VARIABLE AIR VOLUME UNITS
Variable air volume units, by pass type complete with
thermostatic controller including VAV heaters,
accessories, electrical connection and control wiring to
complete the installation all in accordance with drawings
and specifications.
A VAV box 114 l/s air flow, inline 3 nr.
B VAV box 117 l/s air flow, inline 4 nr.
C VAV box 119 l/s air flow, inline 6 nr.D VAV box 122 l/s air flow, inline 1 nr.
E VAV box 123 l/s air flow, inline 3 nr.
F VAV box 127 l/s air flow, inline 1 nr.
G VAV box 131 l/s air flow, inline 6 nr.
H VAV box 132 l/s air flow, inline 2 nr.
A VAV box 133 l/s air flow, inline 1 nr.
B VAV box 138 l/s air flow, inline 6 nr.
C VAV box 141 l/s air flow, inline 1 nr.D VAV box 143 l/s air flow, inline 3 nr.
E VAV box 146 l/s air flow, inline 3 nr.
F VAV box 148 l/s air flow, inline 4 nr.
G VAV box 152 l/s air flow, inline 1 nr.
H VAV box 134 l/s air flow, inline 2 nr.
J VAV box 136 l/s air flow, inline 1 nr.
A VAV box 154 l/s air flow, inline 1 nr.
B VAV box 175 l/s air flow, inline 1 nr.C VAV box 181 l/s air flow, inline 2 nr.
D VAV box 200 l/s air flow, inline 1 nr.
E VAV box 210 l/s air flow, inline 1 nr.
F VAV box 324 l/s air flow inline 4 nr
Page 2
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 2/300
B VAV box 329 l/s air flow, fan assited 1 nr.
C VAV box 351 l/s air flow, inline 1 nr.
D VAV box 377 l/s air flow, inline 1 nr.
E VAV box 378 l/s air flow, inline 1 nr.
F VAV box 380 l/s air flow, inline 4 nr.
G VAV box 391 l/s air flow, inline 7 nr.
H VAV box 395 l/s air flow, fan assisted 15 nr.
J VAV box 432 l/s air flow, inline 1 nr.
A VAV box 457 l/s air flow, inline 4 nr.
B VAV box 470 l/s air flow, fan assisted 2 nr.
C VAV box 480 l/s air flow, fan assisted 3 nr.
D VAV box 491 l/s air flow, inline 4 nr.
E VAV box 566 l/s air flow, inline 1 nr.
F VAV box 650 l/s air flow, inline 1 nr.
G VAV box 669 l/s air flow, inline 1 nr.
Volume Control Damper (VCD)
Supply and install volume control damper as per
specification and tender drawings, sizes shown below
A 150 x 100 mm 6 nr.
B 200 x 100 mm 6 nr.
C 250 x 100 mm 30 nr.
D 300 x 100 mm 54 nr.
E 350 x 100 mm 18 nr.
F 350x150 mm 42 nr.
G 400 x150 mm 48 nr.
A 400 x 250 mm 36 nr.
B 450 x 150 mm 30 nr.
C 450 x 200 mm 12 nr.
D 450 x 200 mm 12 nr.
E 450 x 250 mm 12 nr.
Page 3
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 3/300
G 300 x 200 mm 5 nr.
H 300 x 250 mm 2 nr.
A 350 X 100 mm 3 nr.
B 350 x 200 mm 2 nr.
C 350 x 250 mm 1 nr.
D 400 x 150 mm 6 nr.
E 400 x 200 mm 5 nr.
F 450 x 200 mm 2 nr.
G 500 x 200 mm 3 nr.
H 500 x 250 mm 4 nr.
A 500 x 350 mm 1 nr.
B 550 x 250 mm 1 nr.
C 550 x 300 mm 1 nr.
D 550 x 350 mm 1 nr.
E 550 x 650 mm 5 nr.
F 600 x 250 mm 2 nr.
G 600 x 300 mm 1 nr.
H 650 x 250 mm 1 nr.
J 650 x 300 mm 1 nr.
A 650 x 450 mm 1 nr.
B 750 x 500 mm 2 nr.
C 800 x 350 mm 3 nr.
D 800 x 700 mm 1 nr.
E 850 x 400 mm 1 nr.
F 850 x 450 mm 3 nr.
G 850 x 550 mm 2 nr.
H 900 x 300 mm 1 nr.
J 900 x 450 mm 2 nr.
A 900 x 550 mm 1 nr.
B 900 x 600 mm 1 nr.
C 900 x 800 mm 3 nr.
D 950 x 500 mm 1 nr.
Page 4
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 4/300
F 1200 x 600 mm 3 nr.
G 1200 x 650 mm 1 nr.
H 1200 x 700 mm 3 nr.
J 1200 x 900 mm 1 nr.
A 1250 x 500 mm 1 nr.
B 1250 x 800 mm 18 nr.
C 1300 x 850 mm 2 nr.
D 1350 x 900 mm 2 nr.
E 1400 x 700 mm 1 nr.
F 1500 x 700 mm 1 nr.
G 1500 x 750 mm 1 nr.
H 1500 x 800 mm 1 nr.
J 1600 x 700 mm 2 nr.
K 1600 x 750 mm 1 nr.
Diffusers
Supply, install, test and commission Supply diffuser (600
x 600 mm face) Aluminum powder coated with volume
damper and complete with all required accessories,quantity of air flow . as per schedule in the drawing
A Supply diffuser 150 x 150 mm 21 nr.
B Supply diffuser 225 x 225 mm 193 nr.
C Supply diffuser 300 x 100 mm 11 nr.
D Supply diffuser 300 x 300 mm 293 nr.
E Supply diffuser 375 x 375 mm 78 nr.
F Supply diffuser 450 x 450 mm 13 nr.
G Supply diffuser 500 x 200 mm 5 nr.
H Supply diffuser 600 x 600 mm 11 nr.
Page 5
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 5/300
Supply, install, test and commission Exhaust diffuser
Aluminum power coated with complete with all required
accessories, quantity of air flow . as per schedule in the
drawing
A Exhaust diffuser 150 x150 mm 118 nr.
B Exhaust diffuser 225 x 225 mm 29 nr.
C Exhaust diffuser 225 x 255 mm 2 nr.
D Exhaust diffuser 300 x 100 mm 3 nr.
E Exhaust diffuser 300 x 300 mm 50 nr.
F Exhaust diffuser 375 x 375 mm 6 nr.
G Exhaust diffuser 450 x 450 mm 3 nr.
Supply Grilles
Supply, install, test and commission Supply Grilles
complete with all required accessories, quantity of air
flow .. as per schedule in the drawing
A Supply Grille 200 x 100 mm 4 nr.
B Supply Grille 225 x 225 mm 2 nr.
C Supply Grille 300 x 100 mm 46 nr.
D Supply Grille 350 x 150 mm 1 nr.
E Supply Grille 400 x 150 mm 3 nr.
F Supply Grille 500 x 100 mm 3 nr.
G Supply Grille 500 x 150 mm 8 nr.
H Supply Grille 500 x 200 mm 1 nr.
J Supply Grille 1210 x 610 mm 7 nr.
K Supply Grille 200 x 100 mm 4 nr.
Return Grill
Supply, install, test and commission return grilles
complete with all required accessories, quantity of air
Page 6
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 6/300
Exhaust cowl
Supply, install , test and commission Exhaust cowl,
complete with SS bird screen, all required accessories
and as hown on drawings.
A 45 Degree cowl size 300 x 150 mm 1 nr.
B 45 Degree cowl size 300 x 200 mm 1 nr.
C 45 Degree cowl size 400 x 200 mm 2 nr.
D 45 Degree cowl size 400 x 250 mm 1 nr.
E 45 Degree cowl size 500 x 300 mm 1 nr.
F 45 Degree cowl size 550 x 200 mm 1 nr.
G 45 Degree cowl size 550 x 300 mm 2 nr.
H 45 Degree cowl size 600 x 300 mm 1 nr.
A 45 Degree cowl size 650 x 200 mm 1 nr.
B 45 Degree cowl size 650 x 350 mm 1 nr.
C 45 Degree cowl size 750 x 350 mm 1 nr.
D 45 Degree cowl size 750 x 750 mm 6 nr.
E 45 Degree cowl size 800 x 700 mm 1 nr.
F 45 Degree cowl size 900 x 600 mm 1 nr.
G 45 Degree cowl size 950 x 800 mm 1 nr.
H 45 Degree cowl size 1000 x 600 mm 1 nr.
A 45 Degree cowl size 1000 x 750 mm 2 nr.
B 45 Degree cowl size 1000 x 800 mm 1 nr.
C 45 Degree cowl size 1000 x 900 mm 1 nr.
D 45 Degree cowl size 1000 x 950 mm 1 nr.
E 45 Degree cowl size 1100 x 750 mm 1 nr.
F 45 Degree cowl size 1100 x 800 mm 1 nr.
G 45 Degree cowl size 1200 x 700 mm 1 nr.
H 45 Degree cowl size 1250 x 800 mm 1 nr.
J 45 Degree cowl size 1300 x 850 mm 1 nr.
K 45 Degree cowl size 1350 x 900 mm 1 nr.
L 45 Degree cowl size 1500 x 800 mm 1 nr.
