I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond OTEC 2016 John Katers, PE and Pat Wingate, PE OHM Advisors
49

I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Apr 11, 2017

Download

Engineering

OHM Advisors
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

I-75 / University Drive:

An Interchange Under Pressure Becomes a Diamond

OTEC 2016

John Katers, PE and Pat Wingate, PE

OHM Advisors

Page 2: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

I-75/University DDI

• Background and

History

• Need for

Improvement

• Act of God

• DDI Concept

• Design Build

• Branding

Page 3: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

23,000 residents

100,000 daytime population

Page 4: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Auburn Hills Map

Page 5: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

City of Auburn Hills

DDI

The Palace of Auburn HillsOakland University

Chrysler Tech Center

Page 6: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

1963: Farmland

Page 7: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Operation Problems:

¥ Bottleneck

¥ WB to SB

¥ No Ped facilities

¥ Chrysler ramps

1990s - 2000s:

• Chrysler

• Auburn Hills tech park

• Oakland University

• Others

Page 8: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Operational Problem:Chrysler NB C-D road ends

Page 9: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Solution:

Reconstruct Parclo

• Late 90s

• Impacts

• ROW

• Cost

Page 10: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Reconstruct Parclo:

• Deferred in 2005

• Pavement/bridge conditions

• Operational issues

Now What?

Page 11: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

2005 - 2008

City of Auburn Hills

• Frustration

• Poor Operations

• Ugly Front Door

• Economic Barrier

Other Solutions?

Page 12: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Developing Options

• SPUI

• Modified Parclo

• Roundabouts

• DDI

Page 13: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Developing Options

• SPUI: Bridge deck cost due to skew

• Modified Parclo

• Roundabouts

• DDI

Page 14: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Developing Options

• SPUI: Bridge deck cost due to skew

• Modified Parclo: Highest cost and most ROW impacts

• Roundabouts

• DDI

Page 15: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Developing Options

• Roundabouts: Lowest Cost ($12 million) and LOS B

Page 16: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Developing Options

• SPUI: Bridge deck cost due to skew

• Modified Parclo: Highest cost and most ROW impacts

• Roundabouts: Viable option?

• DDI

Page 17: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Developing Options

• SPUI: Bridge deck cost due to skew

• Modified Parclo: Highest cost and most ROW needs

• Roundabouts: Viable option?

• DDI: Innovative, no ROW, moderate cost, LOS B/C

Page 18: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Developing the DDI Option

• Coordination with Missouri DOT

• Developed understanding of the DDI

• Worked on traffic models

• Concluded DDI was a viable option

• Presented to the City of Auburn Hills

• DDI fit with Innovation/Hi Tech brand

Page 19: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

A Call for Action

2009: DDI

Option is

Pursued by the

City of Auburn

Hills

Page 20: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

A Call for Action

2009 - 2013:

• Auburn Hills aggressively

pursues funding • MDOT program

• Legislators

• Regional coalition

• Bring the $$$

• Pursue TIGER Grant funding

US DOT

Page 21: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

For 4 years, we talked to every leader we could find in government

and business about this project.

-Stephanie Carroll, City of Auburn Hills

Page 22: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

A turn of events...

• City of AH

streetscape project

• University Drive

overlay

• Bridge deck overlay

• Bridge Load Rating

Page 23: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Polar Vortexof 2014

•Severe cracks in

bridge beams

• Emergency closure

• Temp supports

Detroit Free Press

Page 24: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Go Time?!

MDOT priority. Funding sources:

• $8M savings freeway project

• $4M from City of Auburn Hills

• $2M from TEDF

• $4M from Legislature

• $0.5M from TAP

• Looked at design phase

Page 25: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Go Time!!

Design-Build:

• Owner's rep team

Page 26: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Go Time!!

Design-Build:

• Owner's rep team

• RFP Phase (2014):

Prelim design and

bidding

Page 27: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Go Time!!

Design-Build:

• Owner's rep team

• RFP Phase (2014):

Prelim design and

bidding

• Contractor Design

Phase (2015): Reviewer

Page 28: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Go Time!!

Key Elements:

¥ ROW

¥ Traffic Modeling

¥ Geometry

¥ Challenges...

Page 29: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Geometric Challenges

• Queue

sensitivity on

west side

• Manage the

curvature

• Avoid wetlands

and poor soils

Page 30: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Challenges

Queue sensitivity on west side:

• PM Peak

• On-ramp to SB I-75

• Merging

Page 31: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Challenges

• X-over locations

• Minimize lanes on bridge

• Merge for SB on-ramp

• Opdyke Rd

Queue sensitivity on west side (PM)

Preliminary Design

Page 32: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Challenges

• 44 degree skewed bridge

• Lane discipline

• Driver expectation

• Speed control

Manage the curvature

Preliminary Design

Page 33: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Challenges

• Wetlands in SE and NE

• Soft clay and peat in SW

Avoid poor soils and wetlands

Preliminary Design

Page 34: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Challenges

• 26 degree skewed bridge

• Lowers bridge span

• Less wall and fencing

• $1 million in cost savings!

Contractor’s Initial Geometry

Page 35: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Contractor’s Initial Geometry

Challenges

Preliminary Design

Queues on west side

Avoid wetlands and bad soils

• Curvature and driver expectation concerns

Page 36: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Challenges

Queues on west side

Avoid wetlands and bad soils

• Curvature and driver expectation concerns

Contractor’s Initial Geometry

Page 37: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

• Increase distance from x-overs to bridge

• Increase tangent lengths

• Promote lane discipline

Challenges

Modifications

Page 38: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Final Geometry

Challenges

Page 39: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

A Brand

• Joint effort: Auburn Hills and Oakland U

• An iconic gateway

• Elevate the quality of the arrival experience

Page 40: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

A Brand

• An identity beyond an exit number

• A sense of place

• You have arrived!

Page 41: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

A Brand

• Engine for economic growth

• Reinvestment in land use

• High-tech research and college town

Page 42: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

• First of its kind in Michigan

A Brand

Page 43: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

An Identity

Page 44: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Iconic Gateway

Page 45: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Minimal Delay

Page 46: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Quality Arrival

Experience

Page 47: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Economic Growth

Page 48: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond

Innovation

Page 49: I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond