.2 a::;lc before 1ts use, t ~e co"crc~ing shall be perr:nirted on t he explicit

L:;.:::ers:anding tha <: they : .1. :emo , e & redo the work at t heir own cost in case

·. ~c cement specimen fa ils ~o att2in : he specif1ed compressive strengrh . The

t-:.st result of MTL's or ~ny approve d Testing laboratory shou ld be submitted to

t"is office period ically .

15) The RMC producers have to make t hei r own arrangement at their cost fo r·

st oring adequate water of potabiA quality for mixmg concrete. Any suitable

-.,casures sha ll be Cll;._.!oye:a rJ · th ~ p.ant c··Nner to rraima:n the desired

tr-:-rpcrature of concrt~te as :Jer l S . S:JC<;:ifi ca tions at the RMC plant itself ana

for this no ext ra payment ,viii •: c r~1ade.. This w ill be achieved by addmg

requisite quantity of ice in n';xing water at plant, so t hat concrete

temrerature should not exceed 3G )C.

The RMC producers st1ali ma~e arrangement for the sto rage of icc

flakes at the plant, which r~ eeds t:c be added in fvl ·'IO mix.

16) \.''?.':f'~ csed for m ix ing of concretr· shall be clean and free frort' oii, s;; r, ;:r ·c .

vegeti'lble matter and othe r injurious substances harmful to t he concrete . lt

shali meet the requirements st ipulated in latest I.S. Code-456. The water·

brcught for concreting a r; :i curing etc. shall be got tested from municipal

ic:oorctory (situated at G/i\!orth Ward Office) to verify whether is suitable for

above purposes, whenever directed. This testing will be done at the RMC plant

owr.er 's cost . \

17) The sand sha ll be of approv·ed quality w ith fineness modulus between 2.4 to

3.5. The sand wili ha"ve to be screened to remove the over sized particles at

quarry itself and washed at Plant before its use. In no case shall fine

a.Jgregate be accepted containing more t han two percent, by dry weight, not

more than three and. j-, zlf percent, by dry volumes., not more than f ive

percent, by wet volume of ciay ioam , si lt. The fine aggregates will be tested

and retested as directed by the F. :-~g ineen:il l it satisfy the requ ired norms as

per IS! and as specified above. The use of crushed sand /manufactured sand

RPS lnfraprojects Pvt. Ltd.

Page 10: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

sha!l be allowed, if it is procured from the crushers registered with MCGM & if

\ 18) lf conrsc aggregates a:-e found hcving \'.;,ite spots, the sarr:: S"la:l be got

u~st::ci from ap;:>roved test ing ~c.boratory to e'iminate possi:.i!:~y ;f potential

?.~Js;rcg:1 tc-alt(ali rcac~iv!ty befo-·~ ac::epti:·g or using spotted ag<;reg:-:tes. The

~: '-:C prod:Jr:c·~, s:'<)-.; · ~ :nakc the nect:ss<J·y arrangements to s~a::k the

?';~·---:gates se;;c. r;:· ~~::y sn ~~ -.~! !: tr1ey do :"'Ot get m ixed up ~·' ··:1 cJch o~her

::~ : c.'u,. wi'::h li'e f~_,:-c ;gn n:;:;te•·i9ls and get segregated. The screening of

~.1~~ , ~Ja~cs ;;:1a!i he done if fou·---j r;eccssary as directed by the t·:ngineer. Fine

v j.:-.r·se ?.9'Jr"t:yates shali bf: scr ~cncd at qL!arry itself and uni"OI'I'l quzlity

... ; f,n~::/cot:lrse. <.Jgg;·egates pa:.:.:>ii~<J through different I.S. s!cve shall be

-: ';:;: ··Jed f~or. ~he same source . • "!ax;murr size of aggregates st:all be 25 mm.

···- 2 ' '-.e arc coJ-s•-2 agg~egate:s :;ha:l be free of foreign materia ls, impu,..i ties.

-:--- e ~ ;:or age bins for aggregates shall be preferably covered and· Water

s;:.:-;'l!<!crs s~a!l be used .