Page 7
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 7/300
58.548 controls
Unit AED Unit RO Total RO Consider
468.7 32.80 98.40 91.35
468.7 32.80 131.20 91.35
468.7 32.80 196.80 91.35 468.7 32.80 32.80 91.35
468.7 32.80 98.40 91.35
468.7 32.80 32.80 91.35
468.7 32.80 196.80 91.35
468.7 32.80 65.60 91.35
468.7 32.80 32.80 91.35
468.7 32.80 196.80 91.35
468.7 32.80 32.80 91.35 468.7 32.80 98.40 91.35
468.7 32.80 98.40 91.35
468.7 32.80 131.20 91.35
468.7 32.80 32.80 91.35
468.7 32.80 65.60 91.35
468.7 32.80 32.80 91.35
468.7 32.80 32.80 91.35
468.7 32.80 32.80 91.35 468.7 32.80 65.60 91.35
576.2 40.30 40.30 98.85
576.2 40.30 40.30 98.85
645 45 10 180 40 103 65
Aldes
Page 8
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 8/300
645 45.10 45.10 103.65
645 45.10 45.10 103.65
645 45.10 45.10 103.65
746.05 52.20 52.20 110.75
746.05 52.20 208.80 110.75
746.05 52.20 365.40 110.75
746.05 52.20 783.00 110.75
746.05 52.20 52.20 110.75
746.05 52.20 208.80 110.75
746.05 52.20 104.40 110.75
746.05 52.20 156.60 110.75
746.05 52.20 208.80 110.75
746.05 52.20 52.20 110.75
857.85 60.00 60.00 118.55
857.85 60.00 60.00 118.55
-
-
-
85.49 6.00 36.00 6.00
90.2 6.30 37.80 6.30
94.92 6.60 198.00 6.60
96.29 6.70 361.80 6.70
103.12 7.20 129.60 7.20
89.97 6.30 264.60 6.30
117.3 8.20 393.60 8.20
159.86 11.20 403.20 11.20
124.13 8.70 261.00 8.70
161.29 11.30 135.60 11.30
161.29 11.30 135.60 11.30
161.29 11.30 135.60 11.30
Page 9
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 9/300
168.65 11.80 59.00 11.80
181.22 12.70 25.40 12.70
167.67 11.70 35.10 11.70
188.56 13.20 26.40 13.20
194.79 13.60 13.60 13.60
190.18 13.30 79.80 13.30
198.4 13.90 69.50 13.90
208.24 14.60 29.20 14.60
218.08 15.30 45.90 15.30
234.15 16.40 65.60 16.40
267.24 18.70 18.70 18.70
244.87 17.10 17.10 17.10
262.15 18.30 18.30 18.30
279.72 19.60 19.60 19.60
418.45 29.30 146.50 29.30
255.59 17.90 35.80 17.90
273.74 19.10 19.10 19.10
276.38 19.30 19.30 19.30
295.41 20.70 20.70 20.70
393.09 27.50 27.50 27.50
443.58 31.00 62.00 31.00
390.89 27.30 81.90 27.30
536.83 37.50 37.50 37.50
528.45 37.00 37.00 37.00
560.43 39.20 117.60 39.20
607.33 42.50 85.00 42.50
477.9 33.40 33.40 33.40
574.66 40.20 80.40 40.20
622.46 43.50 43.50 43.50
714.22 49.90 49.90 49.90
771.42 53.90 161.70 53.90
1947.5 136.20 136.20 136.20
Page 10
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 10/300
830.29 58.10 174.30 58.10
870.64 60.90 60.90 60.90
911.55 63.70 191.10 63.70
1466.9 102.60 102.60 102.60
811.6 56.80 56.80 56.80
1034.96 72.40 1,303.20 72.40
1558.33 109.00 218.00 109.00
1600.8 111.90 223.80 111.90
1002.7 70.10 70.10 70.10
1038.2 72.60 72.60 72.60
1085.02 75.90 75.90 75.90
1100.52 77.00 77.00 77.00
1073.67 75.10 150.20 75.10
1122.25 78.50 78.50 78.50
- - -
- - -
- - -
- - -
678.24 47.40 995.40 47.40
678.24 47.40 9,148.20 47.40
678.24 47.40 521.40 47.40
678.24 47.40 13,888.20 47.40
678.24 47.40 3,697.20 47.40
678.24 47.40 616.20 47.40
678.24 47.40 237.00 47.40
678.24 47.40 521.40 47.40
- - -
- - -
Page 11
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 11/300
- - -
70.18 4.90 578.20 4.90
166.67 11.70 339.30 11.70
166.67 11.70 23.40 11.70
166.67 11.70 35.10 11.70
166.67 11.70 585.00 11.70
236.05 16.50 99.00 16.50
314.03 22.00 66.00 22.00
- - -
- - -
- - -
- - -
33.58 2.30 9.20 2.30
65.34 4.60 9.20 4.60
46.25 3.20 147.20 3.20
68.93 4.80 4.80 4.80
77.22 5.40 16.20 5.40
72.74 5.10 15.30 5.10
95.3 6.70 53.60 6.70
117.88 8.20 8.20 8.20
701.82 49.10 343.70 49.10
33.58 2.30 9.20 2.30
- - -
- - -
- - -
Page 12
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 12/300
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - - - -
- - -
- - -
Page 13
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 13/300
VCD Unit AED Unit AED Unit RO
Size Qty.
1500X500 1 722.84 961.97 1684.81 117.80
1150X1000 1 642.84 1430.68 2073.52 145.00
1900X900 1 2292.66 2040.65 4333.31 303.00
1200X600 2 761.52 928.11 1689.63 118.20
1700X650 3 1138.94 1350.29 2489.23 174.10
1700X500 1 958.76 1079.34 2038.1 142.50
1700X400 2 783.82 898.72 1682.54 117.70
1200X400 2 537.63 665.87 1203.5 84.20
1200X450 2 638.65 731.43 1370.08 95.80
1850X800 1 1365.94 1785.59 3151.53 220.40
1700X600 1 1115.46 1259.98 2375.44 166.10
1800X1250 1 2307.97 2581.26 4889.23 341.90
1550X1000 1 1468.62 1866.59 3335.21 233.20
2000X600 2 2829.81 1453.78 4283.59 299.60
1200X650 1 777.17 993.67 1770.84 123.80
1700X650 1 1138.94 1350.29 2489.23 174.10
1000X350 1 408.71 529.52 938.23 65.60 1400X500 1 700 914.36 1614.36 112.90
1500X500 1 722.84 961.97 1684.81 117.80
-
-
Size Qty. -
200X100 2 -
300X200 14 -
350X250 1 - 550X200 3 -
-
-
Aldes
SAND TRAP LOUVERS with filter and VCD
Motorised VCD
Sound Attenuator
Includedin MD
Page 14
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 14/300
1200x900 2 5774.74 403.80
1200x600 1 4460.99 312.00
1000x750 1 3998.43 279.60
1200x700 4 4898.9 342.60
1250x800 2 5412.06 378.50
1000x800 2 4170.29 291.60
1350x900 2 5925.22 414.40
950x800 2 4206.16 294.10
900x700 1 3754.85 262.60
1300x850 2 5631.02 393.80
1500x800 2 6657.1 465.50
1300x550 1 4317.28 301.90
1100x750 1 5042.62 352.60
1100x800 2 5261.58 367.90
Factors :
Import Duty
$ to RO
Frieght
Discount (%)
Clearing & FrwdgChrgs
Exchange Rates :UAE Dhs to R.O.
Page 15
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 15/300
Total RO
117.80
145.00
303.00
236.40
522.30
142.50
235.40
168.40
191.60 220.40
166.10
341.90
233.20
599.20
123.80
174.10
65.60 112.90
117.80 4,217.40
-
-
-
-
- -
-
-
Page 16
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 16/300
807.60
312.00
279.60
1,370.40
757.00
583.20
828.80
588.20
262.60
787.60
931.00
301.90
352.60 735.80 14,768.60
18,986.00
11%
-
40%
-
0.105
0.386
Page 17
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 17/300
Actuator Unit AED Unit AED Unit RO Total ROSize Qty.
750X450 1 158 394.29 552.29 44.70 44.70
600X300 2 158 257.79 415.79 33.60 67.20
1400X750 1 158 1024.82 1182.82 95.60 95.60
1000X500 3 158 607.07 765.07 61.90 185.70
750X300 1 158 285.43 443.43 35.90 35.90
550X300 2 158 248.56 406.56 32.90 65.80
1350X900 2 158 1509.47 1667.47 134.80 269.60
1250X800 2 158 994.12 1152.12 93.10 186.20
1500X800 2 158 1071.04 1229.04 99.40 198.80 1200X900 2 158 1441.88 1599.88 129.40 258.80
1050X650 2 158 817.56 975.56 78.90 157.80
800X700 2 158 489.81 647.81 52.40 104.80
1000X800 2 158 458.57 616.57 49.80 99.60
1300X850 2 158 751.73 909.73 73.60 147.20
1200X600 2 158 842.11 1000.11 80.90 161.80
1200X700 4 158 531.01 689.01 55.70 222.80
1000X900 1 158 1183.27 1341.27 108.40 108.40
1000X600 3 158 788.79 946.79 76.50 229.50
950X1050 2 158 1207.1 1365.1 110.40 220.80 900X600 2 158 762.13 920.13 74.40 148.80
850X500 2 158 573.28 731.28 59.10 118.20
1000X750 1 158 901.75 1059.75 85.70 85.70
950X800 2 158 901.8 1059.8 85.70 171.40
1300X500 2 158 758.91 916.91 74.10 148.20
500X450 4 158 295.82 453.82 36.70 146.80
350X150 5 158 161.4 319.4 25.80 129.00
400X150 3 158 168.56 326.56 26.40 79.20
300X450 4 158 250.73 408.73 33.00 132.00
200x100 2 158 127.77 285.77 23.10 46.20
300x200 14 158 189.66 347.66 28.10 393.40
350x250 1 158 206.84 364.84 29.50 29.50
550x200 3 158 236.38 394.38 31.90 95.70
0 - -
83 4 585 10
MOTORIZED Volume control DAMPER
Aldes
Page 18
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 18/300
DUCTING : 7th June 11
Size
Rate / ton (C&F Muscat) (US$)
Landed Price/ton (R.O.) -
Size of sheet (sqmt) 2.97
Rectangular Ducting
No. of
sheets / ton
24G 71
22G 53
20G 46
18G 33
16G 25
Factors
Duty : (%)
Clearing & forwarding (%)
Discount : (%)
Freight : (%)
Addl for PO vs quote 17.5%
Exchg Rates :
UAE Dhs to R.O. 0.105
DUCTING : 7th June 11
Page 19
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 19/300
Clearing & forwarding (%)
Discount : (%) 5%
Freight : (%)
Addl for PO vs quote 17.5%
Exchg Rates :UAE Dhs to R.O. 0.105
FIRE RATED DUCTING : 7th June 11
Size
Rate / ton (C&F Muscat) (US$)
Landed Price/ton (R.O.) -
Size of sheet (sqmt) 2.97
1m2/kg Rectangular Ducting
No. of
sheets / ton
4.95 24G 71 6.91 22G 53
8.45 20G 46
10.6 18G 33
16G 25
Factors
Duty : (%)
Clearing & forwarding (%)
Discount : (%) 5%Freight : (%)
Addl for PO vs quote 17.5%
Exchg Rates :
UAE Dhs to R O 0 105
Page 20
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 20/300
50 mm thick rigid fibre glass insulation of 48kg/m2
density
0
25 mm thick,48kg/m3 sound absorbed lining to
ductwork, internally 1MX1.2M
0
25 mm thick,48kg/m3 externally 0
35 or 15 mm thick rigid fibre glass insulation of
48kg/m3 density
1
50mm thick,32-35kg/m3 density,polystrene 2828.98
Preinsulated Flexible Duct( Crayflex/Supaflex/Atflex)
Description Unit
150mm dia m
200mm dia m
250mm dia m
300mm dia m
Pipe Insulation 15th June 11;
Thermal insulation, as specified to following chilled
water pipes, as specified Sectional rigid fibreglass
0.914m/piece0.914
20 mm diameter pipe 40mm thick,96kg/m3354
Page 21
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 21/300
Pipe Insulation 16th Nov 11;
Thermal insulation, as specified to following chilled
water pipes, as specified Sectional rigid fibreglass
0.914m/piece0.914
Density 64kg/m3 all
12 mm diameter pipe 40mm thick4
13 mm diameter pipe 40mm thick126
20 mm diameter pipe 40mm thick194
25 mm diameter pipe 40mm thick389
32 mm diameter pipe 40mm thick 1145
42 mm diameter pipe 40mm thick1048
50 mm diameter pipe 50mm thick1438
65 mm diameter pipe 65mm thick995
80 mm diameter pipe 65mm thick1010
100 mm diameter pipe 65mm thick 1311
125 mm diameter pipe 65mm thick359
150 mm diameter pipe 75mm thick453
Page 22
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 22/300
20 mm diameter pipe 50mm thick,96kg/m3354
25 mm diameter pipe 50mm thick,96kg/m3160
32 mm diameter pipe 50mm thick,96kg/m3100
42 mm diameter pipe 50mm thick,96kg/m3100
50 mm diameter pipe 50mm thick,96kg/m3120
65 mm diameter pipe 50mm thick,96kg/m3 80
80 mm diameter pipe 50mm thick,96kg/m3 100
100 mm diameter pipe 50mm thick,96kg/m312
125 mm diameter pipe 50mm thick,96kg/m38
150 mm diameter pipe 50mm thick,96kg/m350
200 mm diameter pipe 50mm thick,96kg/m30
250 mm diameter pipe 50mm thick,96kg/m30
Note For external coating 57-86 with all access shall
be RO/m2 4.5
Ducting Insulation 8th June 11
Description Qty
Page 23
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 23/300
19 mm thick closed cell sponge or expanded rubber
sections, comply with ASTM C 534 type 2 insulation
fixed with adhesive to indoor supply and return air
rectangular ductwork
1,886
32 mm thick closed cell sponge or expanded rubber
sections, comply with ASTM C 534 type 2 insulation
fixed with adhesive to indoor outside air
rectangular ductwork and outdoor supply and
return air rectangular ductwork
0
Chilled water piping insulation 8th June 11 R
∏ d(m2/m) Description Qty
Armaflex Type 19mm thick
0.0942 20mm dia 329
0.109 25mm dia 596
0.132 32mm dia 483
0.1571 40mm dia 225
0.1885 50mm dia 459
0.2356 65mm dia 296
0.2827 80mm dia 324
0.3456 100mm dia Use Sheet will require 74sqm 212
0.5027 150mm dia will require 110sqm 196
0.6598 200mm dia will require 35sqm 50
0.817 250mm dia will require 69sqm 79
0.974 300mm dia will require 47sqm 45
above
80dia
Ro/m2 3
Acc RO/m2 1 8
Page 24
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 24/300
0.779216 200mm dia 351
0.936316 250mm dia 259
1.093416 300mm dia 288
1.250516 350mm dia
above80dia
Ro/m2 5.4 2912
Acc RO/m2 2.5
Chilled water piping insulation
Description 40kg/m3 density Qty
phenolic Type
20mm dia,25mm thk
25mm dia,25mm thk 227
32mm dia,25mm thk 113
40mm dia,25mm thk 250
50mm dia,25mm thk 10365mm dia,35mm thk 120
80mm dia,35mm thk 557
100mm dia ,35mm thk 108
125mm dia ,35mm thk 161
150mm dia ,35mm thk 375
200mm dia,35mm thk 351
250mm dia 259
300mm dia ,75mm thk 288350mm dia ,75mm thk
150mm dia , 75mm thk
40mm dia ,25mm thk
Dh
Page 25
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 25/300
20mm dia,25mm thk
25mm dia,25mm thk
32mm dia,25mm thk
40mm dia,25mm thk
50mm dia,25mm thk65mm dia,32mm thk
80mm dia,32mm thk
100mm dia ,32mm thk
125mm dia ,32mm thk
150mm dia ,32mm thk
200mm dia,32mm thk
250mm dia
300mm dia ,75mm thk350mm dia ,75mm thk
150mm dia , 75mm thk
40mm dia ,25mm thk
25mm dia ,25mm thk
0
Description Qty
Dh
Page 26
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 26/300
Acoustic Insulation for plenum boxes m224G 452
Acoustic Insulation for Equip m2
25mm thick,48kg/m3 density 1557.60
Piping in plant room Qty
∏ d(m2/m)0.1571 1" dia 185
0.179 1 1/4" dia
0.204 1 1/2" dia 48
0.235 2" dia
0.2827 2 1/2" dia 100
0.314 3" dia 220
0.392 4" dia 138
0.471 5" dia 830.549 6" dia 256
0.706 8" dia 175
0.864 10" dia 37
1.02 12" dia 71
Cladding 0.9mm (RO/m2) 4.5
External Coat 2
6.5
Page 27
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 27/300
Ancillary (R.O./ sq.mt) (At
Workshop)
Additionalloading (debit
for m/c) At site
FABRICATED DUCTS-
SEAGULL- 29.12.2010 P.O.
