Top Banner
1 Hydel Bullet - June 2015
48

Hydel Bullet - June 2015 - KSEBEA

Apr 21, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hydel Bullet - June 2015 - KSEBEA

1

Hydel Bullet - June 2015

Page 2: Hydel Bullet - June 2015 - KSEBEA

2

Hydel Bullet - June 2015

Page 3: Hydel Bullet - June 2015 - KSEBEA

3

Hydel Bullet - June 2015

KSEB Engineers’ Association

Office Bearers - 2015 - 16

ASSOCIATION

President

Er.E.Mohammed Shereef

Vice-President (S)

Er. K. Radhakrishnakumar

Vice-President (N)

Er. N.T. Job

General Secretary

Er. George Mathew

Treasurer

Er.K.Mukesh kumar

Organising Secretaries

Er. C.V. Premraj (North)

Er. M. Muhammad Rafi (South)

Secretaries

Er. G. Shajkumar (HQ)

Er. Syed Ali T. (South)

Er.V.Suresh (North)

BENEVOLENT FUND

Chairman

Er. P. Jayakrishnan

Vice Chairperson

Er. D.S. Rajesh

Secretary

Er. K.R. Rajesh

Treasurer

Er. William Vinayan Raj

Joint Secretaries

Er. V.Anil

Er. P.C. Salil

EDITORIAL BOARD

Chief Editor

Er. P. Muraly

Associate Editor

Er. Cherian P. Thomas

Er. Kunjunni P.S.

Ex. Officio Members

Er. V. Ranjit Kumar

Er. G. Shaj Kumar

Hydel Bullet(A Monthly Publication of the KSEB Engineers’ Association)

Vol - 3 Issue - 6 June 2015

Contents

Ø Editorial

Ø Pumped Storage Scheme

Er. Shine Sebastian

Ø hymI-cW ]T\wEr. C.-Fw. \ko¿

Ø tZ t]mbn Zm h∂p KpcpPn

Ø amKn Hm¿Ωn-°p-∂Xv Er. cmP≥ hn.

Ø A\-iz-c-amb BflmhvEr. bp.-F-kv. cho-µ≥

Ø A—≥ acn-®q, Ign-™-cm-hn¬ Er. sI. KwKm-[-c-Ip-dp∏v

Ø Board Orders

Ø Unit News

Ø Farewell

Page 4: Hydel Bullet - June 2015 - KSEBEA

4

Hydel Bullet - June 2015

The circumstances that warranted the

sudden formation of these two posts needs

to be looked into seriously by one and all. It

definitely points to some hidden agenda

behind the whole episode. Whereas the real

need for creation of posts exists at the lower

echelons, the management is seen giving a

blind eye towards such requirements. The

management should introspect as to whether

the post of new Chief Engineers are more a

necessity than the lower level employees

who are supposed to carryout the execution

of such time bound projects like RAPDRP,

DDUGVY, IPDS etc.

KSEBL being a big organisation with

around 28000 employees, a Chief Engineer

for HRM is more essential than that for APTS.

The Chief Engineer (HRM) is the appointing

authority and disciplinary authority for the

staff and officers upto the level of Assistant

Executive Engineers. The transfer and posting

is not the only function of HRM. It plays an

important role to manage the employees to

work effectively, creatively, and productively

by arranging regular training programmes at

various levels. To build a good team of

employees in any organisation, a good

Human Resources Management (HRM) is a

must. The HRM of a company has significant

impact on the individual as well as the

organizational effectiveness. An effective

HRM is focused on strategic objectives and

works for achieving the organisational goals.

Any organisation, without a proper setup for

HRM suffers from serious problems while

managing its regular activities. Today,

organizations put in a lot of effort and energy

into setting up a strong and effective HRM

The impulsive upgradation and

downgradation of posts without any benefits

either to the employees or the organisation

needs to be relooked by the management.

Upgrading and downgrading of various posts

depending on the persons who are due to be

appointed to such posts is not a healthy

practice for any organisation. It shall never

be person specific but should instead be

based on the organisational interest

considering the volume and responsibility of

the assignment of that post. What additional

responsibility has been given to CE, APTS

consequent of its upgradation? The

management should reveal the same. It is

known to everyone the complexity of

procedures and time taken in connection with

the upgradation of AE to AEE places that too

without any monetary benefit. It took almost

3 years for the same to materialise. But now

it is seen that rampant upgradation of posts is

being carried out at various levels by the

management without due diligence. In these

circumstances, we demand the Board to

reinstate the post of the Chief Engineer (HRM)

and keep away from arbitrary upgradation and

down gradation of posts and to resort to

upgradation where there are real tangible

benefits for the organisation.

¯

Page 5: Hydel Bullet - June 2015 - KSEBEA

5

Hydel Bullet - June 2015

I learned about this scheme only after joining

KSEB. It was an eye opener because here

energy saving is indirect-in the way it can be

used for managing our peak demand and load

curve smoothning. We all know about the

pumping schemes of Sengulam and Idukki

and now we are talking on PSS. The first

official facility was opened in 1909 in

Schlaffhausen, Switzerland with a capacity of

1500 kW which has separate pump and

turbine.In India to fulfill the peak hour

demand of electricity and due to increasing

imbalance of thermal: hydel mix, need for

developing pumped storage schemes was

realized as earlyas in 1960. In India first

pumped storage plant was built at

Nagarjunasagar in Andhra Pradesh in the year

1970 with an installed capacity of 700 MW.

Since then, 11 pumped storage plants having

3604 MW total capacity have been successfully

constructed in India, which includes

Srisailam(900 MW), Purulia(900 MW),

Kadampani(400 MW), Ghatghar (250 MW),

Kadana(240 MW), Bhira(150 MW) Pumped

Storage Projects and 1200 MW Sardar Sarovar

and 1000 MW Tehri Pumped Storage Plants

are under construction. CEA studies says

KERALA has potential of 4000 MW??!!So with

these schemes we will be able to run

Kayamkulam and use the excess power for

pumping in during off PEAK instead of paying

running cost? This will give us an edge to

operate our steam turbines and to meet the

peak load. Now we will see where the we

have potential. The Anairankal and Ponmudi

has no direct power project except

KuthungalPH. We have seen ponmudi will be

spilled during Monsoon where as anairakal

will be still droughted and will be full during

North east monsoon. So if we have an option

to pump it(roughly400m) towards anairankal

then we can save some spill water during

Monsoon. This water can be used in the

desired season and can be utilized till

Bhoothathankettu after utilizing it in

panniar,Neriamangalam and LP. During off

season we can use this scheme as Pumped

storage for meeting Peak Demand. The same

can be envisaged at Kundala Madupetty

(120m) and Thariode-Kakayam(20m).

As opposed to thermal power

stations, pumped storage power plants are

able to react in the shortest possible time to

network fluctuations, by generating or by

absorbing any excess. Wind and solar power

plants are subject to strong natural

fluctuations. They cannot always provide

electricity in the required amounts or at the

desired time. Excess energy thus needs to be

stored so that it can be made available at any

time. With the current state of technology,

there is only one possibility for achieving this

in an economically viable, large-scale way. As

Pumped Storage Projects do not require a

large Reservoir as compared to the

Conventional Hydropower Projects, the

suitable sites can be identified at various

PUMPED

STORAGE SCHEME

Shine Sebastian AE Chimmony

Ü

Page 6: Hydel Bullet - June 2015 - KSEBEA

6

Hydel Bullet - June 2015

Er. C.-Fw. \ko¿, Nnd-bn≥Iogv

locations where a reasonably Small

Reservoirs can be constructed at different

elevations. Pumped Storage Projects shall

require Small Storage for 6 to 8 hrs. to

generate power during peak demand period

and the water can be recirculated to the upper

reservoir by pumping from the lower

reservoir during off peak hours. Also, due to

small reservoirs, such Projects will not have

much Rehabilitation and Resettlement

problems, which is a big problematic issue in

conventional hydropower projects.

Remember we have dams already in the

above mentioned regions but missing a

project which is nothing but Pumped sotrage

scheme. PS: Water resource management

software is necessary to run our system with

desired efficiency.

¯

ae-bmfw hymI-cW ¢m n¬ hn]-coX ]Z-߃°v sX‰p-

Øcw ]d™ hnZym¿∞nsb A≤ym-]-I≥ Ifn-bm°n Bt£-

]n-®p. a‰p tNmZy-ß-fn-eqsS hnZym¿∞n A≤ym-]-Is‚ Adn-

hns\ tNmZyw sNbvXXn-ß-s\.

hnZym¿∞n : "AwK-\-hmSn-'bpsS hn]-coX-]Zw kmdn\v

]d-bmtam ?

A≤ym-]-I≥ : AsXmcp ÿm]-\-Øns‚ t]cmWv. AXn\v hn]-co-X-]-Z-an√.

hnZym¿∞n : DØcw Rm≥ ]d-bmw, ""Cßs\ t]mSm''-

IÆp-an-gn-®p-t]mb A≤ym-]-I-t\mSv hnZym¿∞n-bpsS ASpØ tNmZyw :

"hmSm-a-√n-'bpsS hn]-co-X-]Zw F¥mWv km¿ ?

A≤ym-]-I≥ : AsXmcp ]pjv]-Øns‚ t]cm-b-Xn-\m¬ hn]-co-X-]-Z-an-√.

hnZym¿∞n : ""t]mSma√m''-bmWv km¿ DØcw.

¯

hymI-c-W -]-T\w

\¿Ωw

Page 7: Hydel Bullet - June 2015 - KSEBEA

7

Hydel Bullet - June 2015

ae-bmf kn\n -am -tem-IsØ ]ikvXXmcw Sn. -hn.Nm\-en¬ Ah-X-cn-∏n-°p∂tImSo-iz-c≥ ]cn-]mSn hoSp-I-fn¬ Sn.-hn.-bp≈\msa√mw Hcn-°-se-¶nepw I≠n-cn-°pw. Cu]cn-]mSn \S-°p-tºmƒ CS-thf ]Jym-]n-°p∂ coXn tZ t]mbn, Zm h∂pî F∂vtIƒ°mw.

sI.-F-kv.-C.-_n. enan-‰-Unse ÿew-am‰\S-]-Sn-Iƒ ImWp-tºmgpw ìtZ t]mbn, Zmh∂pî F∂ ÿnXn-bmWv ImWp-∂-Xv. 5h¿jtam AXn-e-[n-Itam kztZ-iØv tPmensNbvX-h-sc-bmWv ]pd-tØ-°p≈ ÿewam‰-Øn\v hnt[-b-cm-°m≥ ]´n-I-bn-epƒs∏-Sp-Øp-∂-Xv. ]pd-Øp-\n∂v kztZ-i-tØ°v Xncn-s®-Øm-\p-≈-h-cpsS shº¬ kzm-`m-hnIwamXw.

]t£ kztZ-i-Øn\p ]pdØv t]mIp-∂-Xn-\p≈ DØ-c-hns‚ XnøXn apX¬ Bdvamkw Ign-™m¬ XncnsI ÿewam‰-Øn\vAt]-£n-°m≥ A¿l-X-bm-Ip∂p F∂Xvÿm]-\-Øn\v A`n-Im-aytam? Hcp Sm≥kv^¿ DØ-c-hn-dßn kztZ-i-Øp \n∂v as‰mcpÿetØ°v t]mtI≠hsc hnSp -X¬sNøm≥ Hmtcm F.-B¿.-bp.-hnepw FX-amXw Xmakw hcp∂p F∂v i≤n-®n-´pt≠m? CXv ]e-t∏mgpw sshIp-∂-Xn-\m¬Sm≥kv ¿aqew hnSp-X¬ In´n ]pXnb ÿe-tØ°v FØp-∂-h¿ Npcp-ßnb ka-b-Øn-\p-≈n¬ Xncn-®p≈ Sm≥kv -dn\v At]-£n-°p-∂p. ^etam? ]pd-tØ-°p≈ Sm≥kv^-dn¬ Dƒs∏-Spw F∂v tXm∂p-tºmƒ Xs∂X¬k-abw tPmen sNøp∂ Hm^o-knseNpa-X-e-Iƒ \n¿∆-ln-°p-∂Xv H∂v ]Xp-s°-bm-Ipw. C\n ]pd-Øp≈ ÿe-sØØn Xncn-®p-h-cm-\p≈ At]£ sImSp-°m≥ A¿l-X-bp-s≠-¶ntem? ]pd-Øp≈ ÿe-Øp≈

tZ t]mbn,

Hm^o-knse ]Wnbpw XssYh! Cßns\Atßm-´p-an-tßm´pw \n›nX Ime-b-f-hn-√msX ÿewam‰w sImSpØv DØ-c-hn-d-ßp-∂Xv DØ-c-hn-d-°p-∂-Xn-\p-apºv cq]o-I-cn®t\map-Iƒ F√mw Im‰n¬ ]d-Øm≥ th≠namXtam?

kpXm-cy-X-sb-°p-dn®v tLmc-tLmcwhmtXm-cmsX ]kw-K-߃ \ap-s°√mwtIƒ°mw. ]t£ Sm≥kv^-dns‚ Imcywhcp-tºmƒ Cß-s\tbm kpXm-cyX F∂vkwibw tXm∂n-t∏m-Ipw. kztZ-iØp \n∂v]pd-tØ°v am‰-s∏-Sm≥ km≤y-X-bp-≈-h-cpsS]´nI F√m Pn√-Iƒ°pw F√m XkvXn-I-I-fn¬s∏´-h-cp-sSbpw t]cp-Iƒ P\-d¬Sm≥kv ¿ ]Jym-]-\-tØm-sSm∏w ]kn-≤o-I-cn-°-Ww. ]pd-Øp-\n∂v kztZ-i-tØ°vXncn-®p-h-cm-\p≈ At]£ ka¿∏n-°m≥A¿lX t\S-W-sa-¶n¬ ]pd-Øp≈ tÃj-\n¬ dnt∏m¿´v sNbvX XobXn apX¬ Hcph¿j-sa-¶nepw ]q¿Øo-I-cn-®n-cn-°-Ww F∂hyhÿ \ne-hn¬ hc-Ww. P\-d¬ Sm≥kv^¿ ]Jym -]n -®p -I -gn -™m¬ AXns‚Sm≥kv^¿ DØ-c-hp-Iƒ (Hmtcm XkvXn-I-bp-sSbpw) Cd-°p-∂Xp hsc-sb-¶nepw CS-X-S-hn-√msX sNdp Sm≥kv^¿ Hm¿U-dp-IƒCd-°-cpX.v CXn\v P\-d¬ Sm≥kv ¿ ]Jym-]-\-Øn\pw DØ-c-hp-Iƒ°pw CS-bnse Ime-Xm-akw Ipd-bv°-Ww. P\-d¬ Sm≥kv^¿DØ-c-hn-\p-tijw hnc-an-°¬aqew Hgn-hp-h-cp∂ XkvXn-I-I-fn -te°v ]tam-j≥hgntbm ]pXnb \nb-a\w hgntbm t]mÃnwKv\SØ-Ww. CXn\v ]tam-j\v A¿l-X-s∏-´-h-cpsS enÃpw, ]n.-F-kv.-kn. hgn-bp≈ enÃpwbYm-hn[n kq£n-t°≠-n-bn-cn-°p-∂p. Xß-fpsS kwL-S-\-bn¬s∏-´-h¿°v hoSn-\-Sp-tØ°v Sm≥kv^¿ hmßn-s°m-Sp-°m≥