.l S) Ti112 RMC producer·s r1ust maintain the lc?. boratory in fu ll & ir: wcr·king

conditi on, F2ilure to m;Jinta!n the luboratory in full & in working conditior ,

c>C '' :I:y (' " Ps. 500/·· p"'· wer.'< or pa:-t thereof per equipment will b: irnposec

2!"\ ' _I...;,

No.

'. \ \ I

.' ll ~ ' H: P.~' c producers ~:f 1)r:.U:•' th: ne::cc-ssary equiprnents in goo:: wcri<ing

' ·ltv Ri'·!C p:·oduu~rs shall rnamt.1.n ~f1e !3burato!y e1t a plant fo! ;Je;'f.:-;;rninq various

·es~s ana at least the to!lowing equipmcnts sh~!ll be provided the:-eir::

\::cat !;C'od 'c <.m;Jar·<:t•Jc· fo1· ~-..::~ti!;l.. time wit:h plungers, as - J.::. ...:C\9· 1 -:) rj '/

. -· - - - ------ --·--· . , } j 50 rnm >- 150 rn"' x J ~~l.l !THll cuhic."l for compressive

s<.rc·1gtr-

150 fYl'! x 150 " ' 17' x 70C , ..... ,.... jc;:>n' for flexural s_~!~el2gtl}

Cv·:crete ,.,.·,r:·· POVI·~ - d:_iver. , 1 c,j ft . C<"Dacity . --· ~ -- -. -- ---- -- . -- - -- - . --- --- - -- -·-·- ...

I - i

I ... , ' .. .... -·· • _ __J

j ·\gq ... c9~te if'1p3ct te~t <lr·c .. · :-~ ... ~u: 1 ~ ncr IS .. ~:.8r) J

,·p~rt 4 )1963 ' I C~;,~7et~-p~r;~t:'~~~t~r -· -- ---- - .. -·-·-·- · - -----·· -------~ ·----- ~--- -l

- .. ____ --- ----- ----- --· - ------- . ------ - l . -~-- -- - ,_J ~ •:i,. : Equipment for slump test. r. J. I

- - -- - --- ------ - - - - - ---~--------- - --- --------~- - -- ---- ----!

j

J , (

<I .l

j

(':<) f:qwpment for deterrninatlo:. of S.P. Gr~lVity for cement, 1 l. I f ·ects Pvt. ltd. .fine and coarse aggregate as per l .S . 2386 (Part-3) 1963 i RPS n raproj

-~ 7 . .. ___ .. ,__ .. --- - · -· · ·-· . ........ - - . --· . --· -------· l- ....... ·- ·--l ._:,j Flexural attachment to comp. testing mach!r;;1e .:. ' . , • 'f l • \ j

- --· .. - ---·--- --.. -------- ---------------·----- - -- --.J--.. . n. :. S c u .•t. 1 cu . ft .. cv:irdcr ror checking bulk density of I ~ggres;;te NJth tem•Ji;~g ~c·:W

-·-r·-1

- ,,_J

l

'

Page 11: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

I

_... .... ..

Surface moisture meter for aggregate and concrete 1

Density Basket as per IS2386 (Part III)1963 1 --------------~--~----------

' Balance :

l

L----·._(a) 7 Kgs . to 10 Kgs. capacity semi-self indicat ing

Electronic type-Accuracy 1 gm.

I. -----~~

, ( b) 500 gm capacity semi self indicating Electronic type- 1 Accuracy 0.01 gm .

1 ~ (c) Pia;,.;;~ scale~3~~~~~~:_"~~· ·~ ---.,--·-·-·

I (x·;i) Ovens - Electrically operated, t hermostatically controlled (a) f;·om 1 00°c to 220r,c sensi~iv•:ie~

bx;;i:) ·- Sieve_~-=-~-~~~· 460. - 1967~ r;;·c-d-~~~k;vant tests

I l

( <) L S. Sieves 450 rnm interrc! 1ii1 of Sieve sets ilS per ;;rs of requ ired sieve sizec: c, m r I etc wiu1 Ito and p'ln

.. ~·.' IS Sieve 200 mm ir.re ~nal d1 c1 (.b ass fra me and steel ... brass wire c io:~ rr.esh) cc--osi s ~; ng of sieve sets of