(AED) -Japanese sheets m2
Majeestech 11-
01-2012
Rate (R.O./
sq.mt) Access
36.55 2,347.57 3.800 1.500
54.60 942.17 4.500 1.600
59.00 1,004.95 5.500 1.800
68.25 - 7.400 2.000
Avg rate 24G 30% 5.300 1.59
22G 50% 6.100 3.05
20G 20% 7.300 1.46
Total 6.10
Page 28
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 28/300
Avg rate 24G 20% 5.000 1.00
22G 55% 5.700 3.14
20G 25% 7.000 1.75
Total 5.90
Ancillary (R.O.
/ sq.mt) (At
Workshop)
Additional
loading (debit
for m/c) At site
FABRICATED DUCTS-
SEAGULL- 29.12.2010 P.O.
(AED) -Japanese sheets
Fire rated
coating/m2
Majeestech 11-
01-2012
Tuleila 16th
Jan 2012
Rate (R.O./
sq.mt)
Rate (R.O./
kg)
Access/m2
36.55 11.40 3.800 0.768 1.500
54.60 11.40 4.500 0.651 1.500
59.00 11.40 5.500 0.651 2.000
68.25 11.40 7.400 0.698 2.500
Avg rate 24G 20% 3.800 0.76
22G 55% 4.500 2.48
20G 25% 5.500 1.38
Total 4.60
Page 29
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 29/300
m2
336 sheets RO 2.600/sheet 2.17 2.825
m2
4959 Sheets RO 2.500/sheet 2.08 1.2
m21.34 1.835
m2
1.75 1.835
m2 2.60 1.835
25mm 70% 3.18
4th June 2011 50mm 30% 4.993
Unit RO/m0.91
1.05
1.30
1.38
or Gulf college
RO/Piece
InsulationRO/
m AccessRO/m2
10% 2.50
m 2.500 2.5 2.74 1.10
Page 30
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 30/300
for LULU
RO/Piece
InsulationRO/
m AccessRO/m2
Internal 1.80
Discount 5% External 2.50
m 2.30 2.200 0.70
m 2.30 2.200 0.80
m 2.80 2.700 0.80
m 2.90 2.800 0.80
m 3.30 3.100 0.90
m 3.60 3.400 0.90
m 4.30 4.100 1.00
m 4.60 4.400 1.00
m 4.80 4.600 1.10
m 7.00 6.700 1.20
m 8.00 7.600 1.40
m 8.60 8.200 2.50
Page 31
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 31/300
RO/Piece
InsulationRO/
m AccessRO/m2
2.50
m 3 2.50 1.10
m 3.5 2.92 1.10
m 3.8 3.17 1.20
m 4 3.33 1.30
m 4 3.33 1.30
m 4.2 3.50 1.50m 5 4.17 1.60
m 7.5 6.25 1.70
m 8.2 6.83 1.90
m 9.2 10.07 2.10
m 11.6 12.69 2.50
m 15.8 17.29 2.90
Unit Unit Oman Rial Access Unit RO/m2
Adhe,foam
tape,PVC
tape,canvas,co
ating
Page 32
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 32/300
m2 3.000
2.5 9.500 17917
m2 5.300
2.5 15.250
O tender Access RO/m
Unit unit RO
Adhe,foam
tape,PVC tape
Total Unit
RO/m
2.5
m 0.500 0.2355 0.736 164.5
m 0.600 0.2725 0.873 357.6
m 0.700 0.33 1.030 338.1
m 0.800 0.39275 1.193 180
m 1.000 0.47125 1.471 459m 1.300 0.589 1.889 384.8
m 2.000 0.70675 2.707 648
m 1.037 0.864 1.901 219.8016
m 1.508 1.25675 2.765 295.5876
m 1.979 1.6495 3.629 98.97
m 2.451 2.0425 4.494 193.629
m 2.922 2.435 5.357 131.49
Page 33
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 33/300
m 4.208 2.50 6.71 2354.426006
m 5.056 2.90 7.96 2060.631558
m 5.904 3.30 9.20 2650.880563
m 6.753 3.70 10.45 0
15,689.81
Cape Access RO/m Considered
Unit unit RO unit RO
Adhe,foam
tape,PVC tape
Total Unit
RO/m
2.5
m 1.8 1.38 1.10 2.48
m 2.1 1.61 1.10 2.71
m 2.3 1.76 1.20 2.96
m 2.6 1.99 1.30 3.29
m 2.7 2.07 1.30 3.37m 5 3.83 1.50 5.33
m 5.5 4.21 1.60 5.81
m 6.5 4.97 1.70 6.67
m 7.8 5.97 1.70 7.67
m 9.5 7.27 2.10 9.37
m 13.2 10.1 2.50 12.60
m 25 19.13 2.90 22.03
m 30.9 23.64 3.30 26.94m 38.8 29.68 3.70 33.38
m 21.5 16.45 2.10 18.55
m 2.6 1.99 1.30 3.29
far 09/1/2012
Page 34
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 34/300
m 1.8 1.38 1.10 2.48
m 2.1 1.61 1.10 2.71
m 2.3 1.76 1.20 2.96
m 2.6 1.99 1.30 3.29
m 2.7 2.07 1.30 3.37m 4.7 3.6 1.50 5.10
m 4.8 3.67 1.60 5.27
m 5.6 4.28 1.70 5.98
m 7.1 5.43 1.70 7.13
m 9.4 7.19 2.10 9.29
m 11.7 8.95 2.50 11.45
m 0 2.90 2.90
m 30.9 23.64 3.30 26.94m 38.8 29.68 3.70 33.38
m 21.5 16.45 2.10 18.55
m 2.6 1.99 1.30 3.29
m 2.1 1.61 1.10 2.71
0%
2%
25.0%0.0%
0.105
0.386
Unit Unit Oman Rial Unit Oman Rial Access Unit RO/m2Adhe,foam
tape,PVC
tape,canvas,co
Factors :
Import Duty
Frieght
Discount (%)Clearing & FrwdgChrgs
Exchange Rates :
UAE Dhs to R.O.
$ to RO
far 09/1/2012
Page 35
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 35/300
Ducting rate Insulation Total unit/m2 Total3.800 5.26 9.06 4,094.49
Ducting rate Insulation Total unit/m2 Total
- 3.28 3.28 5114.56
RO/m Total
1.02 188.91
1.16 0.00
1.33 63.65
1.53 0.00
1.84 183.76
2.04 449.02
2.55 351.62
3.06 254.103.57 913.54
4.59 803.08
5.62 207.79
6.63 470.73 3886.197
Page 36
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 36/300
Additional TOTAL (R.O.)
Rate/kg
Rate (R.O./
sq.mt)
5.300 1.100 12,442.12
6.100 1.000 5,747.24
7.300 1.000 7,336.14
9.400 0.900
- 25,525.49
Seismic supports
Amount in R.O. -
Ducting amount w/o Seismic 368,000
%age 0.00%
Page 37
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 37/300
Amount in R.O. -
Ducting amount w/o Seismic 368,000
%age 0.00%
Additional TOTAL (R.O.)
Rate/kg
Fire rated
Ducting/m2
Access/kg Rate (R.O./
sq.mt)
Dasmal 19th
Jan 2012 Labour (Mhrs/
0.150 5.300 1.071 3.25
0.250 6.000 0.868 4
0.400 7.500 0.888 22.50 4.75
9.900 0.934 6.2
-
Seismic supports
Amount in R.O. -
Ducting amount w/o Seismic 368,000
%age 0.00%
Page 38
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 38/300
4.99 -
3.28 -
3.18 - -
3.59 3.59
4.44 12,546.53
2.22
1.50
3.72
Total RO/m
3.60
Page 39
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 39/300
Total RO/m
2.90 8.80
3.00 277.20
3.50 523.80
3.60 1,089.20
4.00 3,549.50
4.30 3,563.20
5.10 5,895.80
5.40 4,378.00
5.70 4,646.00
7.90 8,783.70
9.00 2,728.40
10.70 3,714.60
Page 40
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 40/300
Total RO/m
3.60
4.02
4.37
4.63
4.63
5.005.77
7.95
8.73
12.17
15.19
20.19
Cape Phenolic Unit Oman
Rial
Page 41
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 41/300
7.000
12.750
3471.4782
Page 42
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 42/300
0
615.17
334.48
822.5
347.11
639.6
3236.17
720.36
1234.87
3513.75
4422.6
5705.77
7758.72
0
0
0
Page 43
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 43/300
0
0
0
0
00
0
0
0
0
0
0
00
0
0
0
-
Page 44
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 44/300
Page 45
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 45/300
Page 46
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 46/300
Labour (R.O./kg)
0.66
0.58 0.56
0.58
89230978.xlsx.ms_office
Page 47
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 47/300
Rectangular Ducting Measurement Sheet (SMCANA, Metric)Project:- Drg. Ref.:- AHU No:- Drg. Ref.:-
Sr. Duct Typical Duct Size Length Insulation Code Area SMACNA Gaugewise Ducting Area (Sq.M.) DW-142 Gau
No. No. W(mm)xH(mm) m. Therm. Acoust. Sq.m. 24G 22G 20G 18G 16G 24G 22G
1 850 400 32.50 81.25 0.00 81.25 0.00 0.00 0.00 81.