Kpcp-PnZm h∂p

Page 8: Hydel Bullet - June 2015 - KSEBEA

8

Hydel Bullet - June 2015

X߃ hnNm-cn-®m¬ Ft∏mƒ thW-sa-¶nepw km[n°pw F∂ ktµiw AwK-߃°p \¬Ip∂ kwL-S-\-IƒSm≥kv ¿]Inb-bnse \S-]Sn Ia-߃ k¶o¿Æ-am-°m\pw AXp-aqew ÿm]-\-Øn\v A]-cn-lm-cyamb \jvS-ap≠m-°m\pw ]h¿Øn-°p-∂-h-cm-Wv. Sm≥kv^¿ t\map-Iƒ N¿®-I-fn-eqsS Xocp-am-\n-°-s∏-´m¬ Ah Im‰n¬ ]d-ØmsX ]men-°-s∏-Sp-∂p-sh∂v A[n-Im-cn-Ifpw kwL-S-\-Ifpw Htc t]mse i≤n-°-Ww. 2015˛se Sm≥kv^¿ DØ-c-hp-Iƒ]Imcw kztZ-i-tØ°v Sm≥kv^¿ t\Sn-b-hsc ta¬ ]cn-jv°m-c-߃ hcpØn ap≈n¬\ndp-tØ≠-Xn-√. \ne-hn¬ tPmen sNøp∂Hm^o-kn¬ \n∂v 40 Intemao-‰-dn-e-[n-I-sa-¶nepw Zqc-tØ°v am‰-s∏-Sp-∂Xv As√-¶n¬P\-td-‰nwKv tÃj-\n-te°v am‰-s∏-Sp-∂Xv P\-d¬ Sm≥kv^-dmbn IW-°m-°-s∏-S-Ww. 40Intem-ao-‰-dnepw Ipd™ Zqc-tØ°v ka-Xe

]tZ-i-ß-fn-te-°m-sW-¶n¬ P\-d¬ Sm≥kv^¿ A√. (Pn√ amdn-bmepw Cs√-¶n-epw)

Sm≥kv^¿ DØ-c-hn-d-ßn-bm¬ Hcpamk-Øn-\Iw hnSp-X¬ sNøm≥ F.-B¿.-bp.ta[m-hn°v A[n-Imcw D≠m-bn-cn-°-Ww.Ct∏mƒ Cd-°p-∂-Xp-t]mse DØ-c-hn-d-°pI,d±m-°pI, ho≠pw Xncp-ج hcp-ØpIXpS-ßnb \mS-I-߃ aqew A[n-Im-cn-IfpwkΩ¿± X¥-߃ D]-tbm-Kn-°p∂ kwL-S-\-Ifpw A]-lm-ky-cm-Ip-I-bm-Wv. CXmsWm]^-j-W-en-kw?

At©m AXn-e-[n-Itam h¿jw kztZ-i-Øv tPmen sNbvXn´v as‰m-cn-S-tØ°vSm≥kv^-dn¬ t]mb hy‡n Hcp h¿j-Øn-\Iw Xncn®v kztZ-iØv FØn ìtZ t]mbnZm h∂pî F∂ Xc-Øn¬ Imcy-߃ C\n-sb-¶nepw XpS-cmsX A[n-Im-cn-Iƒ i≤n-°-Ww.

¯

"amKn'

A©m-dp-h¿jw apt∂ ChnsS \ap-s°mcpsIm°tImf kacw D≠m-bn-cp -∂-t√m.BZyw \Ωƒ Xs∂ £Wn®v hcp-ØnbIº\n ]q´n-°m-\m-bn-cp∂p kacw. AXv]ns∂ arZp ]m\o-b-߃ Xs∂ \ntcm-[n-°-W-sa-∂p-ff Xe-Øn-te°v amdn, am‰n. CXn-s‚-sbms° ]pd-In¬ \Ωƒ sIm≠p\S-°p∂ Hcp I]S IpØI Iº\n hntcm-[sØ Nne Xev]c I£n-Iƒ Ah-cpsSCjvSm-\n-jvS-߃°v A\p-cq-]-ambn ]tbm-P-\-s∏-Sp-Øp-∂-Xp-sIm-≠mWv C∂v \Ωƒ

D]-tbm-Kn-°p∂ cmhnse ]√v tXbv°m≥FSp-°p∂ t]Ãv apX¬ GXm-s≠√m km[-\-ßfpw _lp-cm-jvS-Ip-Ø-I-I-fpsSXmWv,AsX kabw \Ω-sf√mw IpØI Iº\nhntcm-[n-I-fp-am-Wv. Aßs\ tImf Iº-\n-bpsS ap∂n¬ F√m ]m¿´n-Ifpw kwL-S-\-Ifpw a’-cn®v kacw XpSßn; Iq´-Øn¬\m´p-Im-cpsS P\-]£ ka-c-ßfpw a‰v ÿe-ß-fn¬ Cu Dev]-∂-߃, Iº-\n-bpsStKmUu-Wn¬ \n∂pw h≠n-I-fn¬ \n∂pwbph-P\ kwL-S-\-Iƒ s]´n-°-W-°n\vtdmUn-te°pw IS-en-te°pw hsc, HcparKobm\µ-tØmsS hen-s®-dn-bp∂ ImgvN-Iƒ \Ωƒ Nm\-ep-I-fn¬ I≠v kmbqPyaS-bp-I-hsc sNbvX-XmWv. Ah-km\w Iº-\n-]q- n. CXn-\n-Sbv°v Nne kzImcy em_p-IƒCu ]m\obw \√ IoS-\m-in\n BsW∂vI≠v ]nSn-®p-. am-≤y-a-߃ AtX‰p ]nSn-®p,]ns∂ AXmbn N¿®m hnjbw. Ah-km\wKh¨sa‚ v Hcp hIp-∏ns\ h®v Iº-\n°v

Er. cmP≥ hn. DyCE (Rtd.)

Hm¿Ωn-°p-∂Xv

Page 9: Hydel Bullet - June 2015 - KSEBEA

9

Hydel Bullet - June 2015

Np‰p-h-´-Øp-ff Bfp-Iƒ°v \jvS-]-cn-lmcw\evI-W-sa∂ Hcp dnt∏m¿´v kwL-Sn-∏n-®p.Imiv In´p∂ Imcy-am-bXpsIm≠v \m´p-Im¿henb kt¥m-j-Øn-ep-ambn. Aßs\kwÿm\ k¿°m¿ tIµ-Øn¬ dnt∏m¿´vka¿∏n-®p. ]ns∂m∂pw \S-∂n-√. ]t£Cu Ime-L´- Øn-\n-Sbv°v tImf Dev]-∂-߃ ]q¿∆m-[nIw i‡n-tbmsS Itºm-f-Øn¬ Xncn®v h∂p. Ct∏mƒ kwÿm-\ØvFhnsS t\m°n-bmepw Cu Dev]-∂-߃ImWmw. FXn¿Ø I£n-I-fpsS ao‰nw-Kp-I-fn¬t∏mepw Cu Iº-\n-bpsS IpSn-sh-f-f-amWv \evIp-∂Xv. \ΩpsS Ip´n-I-fpsShnhml kZy°v t]mepw Ip∏n-sh-f-f-amWv\evIp-∂-Xv. \m´n¬ In´p∂ Hcp shf-fhpwIpSn-°m≥ sImf-fn-s√-∂mWv Xev]c I£n-Iƒ ]d-bp-∂-Xv.

CXpI-gn -™-t∏m -gmWv `£-W-Ønse amb-sa∂ Hcp Imcyw \ΩpsSXev]c I£n-IfpsS i≤-bn¬ h∂-Xv.AXns‚ BZy Cc- j-h¿Ω Bbn-cp-∂p.]ns∂ Ipsd Znhkw \Ωƒ Al-a-lanlbmAXns‚ ]pdsI t]mbn. aq∂v \mep ac-Wßfpw AXns‚ t]cn¬ Nm¿Øn. BZy-_-lfsams° Ign -™-t∏mƒ j-h¿ΩCt∏mgpw \ΩpsS IqsSbp≠v. B Iq -Øn¬sI.-F- v.-kn.,]nk, ] vkv, _¿K¿ Aßs\]e ]pXp-X-e-apd Blm-c-ßfpw \ΩpsS\nXy Pohn-X-Øns‚ `mK-ambn. Aßs\a’c _p≤n-tbmsS \Ωƒ AsXms° ]I-S-\m-fl-I-ambn hmßn- I-gn-°m\pw XpS-ßn.\ΩpsS Ip´n-Iƒ CsXms° amXsa Ign-°q-sb-∂v, Fs‚ Ip´n°v Cw•osj Adnbpae-bmfw Adn-bn-√m-sb∂v ]d-bp-∂-Xp-t]mse, hfsc A`n-am-\tØmsS \ΩƒthZn-t]mepw i≤n-°msX ]d-bm-dp-ap-≠v.

CXphsc ]-d™ Imcy-ß-fn¬ amKn\yqUn-en-s\-°p-dn®v H∂pw ]d-™n-√m-sb∂v[cn-°-cp-Xv, AXv hni-Z-ambn ]d-bm≥ am‰nh®n-cn-°p-I-bm-Wv. c≠mgvNbv°p ap-s∂-

bmWv Hcp amKn hntcm[w BIm-iØv\n∂pw s]m´n-ho-W-t]mse \ΩpsS ap∂n¬FØn-b-Xv. At∏mƒ t\csØ ]d-™-X-ev]c I£n-Iƒ kS-IpSs™gp-t∂‰v_lfw D≠m-°m≥ XpS-ßn. k¿°m-cp-Iƒsskzcw In´m≥ \ntcm-[-\hpw G¿s∏-Sp-Øn.Ct∏mƒ ]d-bp-∂Xv AXn¬ Cuøhpw APn-s\-mtam-t´mbpw hfsc IqSp-X-em-sW-∂m-Wv.AXn\v Dt_m-ev_-e-I-amb ]cn-tim-[\dnt∏m¿´p-Iƒ ]e coXn-bn-em-Wv. CuøwCu Dev]-∂-Øns‚ Dev]m-Z\ ]In-b-bn¬Hcn-SØpw D]-tbm-Kn-°p-∂n-√. (tIm-f-bpsSImcy-Ønepw Cu ]iv\w D≠m-bn-cp-∂p)At∏mƒ CsX-ßs\ hcp-∂p-sb∂s√BZyw At\z-jn-t°-≠-Xv. APns\tams´m-sb∂v ]d-bp -∂Xv ssN\okv D∏m-Wv.AXns‚ IqsS Nne aW-ap-f-fXpw \nd-ap-f-f-Xp-amb tNcp-h-I-Iƒ amX-am-Wp-f-f-Xv.CsXms° Btcm-Ky-Øn\v lm\n-I-c-am-sW∂v hniz-k-\o-b-amb Hcp dnt∏m¿´v CXvhsc e`y-a-√. Cu kml-N-cy-Øn¬ \ΩpsStImf-t]mse CXpw DS-s\-Xs∂ Xncn®vhcpw. kaq-l-Øn\v Bh-iy-ap-ff, Xmev]-cy-ap-ff Dev]-∂-߃ Itºm-f-Øn¬ Ft∏mgpwD≠m-Ipw, AXv Itºm-f-Øns‚ ]tXy-I-X.

Cu ]pXp Xe-apd `£W Dev]∂߃ F¥psIm≠v ChnsS hfsc s]s´∂vhenb AwKo-Imcw In´p-∂p-sb-∂-XmWv\Ωƒ At\z-jn-t°-≠-Xv. At∏mƒ NneA]nb kXy-߃ \Ωƒ i≤n-°-Ww. Chn-Sn-t∏mƒ hy‡n-kzm-X-¥yhpw enwK ka-Xz-hp-sams° \S-∏n-em-b-t∏mƒ DØ-c-hm-Zn-Xz-ßfpw _m≤y-X-Ifpw Gs‰-Sp-°p-hm\pw \nd-th-‰m\pw Bcpw Xøm-d-√. F√m-t]¿°pwASn®v s]mfn®v Pohn-°-Ww, _m°n-bp-ffka-bØv ‰n.-hn. I≠n-cn-°-Ww. At∏mƒASp-°f ]q´n tlm´¬ `£-WsØ Bi-bn-s® -a-Xn-bm-Iq, Iq´-Øn¬ ^mÃv ^pUvkzoI-cn-°-epw, B ]gp-Xn¬ IqSn-bmWv

Page 10: Hydel Bullet - June 2015 - KSEBEA

10

Hydel Bullet - June 2015

A—≥ acn®q, Ign-™-cm-hn¬Er. sI. KwKm-[-cIpdp∏v (Rtd.)

t\csØ ]d™ coXn-bn-ep-ff Ffp∏ £-W-߃ \ΩpsS ap∂n¬ FØp-∂-Xv .Ip´n-Iƒ Cu `£-W-Øn\v sNdp-]mbØnse ASn-a-I-fm-bm¬ ]ns∂ AXn¬\n∂pw c£-s∏-Sm≥ ]bm-k-am-Wv. AXp-sIm≠v hcpwXe-ap-d-bpsS Btcm-Ky-Øn¬Xmev]-cy-ap-ff c£m-I¿Øm-°ƒ Ipsd-°qSnDØ-c-hm-ZnXzw ImWn-°m-Øn-S-tØmfw Cuao\p-Iƒ \ΩpsS IqsS Xs∂ ImWpw.PohnXw apgp-h≥ BtLm-jn®v Pohn-°m≥B¿°pw km[n-°n-√, AXn\v hnth-I-ap-f-f-

h¿ ian-°p-I-bpw sNø-cpXv. Pohn-X-Øn¬Nne Imcy-߃ XyPn-°m\pw Nne-sXms°am‰n -h -bv°m-\p -sams° Xøm-dm -bmse\ΩpsS Ip´n-Ifpw hcpwXe-ap-dbpw c£-s∏Sq.am≤y-a-ßfpw a‰v Xev]-c-I-£n-Ifpw ]e-Xpw-]-d-bpw, Ah-c-h-cpsS \ne-\n¬∏ns‚]iv\w. \Ωƒ kz_p-≤n-bn-¬ Imcy-߃a\- n-em°n thWw Imcy-߃ sNøm≥.AX-s√-¶n¬ \in-°p-∂Xv \ΩpsS Ip´n-IfpwcmPy-hp-am-bn-cn-°pw.

¯

s]mffpw aW¬°m-´nekzÿ NnØ-\mbvsXm´-b¬]°-Øp- Iq-Sp-Iƒ Iq´n-tbm˛scms°bpw ]´n-Wn-∏m-h-ß-sf-¶nepwZpxJ-_m-jv]m-RvP-en-b¿∏n-®-\-¥-c˛I¿Ω-ß-sfm-s°bpw sNbvXp \n w-K-cmbvs]‰-\m-Sns‚ hntam-N\ bp≤-Øn˛e¿∞hpw Pohn-Xhpw _en-\¬In-tbm¿injvS-Imew \nXy-tcm-Km-Xp-c-cmbhrØm-¥-amcpw Xnc-™n-s√m-cn-°epwFXtbm kzmX-¥y- tk-\m-\n-Iƒ hoc˛arXyp-h-cn-®q-c-Wm-¶-W-Øn¬ tcmKKkvX-cm-tbm¿, [oc-tZ-im-`n-am-\n-Iƒ\njvI-an®p \nkz-cmbv \ncm-ew-_-cmbvZpxJ-ß-sfms°°Sn-®n-d-°p-tºmgpwD‰-h-cm-cp-an-s√-∂-dn-bp-sºmgpwh‰n-h-c-≠-an-gn-I-fm-se-∂ΩNp‰n\pw tXSn Xt∂m-a-\-∏p-Xs\A—≥ acn-®q- I-gn-™-cm-hn¬]⁄-b-‰n-f-t]m-ep-ap-d-ßn-°n-S-°th]pX≥,I-S-ep-Iƒ°-∏pdw PohnXkz]v\w sa\-bp-I-bm-bn-cp-∂-t∏mgpw

¯

IhnX

A—≥ acn®q Ign-™-cm-hn¬]⁄-b-‰nft]m-ep-ap-d-ßn-°n-S-°-th,H‰-bv°p-d-ßm-Xn-cp-∂Ω \n›-ew,sXm´-cn-I-Øm-sbmcp I¬]Xn-a-t]m¬

sR´n-Ø-cn-®n-s√m-cmfpw, ZnK-¥-߃s]m´p-am-dp-®-Øn-em¿Øp hnfn-®n√sI´n-∏n-Sn®p angn-\o¿Xp-S-bv°p-hm˛s\Øn-bn-√mcpw kam-izm-k-Zq-Xp-ambv

Ft∏m-tgm-h-‰n-h-c≠ angn-bn¬ \n˛∂n‰p-ho-Wo-e-ip-_n-µp-°-sf-¶nepwarXyp-hn≥ K‘w \nd-™p-\n-∂q- \mepZn°nepw Zo\w Nne®p Noho-Sp-IƒHØn-cn-t\cw Ign-™mWp amtem-I˛scØn-b-X,®p‰p-h-´-Øn-ep-f-f-h¿FXtbm h¿j-ß-fm-sb≥ P\-Is‚Xn‡m-\p-`q-Xn-I-fn¬ Ipfn¿tIm-cn-tbm¿thZ-\-tbm-Sp-hn-S-sNm√nb¥ym-`n˛hmZy-ß-f¿∏n-®-\-¥-X-X≥ L\˛iyma-\n-KqV K¿Ø-ß-fn-e¥ym-`n˛emj-߃ tXSp-sa≥ XmX-s\-°m-Wp-hm≥FØn-tbm-sc-√map]t`m-K-kw-kv-IrXnsXm´p-Xo-≠mØ Zcn-Z-\m-cm-b-W¿a°-fm-bm-cp-an-√o-b-¥y-bm-Xbv°pZrIrkm£n-bmbn lX-`m-Ky-\-s∏mgpwNp‰n-Øn-cn-bp-I-bm-bn-cp-∂p, Np´p

Page 11: Hydel Bullet - June 2015 - KSEBEA

11

Hydel Bullet - June 2015

Ü

(sabv -e-°-Øns‚ XpS¿®)

A—≥ Ip™m-bn -cp -∂-t∏mƒ A—s‚Ub-]¿ am‰n-bXv Rm\m-bn-cp∂p-''. c≠p hb- p-Im-c≥ kmw A—t\mSv ]d-bp-∂Xv tI v A—-\-Ω-am¿ A¤p-X-s∏- p. Ch≥ ]d-bp-∂-sX-¥mWv? XpS¿∂p-ff Znh-k-ß-fn¬ A—-\-Ω-am¿ aI≥kmans\ i≤n-°m≥ XpS-ßn. Ah¿°v tXm∂nXpSßn Cu c≠p hb- p-Im-c≥ kmw A∏q-∏s‚ ]p\¿ P∑-am-sW∂v. A—≥ tdm¨tNmZn®p "" kmw \o Fßs\ Xncn®p h∂p. ?kmw ]d™p"" Rm≥ A\-¥-X-bn-te-°p-ffbmX Ah-km-\n-∏n®v ]pXnb Xpd-ap-JØv Xncn-®p-h-∂p. '' kmw km[m-cW Ip™p-ß-sf-t∏m-se-bm-bn-cp-∂p. F¶nepw P\n®v 18 amkwIgn-™-t∏mƒ ]bm-k-ap-ff hm°p-Iƒ D]-tbm-Kn®v Zo¿L-amb hmN-I-߃ ]d-™n-cp-∂p. "" A\-¥Xbpw'' ""Xpd-ap-Jhpw''ho´n¬ km[m-cW D]-tbm-Kn-°mØ hm°p-I-fm-Wv. ktlm-Zco ktlm-Z-c-∑msc∏‰ntNmZn-®-t∏mƒ Ign™ P∑-Øn¬ kz¥wktlm-Zcn a’y-ambnt∏msb∂p ]d-™p.""F¥v a’y-am-bn-t∏m-sbt∂m''? AsXAhƒ sIm-√-s∏´p. km≥ ^m≥kn-kvtIm-bnse IS-∏p-dØp \n∂mWv Ah-fpsS arX-i-cocw e`n-®Xv'' kmw ]d-™p. kw`hw]am-Z-amb Hcp tIkm-bn-cp-∂p''. Fßn-s\-bmWv acn-®-sX∂v kman-\-d-nbmtam ? kmwXe-th-Z-\-bp-ff a´n¬ s\‰n-bpsS c≠p-h-iØpw ssIIƒ h®p. kmw P\n-°p-∂-Xn\vHcp h¿jw ap≥]v tdmWns‚ A—≥ akvXn-jvIm-LmXw aqew acn-®n-cp-∂p.

2) \mev hb- p-Im-c≥ dnbm≥ F√m Znh-khpw shfp-∏n\v c≠p aWn°v Ic-bp-am-bn-

A\-iz-c-amb Bflmhvbp.-F-kv. cho-µ≥ Rtd. EE.

cp-∂p. ""Fs∂ Fs‚ ho´n¬ sIm≠p-t]m-Ip. F\n-°n-hnsS Pohn-°m≥ km≤y-a-√.Fs‚ ]gb hoSv FX- \-∂m-bn-cp-∂p. AXvtlmfn-hp-Un-em-Wv. FX henb hoSv!AXn¬ kznΩnßv ]qfp-≠v. FX -a-t\m-lcw''.F√m Znh-k-ß-fnepw Ic-®n¬ XpS¿∂-t∏mƒ AΩ- \n≥kn°v ]cn-`-a-am-bn. HcpZnhkw \n≥kn sse_-dn-bn¬ \n∂pwtlmfn-hp-Unse ]e ]gb kn\naIfpsS ]S-ß-fp-ff Hcp B¬_w ho´n¬ sIm≠p-h-∂p.t]Pp-Iƒ adn-®p-sIm-≠n-cp-∂-t∏mƒ 1932 sess\‰v B^vS¿ ss\‰v F∂ kn\n-a-bnseko≥ h∂-t∏mƒ t]Pp adn-°p-∂Xv dnbm≥\n¿Øn. AXnse \Ss\ t\m°n ]d-™p."" AtΩ CXp- Rm-\mWv''. 1932 se ss\‰vB^vS¿ ss\‰nse \Ss‚ (am¿´n≥) aIsftXSn-∏n-Sn®v kwkm-cn-®-t∏mƒ dnbm≥ ]d™IY-I-sf√mw hmkvX-h-am-bn-cp∂p F∂v sXfn-™p. tUmIvS¿ ]d™p ""Ip´n°v am\-knIhn`m-¥n-I-sfm∂pw C√. ]gb P∑-ØnseIpSpw_w hn´v ]pXnb IpSpw-_-Øn-se-Ønbt∏mgp-≠mb hnjaw amXw.

3) _qkn-t‚bpw B¿kn-b-bp-sSbpw aI-\m-bn-cp∂p sPbnwkv, c≠p hb- p-]m-bw. HcpZnhkw cmXn sR´n Fgp-t∂-‰p. "" AtΩhnam-\-Øn\v A]-ISw, hnam-\-Øn\v Xo]n-Sn®p, AXnse ss]e-‰n\v ]pdØp IS-°m≥]‰p-∂n√.'' c≠mw temI alm-bp-≤-Im-eØvD]-tbm-Kn® bp≤-hn-am-\-ß-fpsS Nne `mK-ßsf∏‰n Hcp c≠p hb- p-Im-c≥ ]d-bp-tºmƒ amXm-]n-Xm-°ƒ A¤p-X-s∏-Sm-dp-≠v.]nc-`m-¥n-tbmsS BsW-¶nepw. X\n°v

Page 12: Hydel Bullet - June 2015 - KSEBEA

12

Hydel Bullet - June 2015

Ü

kΩm\w In´m-dp-ff tSmbv hnam-\-ß-fpsShnhn[ `mK-߃ sPbnwkv IrXy-ambn ]d-bpw. lnÃ-dn- Nm-\-ense c≠mw temIalm-bp-≤-sØ-∏-‰n-bp-ff ]e tUmIyp-sa‚-dn-IfpwImWp-tºmƒ Narator ]d-bp-∂-Xnse Ncn-X-]-c-amb sX‰p-Iƒ sPbnwkv Aß-s\-b√Cß-s\-bmWv F∂v Xncp-Øm-dp-≠v. c≠mwtemI alm-bp-≤-Im-eØv \t‰ma F∂ bp≤I∏-en-t\mSv tN¿∂p ]h¿Øn-°p∂ hnam-\-Ønse ss]e‰v Bbn-cp∂p Xms\∂pw]k-^nIv kap-Z-Øn¬ hnam\w IØn-ho-gp-I-bm-Wp-≠m-sbsX∂pw sPbnwkv ]d-bm-dp-≠v. NcnXw ]cn-tim-[n-®-t∏mƒ \t‰mam t_F∂ hnam\ hmln\n I∏-en¬ sPbnwkvsluè F∂ ss]e-‰p -≠m-bn -cp∂pF∂pw c≠p-h-b- p-Im-c≥ ]d™ IY-IƒXnI®pw hmkvX-h-am-sW∂pw a\- n-em-bn.

ap≥ P∑-ß-fnse ]h¿Øn Zqjy-߃ sIm≠v Cu PohnXw \nb-¥Ww hn´p-t]m-Im-sa∂ L´-Øn¬ Hcmsf tUmIvS¿_nbm≥ shbvkv NnIn-’n®p c£n® kw`-h-amWv C\n hnh-cn-°m≥ t]mIp-∂-Xv._nbm≥ shbvkns‚ tcmKn-bm-bn-cp∂ptPm¿P.v tPm¿Pv kzbw \in-°m≥ th≠-sXms° sNbvXp-sIm-≠n-cn-°p-∂p. Hcp lrZ-bm-LmXw, CSsØ mKsØ thZ\, Db¿∂c‡-k-Ω¿±w, AanX mcw, Aan-X-amb ]pI-h-en, πm≥ sNbvX D√m-k-bm-X-Iƒ Ah-km\ \nan-j-Øn¬ ths≠∂p hbv°p-I,lrZ-bm-Lm-X-Øn-\p-ff acp∂p Ign-°p-hm≥ad-∂p-t]m-Ip-I, As√-¶n¬ Hmh¿tUmkpIgn-°pI XpS-ßnb ]tXy-I-X-Iƒ Df-f-bm-fm-bn-cp∂p tPm¿÷v. "" \nßsf ]‰n- ]-dbqtPm¿Pv''tUmIvS¿ _nbm≥ shbvkv Bh-iy-s∏-´p.

""Rm≥ kz¥-ambn Hcp I¨kvS-£≥ Iº\n \S-Øp∂p. anbm-an-bn¬apgp-h\pw AXns‚ ssk‰p-Iƒ D≠v. Hm^o-

kp-Iƒ ^mIvS-dn-Iƒ, shb¿ lukp-IƒXpS-ßn-b-h. F\n°v ]e ]iv\-ß-fp-ap≠v]e ssk‰p-I-fn-te°pw t]mIm≥ km[n-°p-∂n-√. Bsc-¶nepw Fs¥-¶nepw ]d-™m¬s]s´∂v tZzjyw hcpw. Fs‚ \nb-¥WwhnSpw, ]eXpw hnfn-®p-]-d-bpw. apJw c‡-h¿W-am-Ipw. lrZbw c‡w ]ºp sNbvXps]m´n sXdn-°p-sa∂v tXm∂pw, Nne-t∏mƒBsc-sb-¶nepw CSn-°-W-sa∂p tXm∂pw.Nne-t∏mƒ sIm∂p-I-f-b-W-sa∂pw. ho´n-em-sW-¶n¬ tami-ambn s]cp-amdpw. icn°pwIpSn-°pw. `£Ww sshIn-bm¬ tZjywsIm≠v s]m´n-sØ-dn-°pw. tlmw h¿°vsNbvXmepw sNbvXn-s√-¶nepw aIsf Ip‰wI≠p]n-Sn®v imkn-°pw. CXp-hsc `mcy-tbbpw a°-tfbpw X√n-bn-´n-√. ASpØXhW Hcp ]t£.... Fs‚ A—\pw AXp-an-Xp-sams° hnfn®p ]d-bp-am-bn-cp-∂p. IpSn-b-\p-am-bn-cp-∂p. Ign™ P∑-Øn¬ Fs¥-¶n -ep -sams° sNbvX-Xns‚ ^etamFt¥m? tPm¿Pns‚ kΩX ]ImcwtUmIvS¿ _nbm≥shbvkv tPm¿Pns\ln]vt\m-ss´kv sNbvXp. ]e ]e L´-ß-fn-embn Npcp-f-gn-™p In´nb ap÷∑ Ncn-X-߃ Cßn-s\-bm-bn-cp-∂p.

Ign™ GtXm P∑-Øn¬ tPm¿÷vHcp kXw kq£n-∏p-Im-c-\m-bn-cp-∂p. `mcy-tbbpw a°-tfbpw i≤n-®n-√. apgp-°p-Sn-b-\m-bn-cp-∂p. ]c-kvXo-_-‘-ßfpw D≠m-bn-cp-∂p. ho´p-Im¿°v thsd hgn-I-sfm∂pwC√m-Ø-Xn-\m¬ Cßs\sbms° BsW-¶nepw tPm¿Pns\ Bi-bn®v PohnXw Xffn\ot°-≠n-h-∂p. Nne-t∏mƒ AI-am-k-‡-\m-Im-dp-≠v. ho´p-Im¿°v tPm¿Pns\ t]Sn-bm-bn-cp-∂p. Cu P∑-Ønse tPm¿Pns‚`mcy Ign™ P∑-Øn¬ tPm¿Pns‚ ]pX-\m-bn-cp-∂p. Cu P∑-Ønse ]pXn Ign™P∑-Øn¬ `mcy-bm-bn-cp-∂p. acn-°p∂ ka-

Page 13: Hydel Bullet - June 2015 - KSEBEA

13

Hydel Bullet - June 2015

bØv Hcp PohnXw ]mgm-°n-b-Xns‚ Ip‰-t_m[w Ah-tem -I\w sNbvXn -´mWvBflmhv icocw hn -Xv. thsdmcp P∑-Øn¬tPm¿Pv H∂mw temI alm-bp-≤-Øn¬ ]s¶-SpØ ^©v ]´m-f-°m-c-\m-bn-cp-∂p. Hcpkvt]mS-\-Øn¬ CSXp ssI \jvS-s∏-´n-cp-∂p. (tPm¿Pns‚ Ct∏m-gsØ CSØp`mKsØ thZ\ CXp-ambn _‘-s∏´pw InS-°p∂p F∂v tUmIvS¿ hniz-kn-°p-∂p.thsdmcp P∑-Øn¬ tPm¿Pv Hcp awtKm-fn-b≥ tk\m-\n-bm-bn-cp-∂p. hfscb[nIwkm[m-cW°msc sImt√-≠n-h-∂n- p-≠v. acn-°p∂ ka-bØv Hcp ]›m-Øm]hpw D≠m-bn-cp-∂n-√. B Pohn-X-ß-fn¬ \n∂pw H∂pw]Tn-°mt\m Bflm-hns\ ]cn-t]m-jn-∏n-°mt\m km[n-°m-Ø-Xp-sIm-≠mWv tPm¿PvCt∏mƒ A\p-`-hn-°p∂ ]iv\-߃ F∂vtUmIvS¿ hniz-kn-°p-∂p. ]e- ln]vt\m´nIv\nZ-Iƒ°p tijw F√mw Ign™pt]mbIY-I-fm-Wv''. F√mw C\n Xncp-Øm≥km[n°pw F∂v D]-tZ-ihpw sImSp-Øp.NnIn-’-Iƒ°p-tijw tPm¿Pv tUmIvS-tdmSv]d-™p. ""`qan-bnse PohnXw Hcp kΩm-\-am-Wv. AXv kvt\lw `uXnI cq]-Øn¬ico-c-Øn-eq-sSbpw hnIm-c-ß-fn-eq-sSbpwFßns\ \ne-\n¬°p∂p F∂v ]Tn-°m-\p-ff Hcp kvIqƒ BWv. B kvIqfn¬ th≠hn[w amXw D]-tbm-Kn-t°-≠-Xmb ]e Ifnÿe-ß-fp-ap-≠v. `uXnI PohnXw kt¥m-jn-°m-\p-f-f-Xm-Wv, AXn-\mWv Cµn-b-ßsfX∂n- p-f-f-Xv. \√-h-cm-bn-cn-°p-I, A\-¥-ambB\-µsØ A\p-`-hn-°p-I˛ a‰p-f-f-h-tcbpw]Ir-Xn-tbbpw Atem-k-c-s∏-Sp-ØmsX.Ct∏mƒ tPm¿Pv kz¥w _nkn-\kv \√-t]mse ssIImcyw sNøp-∂p. ]gb kz`m-h-sa√mw amdn.

lnµp-]p-cm-W-ß-fn¬ ]p\¿P-∑-ß-sf-∏-‰nbpw I¿Ω- -e-ß-sf-∏-‰nbpw hy‡-ambnIY-I-fn-eqsS ]Xn-]m-Zn-°p-∂p-≠v. tXXm-bp-

K-Øn¬ iocm-as‚ Hfn-b-tº‰v acn-t°≠nh∂ _men°v Zzm]c bpK -ØnseioIr-jvWs‚ A¥-I-\m-Im≥ thSs‚ P∑-sa-Sp-t°-≠n-h-∂p. Imin cmPm-hns‚ ]pXn-bmb Aw_bv°v Xs∂ A]-am-\n® ojvascsIm√m≥ ASpØ P∑-Øn¬ inJ-WvUn-bmbn Xotc-≠n- h-∂p. Cu P∑-Øn¬ a‰p-f-f-h-tcmSv hntZz-j-ßfpw sshcm-Ky-ßfpw h®v]pe¿Øn- temIw hntS-≠-Xp-t≠m. Ata-cn -°-bnse tPm¿Pv _pjn -t\m -Sp -ffsshcmKyw Xo¿°m≥ k±mw-lp-ssk\v]p\¿P\nt°≠n hcnt√? Ata-cn-°-bnseH_m-a-tbmSv ]Icw tNmZn-°m≥ Hkm-a°pw]p\¿P-\n-t°-≠n-h-cnt√ ?

c≠mw temI-a-lm-bp≤ ImeØv HcpPm∏-\okv Hm^o-k-dpsS Iqc-a¿±-\-ta‰v h¿j-߃°p-tijw F√m ]oU-\-߃°pw am∏vsImSpØv Bflmhns\ t]mjn®v temIwhn´p-t]mb Hcp kvtIm´vem‚ vImcs‚ IY-bmWv ASp-ØXv (dotUgvkv ssUPÃv 1994HIvtSm-_¿). FdnIv P\n-®Xv 1919 ¬kvtIm´vem‚n¬. A—-∑-Ωm-cpsS GI-k-¥m-\w, sNdp-∏-Im-eØv sSbn≥ bmX hfscCjvS-am-bn-cp-∂p. t]mkv‰¬ Un∏m¿´p-sa‚n¬¢m¿°mbn tPmen sNøp-∂p. AhnsS h®vkpµ-cn-bmb Hcp s]¨Ip-´nbp-ambn ]W-b-Øn-em-bn. hnhmlw Ign-°m≥ Xocp-am-\n-®p. ]t£ 1939 ¬ c≠mw temI-a-lm-bp≤ws]m´n-∏p-d-s∏- -t∏mƒ Fdn-°n\v ]´m-f-Øn¬tNtc-≠n-h-∂p. knwK-∏q-cn¬ \nban-X-\m-bn.1942 ¬ Pm∏m-\okv ]´mfw Fdn-°ns\ XShp-Im-c-\m-°n. Xmbve‚nse _m≥ t]mßv F∂]´-W-Øn-\-SpØv a‰p Ad-\qdv XS-hp-Im-tcm-sSm∏w Pbn-en¬ AS-®p. tISp-h∂ Fe-IvtSm-WnIv `mK-߃sIm≠v FdnIv HcptdUntbm D≠m°n. Pbn-e-[n-Ir-[¿ Adn-bmsX cmXn-Im-e-ß-fn¬ \yqU¬ln-bn¬\n∂pw ]t£]W-w sN-øp∂ bp≤-hm¿Ø-

Ü

Page 14: Hydel Bullet - June 2015 - KSEBEA

14

Hydel Bullet - June 2015

Iƒ a\- n-em°n h∂p. 1943 ¬ F√m XS-hp-Im-tcbpw Im©-\-_qcn F∂ ÿe-Øp-ffPbn-en-te°v am‰-s∏-´p. ]cn-tim-[-\-bn¬Fdn-°ns‚ tdUntbm Hcp tIm^n- Sn-∂n¬AS-®p-h-®n-cp-∂Xv Pbn-e-[n-Ir-X¿ I≠p-]n-Sn®p Cßn-s\-bp-ff Ip‰ßƒ°v h[in-£-bm-sW∂v Fdn-°n\v Adn-bm-am-bn-cp-∂p.BZyw In´nb in£ 13 Intem Kmw Xq°-ap-ff agp-sIm≠v Znhkw apgp-h≥ hndIp Iod-em-bn-cp-∂p. Ipsd Znh-k-߃ AtX in£-Xs∂ XpS¿∂p. Fdn-°n-s\- th-sdmcp Pbn-ente°v am‰-s∏-´p. CXn-∂n-S-bn¬ Fdn-°ns‚ _mKn¬ \n∂pw Hcp Gjy≥ am∏vPbn-e-[n-Ir-X¿ Is≠-Sp-Øp. Pbn¬ NmSm-\p-ff ia-am-sW∂v ]d™p Fdn-°ns\ Iqc-amb in£-Iƒ°v hnt[-b-\m-°n. c≠p-Zn-h-k-tØ°v £-Whpw shf-fhpw \¬ImsXs]mcn shbn-eØv sI´n-bn-´p. aq∂m-asØZnhkw Iqc-a¿±\w G¬t°≠n h∂p. Fdn-°n\v t_m[w \jvS-s∏-´p. hmcn-sb√pIƒ-s]m-´n-bn-cp-∂p. aq°p-]mew XI¿Øn-cp-∂p.ssIIƒ HSn-™n-cp-∂p. Cßn-s\-sbms°bmsW-¶nepw tNmZyw sNø-en\v X°mjoF∂ Pm∏-\okv DtZym-K-ÿ≥ Fdn-°ns\sIm≠p-t]m-Ipw. DØ-c-߃ In´m-Xm-Ip-tºmƒ X°mjn Fdn-°ns‚ apJ-Ø-Sn-®p.tZlØv IpØn-t\m-hn-∏n-®p. A©p-Zn-hkwtNmZyw sNø¬ \S-Øn-bn´pw ^e-sam∂pwIn´m-Xm-b-t∏mƒ X°mjn Db¿∂ a¿±-Øn-ep-ff shffw Fdn-°ns‚ aq°n-te°pw hmbn-te°pw No‰n-®p. Fdn-°n\v izmkw ap´n-h-b¿ ho¿Øp. Cu in£ Znh-k-ß-tfmfw\o≠p\n∂p. Znhkw sN√pw-t¥mdpw X°m-jn-tbm-Sp-ff sshcm-Kyhpw shdp∏pw Fdn-°n\v IqSn-h-∂p. XpS¿®-bm-bp-ff ]oU\waqew XpS¿∂p Pohn-°m-\p-ff BKlwXs∂ Fcn-°n\v \jvS-s∏-´p. Hcp \nanjwX°m-jnsb In´p-I-bm-sW-¶n¬ IgpØvsR°n-∏n-Sn®v izmkw ap´n®v sIm√pw F∂v

Fdn-°v a\- n¬ hnNm-cn-®p. X°m-jn-bpsSapJw Hm¿Øp-h-®p.'' Hcp Znhkw Rm≥FSptØmfmw.''

bp≤w Ah-km-\n®p.1946 ¬ X°mjnA≤ym-]I hrØn-bn¬ tN¿∂p. IqsS-Iq-sS-bp-ff izmkwap´epw s\©p-th-Z-\bpwX°m-jnsb Ae-´n-s°m-≠n-cp-∂p. X°m-jnIv Hm¿Ωn®p ""F¥n-\mWv Fdn-°ns\Rm≥ CX-b-[nIw D]-Z-hn-®-Xv. Db¿∂a¿± -Øn -ep -ff shffw No‰n -b -t∏mƒAbmƒ°v izmkw ap´n-bn-´p-≠m-Ip-I-bn-t√.1953 ¬ Hcp Znhkw izmkw In´msX X°mjn-t_m[w sI´p-ho-Wp. AXn\p tijw X°m-jn°v a\- n¬ tXm∂m-dp≠v ""Fdn-°ns\Hcp ]mhiyw ImWp-I-bm-sW-¶n¬ Rm≥Imep-]n-Sn®v am∏v At]-£n-t®t\ Rm≥sNbvX Iqc-X-sb√mw kz¥w a\- mseAs√∂pw ]´m-f-Øn-\p-th-≠n-bm-sW∂pw]d-t™s\'' bp≤-Øn\p tijw \m´n¬Xncn-®p-h∂ Fdn°v ]g-b-Iq-´p-Im-cnsbIeymWw Ign-®p. c≠p-Ip-´n-I-fpsS A—-\p-am-bn. F¶nepw Nne-t∏mƒ ]g-b -]o-U-\-ß-fpsS Hm¿Ω-Iƒ cmXn Ime-ß-fn¬ Fdn-°ns\ sR´n DW¿Øm-dp-≠v.'' AbmsfIn´n-bm¬ Rm≥ sR°n izmkw ap´n®vsIm√pw'' F∂v Dd-s°-hn-fn®p ]d-bpw.s]s´∂v tZjyw hcpw. t]mÉp-am≥ sshIn-t∏m-bm¬ Nmb XWp-Øp-t]m-bm¬ F√mwAbmƒ s]m´n-sØ-dn-°pw, kl-Po-hnXwZpx -l-am-b-t∏mƒ `mcy hnhml tamN\wtXSn. Hcp P∏m≥Im-cs\ I≠m¬ Fdn°vt]Sn®p hnd-bv°pw. Hcn-°¬ _m¶n¬ \n∂vCd-ßn -Hm-Sn. _m¶v amt\-P¿ P∏m≥Im-c-\m-bn-cp-∂p. Fdn-°ns\ NnIn-’n-®n-cp∂\gvkn\v Imcy-߃ a\- n-em-bn. bp≤-Ø-S-hn¬ \n∂pw-tam-Nn-X-\mbn h∂ Fdn-°ns‚amkn-Im-hÿ a\- n-em-°nb ]m‰n-hm-ekvF∂ t\gvkv Fdn-°ns\ hnhmlw Ign-®p.

Ü

Page 15: Hydel Bullet - June 2015 - KSEBEA

15

Hydel Bullet - June 2015

Ü

Fdn-°n-t\bpw X°m-jn-tbbpw t\cn¬I≠pap-´n-°m≥ Hc-h-kcw e`n-°p-I-bm-sW-¶n¬ Fdn-°ns‚ AI-am-k-‡-amb kz`mhwamdp-sa∂v ]m‰n-hm-e-kn-\-dn-bm-am-bn-cp∂p.]m‰n-bp-sSbpw Fdn-°n-s‚bpw 10- mw hnhmlhm¿jn-I-Øn¬ 1993 ¬ Ah¿ c≠p-t]cpw_mt¶m-°n-te°v ]pd-s∏-´p. bp≤-ayq-kn-b-Øn¬ ]eXpw I≠p-sIm-≠n-cn-°-bm-bn-cp∂p]m‰nbpw Fdn°pw. AIse \n∂pw Hcphr≤≥ \S-∂p-h-cp-∂p. Fdn-°ns‚ ASpØph∂n´v ]d-™p. ""F\n°v hfsc ZpxJap≠v\nßsf D]-Z-hn-®-Xn¬. F\n°v am∏p-Xcq''Abmƒ Fdn-°ns\ sI´n-∏n-Sn®p Ic-bm≥XpS-ßn. Fdn°v B hr≤-s‚ IÆp-I-fn-te°v kq£n®v t\m°n. ]cn-N-b-ap-ff IÆp-Iƒ, Hm¿Ω-Iƒ h¿j-߃ ]n∂n-te°vsIm≠p-t]m-bn. Fdn°v Xncn-®-dn™pCXmWv Rm≥ izmkw ap´n®v sIm√m≥kz]v\w ImWp∂ X°m-jn. Ah¿ XΩn-ep-ff a™p-aeIƒ Dcp-In. Ah¿ ]c-kv]cwsI´n-∏n-Sn-®p. Fdn°v am∏p-sIm-Sp-Øp. C\n\Ωƒ kplr-Øp-°-fmWv. ]c-kv]cw ]d-™p. Cu IqSn ImgvN Fdn-Iv Adn-bmsX]m‰n-hm-ekv Hcp-°n-b-Xm-Wv. (X-°mjn 2011¬ acn-®p. Fdn°v 2012 ¬ acn-®p) F√msshcm-Ky-ßfpw hntZz-j-ßfpw Xo¿Øn-´m-Wv Ah¿ acn-®-Xv. ]Icwho´m≥ C\n HcpP∑w FSp-t°-≠-Xn-√-t√m. Cu Pohn-X-Ønse Hmtcm A\p-`-h-ßfpw Hmtcm \ntbm-K-ß-fmWv. aZy-]m-\n-bmb `¿Øm-hpw, tcmKn-bmb mcybpw A\p-kcWbn-√mØ a°fpwkvt\l-an-√mØ A—-\-Ω-amcpw Cu \ntbm-K-߃ G‰p-hm-ß-m≥ Ign™ P∑-Øn¬\n∂pw Dcp-Øn-cn™p h∂v P∑-sa-Sp-Ø-h-cm-Wv. CX-dn-™m¬ ]ns∂ ZpxJ-Øn-s‚tbmtZjy-Øn-s‚tbm Nn¥-Iƒ DZn-°p-∂n-√.

Cu `qan-kr-jvSn-®n-cn-°p-∂Xv FXat\m-l-c-am-bn-´mWv. hnIm-c-ßsf A\p-`-hn-

®-dn-bmw. _‘-ßsf A\p-`-hn-®-dn-bmw,kvt\ln°mw, kt¥m-jn°mw, B\µn-°mw,]q°-fpsS kpK‘w A\p-`-hn-°mw. inip-hns‚ arZp-e-amb N¿Ωw sXm´-dn -bmw.]IrXn kuµcyw Bkz-Zn°mw, \√kwKoXw tIƒ°mw. CXmWv Dt±-in-®n-´p-f-f-Xv. FX at\m-l-c-amb Hcp ]T-\-ap-dn.CXv ]cn-]m-en-t°-≠Xv \ΩfmWv. Cu ]T\-ap-dnsb ImØp-kq-£n-°pI F∂Xv hcpwIme-ß-fn¬ ia-I-c-am-bn-cn-°pw. H‰-s°m-cmƒhnNm-cn-®m¬ km≤y-am-Ip-I-bn√ F¶nepw\Ω-fpsS e£y-a-Xm-bn-cn-°-s´. F√m-h-cp-sSbpw Bflm-°ƒ°v Hcp ]mb-am-Wv. AXm-bXv Htc ]mb-an-√m-bva-bmWv, F¥p-sIm-s≠-∂m¬ ]mbw F∂p]d-bp-tºmƒ kabwF∂ LSIw hcp-∂p-h-t√m. A\-iz-c-X-bv°p-ff bmX-bn¬ Nne Bflm-°ƒ thKw ]ptcm-K-an-°p-∂p. DZm-l-c-W-Øn\v k±mwlpssk≥aq∂mw ¢m n-em-bn-cp∂p sh¶n¬ Zem-bvemaKmUp-th-j≥ Ign-™-bm-fm-Wv. kz¥w]bXv\w sIm≠p amX-amWv Cu ]T\w]ptcm-K-an-°p-∂-Xv. \ΩpsS CjvS-߃ A\p-k-cn-®p-ff £Ww \Ωƒ Ign-°p-∂p. \ap°n-jvS-ap-ff Im¿ \Ωƒ hmßp-∂p. \ap-°njvSw t]mse-bp-ff hkvX-߃ hmßp-∂p. \ap-°n-jvS-ap-f-f-t]mse Hgnhp kabwNne-hm-°p-∂p. \sΩ kvt\ln-°p∂ A—-\-Ω-am-cpsS k¥m-\-ß-fmbn P\n-°p-∂p.CjvS-ap-ff t]mse _‘-߃ ÿm]n-°p-∂p. AXp-t]mse a‰p-ffhsc kvt\ln-°p-∂p. F√mw Hcp ]c-kv]c \ntbm-K-am-Wv.F√m-h-tcmSpw klm-\p-`q-Xn-bp-≠m-Im-\p-ffIgnhv \ap°v hf¿Øn-°qsS?

ASp-Ø -\√ P∑-Øn-te°v Fßns\Xøm-sd-Sp°mw ? \ap°v Bfl-kw-Xr]vXnXcp∂ sNdnb k¬]-h¿Øn-Iƒ sNbvXpIqsS ? kzm¿∞X°p ]Icw alm-a-\kvIXh-f¿Øn-°qsS ? a‰p-f-f-hsc∏‰n-bp-ff ap≥hn-

Page 16: Hydel Bullet - June 2015 - KSEBEA

16

Hydel Bullet - June 2015

[n-Iƒ am‰n BZ-cn-°p-hm≥ ian-®p-IqsS ?Pohn-X-Øns‚ F√m cwK-ß-fnepw Bflm-hns\ ]cn-t]m-jn-∏n-°p∂ \√ \√ Xocp-am-\-߃ FSp-Øp-IqsS ? ]pen‰vk¿ kΩm\tPXm-hmb tPm¨am¿°v MD (lm¿hmUvbqWn-th-gvkn‰n) Cßs\ ]d-bp-∂p. '' \ΩƒimkvXhpw, a\-xim-kvX-hpw, Bflo-b-Xbpwap≥Im-e -ßsf At]-£n®v IqSp -X¬kwtbm-Pn®v hcp∂ Hcp ]In-b°v km£ywhln-®p-sIm-≠n-cn -°-bm-Wv. ]c-a-ambkXyhpw AssI-X-h-amb kvt\lhpwA]m-]y-amb H∂-√.t_m[-Øns‚ ]e-Xeßsf A¥-k-Ø-bn-te°pw AXns‚ km[m-cW AXn-cp-Iƒ°-∏p-d-tØ°pw \o´m≥km[n-°pw. B A¥-k-Øsb Rm≥Bflmhv F∂v hnfn-°p-∂p...'' \Ωƒ A\-iz-c-cm-Wv. \Ωƒ \nXy-cm-Wv. BflmhvHcn-°epw acn-°p-∂n-√. A\-iz-cX \ap°vIn´nb A\p-K-l-am-sW-∂-dn-™p-sIm≠v\ap°v ]h¿Øn-°mw. Ipd-®p-IqSn efn-X-ambn]d-™m¬ A\-iz-c-X-bn-te°v \ap°v Xøm-sd-Sp-°mw. ChnsS, Ct∏mƒ, C∂v \msfHmtcm-Zn-h-k-hpw, C\n-bp-ff PohnX Ime-a-Xbpw Aßns\ Xøm-sd-Sp-°p-I-bm-sW-¶n¬Cu ]cn-Wma tkm]m-\-Øn¬ Bflmhv IqSp-X¬ ]cn-t]m-jn-°-s∏-Sp-∂p. Ipsd-°qSn

Db¿∂ Xe-Øn¬ FØp-∂p. Xøm-d-s√-¶n¬ Cu PohnX\ne XpS¿∂v PohnXw ]p\-cm-h¿Øn-°-s∏-Sp -∂p. \√ Imcy-߃ASpØ P∑-Øn-te°v am‰n hbv°p-∂p. CuP∑-Øn¬ sNøm-am-bn-cp-∂n-´pw. A\-iz-c-cmb \Ωƒ Fßns\ ]h¿Øn-°-Ww.Fßns\ \√ _‘-߃ ÿm]n°mw, \ne\n¿Øn-sIm≠pt]mImw F∂v \ap°v ]Tn-°mw. Fßns\ IqSp-X¬ kvt\ln°mwF∂v ]Tn-°mw. Fßns\ A\p-I-ºbpwklm-\p- q-Xnbpw D≠m-Imw F∂p ]Tn-°mw.imco-cn-I-am-bpw, Bflo-b-am-bpw, am\-kn-I-ambpw, sshIm-cn-I-ambpw \√ BtcmKywFßns\ \ne-\n¿Ømw F∂v ]Tn-°mw. a‰p-ffhsc Fßns\ klm-bn°mw F∂v ]Tn-°mw. Cu temIw Fßns\ Bkz-Zn-°m-sa∂v ]Tn-°mw. Bfl-]-cn-t]m-j-W-Øn-te-°p-ff tkm]m-\-Øn¬ Ipd-®p-]-Sn-Iƒ IqSnIb-dmw. Aßns\ A\-iz-cX-bn-te°v Xøm-sd-Sp-°p-tºmƒ `b-߃ AI-∂p-t]m-Ip-∂p.\Ω-sf-∏-‰n-Iq-Sp-X¬ aXn∏v tXm∂p-∂p.Bflo-b-ambn hf-cp-∂p. Hmtcm \nan-jhpw`mhn P∑-ß-fnse Pohn-XsØ°qSn ]cn-t]m-jn-∏n-®p-sIm-≠n-cn-°p-∂p. Hm¿°pI \ΩƒA\-iz-c-cm-Wv. Bflmhv acn-°p-∂n√ A\-iz-c-am-Wv.

¯

Letters to the Editor

IØp-Iƒ Ab-t°≠ hnemkw

Chief EditorHydel Bullet,

KSEB Engineers’ AssociationPanavila, Thiruvananthapuram - 01,

Phone : 0471 - 2330696, Email

:[email protected]

Page 17: Hydel Bullet - June 2015 - KSEBEA

17

Hydel Bullet - June 2015

BOARD ORDERS

Read :-

1. B.O. (FM) No. 2349/2011(Estt.III /1555/2007) dated 01-10-2011

2. B.O. (FM) No. 2868/2011 (Estt.III/2244/2011), dated 13-12-2011

3. B.O. (CM) No. 2420/2012 (Estt.III/3706/2012), dated 14-12-2011

4. G.O. (Rt) No. 116/2015/PD, dated 30-05-2015

5. G.O. (Rt) No. 120/2015/PD, dated 05-06-2015

ORDER

The distribution of works and control over Head of Departments among the Chairman & ManagingDirector, Full Time Directors and Secretary ( Administration) were ordered vide Board Orders read as1 to 3 above.

The Government of Kerala have subsequently reconstituted the Board of Directors of KeralaState Electricity Board Ltd., vide GO read as 4th paper above and subsequently modified the same videGO read as 5th paper above.

In consideration of the reconstitution of Board of Directors and having felt the need ofstreamlining the functions of various Head of Departments, the following changes regarding designationof HODs, their duties and responsibilites and the control of the Chairman & Managing Director and FullTime Directors over the Heads of Departments are ordered with immediate effect.

I. Re-designation of posts

(i) The post of Director (Generation) is re-designated as Director (Generation& HRM)

(ii) The post of Chief Engineer (Corporate Planning) is re- designated as

Chief Engineer (Renewable Energy and Energy Savings)

(iii) The post of Chief Engineer (IT) is re-designated asChief Engineer (IT & Customer Relations)

(iv) The post of Chief Engineer (Centrally Aided Projects) created by shifting the post of Chief Engineer(HRM) as per Government Order read as 5th above is redesignated as Chief Engineer ( CentrallyAided Projects & Safety)

(v) The Deputy Chief Engineer (HRM-I) will have Full Powers of Chief Engineer (HRM) including thepowers of appointing authority.

II. Changes in Duties and Functions of Head of Departments

1. Director (CP & SCM) is entrusted with the following additional functions.

(a) The works relating to formulation and pre-construction activities of various generation(except hydro) projects including gas conversion of BDPP, NTPC & BSES, allocation of

KERALA STATE ELECTRICITY BOARD LTD.(Incorporated under the Indian Companies Act, 1956)

Corporate Identity Number : U40100KL2011SGCO27424

Regd. Office : Vydyuthi Bhavanam, Pattom, Thiruvananthapuram - 695 004

Abstract

Establishment - Reconstitution of Board of Directors of Kerala State Electricity Board Ltd.- Distribution

of works among the Chairman & Managing Director and Full Time Directors of Kerala State Electricity

Board Ltd. - Orders issued.

CORPORATE OFFICE (ADMINISTRATION)

B.O. (CMD) No. 1468/ 2015 (Estt. 111/3706/2012) Dated, Thiruvananthapuram, 15-06-2015

Page 18: Hydel Bullet - June 2015 - KSEBEA

18

Hydel Bullet - June 2015

Coal Block, formulation and preparatory works for other thermal projects. Chief Engineer(Thermal) shall report to Director (CP & SCM).

(b) Preparation of documents, liaisoning with Ministry of Power, Government of India, REC,PFC, etc., coordination and monitoring of implementation of Centrally Aided projectssuch as RAPDRP, RGGVY,IPDS, DDUGGVY, etc. The Chief Engineer (Centrally AidedProjects & Safety) will look after these functions and report to Director (CP & SCM).

(c) Corporate Planning functions such as preparation of Annual, Five Year and Long termperspective plans, regulatory and policy matters, liaisoning with State and CentralGovernments, PPA of renewable energy projects, MIS functions, etc.

Note : The officials in the planning wing who were earlier working under the chief Engineer(Corporate Planning) will report to office of Director (CP & SCM) for handling the abovefunctions.

(d) Works in connection with empanelment of vendors.

2. Chief Engineer (Renewable Energy Savings)

(a) Renewable Energy & Projects.

(i) Identify viable and beneficial renewable energy projects and prepare DPR for submission toCentral and State Governments for approval and financing.

(ii) Tendering and awarding of renewable energy projects and innovation works.

(iii) Distributed Decentralized Generation Projects and sustainable micro grids - design andimplementation

(iv) Smart grid.

(b) Innovation & ESCO

(i) Find out innovative ideas and works in the power sector.

(ii) Identify innovators from Start up Villages and Coordinate them.

(iii) ESCO model implementation.

(iv) Supply Side Management and Demand Side Management

(v) Energy Auditing

(vi) Implementation of DELP

3. Chief Engineer (Centrally Aided Project & Safety)

(i) Documentation and liasioning with Central Government, etc and monitoring of Centrally AidedProjects such as RAPDRP, RGGVY, IPDS, DDUGGVY etc. For these activities CE (CAPS)will be reporting to Director (CP & SCM)

(ii) Monitoring the progress of implementation of all Centrally Aided Projects and will bereporting to Director (Distribution & Safety)

(iii) All safety related activities and for this Chief Engineer (CAPS) will be reporting to Director(Distribution & Safety)

4. Chief Engineer (IT & Customer Relations)

(i) All works handled by Chief Engineer (IT) particularly RAPDRP (Part A)

(ii) Customer relation activities including functioning of call centres and redressal of consumergrievances and will report to the Director (Distribution & Safety).

5. Deputy Chief Engineer (HRM - 1)

The Deputy Chief Engineer (HRM-I) will have Full Powers of Chief Engineer(HRM) and will handle thematters relating to the appointments, transfer and postings, etc which are now being handled by theChief Engineer (HRM). He will report to the Director (Generation & HRM).

III. Control over Head of Departments

(i) Chairman & Managing Director

(a) Legal Adviser & Disciplinary Enquiry Officer.

(b) Chief Vigilance Officer

Page 19: Hydel Bullet - June 2015 - KSEBEA

19

Hydel Bullet - June 2015

(c) Chief Engineer (Renewable Energy & Energy Savings)

(d) Secretary (Administration)

Note : The communication Infrastructure works as mentioned below shall be reported to theCMD by the respective Directors.

(a) OPGW through transmission infrastructure under the Director (T& SO)

(b) Last mile connectivity under NOFN and OFC along Distribution infrastructure under theDirector (D &S).

(ii) Director (Finance)

(a) Chief Engineer ( Commercial & Tariff)

(b) Chief Internal Auditor

(c) Financial Adviser

(iii) Director ( Distribution & Safety)

(a) Chief Engineer (IT & Customer Relations)

(b) Chief Engineer (Distribution - South)

(c) Chief Engineer (Distribution - Central)

(d) Chief Engineer (Distribution - North)

Note : In the case of monitoring of Implementation of Centrally Aided projects and safety related functionsthe chief Engineer (Centrally Aided projects & Safety) Shall report to Director (D&S)

(iv) Director (Transmission & System Operation)

(a) Chief Engineer (Transmission - South)

(b) Chief Engineer (Transmission - North)

(c) Chief Engineer (Transmission) System Operation

(v) Director (Corporate Planning & Supply Chain Management)

(a) Chief Engineer (Thermal)

(b) Deputy Chief Engineer (SCM) with Full powers of Chief Engineer

(c) Chief Engineer ( Centrally Aided Projects & Safety)

(vi) Director (Generation & HRM)

(a) Chief Engineer (Generation)

(b) Chief Engineer (PED)

(c) Chief Engineer (Civil Construction) South

(d) Chief Engineer (Civil Construction) North

(e) Chief Engineer (Dam Safety)

(f) Chief Engineer (investigation & Planning)

(g) Deputy Chief Engineer (HRM I ) with full powers of Chief Engineer (HRM)

Not with standing anything contained above, the Chairman & Managing Director will have fulldiscretionary powers in summoning any officials directly and require to submit proposals directly inthe exigencies of service and public interest.

The modification as above will take effect immediately. The Directors and HODs shall ensure that nofunction is handled under more than one Director/ HOD. If handling over of files is required based on theassignment of duties and functions as mentioned above, it shall be done immediately.