1

1

~eq...::~ed sieve s·zes crTo,"':!' w·-r, lid and pan - - ------ - __ _;_ ___ -,---_____ _ S•e, e shaker capable of raking 200 mm & 450 mm dia

(> s:c:·,·es electrica lly operated witt< cime switch assembly _ (as 1

-- . _p_c :~§~S_) _________________________ _ (x';-<) 200 T. Compression testing machine 1

--------- ·- ---------r---:::----(xx) Stop Watches 1/ 5 sec. Accuracy 2

......-----~··- ----·-------·" Glassware comprisin~ of beakers, pipettes, dishes,

(xxi \ , measuring cylinders (100 t o 1000 cc capacity) glass rods 2 ' , and funnels; g lass thermometer range 0°c to 100°c and

mei allic thermo met.>; ranges 3 jO~c -- -- ----------

(xx ii) Hot plates 200 mm d1a (1 500 ,, ·.tt~/stove) 1

i . (d) Circular plates of 250 :nm d1a 1-- ..... ·-· --------------- - --- -----------1 (xx iv) Water testing kit (PH, chior!des, su lrhides) 1 1

lfxx-;,·) - '·E~uipment for testing of s;l t con~enl:s -------/.-:-

3

r-:--- --· : (xYv:)

~~/.\'li) ::•:sc Aid Box

Var'able frequency and <Jmplit.uc1c vibrating table size l r:- cter X 1 meter, as per the r('ievant British Standard

,.--------- ----·----(xxviii) Ot"'er machines as may be directed by the engineer in

charge of M.C.G.M. · L_ _________________________________________________ ~~-------~

Note : 1. The nos. of ind ividual equipments mentioned in the above list

(quantity) may be enhanced as per the work load at RMC Plant

laboratory . \

2. The RMC plant and mea!?uring & testing equipments of RMC plant laboratory

shall be ca librated regLI.3rly.

21) P.l! the Ca libration and test records shall be maintained in t he plant labo1arory

and made available and when requ ired as . RPS lnfraprojects Pvt. Ltd.

I' .' I'-.,: ;·nu~ "-'~··.;iate~\Issuc Lcncr. Docx

Page 12: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

:a'.e iil!Jo ·a~ory Llt the plant ~l:ld GYr.t OU~ r.ecessary tests in r:s !~boratory ,

;_-;cy shc!i subm1t :or every day's wcrk cf •.· -35 g-ace & abov e, 3 cubt.s and 3

f:cxural beams at ;:he apvoved ic.boratury fo- ~es:~fl~ ~c- 23 ca·:r.; ;:c,;r ~ressive

<-: \\'t"i: as f:exural strength. The RI\.1C: o~cdt.Cf: -s s:--a!l a:-;-anse tc :: C": d the

;e .. s ~ t•.-:o days ce:o:e ::.e date 8!' ~eSling of cubes c'ld beams tc1: ;'g whlch

·._: c. c r \ o. 51_ C'•i · ::;cr C rJY \\':·. b ~ i T.oc;<:C enG recovered r. o·-. t';c Rf"lC

_ .•:.: L::··::o:: 1· , --\: ly, c:·, f,:H1•:!':! cf c':e corrp!iance of t' 1;s cor1dirion,

.:;...: "2::!P. ~~e;·c;l ?.ilc/or oi.:1cr ~ctiu·: w:;J be ir·:~iated .

:;-::.: .\'Jf;en('ver the rr.nterials, cubes and beams are required to be sent to the

·?::·:Y'l:ory. the same snail. oc· ~rarsportc-:j to the Laboratory by the· RMC

c·o::c;.;cc:-s c~ th~ i r own cost. .

The chargr..s for testinq o~ cubes and beams at Municipa1 Lcborutory

snaii be as p<:r rate schedule f:xed for testin g by the office of P. .. E. (Soil

Mcc!l.), M.C.G.M . Lub. at Worli from t ime to time and the same shail t·e borne

by the batching producers .