1 550 300 32.00 54.40 54.40 0.00 0.00 0.00 0.00 54.1 1350 900 62.70 282.15 0.00 282.15 0.00 0.00 0.00 0.
1 1200 900 13.00 54.60 0.00 54.60 0.00 0.00 0.00 0.1 1050 650 28.50 96.90 0.00 96.90 0.00 0.00 0.00 0.
1 750 350 20.50 45.10 45.10 0.00 0.00 0.00 0.00 45.1 750 300 5.00 10.50 10.50 0.00 0.00 0.00 0.00 10.
1 1000 800 39.00 140.40 0.00 140.40 0.00 0.00 0.00 140.1 750 300 14.50 30.45 30.45 0.00 0.00 0.00 0.00 30.
1 1200 600 27.50 99.00 0.00 99.00 0.00 0.00 0.00 0.1 850 300 18.50 42.55 0.00 42.55 0.00 0.00 0.00 42.1 1250 800 37.30 152.93 0.00 152.93 0.00 0.00 0.00 0.
1 1500 800 20.00 92.00 0.00 92.00 0.00 0.00 0.00 0.1 900 350 14.00 35.00 0.00 35.00 0.00 0.00 0.00 35.1 800 400 14.00 33.60 0.00 33.60 0.00 0.00 0.00 33.
1 950 800 21.50 75.25 0.00 75.25 0.00 0.00 0.00 75.1 1200 700 22.50 85.50 0.00 85.50 0.00 0.00 0.00 0.
1 1000 550 12.00 37.20 0.00 37.20 0.00 0.00 0.00 37.1 1000 450 7.00 20.30 0.00 20.30 0.00 0.00 0.00 20.
1 1300 550 18.50 68.45 0.00 68.45 0.00 0.00 0.00 0.1 650 250 19.50 35.10 35.10 0.00 0.00 0.00 0.00 35.
1 850 350 6.00 14.40 0.00 14.40 0.00 0.00 0.00 14.1 1100 400 8.00 24.00 0.00 24.00 0.00 0.00 0.00 0.
1 1200 450 2.00 6.60 0.00 6.60 0.00 0.00 0.00 0.1 300 250 1.50 1.65 1.65 0.00 0.00 0.00 1.65 0.1 600 250 3.00 5.10 5.10 0.00 0.00 0.00 0.00 5.1 650 300 7.50 14.25 14.25 0.00 0.00 0.00 0.00 14.1 650 250 10.50 18.90 18.90 0.00 0.00 0.00 0.00 18.
1 900 600 27.50 82.50 0.00 82.50 0.00 0.00 0.00 82.1 1000 750 19.50 68.25 0.00 68.25 0.00 0.00 0.00 68.1 850 500 21.50 58.05 0.00 58.05 0.00 0.00 0.00 58.1 850 400 10.00 25.00 0.00 25.00 0.00 0.00 0.00 25.1 1000 500 21.50 64.50 0.00 64.50 0.00 0.00 0.00 64.
89230978.xlsx.ms_office
Page 48
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 48/300
Rectangular Ducting Measurement Sheet (SMCANA, Metric)
Project:- Drg. Ref.:- AHU No:- Drg. Ref.:-
Sr. Duct Typical Duct Size Length Insulation Code Area SMACNA Gaugewise Ducting Area (Sq.M.) DW-142 Ga
No. No. W(mm)xH(mm) m. Therm. Acoust. Sq.m. 24G 22G 20G 18G 16G 24G 22G
(without wastage) (Sq.Ft.) 30448 3059 27389 0 0 0 250 166
NO. OF DUCT SHEETS 1047 105 942 0 0 0 9 5
TOTAL 24G 22G 20G 18G 16G 24G 22G
INSULATION SUMMARY (Sq.M.)
Indoor Insulation Outdoor Insulation Acoustic Insulation
(I1) :25mmx24kg F 0 (E1) :50mm Polysty. 0 (A1) :25mmx24kg FG 0COST ESTIMATE'!A1
(I2) :50mmx24kg F 0 (E2) :50mmx48kg FG 0 (A2) :15mmx48kg FG 0(I3) :25mmx48kg F 0 (E3) :25mm Polysty. 0 (A3) :25mmx48kg FG 0
Page 49
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 49/300
Description unit Access Qty unit $ Unit RO Total
Chilled water Pumps
P1 TO P5 56L/S@25M No 0 5 0.00 - -
PP Control panel 30KW No 0 1
S1 TO S5 110L/S@45M No 0 3
SP Control panel 75KW+VFD No 1
Pressurization Unit;7.8m3/[email protected] No 1 0.00 - -
Chemical dosing pot No 1 - -
Air Separator No 1 - -
0.00
5%
0%
5.0%
2.5%
0.105
0.386
Discount (%)
Factors :
ITT Bell & Gosset
Frieght
Import Duty
Clearing & FrwdgChrg
Exchange Rates :
$ to RO
UAE Dhs to R.O.
Page 50
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 50/300
unit RO Unit RO Total unit RO Unit RO Total unit RO Unit RO
2,195.00 2,030.38 10,151.90 - - 5,480.00 4,932.00
1,170.00 1,082.25 1,082.25 - 1,082.25
7,535.00 6,969.88 20,909.64 - - 7,880.00 7,092.00
11,255.00 10,410.88 10,410.88 - 10,410.88
2,466.00 2,281.05 2,281.05 - - 2,281.05
500.00 462.50 462.50 462.50 462.50 462.50
500.00 462.50 462.50 0.00 462.50 462.50 462.50
45,760.72 925.00
0% 0%
0% 0%
7.5% 15.0%0.0% 0.0%
0.105 0.105
0.386 0.386
Discount (%) Discount (%) Discount (%)
Wilo
Factors : Factors : Factors :
Ebara
Import Duty
Frieght Frieght Frieght
KSB
Import Duty Import Duty
Clearing & FrwdgChrgs Clearing & FrwdgChrgs Clearing & FrwdgChrgs
$ to RO $ to RO $ to RO
Exchange Rates : Exchange Rates : Exchange Rates :
UAE Dhs to R.O. UAE Dhs to R.O. UAE Dhs to R.O.
Page 51
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 51/300
Consider
Total per unit
24,660.00 2,030.38
1,082.25 216.45 2,246.83
21,276.00 6,969.88
10,410.88 3,470.29 10,440.17
2,281.05 2,281.05
462.50 462.50
462.50 462.50
60,635.18
0%
0%
10.0%0.0%
0.105
0.386
Page 52
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 52/300
Sl.No Description Fig.No.Size
(mm)U/Rate( R.O)
QtyNos.
1 Bronze Gate Valve - PN16 C31 15 3.500 2
1 Bronze Gate Valve - PN16 C31 20 4.100 12
2 Bronze Gate Valve - PN16 C31 25 5.600 33
3 Bronze Gate Valve - PN16 C31 32 7.400 189
4 Bronze Gate Valve - PN16 C31 40 9.800
5 Bronze Gate Valve - PN16 C31 50 14.700 48
6 C.I Gate Valve - PN16 541 65 51.300 97 C.I Gate Valve - PN16 541 80 61.300 11
8 C.I Gate Valve - PN16 541 100 86.500 26
9 C.I Gate Valve - PN16 541 125 119.800 10
10 C.I Gate Valve - PN16 541 150 159.700 5
10 C.I Gate Valve - PN16 541 200 191.600 3
10 C.I Gate Valve - PN16 541 250 304.300 1
10 C.I Gate Valve - PN16 541 300 454.000 2
10 C.I Gate Valve - PN16 541 350 1147.000 2
11 C.I NRV - PN 16 651 125 114.300
C.I NRV - PN 16 651 150 153.700
C.I NRV - PN 16 651 300
C.I Y strainer - PN16 810 20 4.000
C.I Y strainer - PN16 810 25 6.100
C.I Y strainer - PN16 810 32 10.000C.I Y strainer - PN16 810 40 14.300
C.I Y strainer - PN16 810 50 22.800
C.I Y strainer - PN16 810 65 32.000
Hattersley 12
SCHEDULE OF VALVES
Page 53
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 53/300
22 C.I DRV with Test ports - PN16 737 350 2175.100 2
23 D.I Semi Lugged Butterfly Valve - PN16 C950 125 40.100
24 Bronze Draining Tap 370 15 5.100
TOTALDiscount 17%
S.No Description Fig.No.
Size
(mm)
U/Rate
( R.O)
Qty
Nos.
1
Flexible Connector-Double Bellow
Threaded type FCU-12 32 9.300 2
2
Flexible Connector-Double Bellow
Threaded type FCU-15 40 11.600 22
3
Flexible Connector-Double Bellow
Threaded type FCU-20 50 14.300 4
4
Flexible Connector-Single Bellow
Flanged type FCS-50 125 39.500 16
5
Straight Thermometer Range 0-50deg,110/63mm 15.100 32
6
Pressure Gauge 4" Dial 1/2" BSP -Bottom Connection, 0-150 PSI
- -
7.800 44
TOTALDiscount 15%
Grand Total
SCHEDULE OF FLEXIBLE CONNECTORS & INSTRUME
Grand Total
Grand Total
Page 54
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 54/300
AmountR.O.
U/Rate( R.O)
QtyNos.
AmountR.O.
U/Rate( R.O)
QtyNos.
7.000 0.000 0.000 0.000
49.200 4.807 0.000 4.300
184.800 6.739 0.000 5.800
1398.600 10.442 0.000 7.800
0.000 14.352 0.000 10.300
705.600 22.402 0.000 15.300
461.700 59.064 0.000 43.600674.300 74.000 0.000 48.300
2249.000 104.000 0.000 73.800
1198.000 142.000 0.000 89.700
798.500 164.000 0.000 114.700
574.800 0.000 0.000 0.000
304.300 0.000 0.000 0.000
908.000 0.000 0.000 0.000
2294.000 0.000 0.000 0.000
0.000 107.000 0.000 76.100
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Econostth Nov 2011 Crane
Page 55
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 55/300
4350.200 0.000 0.000 0.000
0.000 42.000 0.000 46.800
0.000 2.320 0.000 2.320
28,323.30 TOTAL - TOTAL2832.330 Discount 10% 0.000 Discount 10%
25,490.97 -
Amount
R.O.
U/Rate
( R.O)
Qty
Nos.
Amount
R.O.
U/Rate
( R.O)
Qty
Nos.
