WHAT WE LEARNED
Value in Early Communication with Stakeholder Groups
Spend Time to Choose the Right Team
Do Not Hesitate to Innovate
Page 3
3DOC ID© Chevron 2005
BACKGROUND
Retail Location Since 1920’s
Chevron Retail Outlet Since 1950’s
Currently Four 46,000L Fiberglass USTs
Maintenance Upgrade Work in the 1990’s
Early Investigation Work in Late 1990’s
On Site Source Removal in Late 1990’s
Page 4
4DOC ID© Chevron 2005
PROJECT GOALS
Ensure Safety of All Receptors
Manage Contamination Issue and Liabilities
Obtain CoC for Off-Site Stakeholders
How to Obtain These Goals:
Define and Delineate Hydrocarbon Plume
Abate Further Migration
Remove Existing Contamination
Retain Future Lingering Contamination to Site
Execute Monitoring Strategy
Page 5
5DOC ID© Chevron 2005
SITE CHARACTERIZATION
Keystone Environmental Conducts Detailed Site Investigation
62 Boreholes Advanced On and Off-Site
Analyzed > 400 Soil samples for Hydrocarbon Indicators
Analyzed > 500 Ground Water Samples for Hydrocarbon Indicators
Developed Detailed Conceptual Site Model
Conducted Indoor Air Quality Monitoring
Regular Liaison with Stakeholders (i.e. Residents, Local and Provincial Governments)
Page 6
6DOC ID© Chevron 2005
SITE LAYOUT
Work Area
Page 7
7DOC ID© Chevron 2005
INVESTIGATED AREAS
Soil Data
Page 8
8DOC ID© Chevron 2005
INVESTIGATED AREAS
Groundwater Data
Page 9
9DOC ID© Chevron 2005
SOIL AND GROUNDWATER PLUME
Page 10
10DOC ID© Chevron 2005
PROJECT PLANNING
Evaluate Remedial Options
Series of Options Developed
Economic Evaluation of Options
Select Remedial Option
Agreement with Stakeholders, Internal and External
Assemble Project Team
Coordinate with Municipality, Utilities, Residents and Neighbours
Page 11
11DOC ID© Chevron 2005
REMEDIATION
Underpinning and Shoring
Piles and grade beams installed on 4 homes
One home demolished
Excavation
Removed all backyard improvements
Removed soil from backyards and under homes
Barrier Wall Installation
45m by 5.5m organic reactive barrier wall installed on retail station property line
Page 12
12DOC ID© Chevron 2005
UNDERPINNING AND SHORING
Page 13
13DOC ID© Chevron 2005
UNDERPINNING AND SHORING
Page 14
14DOC ID© Chevron 2005
UNDERPINNING AND SHORING
Page 15
15DOC ID© Chevron 2005
UNDERPINNING AND SHORING
Page 16
16DOC ID© Chevron 2005
UNDERPINNING AND SHORING
Page 17
17DOC ID© Chevron 2005
UNDERPINNING AND SHORING
Page 18
18DOC ID© Chevron 2005
EXCAVATION LIMITS
Page 19
19DOC ID© Chevron 2005
EXCAVATION
Page 20
20DOC ID© Chevron 2005
EXCAVATION
Page 21
21DOC ID© Chevron 2005
EXCAVATION
Page 22
22DOC ID© Chevron 2005
EXCAVATION
Page 23
23DOC ID© Chevron 2005
EXCAVATION
Page 24
24DOC ID© Chevron 2005
EXCAVATION
Page 25
25DOC ID© Chevron 2005
EXCAVATION
Page 26
26DOC ID© Chevron 2005
EXCAVATION
Page 27
27DOC ID© Chevron 2005
BARRIER WALL DESIGN
Page 28
28DOC ID© Chevron 2005
BARRIER WALL MODEL
Page 29
29DOC ID© Chevron 2005
BARRIER WALL INSTALLATION
Page 30
30DOC ID© Chevron 2005
BARRIER WALL INSTALLATION
Page 31
31DOC ID© Chevron 2005
BARRIER WALL INSTALLATION
Page 32
32DOC ID© Chevron 2005
BARRIER WALL INSTALLATION
Page 33
33DOC ID© Chevron 2005
BARRIER WALL INSTALLATION
Page 34
34DOC ID© Chevron 2005
POST REMEDIATION ACTIVITIES
Install Post Remediation Confirmatory Wells
Reinstate Structures (eg. floor slabs)
Reinstate Rear Yards, Fences, Garages
Reconnect Utilities
Performance Monitoring of Barrier Wall
Preparing Closure Reports for Certificates of Compliance on Off-Site Properties
Page 35
35DOC ID© Chevron 2005
PROJECT PARTICIPANTS
Chevron Canada Limited (Environment, Public and Government Affairs, Legal, and Engineering)
Keystone Environmental Ltd. (Environmental and Contract Administrator)
Hazco Environmental Services Ltd. (Remediation Contractor)
City of Burnaby (Engineering, Planning, Traffic)
GeoPacific Consultant Ltd. (Geotechnical)
Sommerset Engineering Group (Structural)
PLUS several other sub-contractors
Page 36
36DOC ID© Chevron 2005
CONCLUDING REMARK
Treat project as an investment, not an expense
Page 37
37DOC ID© Chevron 2005