" 4 ) I "": cCdit io!' co <J l.'ove, the cubes ~or every day's work shall also bf' tested for

' 7 ·J<' 1: and l(i C'~1ys str~"ng ' n nt ' ·he laborato~y attached to the plant . Tr~e RMC

., ., ,. o• .... ner sha I Ci.l';t ,-,• !t..,1 :;: CJ cubes dvir.g :he concreting of e;;ch di:ly's

wor!.-. o~ :>.1 -35 grade & Ll~ove ano test the cubes at laboratory atci'lC'':' O to the

r ,iJ :-:t .n accordarcc w'th the I S 456 ~nd ; or iatest I.S.Code fer 7 r!a,• s r.: nd

i.4 c:::\·s strcr.g"t•. The acceptc>'l(<' ~:- i tP.r·ia ~o·· the te~t results sr,al: t:Jc as per

lS 456 and /or latest l.S.Code.

;., use of cur'cq~l<.' oi cadt' less ~han :Vl 35, at least 2 :>E:t'; of' cubes

All the test re-:>u! ts shoui::J be se·:t to th•s off·cc monthly, on fai lure of

r ,_ ?. ~CC .

n >:e·j propc-,r::i(1'1 rerr·~i · l uralte; ::d, the \v3:c- lOntent shall be !:h -. ;niilirnum

'·''l'.l;rcc tc o• ovidc '1c sr;c - i':ea wo~·k ;-j;::::v for full cornpc:cr:on of the

' RPS Jnfraprojects Pvt. ltd.

as required shall b2 prcpared-.e \~ .. '

26) i•'iiX -dc:sign to give the targr;: s:·~ength

p:·eferably in accordance with the relevant I.R.C./I.S. specifications. The same

shall be done by batching plant personnel and checked by concerned

"->r:icipa! Asstt. Engineer/ Exl:cu:ive Engi'ieer . Whenever f;-f!s~l !ot of

Dir~tor

Page 13: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

I

got checked. For this purpose, grodation analysis of coarse and fi ne

aggregates shall be performed. The necessary correction shal l be made in the

mix des ign according ly.

Bi~fo r0 actua l starti ng of rv:.::;s s, c; ;)oV'.? concrete mix, sand shall be checked

for rr:oist ure content. According iy, cuantity of water and sand shall be

adj usted .

28 ) Tr·,,,; mi'1imum O.P.C. con;;u rPpt ion : ')r :+40 grade shall be 3SO Kg /Cu . r-.· ..

c:s :cccssary or else fresh Pl ix ce s~n shal! be ca rried out ti ll desired resulcs

e: :-r:: oot amed.

29 ~ r=.~-- rr·e desired workabdiu ;:he co'lcre!e m ix of M-35 & above w il l have a

s._;no ')f 50 mm. at th e work site. ·c m ay v ary by±. 10 mm .

3 0) Ready Mix concrete prep"arP.d and u·ansported will be as per IS 4926.

31 ) R.e ady m ix concrete wi ll be brought to t he si te from R.M.C. plant only by trars 't mixers. The concrete ;:; re rJar2d and transported will be as per I S 492.6 :) > th ~ relevant latest i S coc~e .

32) The ce1tral m ixer shall be ma i n•a i : ~ ed •n clean cond it ion. Hardened concrete

shouici not get accumu;ated cwerr.oatr•. The i:l!ades of the mixer shall be f ree

.Jf e>·c::-ssi ve wear.

33 ) Ev~: :·y ·rrans it m ixer hc.vi r,g installed \ITS w il l generate online computerized

delivery cha ll an, wh ich wil l have m in imum fo llowing deta i ls .

l . Nam e of manufacturer c: r;d Depnt.

~ . P;·ir. ted Sr. No. of ch.:: llar1

4 . ·rruck No.

5 . Name of the Contractor to whorn tf:e RJJt.C. is being supplied .

6. Location of contract . 6a) Na me ~f Dept./ Name of work

7 . G;·c.de of concrete.

8 Specified workability. (siump)

9. Cement content and grade of cement.

11. Time of receipt at work site .

12 . Quant it y of concrete .

The details of a!! the computerized generated online RMC cha llan with batch

repo rts of materia ls/concre::e supplied to the MCGM works sh ail be subrn;tted

to the office of respective Execut ive Er·g ineer monthly & also copies of sam e

shal! be submitted to this offi ce.