18.600 9.300 2 18.600 8.600 2
255.200 11.600 22 255.200 10.900 22
57.200 11.900 4 47.600 13.600 4
632.000 30.200 16 483.200 32.100 16
483.200 13.500 32 432.000 10.700 32
343.200 6.600 44 290.400 6.000 44
1789.400 TOTAL 1527.000 TOTAL178.940 Discount 10% 152.700 Discount 10%
1610.460 1374.300
27,101.43 1,374.30
Grand Total
Grand Total
TS
Grand Total
Grand Total
Page 56
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 56/300
Access Considered
AmountR.O.
0.000 2.91
0.000 3.40
0.000 4.65
0.000 6.14
0.000 8.13
0.000 12.20
0.000 6 48.58 0.000 7 57.88
0.000 8.5 80.30
0.000 11 110.43
0.000 15 147.55
0.000 22 181.03
0.000 35 287.57
0.000 46 422.82
0.000 82 1,034.01 -
0.000 11 105.87
127.57
192.00
-
3.32
5.06
8.30
11.87
18.92
6 32.56
Page 57
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 57/300
0.000 82 1,887.33
0.000 11 44.28
0.000 4.23
- 0.000
-
Amount
R.O.
17.200
239.800
54.400
513.600
342.400
264.000
1431.400143.140
1288.260
1,288.26
Page 58
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 58/300
Sl.No Description Fig.No. Size (mm)U/Rate( R.O)
Accessflange
Gate Valves
1 Bronze Gate Valve - PN16 C31 20 4.100
2 Bronze Gate Valve - PN16 C31 25 5.600
3 Bronze Gate Valve - PN16 C31 32 7.400
4 Bronze Gate Valve - PN16 C31 40 9.800
5 Bronze Gate Valve - PN16 C31 50 14.700
6 C.I Gate Valve - PN16 541 65 51.300 6.000
7 C.I Gate Valve - PN16 541 80 61.300 7.000
8 C.I Gate Valve - PN16 541 100 86.500 8.500
9 C.I Gate Valve - PN16 541 150 159.700 15.000
Strainer
10 Bronze Y strainer - PN16 817 20 4.000
11 Bronze Y strainer - PN16 817 25 6.100
12 Bronze Y strainer - PN16 817 32 10.000
13 Bronze Y strainer - PN16 817 40 14.300
14 Bronze Y strainer - PN16 817 50 22.80015 C.I Y strainer - PN16 810 65 32.000 6.000
16 C.I Y strainer - PN16 810 80 39.800 7.000
17 C.I Y strainer - PN16 810 100 57.900 8.500
DRV
18 Bronze DRV with Test ports - PN20 1732 20 20.300
19 Bronze DRV with Test ports - PN20 1732 25 22.000
18 Bronze DRV with Test ports - PN20 1732 32 26.000
19 Bronze DRV with Test ports - PN20 1732 40 34.500
20 Bronze DRV with Test ports - PN20 1732 50 42.60021 C.I DRV with Test ports - PN16 737 65 85.900 6.000
22 C.I DRV with Test ports - PN16 737 80 132.400 7.000
23 C I DRV ith T t t PN16 737 100 172 400 8 500
SCHEDULE OF VALVES 12-06-2011( RGO & Majan)
Page 59
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 59/300
4
Flexible Connector-Single Bellow
Flanged type FCS-60 150 44.400
5Straight Thermometer Range 0-50deg, 110/63mm
- -15.100
6Pressure Gauge 4" Dial 1/2" BSP -Bottom Connection, 0-150 PSI
- -7.800
Factors :
Import Duty 5.0%
Frieght 10.0%
Discount (%) 5.0%
Clearing & Forwarding Chrgs 2.5%
Exchange Rates :
UAE Dhs to R.O. 0.105
RO to RO 1
Sl.No Description Qty Unit AED Unit RO
Access
flange
Automatic balancing valves
1 20mm dia 229.46 24.0933
2 25mm dia 245.64 25.7922
3 32mm dia 449.9 47.2395
4 40mm dia 467.5 49.0875
5 50mm dia 825 86.625
6 65mm dia 1320 138.6 6.000
7 80mm dia 1430 150.15 7.000
8 100mm dia 1991 209.055 8.500
Motorised Butterfly valves
1 100mm dia 2905 305.025 8.500
2 150mm dia 3866 405.93 15.000
Factors :Import Duty 5.0%
Frieght 10.0%
Discount (%) 5.0%
Technoflow Trading 10th July 2011
Page 60
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 60/300
8 100mm dia 806 8.500 814.5
1.2
Sl.No Description Qty Unit RO
Thermostat
/flange
Unit
Amount
R.O.
2 way on/off Control Valves with
actuator & thermostat
1 20mm dia 27.6 10 37.6
2 25mm dia 34.8 10 44.8
32mm dia
2 way modulating motorised valves
with return air duct temp
sensor,thermostat & actuator
20mm dia
25mm dia
3 32mm dia 204 0 204
4 40mm dia 210 0 210
5 50mm dia 276 0 276
6 65mm dia(either 50 or 80mm) 336 6.000 342
7 80mm dia 336 7.000 343
8 100mm dia 967.2 8.500 975.72way on/off motorised Valves with
actuator & thermostat
8 125mm dia 450 15.000 465
Factors :
Import Duty 5.0%
Frieght 10.0%
Discount (%) 5.0%
Clearing & Forwarding Chrgs 2.5%
Exchange Rates :UAE Dhs to R.O. 0.105
RO to RO 1
Johnson Control
Page 61
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 61/300
Unit AmountR.O.
Discountassume(Hattersley)
U/Rate( R.O)
Unit AmountR.O.
Discountassume(Crane)
4.100 3.90 7.06 7.06 6.70
5.600 5.30 11.00 11.00 10.50
7.400 7.00 17.07 17.07 16.20
9.800 9.30 22.99 22.99 21.80
14.700 14.00 34.95 34.95 33.20
57.300 54.40 59.06 65.06 61.80
68.300 64.90 74.00 81.00 77.00
95.000 90.30 104.00 112.50 106.90
174.700 166.00 164.00 179.00 170.10
- - -
4.000 3.80 4.50 4.50 4.30
6.100 5.80 7.00 7.00 6.70
10.000 9.50 11.40 11.40 10.80
14.300 13.60 16.35 16.35 15.50
22.800 21.70 26.16 26.16 24.90
38.000 36.10 40.00 46.00 43.70
46.800 44.50 46.00 53.00 50.40
66.400 63.10 67.00 75.50 71.70
- - -
20.300 19.30 23.20 23.20 22.00
22.000 20.90 26.00 26.00 24.70
26.000 24.70 30.00 30.00 28.50
34.500 32.80 40.00 40.00 38.00
42.600 40.50 49.00 49.00 46.60
91.900 87.30 96.00 102.00 96.90
139.400 132.40 129.00 136.00 129.20
180 900 171 90 168 00 176 50 167 70
Hattersley Crane
Page 62
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 62/300
44.400 42.20
15.100 14.30 13.50
7.800 7.40 6.60
Unit Amount
R.O. Discount assume
24.0933 22.90
25.7922 24.50
47.2395 44.90
49.0875 46.60
86.625 82.30
144.6 137.40
157.15 149.30
217.555 206.70
313.525 297.80
420.93 399.90
773 80
Page 63
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 63/300
773.80
Unit AED Unit RO
Access
flange/thermo
stat
Unit Amount
R.O.
Discount
assume Unit RO
35.70 2610.36 274.09 274.0878 260.38341 16
42.60 2741.04 287.81 287.8092 273.41874 17
- 22
-
- 33
- 35
193.80 3021.84 317.29 317.2932 301.42854 37
199.50 3283.2 344.74 344.736 327.4992 180
262.20 3715.2 390.10 390.096 370.5912 195
324.90 5603.04 588.32 6.00 594.3192 564.60324 305
325.90 11770.92 1,235.95 7.00 1242.9466 1180.7993 452
926.90 13478.4 1,415.23 8.50 1423.732 1352.5454 605
-
441.80 0
Clorius Control 10th July 2011 T
Page 64
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 64/300
Page 65
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 65/300
Page 66
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 66/300
Thermostat/ flange
Unit
AmountR.O.
Discountassume
Discount
assume &Considered
18 34 32.30 32.30
18 35 33.30 33.30
18 40 38.00 38.00
- -
20 53 50.40 50.40
20 55 52.30 52.30
20 57 54.20 54.20
20 200 190.00 190.00
20 215 204.30 204.30
58 363 344.90 344.90
64 516 490.20 490.20
78 683648.90 648.90
- -
0.000 0 - 441.80
REND-HONEYWELL 22/8/11
Page 67
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 67/300
Unit RO Unit RO Total RO Unit RO
S. No Cap TR Qty
Access
w/o Ref
Pipe
1 1 16 20 135 128.30 2,052.80 135
2 1.5 351 20 195 185.30 65,040.30 150
3 2 113 20 230 218.50 24,690.50 185
4 2.5 0 20 402 381.90 - 402
5 3 0 20 470 446.50 - 470
6(Ducted) 2.5 0 30 525 498.80 - 525
91,783.60
Factors : Factors :
0%
0%
5.0%
0.0%
0.105
0.386
Actual rate
$ to RO $ to
UAE Dhs to R.O. UAE Dh
Exchange Rates : Exchang
Clearing & FrwdgChrgs Clearing &
Discount (%) Discou
Frieght Frie
Split Units
Import Duty Import
LG (Korea)
Page 68
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 68/300
YORK
Consider
Unit RO Total RO Unit RO Unit RO Total RO Unit RO Unit RO
128.30 2,052.80 135 124.90 1,998.40 144.90 135
142.50 50,017.50 140 129.50 45,454.50 149.50 155
175.80 19,865.40 185 171.10 19,334.30 191.10 210
381.90 - 255 235.90 - 255.90 402
446.50 - 440 407.00 - 427.00 470
498.80 - 525 485.60 - 515.60 525
71,935.70 66,787.20
Factors : Factors :
0% 0%
0% 0%
5.0% 7.5%
0.0% 0.0%
0.105 0.105
0.386 0.386RO $ to RO $ to
to R.O. UAE Dhs to R.O. UAE Dh
Discou
Rates : Exchange Rates : Exchang
rwdgChrgs Clearing & FrwdgChrgs Clearing &
nt (%) Discount (%)
ght Frieght Frie
Duty Import Duty Import
LG (China) York
Page 69
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 69/300
Unit RO Total RO Unit RO Unit RO Total RO Unit RO Unit RO
128.30 2,052.80 135 128.30 2,052.80 135 128.30
147.30 51,702.30 195 185.30 65,040.30 245 232.80
199.50 22,543.50 230 218.50 24,690.50 325 308.80
381.90 - 402 381.90 - 402 381.90
446.50 - 470 446.50 - 470 446.50
498.80 - 525 498.80 - 525 498.80
76,298.60 91,783.60
Factors : Factors :
0% 0%
0% 0%
5.0% 5.0%
0.0% 0.0%
0.105 0.105
0.386 0.386RO $ to RO
to R.O. UAE Dhs to R.O.
Exchange Rates :
$ to RO
UAE Dhs to R.O.
nt (%) Discount (%)
Rates : Exchange Rates :
Discount (%)
rwdgChrgs Clearing & FrwdgChrgs Clearing & FrwdgChrgs
ght Frieght Frieght
Import DutyDuty Import Duty
Lennox Classic Make Genera
Page 70
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 70/300
Total RO Unit RO Unit RO Total RO Unit RO Unit RO
2,052.80 135 128.30 2,052.80 135 128.30
81,712.80 245 232.80 81,712.80 220 209.00
34,894.40 270 256.50 28,984.50 245 232.80
- 402 381.90 - 402 381.90 - 470 446.50 - 470 446.50
- 525 498.80 - 530 503.50
118,660.00 112,750.10
Factors : Factors :
0% 0%
0% 0%
5.0% 5.0%
0.0% 0.0%
0.105 0.105
0.386 0.386
Exchange Rates : Exchange Rates :
$ to RO $ to RO
UAE Dhs to R.O. UAE Dhs to R.O.