By order of the

Chairman & Managing Director

Sd/-

R. RAJASEKHARAN NAIR

SECRETARY (ADMINSTRATION)

Page 20: Hydel Bullet - June 2015 - KSEBEA

20

Hydel Bullet - June 2015

KERALA STATE ELECTRICITY BOARD LTD.(Incorporated under the Indian Companies Act, 1956)

Regd. Office : Vydyuthi Bhavanam, Pattom, Thiruvananthapuram -695 004

Abstract

Establishment - Promotion of Deputy Chief Engineers (Electrical) and

posting- Sanctioned - Orders issued

CORPORATE OFFICE (ADMINISTRATION)

B.O. (CMD) No. 1378/2015 (Estt.III/25/2015) Dated, Thiruvananthapuram, 05-06-2015

Read : 1) B.O. (FTD) No. 290/2015 (Estt.III/DPC/2015) dated 03.02.2015

2) GO (Rt.) No. 116/2015/PD, dated 30-05-2015

3) GP (Rt.) No. 120/2015/PD, dated 05-06-2015

ORDER

The Government have appointed four Chief Engineers of Kerala State Electricity Board Ltd. as

Directors of Kerala State Electricity Board Ltd. vide GO read as 2nd paper above. Subsequently the Board

decided to upgrade the post of Deputy Chief Engineer(APTS) to that of Chief Engineer (APTS) without any

financial commitment. In the meantime five Chief Engineers retired from service on superannuation on

31-05-2015. Now the Government vide Go read as 3rd paper above has decided to create a new post of

Chief Engineer ( Centrally Aided Projects) by shifting the present post of Chief Engineer (HRM) for the

implementation of Centrally Aided projects.

In consideration of the above changes, the following promotions of Deputy Chief Engineers to

the cadre of Chief Engineers and transfer and posting of chief Engineers are ordered with immediate

effect.

Sl. No. Name & Present Office Office to which posted

1. Sri. Kumaran P.

Deputy Chief Engineer

Electrical Circle, Irinjalakuda

Chief Engineer (Distribution North), Kozhikode

2. Sri. Venugopal N.

Deputy Chief Engineer

Generation Circle, Moozhiyar

Chief Engineer (Commercial & Tariff)

Vydyuthi Bhavanam, Thiruvananthapuram

3.Smt. Jayakumari K.K.

Deputy Chief Engineer

O/o. Chief Engineer (Distribution -

North) Kozhikode

Chief Engineer (Centrally Aided Projects)

Vydyuthi Bhavanam, Thiruvananthapuram

4. Smt. Jayaletha A.

Deputy Chief Engineer (APTS)

Thiruvananthapuram

Chief Engineer (APTS)

Vydyuthi Bhavanam, Thiruvananthapuram

5. Smt. Sujatha Gopalan

Deputy Chief Engineer

Transmission Circle

Thiruvananthapuram

Chief Engineer (PED)

Vydyuthi Bhavanam, Thiruvananthapuram

Page 21: Hydel Bullet - June 2015 - KSEBEA

21

Hydel Bullet - June 2015

6.Sri. Bhuvanendra Prasad T.R.

Deputy Chief Engineer

Electrical Circle, Kasargode

7. Sri Shaji N.N.

O/o the Chief Engineer

(Generation), Moolamattom

8.Smt. Susan Jacob P.

Deputy Chief Engineer

System Operation Circle, Kalamassery

Chief Engineer (Transmission South)

Vydyuthi Bhavanam, Thiruvananthapuram

9. Sri. James M. David

Deputy Chief Engineer

Electrical Circle, Pathanamthitta

Chief Engineer (Transmission - North)

Kozhikode

10. Sri. Kesavadas V.

Deputy Chief Engineer

Electrical Circle, Eranakulam

Chief Engineer (IT), Vydyuthi Bhavanam

Thiruvananthapuram with additional

responsibility of Customer Relations.

Chief Engineer (Transmission System Operation)

Kalamassery

Chief Engineer (Thermal Projects)

Ernakulam

2. The promotion ordered above are purely provisional as per relevant rules adopted by the

Board and without prejudice to the claim of seniors, if any. If the officers promoted does not join

duty within 15 days from the date of order, it shall be presumed that the officer has not accepted

the promotion and the promotion order with respect to him/her will stand cancelled and the

financial benefits, if any, availed by him / her on account of grade promotion to the grade of Chief

Engineer shall be recovered in lump, as per rules.

3. The following transfer and postings of Chief Engineers (Ele.) are also ordered.

Sl. No. Name & Present Office Office to which posted

1. Sri. Dayapradeep C.K.

Chief Engineer (Thermal Projects)

Ernakulam

Chief Engineer (Distribution North), Ernakulam

2. Sri. Mohanathapanicker G.

Chief Engineer

(Transmission - North), Kozhikode

Chief Engineer (Distribution South)

Power House, Thiruvananthapuram

4. The transfers and postings ordered above are in the exigency of service and in public interest.

By Order of the

Full Time Directors,

Sd /-

R. RAJASEKHARAN NAIR

SECRETARY (ADMINISTRATION)

Page 22: Hydel Bullet - June 2015 - KSEBEA

22

Hydel Bullet - June 2015

KERALA STATE ELECTRICITY BOARD LTD.(Incorporated under the Indian Companies Act, 1956)

Regd. Office : Vydyuthi Bhavanam, Pattom, Thiruvananthapuram -695 004

Abstract

Establishment - Promotion of Executive Engineers (Electrical ) to the cadre of Deputy Chief

Engineers (Electrical) and posting - Sanctioned - Orders issued

CORPORATE OFFICE ( ADMINISTRATION)

B.O. (FTD) No. 1379/2015 (Estt.III/1390/2015). Dated, Thiruvananthapuram, 05-06-2015

Read : 1. B.O. (FTD) No. 290/2015 (Estt.III/DPC/2015) dated 03-02-2015

2. B.O.(FTD) No. 1378/2015 (Estt.III/DPC/2015) dated 05-06-2015

ORDER

The following promotions and posting of senior most Executive Engineers (Ele.) to the cadre of Deputy

Chief Engineers (Ele.) are ordered with immediate effect

Sl. No. Name & Present Office Office to which posted

1. Sri. Mohan Kumar B.V

Executive Engineer

Transmission Division, Mavelikkara

Deputy Chief Engineer

O/o. the Director (Distribution & Safety)

Vydyuthi Bhavanam, Thiruvananthapuram

2. Sri. Mohammed Shereef E.

Executive Engineer

Electrical Division, Kazhakuttom

Deputy Chief Engineer

O/o. the Chief Engineer (Transmission- South)

Thiruvananthapuram

3. Sri. Swaminathan K.B.

Executive Engineer

Electrical Division, Palakkad

Deputy Chief Engineer

Electrical Circle, Palakkad

4. Sri. Rajan K.R.

Executive Engineer

Electrical Division, Kallarkutty.

Deputy Chief Engineer

Electrical Circle, Ernakulam

5. Sri. Sreekumar P.K.

Executive Engineer

Electrical Circle, Shornur

Deputy Chief Engineer

O/o the Chief Engineer (Distribution- North)

Kozhikode

6. Sri.George V. James

Executive Engineer

APDRP Division, Ernakulam

Deputy Chief Engineer

KDPP, Kozhikode

7. Sri. John Thomas

Executive Engineer

Transmission Division, Pathanamthitta

Deputy Chief Engineer

Electrical Circle, Kasargod

8. Sri. Suresh Chand C.

Executive Engineer

Mechanical Maintenance Division

Moolamattom

9.

Deputy Chief Engineer

Electrical Circle, Pathanamthitta

Sri. Santhosh K.

Executive Engineer

Electrical Division, Manjeri

Deputy Chief Engineer

GRID, Kalamassery

Page 23: Hydel Bullet - June 2015 - KSEBEA

23

Hydel Bullet - June 2015

Page 24: Hydel Bullet - June 2015 - KSEBEA

24

Hydel Bullet - June 2015

Page 25: Hydel Bullet - June 2015 - KSEBEA

25

Hydel Bullet - June 2015

Page 26: Hydel Bullet - June 2015 - KSEBEA

26

Hydel Bullet - June 2015

Page 27: Hydel Bullet - June 2015 - KSEBEA

27

Hydel Bullet - June 2015

2. The following transfers and postings of Deputy Chief Engineers (Ele.) are also ordered.

10. Smt. Soosamma Jacob

Executive Engineer

Transmission Division, Thodupuzha

Deputy Chief Engineer

Electrical Circle, Vadakara

11.Sri. Narayanan M.K.

Executive Engineer

TMR Division, Angamali

Deputy Chief Engineer

O/o. the Chief Engineer (Generation)

Moolamattom

12.Sri. Salimkumar C.P.

Executive Engineer

Transmission Division, Kalamassery

Sri.Mohankumar B.

Executive Engineer

Transmission Division, Tirur

Deputy Chief Engineer

Generation Circle, Chithirapuram

13.Deputy Chief Engineer

Electrical Circle, Kalpetta

9. Sri. Rajkumar S.

Deputy Chief Engineer

Electrical Circle, Alappuzha

Deputy Chief Engineer

Electrical Circle, Haripad

Sl. No. Name & Present Office Office to which posted

1.Smt. Geethakumari S.Deputy Chief Engineer (Commercial)O/o Chief Engineer (C&T), Vydyuthi

Bhavanam, Thiruvananthapuram

Deputy Chief Engineer

Transmission Circle, Vydyuthi Bhavanam

Thiruvananthapuram

2. Deputy Chief Engineer, Commercial

O/o the Chief Engineer (C& T),

Thiruvananthapuram

Deputy Chief EngineerSystem Operation Circle

Kalamassery

Smt. Mini P. Nayar

Deputy Chief Engineer

Electrical Circle, Vatakara

CGRF, Kozhikode

Sri. Joseph V.K.

Deputy Chief EngineerO/o Chief Engineer (PED), VB.

Thiruvananthapuram

Deputy Chief Engineer

System Operation Circle

Thiruvananthapuram

Smt. Sreedevi B.

Deputy Chief EngineerO/o the Chief Engineer (Trans- North)Kozhikode

3. Smt. Manju B.

Deputy Chief EngineerSystem Operation CircleThiruvananthapuram

Deputy Chief Engineer

O/o the Chief Engineer (Trans - North)

Kozhikode

4.Smt. Susan JosephDeputy Chief EngineerElectrical Circle, Nilambur

Deputy Chief EngineerGeneration Circle, Moozhiyar

5. Sri. Austin D CruzDeputy Chief Engineer (Grid)

System Operation Circle, Kalamassery

6.

7.

8. Sri. Radhakrishnan R.Deputy Chief EngineerO/o Chief Engineer (Transmission-South)Thiruvananthapuram

Deputy Chief Engineer

O/o Chief Engineer (PED), Vydyuthi Bhavanam

Thiruvananthapuram

Page 28: Hydel Bullet - June 2015 - KSEBEA

28

Hydel Bullet - June 2015

13. Sri. Parameswaran C.Deputy Chief EngineerElectrical Circle, Shornur

Deputy Chief Engineer

Electrical Circle, Irinjalakuda

3. The transfers and postings ordered above are in the exigency of service and in public

interest.

By Order of the Full Time Directors

Sd/-

R. RAJASEKHARAN NAIR

SECRETARY (ADMINISTRATION)

14. Sri. Sidharthan P.B.

Deputy Chief Engineer

Generation Circle, Chithirapuram

Deputy Chief Engineer

Electrical Circle, Nilambur

10. Sri. Udaya Varma B.Deputy Chief EngineerElectrical Circle, Kottarakara

Deputy Chief Engineer

Electrical Circle, Alappuzha

11. Sri. Mani V.K.

Deputy Chief Engineer

Electrical Circle, Haripad

Deputy Chief Engineer

Electrical Circle, Kottarakkara

12. Smt. Sosamma Kuruvila

Deputy Chief Engineer

Electrical Circle, Palakkad

Deputy Chief Engineer

Electrical Circle, Shornur

Page 29: Hydel Bullet - June 2015 - KSEBEA

29

Hydel Bullet - June 2015

2. The above transfers and postings ordered are in the exigency of service and in public interest.

By Order of the

Full TIme Directors,

Sd/-

R. RAJASEKHARAN NAIR

SECRETARY (ADMINISTRATION)

KERALA STATE ELECTRICITY BOARD LTD.(Incorporated under the Indian Companies Act, 1956)

Regd. Office : Vydyuthi Bhavanam, Pattom, Thiruvananthapuram -695 004

AbstractEstablishment - Promotion of Executive Engineers (Electrical ) to the cadre of Deputy Chief Engineers

(Electrical) and postings of Deputy Chief Engineers (Ele.) - Sanctioned - Orders issued

CORPORATE OFFICE ( ADMINISTRATION)

B.O. (FTD) No. 1383/2015 (Est. III/1390/2015. Dated, Thiruvananthapuram, 06-06-2015

Read : 1. B.O. (FTD) No. 290/2015 (Estt.III/DPC/2015) dated 03-02-2015

2. B.O.(FTD) No. 1378/2015 (Estt.III/25/2015) dated 05-06-2015

3. B.O. (FTD) No.1379/2015 (Estt/III/1390/2015), dated 05-06-2015

ORDER

In continuation of the Board Order read as 3rd paper above the following modifications in the postings

of Deputy Chief Engineers and correction of incumbency are ordered with immediate effect.

Sl. No. Name & Present Office Office to which posted

1. Sri. John ThomasExecutive Engineer

Transmission Division, Pathanamthitta

Deputy Chief Engineer

Generation Circle, Chithrapuram

2. Deputy Chief Engineer

Electrical Circle, Kasargode

Sri. Narayanan M.K.

Executive EngineerTMR Division, Angamali

3. Sri. Salimkumar C.P.

Executive Engineer

Transmission Divison, Kalamassery

Deputy Chief Engineer

O/o the Chief Engineer (Generation)

Moolamattom

4. Sri. Rajan K.R.Executive Engineer, Erection DivisionKallarkutty

Deputy Chief EngineerElectrical Circle, Ernakulam

Page 30: Hydel Bullet - June 2015 - KSEBEA

30

Hydel Bullet - June 2015

KERALA STATE ELECTRICITY BOARD LTD.(Incorporated under the Indian Companies Act, 1956)

Regd. Office : Vydyuthi Bhavanam, Pattom, Thiruvananthapuram -695 004

Abstract

Establishment - Promotion and postings of Assistant Executive Engineers (Electrical) to the cadre of

Executive Engineer (Electrical) and transfers and postings of Executive Engineers (Ele) - sanctioned -

Orders issued

CORPORATE OFFICE ( ADMINISTRATION)

B.O. (FTD) No. 1485/2015 (Estt.III/1611/2015). Dated, Thiruvananthapuram, 17-06-2015

Read : 1. B.O. (FTD) No. 290/2015 (Estt.III/1390/2015) dated 05-06-2015

ORDER

The following promotion of Assistant Executive Engineer (Ele) to the cadre of Executive Engineers (Ele)

are ordered with immediate effect.

Sl. No. Name & Present Office Office to which posted

1. Sri. Madhusoodhanan N.V.

Assistant Executive Engineer

Electrical Sub Division, Chenganoor

Executive Engineer

Electrical Division

Manjeri

2. Smt. Rejini K.S.

Assistant Executive Engineer

Transmission Sub Division, Shornur

Executive Engineer

Transmission Division, Palakkad

3. Sri. Hareesan Mottammel

Assistant Executive Engineer

Communication Sub Division, Kannur

Executive Engineer

Transmission Division, Kanjirode

4. Smt. Santhy K.

Assistant Executive Engineer

Electrical Circle Stores, Kozhikode

Executive Engineer

O/o Chief Engineer (Distribution North)

Kozhikode5. Sri. Sajeev G.

Assistant Executive EngineerSystem Operation CircleSub LD Station, VB, TVM

Executive Engineer

O/o Director (Corp. Plg & SCM)

VB, TVM

6. Sri. Sivadas S.Assistant Executive EngineerElectrical Circle, Vadakara

Executive Engineer

Electrical Division, Mananthavady

7. Sri. Mohammed Abdul Salam

Assistant Executive Engineer

Relay Sub Division, Edarikode

Executive Engineer

Communication Division, Kannur

8. Sri. Joseph P.T.

Assistant Executive Engineer

Electrical Sub Division, West Hill

9.

Executive Engineer

Electrical Division, Iritty

Sri. Jayaraj V.

