Top Banner
Hydrology Project II Central Water and Power Research Station Pune
16
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hydrology Project II Central Water and Power Research Station Pune.

Hydrology Project II

Central Water and Power Research StationPune

Page 2: Hydrology Project II Central Water and Power Research Station Pune.

Hydrology Project I Institutional Strengthening Upgradation of Current Meter Rating Tank Facility Hydrometric Instrumentation Services Facility R&D Studies Reservoir Sedimentation Survey using IBSRSS Field Investigations & Development of Model for Predicting Water Quality in Reservoir Systems: Panshet and Ujjani Estimation of Irrigation Return Flow – Kukadi, Maharashtra Training of Trainers

Create a Centre of Excellence for Equipment and Maintenance

Page 3: Hydrology Project II Central Water and Power Research Station Pune.

14

9 9

67

12

5 56

0

2

4

6

8

10

12

14

Part

icip

ants

CWC AP GUJ KAR KER MAH MP ORI TN

Agencies

Personnel

trained: 73

Five rounds of ToT Course on ‘Analogue/ Digital Water Level Recorder (A/DWLR), Bank Operated Cable Ways (BOCW) and Sediment Sampling’

Page 4: Hydrology Project II Central Water and Power Research Station Pune.

Guest Faculty byCWPRS :

HYMOS Implementation

Six BasicCourses

Two RefresherCourses One TOT

Course

One AdvancedCourse

Follow-up at Data processing

centers

Page 5: Hydrology Project II Central Water and Power Research Station Pune.

27

1211

16

11 107 7

3

74

0

5

10

15

20

25

30

Pa

rtic

ipa

nt

Tra

ine

d

CWCMAH GUJ AP KAR KER TN ORI CHSG MP OTH

Agency/State

HYMOS: Officials Trained

Page 6: Hydrology Project II Central Water and Power Research Station Pune.

0

5

10

15

20Pa

rticp

ants

AP GUJ KAR KER MP CHSG MAH TN CWC

Agency/State

TOTAL Officers Trained :60

Faculty in Refresher courses for ToT

in Hydrometry

Page 7: Hydrology Project II Central Water and Power Research Station Pune.

Hydrology Project II

CWPRS-Component

With the experience gained and facilities created, CWPRS is well equipped to offer services to implementing agencies under vertical and horizontal extensions

Page 8: Hydrology Project II Central Water and Power Research Station Pune.

Major Activities Proposed Under HP II

Hydrometric Instrumentation Services Facility for calibration, repairs and trouble-shooting of DWLRs

DWLR technology development

Sustainable DSS technology development/ training to implementing agencies

Purpose-driven studies of river basins using HP data, addressing SW issues relevant to implementing agencies

Page 9: Hydrology Project II Central Water and Power Research Station Pune.

CWPRS-Component of Hydrology Project IICWPRS-Component of Hydrology Project II

No.No. CategoryCategory AmountAmount

(Rs million)(Rs million)PercentaPercenta

gege

11 WorksWorks 0.970.97 2.632.63

22 GoodsGoods 15.8715.87 42.9142.91

33 TrainingTraining 8.578.57 23.1823.18

44 ConsultancyConsultancy 2.902.90 7.847.84

55 StaffStaff 5.165.16 13.9513.95

66 O&MO&M 3.513.51 9.499.49

TotalTotal 36.98 100.00

Amount: Rs 36.98 million

Page 10: Hydrology Project II Central Water and Power Research Station Pune.

Purpose Driven Studies

Type of studies proposed for identified river Type of studies proposed for identified river basinsbasins

Water availabilityWater availability Drought and floodsDrought and floods Ungauged basins Ungauged basins Studies will have linkage through IWRMStudies will have linkage through IWRM

for development/ planning of available for development/ planning of available

water resourceswater resources

Page 11: Hydrology Project II Central Water and Power Research Station Pune.

DSS StudiesDSS Studies

Customising DSS for specific basins of Customising DSS for specific basins of implementing agencies (Maharashtra, implementing agencies (Maharashtra, Gujarat, etc.)Gujarat, etc.)

Page 12: Hydrology Project II Central Water and Power Research Station Pune.

Purpose Driven StudiesActivity/ Description 2006 2007 2008 2009 2010 2011 2012

Discussions with StatesDiscussions with States **

Identification of Identification of purpose driven Studiespurpose driven Studies ** **

For selected basin(s): For selected basin(s): Finalising scope/ Finalising scope/ methodology/ methodology/ responsibilityresponsibility

** **

Identification and Identification and procurement of data/ procurement of data/

Machinery & Machinery & Equipment Equipment

** ** ** ** ** ** ** **

Participation in training Participation in training programs/ workshop/ programs/ workshop/ Symposia/ meetings/ Symposia/ meetings/ conferencesconferences

** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **

Page 13: Hydrology Project II Central Water and Power Research Station Pune.

Purpose Driven StudiesActivity/ DescriptionActivity/ Description 20062006 20072007 20082008 20092009 20102010 20112011 20122012

Field experiments/ Field experiments/ analysis/ model analysis/ model development/ test development/ test runsruns

** ** ** ** ** ** ** **

Test & Validation Test & Validation runs/ submission of runs/ submission of interim reportinterim report

** ** ** ** ** ** ** **

Model use/ Model use/ recommendations/ recommendations/ submission of final submission of final reportreport

** ** ** **

Preparation and Preparation and submission of submission of Completion ReportCompletion Report

** **

Page 14: Hydrology Project II Central Water and Power Research Station Pune.

Budget Allocation - 2006-07

External SupportExternal Support :: Rs 4 millionRs 4 million

Domestic SupportDomestic Support :: Rs 1 millionRs 1 million

TotalTotal :: Rs 5 millionRs 5 million

Page 15: Hydrology Project II Central Water and Power Research Station Pune.

Procurement Plan for first 18 monthsDescriptionDescription Estimated cost Estimated cost

(Rs million)(Rs million)

1 (A). Software & data acquisition1 (A). Software & data acquisition (B). Equipment (as required for (B). Equipment (as required for

purpose-driven studiespurpose-driven studies

0.230.230.280.28

2. Audio-visual 2. Audio-visual 0.210.21

3. Office equipment3. Office equipment 0.710.71

4. Training equipment4. Training equipment 0.180.18

5. Wagon/Van5. Wagon/Van 0.720.72

6. Supplementary training on 6. Supplementary training on domain softwaredomain software

1.281.28

Total Total 3.613.61

Page 16: Hydrology Project II Central Water and Power Research Station Pune.