Discount (%) Discount (%)
Clearing & FrwdgChrgs Clearing & FrwdgChrgs
Frieght Frieght
Import Duty Import Duty
Carrier McQul
Page 71
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 71/300
Total RO Unit RO Unit RO Total RO
2,052.80 135 128.30 2,052.80
73,359.00 185 175.80 61,705.80
26,306.40 230 218.50 24,690.50
- 356 338.20 - - 370 351.50 -
- 530 503.50 -
101,718.20 88,449.10
Factors :
0% 0%
0% 0%
5.0% 5.0%
0.0% 0.0%
0.105 0.105
0.386 0.386
Exchange Rates :
$ to RO
UAE Dhs to R.O.
Discount (%)
Clearing & FrwdgChrgs
Import Duty
Frieght
ay Daikin
11/20/2011
Page 72
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 72/300
11/20/2011
2 Refrigerant piping with fittings MAJEES TECH
Maksal Mueller
Size : Unit RO/m Unit RO/m
Cu pipe- bare :
SOFT Fittings :
Unit Rate 30%
6.4 mm 0.67 0.85 0.60 0.18
9.5 mm(3/8) 1.13 1.46 1.00 0.30
12.7 mm(1/2) 1.57 1.8 1.50 0.45
15.9 mm(5/8) 2 2.5 2.20 0.66
19.10 mm(3/4) 2.33 3 2.80 0.84
22.2 mm(7/8) 4.3 4.9 3.50 1.05 28.58 mm (1 1/8) 5.5 6.6 5.10 1.53
34.9 mm(1 3/8) 7.8 8.8 6.90 2.07
42 mm(1 5/8) 9 12 8.90 2.67
54 mm( 2 1/8) 13.5 17.5 14.30 4.29
67mm( 2 5/8) 18.5 25.2 20.20 6.06
Safety factor 5% 5%
3 Ref. Pipe InsulationNitrile rubber Armaflex Gulf-o-flex 1.80
Size : 25 mm thk Unit RO/m Ancillaries Total unit (R.O.)/m
Adhesive,Tape,30-
36 coating,canvas(
1.5RO/m2)
6.4 mm 0.6 0.31 0.300 0.6109.5 mm(3/8) 0.8 0.425 0.300 0.725
12.7 mm(1/2) 0.8 0.425 0.300 0.725
28.58 mm (1 1/8) 6.4 1.20 -
34.9 mm(1 3/8) 8.7 1.20 -
42 mm(1 5/8) 11 2 1 50
Page 73
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 73/300
42 mm(1 5/8) 11.2 1.50 -
54 mm( 2 1/8) 17.9 1.50 -
67mm( 2 5/8) 25.3 1.50 -
2500 5000Trunking 100x100 3 1 -
Guard Room & Admin
Size Qty m Unit Pipe RO MH Total Pipe RO
6.4 mm 0.8 0.80 -
9.5 mm(3/8) 90 1.2 0.80 108.00
12.7 mm(1/2) 1.9 0.80 -
15.9 mm(5/8) 90 2.8 0.80 252.00 19.10 mm(3/4) 3.5 0.85 -
22.2 mm(7/8) 4.4 1.00 -
28.58 mm (1 1/8) 6.4 1.20 -
34.9 mm(1 3/8) 8.7 1.20 -
42 mm(1 5/8) 11.2 1.50 -
54 mm( 2 1/8) 17.9 1.50 -
67mm( 2 5/8) 25.3 1.50 -
180 360Trunking 100x100 3 1 -
Guard Room & office
Size Qty m Unit Pipe RO MH Total Pipe RO
6.4 mm 0.8 0.80 -
9.5 mm(3/8) 430 1.2 0.80 516.00
12.7 mm(1/2) 1.9 0.80 -
15.9 mm(5/8) 430 2.8 0.80 1,204.00 19.10 mm(3/4) 3.5 0.85 -
22.2 mm(7/8) 4.4 1.00 -
42 mm(1 5/8) 11.2 1.50 -
54 mm( 2 1/8) 17.9 1.50 -
67mm( 2 5/8) 25 3 1 50
Page 74
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 74/300
67mm( 2 5/8) 25.3 1.50 -
780 1560
Trunking 100x100 3 1 -
Officer Accomodation
Size Qty m Unit Pipe RO MH Total Pipe RO
6.4 mm 0.8 0.80 -
9.5 mm(3/8) 1040 1.2 0.80 1,248.00
12.7 mm(1/2) 1.9 0.80 -
15.9 mm(5/8) 1040 2.8 0.80 2,912.00
19.10 mm(3/4) 3.5 0.85 -
22.2 mm(7/8) 4.4 1.00 - 28.58 mm (1 1/8) 6.4 1.20 -
34.9 mm(1 3/8) 8.7 1.20 -
42 mm(1 5/8) 11.2 1.50 -
54 mm( 2 1/8) 17.9 1.50 -
67mm( 2 5/8) 25.3 1.50 -
2080 4160
Trunking 100x100 3 1 -
prayer Hall
Size Qty m Unit Pipe RO MH Total Pipe RO
6.4 mm 0.8 0.80 -
9.5 mm(3/8) 40 1.2 0.80 48.00
12.7 mm(1/2) 1.9 0.80 -
15.9 mm(5/8) 40 2.8 0.80 112.00
19.10 mm(3/4) 3.5 0.85 -
22.2 mm(7/8) 4.4 1.00 - 28.58 mm (1 1/8) 6.4 1.20 -
34.9 mm(1 3/8) 8.7 1.20 -
67mm( 2 5/8) 25.3 1.50 -
1540 3080
Trunking 100x100 3 1 -
Page 75
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 75/300
Trunking 100x100 3 1 -
Substation
Size Qty m Unit Pipe RO MH Total Pipe RO6.4 mm 0.8 0.80 -
9.5 mm(3/8) 110 1.2 0.80 132.00
12.7 mm(1/2) 1.9 0.80 -
15.9 mm(5/8) 110 2.8 0.80 308.00
19.10 mm(3/4) 3.5 0.85 -
22.2 mm(7/8) 4.4 1.00 -
28.58 mm (1 1/8) 6.4 1.20 -
34.9 mm(1 3/8) 8.7 1.20 - 42 mm(1 5/8) 11.2 1.50 -
54 mm( 2 1/8) 17.9 1.50 -
67mm( 2 5/8) 25.3 1.50 -
220 440
Trunking 100x100 3 1 -
BMT
Size Qty m Unit Pipe RO MH Total Pipe RO6.4 mm 0.8 0.80 -
9.5 mm(3/8) 225 1.2 0.80 270.00
12.7 mm(1/2) 1.9 0.80 -
15.9 mm(5/8) 225 2.8 0.80 630.00
19.10 mm(3/4) 3.5 0.85 -
22.2 mm(7/8) 4.4 1.00 -
28.58 mm (1 1/8) 6.4 1.20 -
34.9 mm(1 3/8) 8.7 1.20 - 42 mm(1 5/8) 11.2 1.50 -
54 mm( 2 1/8) 17.9 1.50 -
Trunking 100x100 3 1 -
Page 76
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 76/300
AHU'S
Size Qty m Unit Pipe RO MH Total Pipe RO6.4 mm 0.8 0.80 -
9.5 mm(3/8) 1.2 0.80 -
12.7 mm(1/2) 1.9 0.80 -
15.9 mm(5/8) 2.8 0.80 -
19.10 mm(3/4) 3.5 0.85 -
22.2 mm(7/8) 4.4 1.00 -
28.58 mm (1 1/8) 6.4 1.20 -
34.9 mm(1 3/8) 8.7 1.20 - 42 mm(1 5/8) 11.2 1.50 -
54 mm( 2 1/8) 17.9 1.50 -
67mm( 2 5/8) 25.3 1.50 -
0 0
Trunking 100x100 0 3 1 -
Mini Splits
Size Qty m Unit Pipe RO MH Total Pipe RO6.4 mm 0.8 0.80 -
9.5 mm(3/8) 1 1.2 0.80 1.20
12.7 mm(1/2) 1.9 0.80 -
15.9 mm(5/8) 1 2.8 0.80 2.80
19.10 mm(3/4) 3.5 0.85 -
22.2 mm(7/8) 4.4 1.00 -
28.58 mm (1 1/8) 6.4 1.20 -
34.9 mm(1 3/8) 8.7 1.20 - 42 mm(1 5/8) 11.2 1.50 -
54 mm( 2 1/8) 0 17.9 1.50 -
Page 77
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 77/300
Maksal Mueller
Total unit(R.O.)/m Unit RO/m Unit RO/m
0.80 0.6 0.65
1.20 0.94 0.97
1.90 1.47 1.52
2.80 2.13 2.19
3.50 2.69 2.78
4.40 3.38 3.56.40 4.87 5.04
8.70 6.58 6.78
11.20 8.49 8.75
17.90 13.59 14.04
25.30 19.26 19.89
0% 0%
Unigulf 20/12/2011
0 0.99 1 0 0
0 1.21 1 0 0
0 1.38 1.2 0 0
Page 78
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 78/300
0 1.78 1.4 0 0
0 1.95 1.4 0 0
2000 1843.75 1875 6,843.75 0 - 0 0 0 -
Total MH Insulation RInsulation MH Total Insulation Total Insulation MH Total Mat
0 0.61 0.75 0 0
72 0.73 0.75 65.25 67.5
0 0.73 0.75 0 0
72 0.75 0.75 67.5 67.50 0.93 1 0 0
0 0.95 1 0 0
0 0.99 1 0 0
0 1.21 1 0 0
0 1.38 1.2 0 0
0 1.78 1.4 0 0
0 1.95 1.4 0 0
144 132.75 135 492.75 0 - 0 0 0 -
Total MH Insulation RInsulation MH Total Insulation Total Insulation MH Total Mat
0 0.61 0.75 0 0
344 0.73 0.75 311.75 322.5
0 0.73 0.75 0 0
344 0.75 0.75 322.5 322.50 0.93 1 0 0
0 0.95 1 0 0
0 1.38 1.2 0 0
0 1.78 1.4 0 0
0 1.95 1.4 0 0
Page 79
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 79/300
624 575.25 585 2,135.25
0 - 0 0 0 -
Total MH Insulation RInsulation MH Total Insulation Total Insulation MH Total Mat
0 0.61 0.75 0 0
832 0.73 0.75 754 780
0 0.73 0.75 0 0
832 0.75 0.75 780 780
0 0.93 1 0 0
0 0.95 1 0 00 0.99 1 0 0
0 1.21 1 0 0
0 1.38 1.2 0 0
0 1.78 1.4 0 0
0 1.95 1.4 0 0
1664 1534 1560 5,694.00
0 - 0 0 0 -
Total MH Insulation RInsulation MH Total Insulation Total Insulation MH Total Mat
0 0.61 0.75 0 0
32 0.73 0.75 29 30
0 0.73 0.75 0 0
32 0.75 0.75 30 30
0 0.93 1 0 0
0 0.95 1 0 00 0.99 1 0 0
0 1.21 1 0 0
0 1.95 1.4 0 0
1232 1135.75 1155 4,215.75
0 - 0 0 0 -
Page 80
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 80/300
Total MH Insulation RInsulation MH Total Insulation Total Insulation MH Total Mat0 0.61 0.75 0 0
88 0.73 0.75 79.75 82.5
0 0.73 0.75 0 0
88 0.75 0.75 82.5 82.5
0 0.93 1 0 0
0 0.95 1 0 0
0 0.99 1 0 0
0 1.21 1 0 00 1.38 1.2 0 0
0 1.78 1.4 0 0
0 1.95 1.4 0 0
176 162.25 165 602.25
0 - 0 0 0 -
Total MH Insulation RInsulation MH Total Insulation Total Insulation MH Total Mat0 0.61 0.75 0 0
180 0.73 0.75 163.125 168.75
0 0.73 0.75 0 0
180 0.75 0.75 168.75 168.75
0 0.93 1 0 0
0 0.95 1 0 0
0 0.99 1 0 0
0 1.21 1 0 00 1.38 1.2 0 0
0 1.78 1.4 0 0
0 - 0 0 0 -
Page 81
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 81/300
Total MH Insulation RInsulation MH Total Insulation Total Insulation MH Total Mat0 0.61 0.75 0 0
0 0.73 0.75 0 0
0 0.73 0.75 0 0
0 0.75 0.75 0 0
0 0.93 1 0 0
0 0.95 1 0 0
0 0.99 1 0 0
0 1.21 1 0 00 1.38 1.2 0 0
0 1.78 1.4 0 0
0 1.95 1.4 0 0
0 0 0 -
0 - 0 0 0 0
Total MH Insulation RInsulation MH Total Insulation Total Insulation MH Total Mat0 0.61 0.75 0 0
0.8 0.73 0.75 0.725 0.75
0 0.73 0.75 0 0
0.8 0.75 0.75 0.75 0.75
0 0.93 1 0 0
0 0.95 1 0 0
0 0.99 1 0 0
0 1.21 1 0 00 1.38 1.2 0 0
0 1.78 1.4 0 0
Page 82
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 82/300
Page 83
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 83/300
3,875.00 -
Total MH
279.00 -
Total MH
1 209 00
Page 84
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 84/300