Assistant Executive Engineer

O/o Director (Corp. Plg. & SCM)

VB, TVM

Executive Engineer

Electrical Division, Thalassery

Page 31: Hydel Bullet - June 2015 - KSEBEA

31

Hydel Bullet - June 2015

10. Sri. Saji C.A.Assistant Executive Engineer

Electrical Sub Division,Kuruppampady

Executive Engineer

Electrical Circle, Manjeri

11. Sri. Rajesh R.Assistant Executive EngineerO/o Chief Engineer (PED), VB, TVM

Executive Engineer

Electrical Circle, Nilambur

12.Sri. Ramiah K.Assistant Executive EngineerElectrical Sub Division, Vazhathope

Executive Engineer

Generation Division, Kakkayam

13. Sri. Praveen M.A.Assistant Executive EngineerElectrical Sub Division, Valancherry

Executive Engineer

LD Shift, Kalamassery

14. Smt. Geetha M.Assistant Executive EngineerO/o Chief Engineer (C&T), VB, TVM

Executive Engineer

Electrical Circle, Tirur

15. Smt. Sheeba K.S.Assistant Executive EngineerO/o Director (Corp. Plg & SCM)VB, TVM

Executive Engineer

Electrical Division, Haripad

16. Sri. Prasad V.N.Assistant Executive EngineerElectrical Circle, Thodupuzha

Executive Engineer

Electrical Division, Wandoor

17. Sri. Anil Kumar K.S.Assistant Executive EngineerElectrical Sub Division, Thrithala

Executive Engineer

Electrical Division, Kalpetta

18. Sri. Anil Kumar K.R.Assistant Executive EngineerO/o Chief Engineer (Distribution -South), TVM

Executive Engineer

Transmission Division, Tirur

19. Smt. Sylaja N.V.Assistant Executive EngineerSubstation Sub Division, Ottappalam

Executive Engineer

Electrical Division, Tirur

20. Sri. Abdul Samadu M.Assistant Executive Engineer220 KV Substation Sub Division,Punnapra

Executive Engineer

RPTI, Kozhikode

21. Smt. Dahlia SreedharAssistant Executive EngineerElectrical Division, Adimali

Executive Engineer

Generation Division, Chithirapuram

22. Smt. Sajitha Kumari T.S.Assistant Executive EngineerO/o Director (Corp. Plg & SCM) VB, TVM

Executive Engineer

Electrical Division, Alappuzha

23. Smt. Mini KrishnanAssistant Executive EngineerSubstation Sub Division,Kunnamangalam

Executive Engineer

Electrical Circle, Kozhikode

24. Sri. Santhosh Kumar N.Assistant Executive EngineerSubstation Sub Division, Payyannur

Executive Engineer

Electrical Division, Payyannur

Page 32: Hydel Bullet - June 2015 - KSEBEA

32

Hydel Bullet - June 2015

2. The promotion ordered above is purely provisional as per relevant rules adopted by the Board and

without prejudice to the claim of seniors if any. If the officer promoted does not join duty within15 days from the date of order, it shall be presumed that the officer has not accepted the promotionand the promotion order with respect to him / her will stand cancelled and the financial benefits,if any, availed by him /her on account of grade promotion to the grade of Executive Engineer shall

be recovered in lump, as per rules.

3. The following transfers and postings of Executive Engineers (Ele) are ordered with immediate

effects.

Sl. No. Name & Present Office Office to which posted

1. Sri. Dilip Kumar I.P.

Executive Engineer

Electrical Division, Payyannur

Executive Engineer

Transmission Division, Kasargod

2. Sri. Kuriakose P.P.

Executive Engineer

Transmission Division, Kaniyambetta

Executive Engineer

Electrical Circle, Kalpetta

3. Sri. Saji Paulose

Executive Engineer

Electrical Division, Mananthavady

Executive Engineer

Transmission Division

Kaniyambetta

4. Sri. Unnikrishnan T.P.

Executive Engineer

Electrical Division, Kozhikode

Executive Engineer

Electrical Division, Nadapuram

5. Sri. Chandran T.P.

Executive Engineer

Electrical Division, Iritty

Executive Engineer

Electrical Division, Kozhikode

6. Sri. Bose Jacob

Executive Engineer

Electrical Circle, Kalpetta

Executive Engineer

APDRP Division, Kozhikode

7. Sri. Ravi C.V.

Executive Engineer

Electrical Division, Irinjalakuda

Executive Engineer

Electrical Division

Tirurangadi

8. Sri. Sheraffideen C.P.

Executive Engineer

Electrical Division, Tirurangadi

9.

Executive Engineer

Transmission Circle, Malappuram

Sri. Rajkumar K.

Executive Engineer

Transmission Division, Palakkad

Executive Engineer

Electrical Division, Palakkad

10. Sri. Muhammed Sheriff

Executive Engineer

Electrical Division, Aluva

Executive Engineer

Electrical Circle, Shornur

11. Sri. Martin C.S.

Executive Engineer, LD

Kalamassery

Executive Engineer

Transmission Division

Shornur

Page 33: Hydel Bullet - June 2015 - KSEBEA

33

Hydel Bullet - June 2015

12. Sri. Kuriakose T.A.

Executive Engineer

Transmission Division, Madakathara

Executive Engineer

Transmission Division, Shornur

13. Sri. Regunath P.B.

Executive Engineer

KG Division, Kakkayam

Executive Engineer

Transmission Divsion, Thrissur

14. Sri. Geevarghese Tharakan T.

Executive Engineer

APDRP Division, Kozhikode

Executive Engineer

Transmission Divsion, Thrissur

15. Smt. Nisha P.

Executive Engineer

RPTI, Kozhikode

Executive Engineer

Electrical Circle, Thrissur

16. Sri. Roby George P. Chittilappally

Executive Engineer

Electrical Division, Nadapuram

Executive Engineer

Electrical Division (East), Thrissur

17. Smt. Radha N.N.

Executive Engineer

O/o Chief Engineer (Distribution - North)

Kozhikode

Executive Engineer

Electrical Division, Chalakudy

18. Sri. Sedhumadhavan P.

Executive Engineer

Electrical Division, Thalassery

Executive Engineer

Electrical Division, Kodungallur

19.

21. Smt. Rajashree R.

Executive Engineer

Electrical Circle, Manjeri

Executive Engineer

Electrical Circle, Ernakulam

20. Smt. Sreelatha S.

Executive Engineer

LD Station, Kalamassery

Executive Engineer

Electrical Division, Ernakulam

Smt. Girija BExecutive Engineer

Electrical Division, Kodungallur

Executive Engineer

TMR Division, Angamaly

22. Sri. Christy K. Abraham

Executive Engineer

Electrical Division, Thrissur (East)

Executive Engineer

Regional IT Unit

Ernakulam

23. Sri. Varghese M.E.

Executive Engineer

Transmission Division, Shornur

Executive Engineer

Transmission Division, Kalamassery

24. Sri. Paul V.J.

Executive Engineer

Electrical Division, Ernakulam

Executive Engineer

APDRP Division

Ernakulam

25. Sri. Jayaraj K.V.

Executive Engineer

Transmission Division, Thrissur

Executive Engineer

BDPP, Ernakulam

Page 34: Hydel Bullet - June 2015 - KSEBEA

34

Hydel Bullet - June 2015

Smt. Beno Paul

Executive Engineer

Electrical Circle,Nilambur

26. Smt. Beena Beevi M.K.

Executive Engineer

Electrical Circle,Tirur

Executive Engineer

Electrical Division, Aluva

27. Executive Engineer

LD 2, Kalamassery

28. Sri. Jose M.V.

Executive EngineerTransmission System Operation

Kalamassery

Executive Engineer

LD Shift, Kalamassery

29. Smt. Pushpa T.

Executive EngineerElectrical Circle, Ernakulam

Executive Engineer

LD Shift, Kalamassery

30. Sri. Narayanan M.

Executive EngineerTransmission Division, Kasargod

Executive Engineer

Electrical Division,

Irinjalakuda

31. Sri. Bimal B.

Executive EngineerRegional IT Unit, Ernakulam

Executive Engineer

Electrical Division

Muvattupuzha

32. Sri. Sreekumar B.

Executive EngineerElectrical Circle, Thrissur

Executive Engineer

Transmission Division

Alappuzha

Executive Engineer

Transmission Division

Mavelikkara

33. Sri. Anil M.

Executive EngineerTransmission Circle, Poovanthuruth

34. Sri. Pratap G. Ninan

Executive EngineerElectrical Division, Mavelikkara

Executive Engineer

Electrical Division

Chengannur35. Smt. Sreekala K.

Executive EngineerTransmission Circle, Alappuzha

Executive Engineer

Electrical Division

Mavelikkara

36. Smt. Meena S.

Executive EngineerElectrical Division, Pala

Executive Engineer

Transmission Circle, Alappuzha

37. Sri. Suresh K.

Executive EngineerElectrical Division, Chenganoor

Executive Engineer

Transmission Division

Pathanamthitta

38. Smt. Prasanna Kumari S.

Executive EngineerTransmission Circle, Kottarakara

Executive Engineer

Electrical Division, Adoor

Page 35: Hydel Bullet - June 2015 - KSEBEA

35

Hydel Bullet - June 2015

39. Sri. Babu P.K.

Executive Engineer

Electrical Division, Kalpetta

Executive Engineer

Mechanical Maintenance Division

Moolamattom

40. Sri. Satheesh N.

Executive Engineer

Transmission Division, Alappuzha

Executive Engineer

Erection Division, Kallarkutty

41. Smt. Jaisy E.N.

Executive Engineer

Electrical Division, Kattappana

Executive Engineer

Generation Division, Kallarkutty

42.Sri. Eby Kuriakose

Executive Engineer

Electrical Circle, Kottayam

Executive Engineer

Electrical Circle, Thodupuzha

43. Sri. Umamaheswaran

Executive Engineer

Electrical Division, Vaikom

Executive Engineer

Electrical Division, Thodupuzha

44. Sri. Joseph P. Varghese

Executive Engineer

Generation Division, Chithirapuram

Executive Engineer

Transmission Circle

Poovanthuruthu

45. Sri. Vincent Varghese

Executive Engineer

Transmission Circle, Thodupuzha

Executive Engineer

Transmission Division

Thodupuzha

46.Smt. Puspalatha S.

Executive Engineer

TMR Division, Pallom

Executive Engineer

Transmission Circle

Thodupuzha

Sri. Mekkunnel S.J.

Executive Engineer

Electrical Division, Thodupuzha

47. Executive Engineer

Electrical Division

Kattappana

48. Sri. Mohanan G.

Executive Engineer

Electrical Division, Adoor

Executive Engineer

Electrical Division

Peerumedu

49.

50.

51.

52.

Sri. Mathew P. Kurien

Executive Engineer

BDPP, Ernakulam

Executive Engineer

Transmission Division

Pala

Executive Engineer

Electrical Circle

Pala

Executive Engineer

Electrical Division

Pala

Executive Engineer

Electrical Division, Vaikom

Asharaf V.A.

Executive Engineer

Electrical Division, Peerumedu

Sri. Mathew K.T.

Executive Engineer

Transmission Division, Pala

Sri. Prasad K.

Executive Engineer

Transmission Division, Kanjirode

Page 36: Hydel Bullet - June 2015 - KSEBEA

36

Hydel Bullet - June 2015

Smt. Elizabeth Kurian

Executive Engineer

Electrical Circle,Thodupuzha

53. Smt. Jyothy P.V.

Executive Engineer

Electrical Circle, Kozhikode

Executive Engineer

TMR, Pallom

54. Executive Engineer

Electrical Circle, Kottayam

55. Sri. Ranjith V. Dev

Executive EngineerCommunication Division, Kannur

Executive Engineer

Transmission Division, Punalur

56. Sri. Johnson B.

Executive EngineerElectrical Division, Alappuzha

Executive Engineer

Electrical Division, Punalur

57. Smt. Sophia Vincent

Executive EngineerElectrical Division, Attingal

Executive Engineer

Transmission Circle, Kottarakkara

58. Smt. Asha V.

Executive EngineerElectrical Circle, Pala

Executive Engineer

O/o Chief Engineer (Trans - South)

VB, TVM

59. Sri. Santhosh Kumar T.S.

Transmission DivisionPunalur

Executive Engineer

O/o Chief Engineer

(Transmission - South), VB, Tvm

60. Smt. Sreelatha Selvam E.R.

Executive EngineerElectrical Division, Haripad

Executive Engineer

Electrical Division

Kazhakoottam

61.Sri. Vijayaraj S.T.

Executive EngineerElectrical Division, Tirur

Executive Engineer

Transmission Division

Neyyattinkara

62.Smt. Supriya Jasmine

Executive Engineer

HRD Cell, VB, TVM

Executive Engineer

O/o Chief Engineer (Commercial & Tariff)

VB, TVM

63.Sri. Murali P.

Executive EngineerAPDRP Division, TVM

Executive Engineer

Electrical Division

Nedumangad

64. Smt. Rethi Devi O.

Executive EngineerO/o Chief Engineer (Commercial & Tariff)

Executive Engineer

Transmission Circle, Alappuzha

65. Sri. Prasad V.

Executive EngineerGeneration Division, Kallarkutty

Executive Engineer

Electrical Circle, Kattakada

66 Sri. Sreenivasan G.

Resident Engineer

New Delhi

Executive Engineer (Safety)

O/o Director (Distribution & Safety)

VB, Thiruvananthapuram

Page 37: Hydel Bullet - June 2015 - KSEBEA

37

Hydel Bullet - June 2015

Sri. Sunil Babu S.

Executive Engineer

Electrical Division,Nedumangad

67.Sri. Suresh Kumar C.

Executive Engineer

O/o Director (Distribution & Safety)

VB, TVM

Executive Engineer

Electrical Division, Attingal

68. Executive Engineer

HRD Cell

VB, TVM

69. Smt. Kala S.

Executive EngineerO/o Chief Engineer (Transmission-South), VB, Pattom, TVM

Executive Engineer

O/o Director (Corp. Plg & SCM)

VB, TVM

70 Sri. Mohammed E.

Executive Engineer

APTS, TVM

Executive Engineer

Transmission Division, Kazhakoottam

71 Sri. Manoj D

Executive Engineer

Relay Division, Thiruvannathapuram

Executive Engineer

APTS, TVM

72 Sri. Mohanan G.

Executive Engineer

Transmission Division, Kazhakootam

Executive Engineer

Relay Division, TVM

4. The posting ordered above is in the exigencies of service and in public interest.

5. Item Nos. 63, 64,65 & 68 of the above transfer order will come into effect with effect from

01-07-2015.

By order of the Full Time Directors

Sd/-

R. RAJASEKHARAN NAIR

SECRETARY (ADMINISTRATION)

Page 38: Hydel Bullet - June 2015 - KSEBEA

38

Hydel Bullet - June 2015

KERALA STATE ELECTRICITY BOARD LTD.(Incorporated under the Indian Companies Act, 1956)

Regd. Office : Vydyuthi Bhavanam, Pattom, Thiruvananthapuram -695 004

Abstract

Establishment - Promotion and postings of Assistant Executive Engineers (Electrical) to the

cadre of Executive Engineer (Electrical) and transfers and postings of Executive Engineers (Ele)-

Modifications - sanctioned - Orders issued.

CORPORATE OFFICE ( ADMINISTRATION)

B.O. (FTD) No. 1498/2015 (Estt. III/ 1611/2015) Dated, Thiruvananthapuram 18-06-2015

Read : B.O. (FTD) No. 1485 /2015 (Est III/ 1611/2015) dt : 17-06-2015

ORDER

In partial modification to the Board Order read above, the following changes are ordered with immediate

effect.

