I-40 in Oklahoma County from MM 167 to MM 173 From East of Choctaw Road, East to the Pottawatomie County Line March 4, 2014 6:00 p.m. 1
21

I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Apr 06, 2018

Download

Documents

tranliem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

I-40 in Oklahoma County from MM 167 to MM 173

From East of Choctaw Road,

East to the Pottawatomie County Line

March 4, 2014

6:00 p.m.

1

Page 2: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Purpose of Meeting

Present purpose and need for the proposed

project

Collect comments and information to

incorporate into the project development

process

2

Page 3: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Project Extents

3

Page 4: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Project Development Personnel

Oklahoma Department of Transportation Brian Taylor, Division 4 Engineer

Joe Echelle, Division 4 Construction Engineer

Daniel Nguyen, Project Management

David Saulsberry, Environmental Programs

Frank Roesler III, Public Involvement Officer

CEC – Design Engineers Taylor Barnes, P.E.

Don Steel, P.E. – Roadway Design Lead

Felicia Jackson, P.E. – Roadway Design Lead

Travis Collins, P.E. – Bridge Design Lead

Amanda Baker, P.E. – Design and Noise Studies

Jared Bechtol – NEPA Clearance

4

Page 5: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Project Development Process

Corridor Identification Public Meeting

(Input)

Incorporate Comments

Environmental Studies

Final Environmental Document

Submission

Approval

Construction Plans

5

Page 6: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Improvement Considerations

Proposed Scope

Traffic

NEPA

Constraints

Engineering

Public Input

Economic

Feasibility

6

Page 7: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Study Area

From east of the I-40/Choctaw Road

Interchange east to the Pottawatomie County

Line

100’ to 300’ beyond present right of way

1000’ north and south of I-40 along county

road crossings

7

Page 8: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Typical Evaluation Criteria

Land Use Impacts

Farmland Impacts

Relocation Impacts/Rights-of-Way Acquisition

Joint Development

Noise Impacts

Wetlands Impacts

Water Body Modification and Wildlife Impacts

Floodplain Impacts

Wild and Scenic Rivers

River/Creek Rechannelization

Threatened and Endangered Species

Archeological Sites

Hazardous Waste Sites

Underground Storage Tanks

Construction Impacts

Environmental Justice

8

Page 9: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Noteworthy Environmental Study Findings

Waterways & potential wetlands

Require USACE Review

Noise Impacts

47 receptor sites modeled, representing 55 single family residential dwellings

23 residential dwellings would experience future noise impacts of 2 decibel to 5 decibel increases over existing noise levels

17 residential dwellings at Bella Ranch Subdivision,

6 residential dwellings at stand-alone locations

Noise abatement measures not included in project

9

Page 10: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Existing Conditions

Original Construction Completed 1961

1957 Average Daily Traffic (ADT) = 6,495

1975 Average Daily Traffic (ADT) = 12,796

Deteriorated Roadway Pavement

Bridges

3 Functionally Obsolete

Triple X Road, Luther Road, & Harrah Road

1 Structurally Deficient

East of Harrah Road

10

Page 11: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Existing Conditions

Current Traffic Demands

I-40 Mainline

48,400 (ADT) west of Peebly Road

36,400 (ADT) east of Harrah Road

Peebly Road Interchange

350 vehicles per hour turn movement (2013)

5000 vehicles per day on Peebly Road (2013)

Harrah Road Interchange

380 vehicles per hour turn movement (2013)

7200 vehicles per day on Harrah Road (2013)

11

Page 12: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Project Purpose

Increase traffic capacity of I-40

Improve deteriorated pavement

Improve deteriorated bridges

Safety Improvements

12

Page 13: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Improvement Alternatives Considered

Widen to inside of existing pavement

Paved median in some locations

Widen to outside of existing pavement

Combination of widening to inside and

outside of existing pavement

13

Page 14: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Proposed Improvements

I-40 – Divided 6 Lane Facility

Build on existing alignment

Widen to outside of existing pavement in areas

of existing narrow median (40’ wide)

Widen to inside of existing pavement in areas

of wide median (more than 40’ wide)

46’ minimum width open median

10’ paved shoulders inside and outside.

14

Page 15: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Proposed Improvements

Harrah Road Interchange

Provide additional acceleration/deceleration

length at Harrah Road Interchange

Improve loop ramp curves at Harrah Road

Interchange

Provide Left Turn Lanes on Harrah Road to

I-40 Ramps

Rebuild bridge to 4 lane width

15

Page 16: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Proposed Improvements

Peebly Road Interchange

Provide parallel lanes for I-40 on and off

ramps

Reconstruct bridges over Peebly Rd.

Add turn lanes on Peebly Rd.

Luther and Triple X Roads

Rebuild overpass structures and approach

roadways to accommodate widened I-40

32’ roadway width

16

Page 17: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

During Construction

I-40

Maintain two lanes of traffic each direction during

construction

Opportunities to speed construction with night time

work and lane reductions will be considered.

County Roads

Close Triple X and Luther Roads to reconstruct

bridges and approach roadways

Short duration closures of Peebly Road for bridge

removal and new beam placement

Harrah Road and interchange ramps remain open

17

Page 18: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Proposed Improvments

ODOT 8 Year Construction Work Plan Two Construction Projects Currently Scheduled in FFY 2017

West Project from east of Choctaw Road to east of Peebly Road

East Project from east of Peebly Road to county line

$50 million currently programmed for construction

3 year estimated project duration for construction of both

projects together

Will have additional Right of Way to Acquire and Utilities to

Relocate.

18

Page 19: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Next Steps

Receive comments from public

Complete environmental document and

obtain approval

Preliminary design

Right-of-way acquisition and utility relocation

Final design

Construction Currently Scheduled in FFY

2017

19

Page 20: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Question & Answer

Please provide comments

now in open forum

in writing on the forms provided

by email to:

[email protected]

[email protected]

20

Page 21: I-40 in Oklahoma County - odot.org in Oklahoma County ... Felicia Jackson, P.E. ... Amanda Baker, P.E. – Design and Noise Studies Jared Bechtol ...

Thank You!

21