1,209.00
-
Total MH
3,224.00
-
Total MH
2,387.00
-
Page 85
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 85/300
Total MH
341.00
-
Total MH
-
Page 86
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 86/300
Total MH
-
0
Total MH
Page 87
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 87/300
Description unit Qty unit AED Unit RO
Steel pipe,ASTM A106 type
S(seamless),Grade B,Sch 40,black
steel,plain ends
20mm dia m 26.50 3.10 25mm dia m 227 23.67 2.80
32mm dia m 112 30.67 3.60
40mm dia m 250 43.33 5.10
50mm dia m 103 41.17 4.80
65mm dia m 120 64.83 7.60
80mm dia m 557 82.67 9.70
100mm dia m 108 120.00 14.10 125mm dia m 158 120.00 19.35
150mm dia m 375 210.17 24.60
200mm dia m 351 333.67 39.10
250mm dia m 259 499.67 58.60
300mm dia m 288 651.83 76.40
350mm dia m -
2908
Factors :
Import Duty 5% Fittings 35%
Alinco
22nd June 11
25mm dia m 227 11.67 1.20
32mm dia m 112 15.00 1.50
Page 88
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 88/300
40mm dia m 250 18.00 1.80
50mm dia m 103 24.33 2.40
65mm dia m 120 38.83 3.90
80mm dia m 557 50.17 5.00
100mm dia m 108 70.33 7.00
125mm dia m 158 72.00 7.20
150mm dia m 375 132.00 13.20
200mm dia m 351 201.50 20.10
250mm dia m 259 282.00 28.10
300mm dia m 288 386.67 38.60 350mm dia m 0.00 -
700mm dia m 0.00 -
Factors : 2908
Import Duty 0%
Frieght 0%
Discount (%) 5.0%
Clearing & Forwarding Chrgs 0.0%Exchange Rates :
UAE Dhs to R.O. 0.105
FCU Valves Qty Unit RO Total RO
20mm dia 36.000
Flexible connectors 2.000 5.900 11.80
Gate Valve 2.000 3.590 7.18
2 way motorised valve 0.000 -
Duct flexible connectors 2.000 5.000 10.00
P t 1 000 2 000 2 00
Page 89
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 89/300
P trap 1.000 2.000 2.00
Vibration Isolators 4.000 5.000 20.00 68.790
32mm dia 69.000 -
Flexible connectors 2.000 9.300 18.60
Gate Valve 2.000 6.480 12.96
Test point 3.000 2.000 6.00
AAV 1.000 6.000 6.00
DRV 1.000 22.750 22.75
2 way motorised valve 1.000 - Duct flexible connectors 2.000 5.000 10.00
P trap 1.000 2.000 2.00
Vibration Isolators 4.000 5.000 20.00 98.310
-
40mm dia 5.000 -
Flexible connectors 2.000 9.300 18.60
Gate Valve 2.000 8.580 17.16 Test point 3.000 2.000 6.00
AAV 1.000 6.000 6.00
DRV 1.000 30.190 30.19
2 way motorised valve 1.000 -
Duct flexible connectors 2.000 5.000 10.00
P trap 1.000 2.000 2.00
Vibration Isolators 4.000 5.000 20.00 109.950
50mm dia 8.000 -
DRV 1.000 18.000 18.00
2 way motorised valve 1.000 -
Strainer 1 000 6 100 6 10
Page 90
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 90/300
Strainer 1.000 6.100 6.10
AAV 1.000 6.000 6.00
Thermometer 2.000 10.700 21.40
Pressure test point 4.000 2.000 8.00
U trap 1.000 2.000 2.00
Duct flexible connector 2.000 5.000 10.00
Vibration Isolators 4.000 5.000 20.00 113.740
32mm dia
Flexible Connectors 2.000 9.300 18.60Gate valve 2.000 7.020 14.04
DRV 1.000 23.760 23.76
2 way motorised valve 1.000 -
Strainer 1.000 10.000 10.00
AAV 1.000 6.000 6.00
Thermometer 2.000 10.700 21.40
Pressure test point 4.000 2.000 8.00 U trap 1.000 2.000 2.00
Duct flexible connector 2.000 5.000 10.00
Vibration Isolators 4.000 5.000 20.00
133.800
50mm dia
Flexible Connectors 2.000 30.000 60.00
Gate valve 2.000 13.770 27.54
DRV 0.000 34.020 -
2 way motorised valve 1.000 -
Thermometer 2.000 10.700 21.40
Pressure gauge 2.000 7.800 15.60
Pressure test point 2 000 2 000 4 00
Page 91
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 91/300
Pressure test point 2.000 2.000 4.00
U trap 1.000 2.000 2.00
Duct flexible connector 2.000 8.000 16.00
Vibration Isolators 4.000 15.000 60.00 426.780
-
80mm dia -
Flexible Connectors 2.000 40.000 80.00
Gate valve 2.000 57.880 115.76
DRV 1.000 116.890 116.89
2 way motorised valve 1.000 490.200 490.20 Strainer 1.000 40.030 40.03
AAV 1.000 6.000 6.00
Thermometer 2.000 10.700 21.40
Pressure gauge 2.000 7.800 15.60
Pressure test point 2.000 2.000 4.00
U trap 1.000 2.000 2.00
Duct flexible connector 2.000 8.000 16.00 Vibration Isolators 4.000 15.000 60.00 967.880
-
100mm dia -
Flexible Connectors 2.000 40.000 80.00
Gate valve 2.000 80.300 160.60
DRV 1.000 151.590 151.59
2 way motorised valve 1.000 648.900 648.90
Strainer 1.000 56.560 56.56
AAV 1.000 6.000 6.00
Pressure test point 2.000 2.000 4.00
U trap 1.000 2.000 2.00
Duct flexible connector 2 000 8 000 16 00
Page 92
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 92/300
Duct flexible connector 2.000 8.000 16.00
Vibration Isolators 4.000 15.000 60.00 707.080
150mm dia -
Flexible Connectors 2.000 45.000 90.00
Gate valve 2.000 231.750 463.50
DRV 0.000 340.120 -
2 way motorised valve 1.000 -
Strainer 1.000 194.520 194.52
AAV 1.000 6.000 6.00 Thermometer 2.000 10.700 21.40
Pressure gauge 2.000 7.800 15.60
Pressure test point 2.000 2.000 4.00
U trap 1.000 2.000 2.00
Duct flexible connector 2.000 8.000 16.00
Vibration Isolators 4.000 25.000 100.00 913.020
Chillers Valves Qty Unit RO Total RO
200mm dia
Vibration isolators 6.000 55.000 330.00
Flexible connector 4.000 45.000 180.00
Thermometer 4.000 10.700 42.80
Pressure gauge 2.000 6.000 12.00
Test points 6.000 3.400 20.40
DRV with MS 2.000 536.930 1,073.86
Strainer 2.000 187.000 374.00
Secondary Pumps Valves Qty Unit RO Total RO
250mm dia 3.000
Vibration isolators 4 000 55 000 220 00
Page 93
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 93/300
Vibration isolators 4.000 55.000 220.00
Flexible connector 2.000 45.000 90.00
Pressure gauge 2.000 6.000 12.00
Gate valve 2.000 287.570 575.14
DRV with MS 1.000 813.870 813.87
Strainer 1.000 187.000 187.00
NRV 1.000 180.000 180.00
Drain Cock 1.000 8.000 8.00 2086.010
TPC Abu Dhabi
Page 94
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 94/300
TPC Abu Dhabi
(Arcelor
Mittal,Europe) Considered
unit AED Unit RO Unit RO unit AED Unit RO unit AED
with fittings
13.95 1.40 1.62 15.00 1.50 11.8319.75 2.00 2.30 17.00 1.70 17.50
26.75 2.70 2.97 21.00 2.20 22.49
31.95 3.30 3.38 24.00 2.50 26.86
41.25 4.20 4.59 33.00 3.40 36.08
65.45 6.70 7.29 53.00 5.40 57.24
85.60 8.80 9.59 69.00 7.10 74.89
117.75 12.10 13.77 99.00 10.20 106.59
159.00 16.30 18.50 133.00 13.70 144.40
199.95 20.50 24.03 173.00 17.80 187.45
301.05 30.90 39.15 301.05 30.90 282.23
426.70 43.80 59.13 426.70 43.80 400.04
578.15 59.40 72.23 521.00 53.50 490.05
- 85.00 -
TPC Dubai (Interpipe) Lucerne c
27th June 11 29th June 2011 14th Aug
0.96 1.49 10.00 1.00 10.94 1.10
1.30 2.03 13.00 1.30 14.83 1.50
1.55 2.43 15.00 1.50 17.72 1.80
Page 95
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 95/300
2.08 3.24 20.00 2.10 23.80 2.40
3.30 5.13 32.00 3.30 37.75 3.80
4.31 6.62 42.00 4.30 49.38 4.90
6.14 9.45 59.00 6.10 70.29 7.00
7.40 12.83 72.00 7.40 95.22 9.50
11.00 16.61 104.00 10.70 123.61 12.30
16.50 25.11 161.00 16.50 186.12 18.60
24.50 35.51 238.00 24.50 263.80 26.30
30.00 44.01 363.00 37.30 326.70 32.60 37.40 50.49 0.00 - 374.63 37.40
84.80 114.48 0.00 - 850.46 84.80
Page 96
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 96/300
Page 97
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 97/300
Page 98
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 98/300
Page 99
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 99/300
Page 100
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 100/300
6258.030
14087.980
Page 101
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 101/300
Unit RO
1.20 - 1.80 522.10
2.30 332.64
2.80 845.00
3.70 472.77
5.90 874.80
7.70 5,341.63
11.00 1,487.16
14.80 2,923.00
19.30 9,011.25
29.00 13,741.65
41.10 15,314.67
50.30 20,802.24
- -
71,668.91
nada
2011
338.23
227.36
607.50
333 72
Page 102
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 102/300
333.72
615.60
3,687.34
1,020.60
2,027.14
6,228.75
8,813.61
9,197.09
12,674.88 -
-
45,771.82
25,897.09 savings
Typical Duct Size Length Area DW-142 Gaugewise Ducting Area (Sq.M.) Remarks
W(mm)x H(mm) m. Sq.m. 24G 22G 20G 18G 16G