34) ·A computerized sheet generated online showing details of ingred ients of ready

Page 14: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

r.:x co'lcrc~e i;~cludinq ccrnixtur<'! viz. the c:ctual weight of each i~gr·ed ie;;ts,

r co uh~d wr>igl t of each inc;rcdicnt~ <:s pe;- mix design etc. shall · ·'var' ~ ::::y be

oene;-atec onl'ne shal be preserved as a reccrd o" tne site. - '

2 5) Use of trunked rad10 se:s;:not)nc· phO""eS s:1a'· De mcl"ldatory i;1 eac!1 transit

. '(:d:: l:.J •o J S r\2v.;rn:n . :·:>:·a~ IQ:::st '>10 minutes to make sure t:1a~ concrete

~;c.-., r.12k•ng sure tt1<H tne co Ki'l'~e has bc.::n ~niformly mixed, a sample from

-~-= • rs: O.S C.; .r.1 . of Cv'Kre~e d.s.:!1c ge s;-:all be taken by Site Er;,;i;1.:..:: and a

'··: ·'-: ~"~t o:~ tre sa,';:)lc s'lcli be done. l~ the result comp;.es \·:!~·-; ~he

"'~~~c;f,ed reou:rerrents, the;·; tl·:c loc:d shall be ·3Ccepteci . If the re~u:l f<.JII s

::i~;:s<ce the :i:-TJits, a furt•.cr sa.mp!e shall be :aken from the second 0.5 Cu .m .

· o:' r:1e d1scharqe and if th!s is satisfactory, the load shall be accepted . i f not,

· "'·- c..!' err:"' :Tlay be rqcc~ed <IS ~~.c sarne being outside the S;JC:c!!'Ocat:on

:~~~-· ·:·,: · .::·~·n>·ture used sha!i c~r::o·~ to IS · ::;r AS ff./1 . The adrr.iX~- :-'2 shoi: be

' ·.- ., . ~,! ~. ·'r(' during the worv. in drp ·ovf'd iuborwtory and test c;.;; ~;;'ice:tes t.o

•:,;'· l '~'-c: s" r: ll be SL!tlrri~te•:l to :'1.C.G. f'-1. ~.o ·~xtr·n payrr.enl wi !! l.:c marie for

.. ~,~ . ..,.. ···~-cs sha:~ be oroocr!y storl:G, ~o r:::::;:-r1izc contamination .

, , . S"'r;Clr"'"C' ··egister will t)e ...,~ :'ra · ~r:c: r~)" ~- ~·:lC~ and consurr J\. o;- of U:e

-.J·~. :\t.l;rcs consun~ed for R.'-l .C. ~li"es supplied for municipal wGrks A \:est

• ·"'.•;,, .·~e for ttY~ cor.lOa'Jbii:~y ol :1d·:1 xture. •,-;,:h cemen:: sha ll be ub:o:ir.cd.

· xr,.;m o· e ·.-·~drer uroof s•io 'i ~':;; 1'--lT Cdo~.c;ty shall be provido2a :,., f{ . iv!.C .

. r~ T;;e R.M .C. '.vork s"':a!l not be affec~d at any time due to ·:-!' . rritjent

~ .'-:c o .1n~s s':nll sub~'t ~1 "·~d?.C .. :r e · s ~es:_ ce-t.iricate of GGBS duri•-:g 1ts use .

. :.1:;;:;, PJvlC p'CJnts shall su'Y> ;t c.': .::kc:e ol ~n·.:s'c<31 test:ng of cer~~ent rn,xture

t '-13 grade OPC and CGBS or ~ crt.ar.d s:ag cement per rnon:h :~ chemical

rcstil~f,; of the same before its use from the Laboratories approve(i by Ch .

r:JRc;.:: 1'~ Tr. ). Furt.h;r, ~o cov .: c~wab;li:v parar.1cters of concrete. R.M.C.

::';::~-.; s'l<li! subm;t one ~est rc!):.''t durir.g tr·e project on permea~~~,~~aprojects Pvt. Ltd.

