I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No. 0495-029-123, P101, C501 CITIZEN’S INFORMATION MEETING UPC 105130 NOVEMBER 19, 2013
9

I-495 Northern Section Shoulder use Project

Feb 24, 2016

Download

Documents

Citizen’s Information Meeting. November 19, 2013. I-495 Northern Section Shoulder use Project. UPC 105130. State Project No. 0495-029-123, P101, C501. Location Map. Project Location. Proposed Shoulder Use. Northbound Inside Shoulder (no work on Southbound) - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: I-495 Northern Section Shoulder use Project

I-495 NORTHERN SECTION SHOULDER USE PROJECT

State Project No. 0495-029-123, P101, C501

CITIZEN’S INFORMATION MEETING

UPC 105130

NOVEMBER 19, 2013

Page 2: I-495 Northern Section Shoulder use Project

Location Map

 Project Location

Page 3: I-495 Northern Section Shoulder use Project

Proposed Shoulder Use

Northbound Inside Shoulder (no work on Southbound)

All traffic will be allowed to use shoulder lane in peak periods (no flexible delineators)

AM and PM peak hours to alleviate traffic queues and improve merging

Static and dynamic signing, lane markings, and overhead lane-use system included

Page 4: I-495 Northern Section Shoulder use Project

Typical Section

Page 5: I-495 Northern Section Shoulder use Project

Pavement Work Mill and overlay, restripe Northbound I-

495 within project limits Reconstruct outside shoulder to full depth

pavement Widen right shoulder at Georgetown Pike

Interchange to provide emergency pull off Pavement joint repairs for improved ride

and longer pavement life

Page 6: I-495 Northern Section Shoulder use Project

Structures No major bridge work anticipated. Sound wall/retaining wall impacts under

evaluation. Pier protection will be upgraded at

overpasses within project limits Overhead dynamic and static sign

structures along median barrier and outside barrier

Page 7: I-495 Northern Section Shoulder use Project

Concept of Operations

Advance DMS signs, static signs, overhead lane control signs, and striping to delineate shoulder lane

Light gray color for shoulder lane to provide contrast

Additional camera coverage and traffic detectors along Northbound I-495

Page 8: I-495 Northern Section Shoulder use Project

Other Items During construction, no lane/shoulder

closures during peak hours. Minor drainage work anticipated Median barrier modifications to upgrade

to meet current standards No right-of-way or utility relocations

anticipated

Page 9: I-495 Northern Section Shoulder use Project

Schedule Citizen’s Information Meeting -

November 19, 2013 NEPA Document - January 2014 Notice to Proceed for Construction - May,

2014 Open for traffic - December, 2014