Sl. No. Name & Present Office Office to which posted

1. Sri. Suresh Kumar C.

Executive Engineer

O/o Director (Distibution & Safety)

VB, TVM

Executive Engineer

O/o Chief Engineer (PED)

VB,TVM

2.

3.

4.

5.

6.

7.

8.

Sri. Prasad V.

Executive Engineer

Generation Division

Kallarkutty Sub Division, Shornur

Executive Engineer

Electrical Division

Attingal

Sri. Prasad M.S.

Executive Engineer

O/o Chief Engineer (PED),VB, TVM

Executive Engineer

Electrical Circle

Kattakada

Smt. Prasanna Kumari S.

Executive Engineer

Transmission Circle, Kottarakara

Executive Engineer

Electrical Division

Thiruvalla

Sri. Mohanan G.

Executive Engineer

Electrical Division, Adoor

Transfer ordered vide item No. 48

as per B.O. read above asExecutive Engineer Electrical Division

Peerumedu stands cancelled

Sri. Sunny John

Executive Engineer

Electrical Division, Thiruvalla

Executive Engineer

Electrical Division

Peerumedu

Sri. Praveen M.A.

Executive Engineer

LD Shift, Kalamassery

Executive Engineer

Electrical Division

Tirurangadi

Sri. Ravi C.V.

Executive Engineer

Electrical Division, Tirurangadi

Executive Engineer

LD Shift

Kalamassery

Page 39: Hydel Bullet - June 2015 - KSEBEA

39

Hydel Bullet - June 2015

9. Sri. Roby George P. Chittilappaly

Executive Engineer

Electrical Division

Thrissur (East)

Executive Engineer

Electrical Division

Kodungalloor

10.

11.

12.

Sri. Sedhumadhavan P.

Executive Engineer

Electrical Division

Kodungalloor

Executive Engineer

Electrical Division

Thrissur (East.)

Sri. Kuriakose P.P.Executive EngineerTransmission Division

Kaniyambetta

Executive Engineer

Electrical Division

Kalpetta

Sri. Anil Kumar K.S.

Assistant Executive Engineer

Electrical Sub Division, Thrithala

On promotion posted as Executive Engineer,

Electrical Division, Kalpetta vide B.O. read above

is posted as Executive Engineer, Electrical Circle,

Kalpetta

The posting ordered above is in the exigencies of service and in public interest.

By Order of the Full Time Directors

Sd/-

R. RAJASEKHARAN NAIR

SECRETARY (ADMINISTRATION)

Page 40: Hydel Bullet - June 2015 - KSEBEA

40

Hydel Bullet - June 2015

KERALA STATE ELECTRICITY BOARD LTD.(Incorporated under the Indian Companies Act, 1956)

Office of the Chief Engineer (Human Resources Management)

PROCEEDINGS OF THE CHIEF ENGINEER (HRM), K.S.E.BOARD, THIRUVANANTHAPURAM

Sub : Temporary up - gradation of 167 places of Assistant Engineers - regularization of Assistant

Executive Engineers (Electrical) - revival of places of Assistant Engineers - sanctioned orders

issued -

No. EB.1 /AE/AEE/UG/REG/2015 Dated, Tvpm 30-05-2015

Read : 1. B.O. (FM) No. 623/2011/CE(HRM)GENL/2/AE- AEE(E) 2011 dated 26-02-2011

2. GO (MS) No. 4/2014/PD dated 13-02-2014

3. This office order No. EB.1/AE(E)/Pro/Degree/2014/50 dated 01.03.2014

4. This office note of even No. dated 31-03-2015 and direction thereon by the

Chairman and Managing Director, KSEB Ltd.

ORDER

Board vide order under read(1) decided to up-grade 167 places of Assistant Engineer (Electrical) in

corporate office, offices of Chief Engineers (74 places), Electrical Circle office (69 places), Transmission

Circle Office (22 places) and a Transmission Division after obtaining sanction from the Government. In

2014 the Government accorded sanction for temporary up - gradation of 167 places of Assistant

Engineers (Electrical) subject to the following conditions.

i. Assistant Engineers will be promoted based on existing seniority and no re-fixation of pay

will be allowed.

ii. There shall not be any financial commitment except the difference in the cadre pay of

` 50 /- pm . The additional financial commitment shall be borne by the Board itself.

iii. The benefit of personal up - gradation shall have prospective effect only and is applicable to

those who are already in service at the moment. Those who are on long leave which will not

count for pension/ increment. Higher grade will not be eligible for the up - gradation.

iv. Temporary up - gradation of 167 Assistatnt Engineers to Assistant Executive Engineers shall

be permitted till their retirement or promotion to the next higher posts whichever is earlier

and absorbed automatically in the arising Assistant Executive Engineer vacancy till the 167

personal up -gradation are covered. No more appointment of Assistant Engineers in the 167

posts so upgrade will take place until these 167 posts are adjusted and no more promotion

to the post of Assistant Executive Engineer will take place until the 167 temporary

up - gradation is adjusted.

v. There shall not be any structural changes in the existing pattern of offices.

vi Every year the Board shall ensure the ratio of Assistant Engineer to Assistant Executive

Engineer and intimate the same to the Government until the original ratio of Assitant Engineer

and Assistant Executive Engineer is restored.

As such 1961 Assistant Engineer (Electrical) selected by Departmental Promotion Committee

(Lower) have been promoted to the temporarily up -graded places so far. Now complying with Government

Order read as 2nd above, the followng Assistant Executive Engineer (Electrical) who were promoted

from the cadre of Assistant Engineer (Electrical) to the upgrade places vide order read as 3rd above are

absorbed with effect from the date which is shown against their names, in the vacancies that arose upto

01-02-2015 FN consequent on retirement, promotion etc.

Page 41: Hydel Bullet - June 2015 - KSEBEA

41

Hydel Bullet - June 2015

Besides the temporary up- gradation of places of Assistant Engineer as that of Assistant Executive

ENgineer (Electrical) in the following offices is withdrawn and the respective controlling officers are

directed to relieve those Assistatnt Executive Engineer (Electrical) working in the said places forthwith.

Name of circles No. of places

O/o. the Dy. CE, Electrical Circle, Kasargod 3

O/o. the Dy. CE, Electrical Circle, Kannur 3

O/o. the Dy. CE, Transmission Circle, Kannur 2

O/o. the Dy. CE, Electrical Circle, Sreekanthapuram 3

O/o. the Dy. CE, Electrical Circle, Vatakara 3

O/o. the Dy. CE, Transmission Circle, Kozhikode 3

O/o. the Dy. CE, Transmission Circle, Kozhikode 2

O/o. the Dy. CE, Electrical Circle, Kalpetta 3

O/o. the Dy. CE, Electrical Circle, Manjeri 3

O/o. the Dy.CE, Electrical Circle, Tirur 3

O/o. the Dy. CE, Transmission Circle, Malappuram 2

O/o. the Dy. CE, Electrical Circle, Palakkad 3

O/o. the Dy. CE, Transmission Circle, Palakkad 2

O/o. the Dy. CE Electrical Circle, Shornur 2

Sd/-

CHIEF ENGINEER (HRM)

Page 42: Hydel Bullet - June 2015 - KSEBEA

42

Hydel Bullet - June 2015

sIm√w Pn√l Unit meeting held on 06.06.2015 at Engineers House, Kollam.l Er. B. Neena, Director (Distribution & IT) was felicitated during the meeting, for her

inclusion in the “Board of Directors”, KSEB Limited.l “Kollam Power scene” for June 2015 was released.l Seminar on “Grid connectivity of Solar power” by Er.Reji.T.Alex, AEE. Schematic diagram

of a prototype decentralized solar generation unit & its connection to the grid wasexplained. Also, the recently released circular No.DREP/Solar/General/14-15 dtd16.03.2015 of The Director, Renewable Energy & Planning, was discussed in detail.

l Farewell to retired Er. Titus.A, AEE.

UNIT NEWSXncp-h-\-¥-]pcw Pn√sI.-F-kv.-C.-_n. F≥Pn-\n-tbgvkv At m-kn-tb-j≥ Xncp-h-\-¥-]pcw Pn√m hm¿jnI s]mXp-tbmKw sNb¿am-\mbn Pn. taml-\-s\bpw, skI-´-dn-bmbn A\q]v hnP-b-s\bpwXnc-s™-Sp-Øp. sI. APnØv Ipam¿ (sshkv sNb¿am≥) kpPnØv ‰n.-B¿. (S-j-d¿), C.kt¥mjv, sP. sska¨, hn.-F-kv. ]m¿∆-Xn, hn\o-Xv, hn.-hn. (tI-µ-I-Ωn-‰n) AwK-ß-fmbpw Xnc-s™-SpØp. sI.-F-kv.-C.-_n. Ub-d-IvS-dmbn tkh-\-a-\p-jvTn®v hnc-an® Fw.apl-Ω-Zen dmhq-Ø¿, Akn. FIvkn-Iyq-´ohv F≥Pn-\o-b¿ kenw Fkv. F∂n-h¿°vbmXbb∏v \¬In, Atkm-kn-tb-j≥ kwÿm\ ]kn-U‚ v C. apl-ΩZv sjco-^v,P\-d¬ skI-´dn tPm¿÷v amXyp, sshZypXn sdKp-te-‰dn IΩn-j-\wKw tPm¿Pv tP°_vhn. cRvPnØv Ipam¿, Pn.-F-kv. APn-Ip-am¿ XpS-ßn-b-h¿ kwkm-cn-®p.

Page 43: Hydel Bullet - June 2015 - KSEBEA

43

Hydel Bullet - June 2015

Unit meeting held on 04/06/2015 5:45 pm at Bestotel, Kottayam with Chairman Er C.P.

George in the chair. Chair welcomed all members to the meeting. Unit appreciated Palakkad

unit for successfully conducting Annual general body of our association. The chair shared

recent developments in the field. Chair brought the attention of the unit to recent CE(HRM)’s

order regarding revival of AEE’s upgradation places to AE places at Circle offices functioning at

northern Kerala. Unit members have the opinion that the order should be reviewed. The

order didn’t account earlier board order for having one AEE in each circle as safety officer. Also

its opined that the circle’s working behaviour changed positively by the involvement of field

experienced officers in the circle due to the upgradation of AE places. The unit discussed

another issue regarding KSEBL continuing subsidized electricity charges though the

government has not allocated any budget provisions for the same and decided to take up the

matter to CEC. Audited annual accounts for the year 2014-15 were passed in the meeting.

Election for new unit office bearers for the year 2015-16 were conducted and elected below

mentioned members for the same.

tIm´bw Pn√

UNIT OFFICE BEARERS FOR 2015 -16

Chairman Er. C.P. George Ph : 9446008302

Vice - Chairman Er. James George Ph : 9447956527

Secretary Er. Mahesh T. Ph : 9495600714

Treasurer Er. Renjit Raj K. Ph : 9496008343

C.E.C. Members Er. Sreeraj R. Ph : 9496008158

Er. Viji Prabhakaran Ph : 9446007899

Er. Yoosuf K.S. Ph : 9496008233

Power Scene Editor Er. Midhun Varghese Ph : 9496008342

Regional coordinators Er. Anu paul

Er. Mathew K.T.

Er. Dennis Joseph T.

Er. Joby Zachariah

Lady Coordinators Er. Aritha Krishnan G

Er. Shymol C Mathen

C.E.C. Members Er. K.R. Rajan Ph : 9496008355

Er. Viji Prabhakaran Ph : 9446007899

Er. C.S Mammen Ph : 9496011822

Power Scene Editor Er. Mahesh T. Ph : 9495600714

Power Scene Co-Editor Er. Joby Mathai Ph : 9446008574

Page 44: Hydel Bullet - June 2015 - KSEBEA

44

Hydel Bullet - June 2015

CongratulationsCongratulationsCongratulationsCongratulationsCongratulations

Er. C.V. NANDAN

Director, GenerationEr. O. Asokan

Director, Corporate Planning & SCM

Er. P. Vijayakumari

Director, Transmission &

System Operations

Er. B. Nina

Director, Distribution & Safety

Newly appointed directors of KSEBL

Page 45: Hydel Bullet - June 2015 - KSEBEA

45

Hydel Bullet - June 2015

Er. Muhammed Ali Rawther, Director(Distribution & Safety) retired

from KSEB Board Ltd. on 31.05.2015, having served the organisation for

the past 29 years.

After graduating from Kerala University in 1981, M.A. Rawther, Director,

Distribution and Safety, Kerala State Electricity Board Limited (KSEBL),

did a teaching stint at the National Institute of Technology (erstwhile

Regional Engineering College), Kozhikode and College of Engineering,

Trivandrum. He joined KSEB in 1986, and went on to work in various

segments including generation, transmission and distribution from

Asst. Engineer to Chief Engineer(Generation). While at KSEB, he has

also served as technical adviser to the Kerala state government for the

ADB-funded Tsunami Emergency Assistance Project. He has held his current position since

October 2013, post the unbundling of KSEB and prior to that he was Member (Transmission &

Generation) from 02.09.2011 and Member (Distribution & Generation) from 27.06.2013 in the

KSEB.

The rebuilding and renovation of the 340 MW Sabarigiri hydro plant in Moozhiyar, which was

damaged after a generator explosion accident in May 2008, was carried out under his leadership

and those years stand out as one of the golden years of the Sabarigiri Power house.

He has been a very active member of our association and during his term in Moozhiyar, he

took the initiative to admit maximum number of members into our association, for which we

sincerely thank him.

KSEB Engineers Association wishes him a, prosperous and happy retirement life.

Er. J. Baburaj Director(Supply Chain Management & Generation)

retired from KSEB Board Ltd. on 31.05.2015

He has a creditable performance of working for 25 years in

Idukki Hydel Electric project at Moolamattom. Due to his

dedication to work, KSEB has provided Generation Training to him

in Canada.

He has been a very active member of KSEBEA. We

congratulate him for this achievement and wishes him in

all his future endeavours.

KSEB Engineers Association wishes him a, prosperous and

happy retirement life.

FAREWELL

Page 46: Hydel Bullet - June 2015 - KSEBEA

46

Hydel Bullet - June 2015

Er. K. Venugopalan Director(Transmission & System

Operations) retired from KSEB Board Ltd. on 31.05.2015, He

was working as Chief Engineer (Transmission- North) before

his appointment as Director.

He joined the services of KSEB on 11-08-1986 and after initial

service in Generation, he worked in the transmission wing

and was involved in the Construction of Kaloor, Pullazhi,

Cherpullaserry (2nd stage), Arangottukara, Shornur(2nd stage)

substations. He was also involved in the construction of 220

KV multi circuit line from Madakkathara , 110 kV line to

Nedumbassery airport sub station etc. He played a pivotal

role in getting the HVDC line extended to Thrissur.

He has been a very active member of KSEBEA all through his

career.

KSEB Engineers Association wishes him a, prosperous and

happy retirement life.

Er. Gopala Krishnan C.,AE,110kV substation,Azhikkode

retired from service on 30-04-15. After completing his

diploma, he joined KSEB on 7-12- 1987 as shift assistant at

11OkV substation kubanoor. He worked in Transmission and

distribution wings in kannur and kasargode districts.He has

served Kannur unit of our association as Treasurer for 3 years

till his retirement.

He has been a very active member of KSEBEA. We wish him

a happy retirement life.

Er. Salim S. Assistant Executive Engineer,Control room,

Thiruvananthapuram , has retired from service on 31.05.2015.

He has worked in all fields of KSEB namely, Generation,

Transmission and Distribution.

He has been a very active member of KSEBEA. We wish him

a happy retirement life.

Page 47: Hydel Bullet - June 2015 - KSEBEA

47

Hydel Bullet - June 2015

Page 48: Hydel Bullet - June 2015 - KSEBEA

48

Hydel Bullet - June 2015