~ReP: as per /~STf\.1 1/.02) ,:;nc h<'•at of hvdrc:1tio~ of cement mixture of GGBS ~ ;:;r:d OPC determmed ar 7 & 28 days from t0e Laboratories approved oy Ch.E. ptreetor

Page 15: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

--~-

(Rds & Tr.).

It will be the sole right of the administration to allow or disallow the use ot

Ready Mix concrete as also in specific •Narks, based on site situation, numoer

of works, distance of plant from the sit <:: of work etc.

43) Fe! nv:ing are the directic;~s fer us-: o~ F1y ash -

'6; 1 S 1. mark fly ash contorn-:' ''9 to IS 3812 shcdl be used 2 0'-'~o 'Jy

~ove;gnt of cement content.

o) "!est certificate from Mnnufactl'rc~ ~'n2:1 be produced for satlsfytng ;?nysica!

and chemical test properties 3S per IS 3812 before the use and for

f: ·''2''Y batch of fly ash .

c) In addition to the mar:ufactur~r's test certificate, R.M.C. Plar,ts shall get

~'ie fly ash tested for its chvsical and chemical properties from the

•.2-Yator ies at V.J.T.l o~ I.L- I nrcferab:y before its usr:. dt ::h~ ·.-o~: · ,-.'

~ ' · .C. Plants.

44 j CPr:crHe slurry or sludge frorn H'·1C piant and transit mixers shall . not be

cisposed either at site of work or aroy other locations which may gen.erate

complaints. The RMC piant o~vner snai: arrange to treat the Concrete slurry by

providing sedimentatior> tank ;:, ·ong witn necessary additional number of tanks

;;. ,-j n:oe line netwo~k ;;~ t~•!" R.1·l.C. P' <: i1!'.

\

TABLE_;_L1::1It-JTMUt1_ ItSJ_ff.EQU!;NC_IES_E_Q_fLQ\-l.ALTTY._..CONTRO_b OF CO~CRJ:IE.~Q.t\1) _CQtJSTR\,JC.TIO__!.~ -

r:---·-·- -·-·-·-1 Item Test Check Cortro! Frequency L_ __ _

I cr::erion

-'------=----'--- . - - -- ~--·-~- ---------

APPROVAL OF SOURCE OF SUPPLY OF MATERIALS I , ...

c e;,,-e,.:jt·----TPhysical-and -F~;-s112T-"6nce for-·each -·source' supply- fo-r-·

I ' !

-43 :,:. c.;::;c:

1 Port:a,··! i Sl?.g

cer11erot conform in g to IS 455 using G.G.B.S.

--Cement --:l, xture rf

'43 grade

I OPC and

I GGBS

I

1 Chemical Test ' · approval of source and · . subsequent when warranted by

-------·. PnysiC2• ~::::,~ :::~ -8 ·: 2

1 Chemical Tes! IS -£1 5 5 I

I

i change In quality in ca se of · 1

doubt.

Once

} YI>lY ____ _,__ ___ -+---:---·---------~--------,--------! Coarse and Fine I - do- IS- 383 ' --do--! Agg•eg3te i (Includ ing ! I soundr.ess

! ar,d al~c:;li I r--- ··-- .. ·-~C?_ter_

·---- ______ ' reac!).y_i!Y_L_~·---- --,--------------------·---____l_QlemJCa_Ue~!_jJ~!!...5Ll_ -· do--

RPS lnfraprojects Pvt. Ltd.

~ · Director

Page 16: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

--- ... __ --,

r f:c,:f·~ · cc! . ! . '

'13 sr ace Cemenc ! ., ---~

PcYtiand , mi>.:(L:re sl-:J9 cE:-;;~;-':_ of 43 -- __ _J

! . CGnfc_.rrr,::~g g:--aC:.::: Once t0 ;•:; •1 5S : OPC arc

G G . .? S.

0 _:l'i __ - -··-· ····· Gradation rece!'il~d . -~1oist·u-rc-content:--·--·;-

j

i !

--- -----------·-·-·-·---· -·---4 .;;?.~38 3 __ j_for e~cb_lot_o!~.sn~.s.a!~----:~ -··de- - ._ ~eglllar!y as requ 1r-2a !

· :;ubject to a minimuf"T' c~ i -·--·- -··--·- .. ·- ---- ---- : :?. t~s!_~P~.C -~-~...:.... - --·· ·--·-__ j

F!akiness Index - -co-- --de··- · _ _ ______ -~~~~ati9~ r.::.S:..:~x ~-~:-=.=_-:-co_~---=~--- ---~~cio.:~ ~--· =~--~ -.~J

c~ ':--::_~_: __ ------ Wo_~kab~~ - --------.- -- - -----···-·; _yor~3~~-~.9..:'2~~~ -r~:L~~-~---------- ; Concrete stren<;;th = Cube samples, cs s~t:cif,eJ I

. c ~'"\ - "' - ....., ......! - \ - .. :' I : ,,x eac •. dge ur 1 v<== /:.o, .l·; 1

., days and 28 d2;:s (for ;

.... ---~;.::-e>'L.9.9.'.(§..'~.9_rk2_. _ . ..!

.. - --- --- - -------------- ---:.-. .. ~ . Cnt8~ i.) :·l Tctera r.ce

., ----..f- -- --- -- ------ -- -· _ _ ; -----. ------- - ----- ------··-··-· -· . - --- · --

CCP'" :: ··: c:;r-c:--e:r= i Quality concrete Grade • Toler(;r~(-~~ !eve: fL1r c:!lurch.r:: .. r>: _·t: ' .

PA ·. ~ "'iT>::.:~ _:_ r:::1S ~'( ?'.~:"":'.:·~·--------------~ s~:.~l~9~~--~-S?~S_;l '-J e·:t : 1 . : "1 t._

' ____ _j

~.! .~~~ L_-~~ '7~-

.:.) -~·--;_ o:v··iis:o:--:ai ~p~1;0\·.::! 9··4·c.: ro -i sh:::.~; ;:_;r;-, ,.,;'--~'= ~·ia;~- upG:--· ~~rc..--.r>:i

RPS tnfraprojects Pvt. Ltd.

?'IJ~f -:-oB·t0 ·/3

:.~x.ecut ! ve Engineer ~ ~<!)cj~·

,_;!,,rn Suburbs U'i?-: , ;:-~c:

---1

,· .... ' '

Page 17: /~~i:. Department... · 2015-04-08 · Cost Centre Cock ·\ c I k ;ld Code ... We hereby certify that the M1 Concrete Batching Plant bearing M/c ... T'1:,t the batching plant …

·,___

«~11. 'lrD~l ~ READYMIX CONCRETE

To,

The Deputy Chief Engineer (Road) E.S.,

M.C.G.M.51h Floor, Transport Garage Building,

Plan.t Nagar, Near S.T. Depo.

Ghatkoper (East).Mumbai.400086

Sub: Renewal of Ready Mixed Concrete Plant situated on survey no.

345(p), CTS No.2330/A Sant Kabir Rd ., Kokni Pada, Singte Quarry,

Dahisar (E). Mumbai- 400068 With MCGM

Ref: Your latter No. Dy. Ch. Eng./2853/Rds./Pig. Of 01/04/2014.

Dear Sir,

Date:- 23/06/2014

With reference to above here we are submitting the following Documents and Details of our

co. 1) The permission from E.E. {BP) W.S. is in progress.

2) The calibration certificates of laboratory equipment's.

3) The revalidation of environment NOC. 4) The validity certificate from the competent authority for Weigh batching Equipment's of the

RMC plant. 5) The test result of various materials (Cement, Crushed sand, Metall, Meta12, admixtures,

Water.)

6) The Accreditation certificate for our RMC Plant in progress .

7) Factory License 394

8) Factory Permit 390

9) MPC certificate

You are requested to do the needful at your earliest.

Thanking You.

Fo~~IATES

PARTN

Regd. Off.: Gr. B-61A.Divya Smruti. Link Road, Opp. Toyota Showroof!~ . Malad (W), Mumbai . 400 064. Phone: 022-32617251 I 022-28482621 I 022-28082711

.. -..,;;;;;~-­·w ~ (

ii a · ~

• (

Plant: Survey No.345 C (P), CTS No. 233016. Silnl K;~hir Rti Knnbni P :ub <:i<>ntn f\ .. M~ • n~h: ••• ,r• "· ·-~-' N'•