1 900 500 8.00 22.40 0.00 22.40 0.00 0.00 0.00 AHU-1.1
1 750 450 8.00 19.20 0.00 19.20 0.00 0.00 0.00
Page 103
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 103/300
1 1400 700 8.00 33.60 0.00 0.00 33.60 0.00 0.00 AHU-1.21 600 300 0 0.00 0.00 0.00 0.00 0.00 0.00
1 1500 750 8.00 36.00 0.00 0.00 36.00 0.00 0.00
1 600 300 0 0.00 0.00 0.00 0.00 0.00 0.00
1 900 600 8.00 24.00 0.00 24.00 0.00 0.00 0.00 AHU-1.3
1 900 600 8.00 24.00 0.00 24.00 0.00 0.00 0.00
1 1000 500 8.00 24.00 0.00 24.00 0.00 0.00 0.00 AHU-1.4
1 1200 500 8.00 27.20 0.00 0.00 27.20 0.00 0.00
1 1200 1000 8.00 35.20 0.00 0.00 35.20 0.00 0.00 AHU-1.5
1 800 350 8.00 18.40 0.00 18.40 0.00 0.00 0.00
1 850 400 8.00 20.00 0.00 20.00 0.00 0.00 0.00 AHU-1.6
1 550 300 8.00 13.60 0.00 13.60 0.00 0.00 0.00
1 1050 650 8.00 27.20 0.00 0.00 27.20 0.00 0.00 AHU-2.1
1 750 300 8.00 16.80 0.00 16.80 0.00 0.00 0.00
1 1000 900 8.00 30.40 0.00 30.40 0.00 0.00 0.00 AHU-2.31 1000 500 0 0.00 0.00 0.00 0.00 0.00 0.00
1 1000 650 8.00 26.40 0.00 26.40 0.00 0.00 0.00
1 1000 600 0 0.00 0.00 0.00 0.00 0.00 0.00
1 1200 900 8.00 33.60 0.00 0.00 33.60 0.00 0.00 AHU-2.4
1 1200 900 8.00 33.60 0.00 0.00 33.60 0.00 0.00
1 1200 600 8.00 28.80 0.00 0.00 28.80 0.00 0.00 AHU-3.1
1 1000 750 8.00 28.00 0.00 28.00 0.00 0.00 0.00
1 1200 700 8.00 30.40 0.00 0.00 30.40 0.00 0.00 AHU-3.2
1 1200 700 8.00 30.40 0.00 0.00 30.40 0.00 0.00
2 1100 800 8.00 60.80 0.00 0.00 60.80 0.00 0.00 AHU-5.4(A,B)
2 1200 700 8.00 60.80 0.00 0.00 60.80 0.00 0.00
2 1100 800 8.00 60.80 0.00 0.00 60.80 0.00 0.00
2 1200 700 8.00 60.80 0.00 0.00 60.80 0.00 0.00
Total 1,557.60 0.00 481.60 1076.00 0.00 1557.60
Page 104
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 104/300
Page 105
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 105/300
Page 106
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 106/300
Logstor Pre-insulated Pipes & Fittings
Annexure
Page 107
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 107/300
Logstor Pre insulated Pipes & Fittings
Sl Logstor size steel pipe OD/ Qty Unit U. Price AmountNo Jacket pipe OD (R.O) (R.O)
Pipes Pre-insulated #20001 88/160mm 12mtr 16 length 138.500 2,216.0002 139/225mm 12mtr 5 length 229.000 1,145.000
3 323/450mm 12mtr 7 length 791.000 5,537.000
Elbow Pre-insulated #25004 88/160mm 90deg 10 nos 33.500 335.0005 139/225mm 90deg 10 nos 59.000 590.0006 323/450mm 90deg 6 nos 222.500 1,335.000
T-Fitting Pre-insulated 45º #35007 88/160 X 60/125 X 88/160mm 2 nos 88.500 177.000
8 139/225 X 60/125 X 139/225mm 2 nos 98.000 196.0009 323/450 X 60/125 X 323/450mm 4 nos 381.000 1,524.000
BX Joints #502210 60/125mm 780mm 8 nos 15.000 120.00011 88/160mm 780mm 32 nos 16.500 528.00012 139/225mm 780mm 16 nos 33.000 528.00013 323/450mm 780mm 26 nos 53.000 1,378.000
TOTAL AMOUNT 15,609.000
Project:Construction of Haematology and BMT centre building
12
Page 108
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 108/300
Qty m
19260
84
VENTILATING FANS
Supply, installation, testing & commissioning of ventilating
fan with electrically operated louvers, as specified on the
drawings, complete with all mounting requirements, flexible
Page 109
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 109/300
connections, electrical connections, support, back draftdampers, auto changeover controller, complete all in
accordance with drawings, specification and to the Engineer
approval.
Access
A Twin Exhaust Fan Ref EXF-1; 375 air flow 150 Pa static fan. 1
B Twin Exhaust Fan Ref EXF-2; 450 air flow 150 Pa static fan. 1
C Twin Exhaust Fan Ref EXF-3; 350 air flow 150 pa static fan. 1
D Twin Exhaust Fan Ref EXF-4; 150 air flow 75 Pa static fan. 1
E Twin Exhaust Fan Ref EXF-5; 575 air flow 150 Pa static fan. 1
F Twin Exhaust Fan Ref EXF-7; 1052 air flow 200 Pa static fan. 1
G Twin Exhaust Fan Ref EXF-8; 675 air flow 150 Pa static fan. 1
A Twin Exhaust Fan Ref EXF-9; 225 air flow 150 Pa static fan. 1
B Twin Exhaust Fan Ref EXF-10; 870 air flow 150 Pa static fan. 1
C Twin Exhaust Fan Ref EXF-11; 1321 air flow 200 Pa static fan. 1
D Twin Exhaust Fan Ref EXF-12; 1000 air flow 200 Pa static fan 1E Twin Exhaust Fan Ref EXF-13; 875 air flow 150 Pa static fan. 1
F Twin Exhaust Fan Ref EXF-14; 1455 air flow 250 Pa static fan. 1
G Twin Exhaust Fan Ref EXF-15; 150 air flow 75 Pa static fan. 1
A Kitchen Exhaust Fan Ref K-EXF; 650 air flow 150 Pa static fan. 1
B
Staircase Pressurization Fan Ref FAN-1T05; 9567 air flow 350 Pa staticfan. 5
Supply, installation, testing & commissioning of ventilating
fan with electrically operated louvers as specified on the
E Smoke Exhaust Fan Ref S-EXF-11; 1
F Smoke Exhaust Fan Ref S-EXF-12; 1
A Smoke Exhaust Fan Ref S-EXF-13; 1
B Smoke Exhaust Fan Ref S-EXF-14; 1
C Smoke Exhaust Fan Ref S-EXF-15; 1
Page 110
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 110/300
C Smoke Exhaust Fan Ref S EXF 15; 1
D Smoke Exhaust Fan Ref S-EXF-16; 1
E Smoke Exhaust Fan Ref S-EXF-17; 1
A Smoke Exhaust Fan Ref S-EXF-18; 1
B Smoke Exhaust Fan Ref S-EXF-19; 1
C Smoke Exhaust Fan Ref S-EXF-20; 1
D Smoke Exhaust Fan Ref S-EXF-21; 1
E Smoke Exhaust Fan Ref S-EXF-22; 1
A
EXF-16 (Substation); Twin axial fan, 4000 L/s air flow, 100 Pa.ESP, 3kW motor capacity
2
Xpelair Dynair
Page 111
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 111/300
Unit RO Unit RO Total RO Consider Unit RO Unit RO Total RO
875 612.50 612.50 510.30 567 510.30 510.30
875 612.50 612.50 510.30 567 510.30 510.30
875 612.50 612.50 422.82 469.8 422.82 422.82
150 105.00 105.00 444.69 494.1 444.69 444.69
950 665.00 665.00 517.59 575.1 517.59 517.59
2200 1,540.00 1,540.00 517.59 575.1 517.59 517.59
1500 1,050.00 1,050.00 517.59 575.1 517.59 517.59
875 612.50 612.50 510.30 567 510.30 510.30
1600 1,120.00 1,120.00 510.30 567 510.30 510.30
2200 1,540.00 1,540.00 838.35 931.5 838.35 838.35
1800 1,260.00 1,260.00 670.68 745.2 670.68 670.68 1600 1,120.00 1,120.00 510.30 567 510.30 510.30
2300 1,610.00 1,610.00 860.22 955.8 860.22 860.22
550 385.00 385.00 444.69 494.1 444.69 444.69
552.58 552.58 552.58 613.98 552.58 552.58
900.32 4,501.60 900.32 1000.35 900.32 4,501.60
- - - - -
775 542.50 542.50 759.62 844.02 759.62 759.62
775 542.50 542.50 1,245.13 1383.48 1,245.13 1,245.13
1700 1,190.00 1,190.00 787.32 874.8 787.32 787.32
1700 1,190.00 1,190.00 658.26 731.4 658.26 658.26
1800 1,260.00 1,260.00 1,186.81 1318.68 1,186.81 1,186.81
Page 112
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 112/300
1800 1,260.00 1,260.00 1,186.81 1318.68 1,186.81 1,186.81
1700 1,190.00 1,190.00 753.79 837.54 753.79 753.79
950 665.00 665.00 787.32 874.8 787.32 787.32
950 665.00 665.00 502.28 558.09 502.28 502.28
950 665.00 665.00 602.88 669.87 602.88 602.88
950 665.00 665.00 787.32 874.8 787.32 787.32
1800 1,260.00 1,260.00 1,476.23 1640.25 1,476.23 1,476.23
875 612.50 1,225.00 1,128.49 1253.88 1,128.49 2,256.98 42,154.18 35,723.90
0% 0%0% 0%
30.0% 10.0%0.0% 0.0%
0.105 0.1051 1
Exchange Rates :
UAE Dhs to R.O.$ to RO
Factors :
Import DutyFrieght
Discount (%)Clearing & FrwdgChrgs Clearing & FrwdgChrgs
Exchange Rates :
UAE Dhs to R.O.$ to RO
Factors :
Import DutyFrieght
Discount (%)
Qty Access Unit $
Supply, installation, test & commission of Air
cooled chiller; as per the contract specification and
drawings; including hoisting and setting in positin,
Chillers
Page 113
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 113/300
anti vibration mountings, control panel, wiring ,
labelling, final connections and other required
materials to complete all works in accordenec with
drawings and specifications. .
AChiller 1 to 5 ; Screw type 1134 kW cooling capacity 54 L/sflow Rate
5138000
Qty Access Unit $
Plate heat exchanger unit on steel frame including
base channels, double skin, with all required
dampers, 2 way motorized valve, sand trap louver
filters, cooling coils, heaters wherever shown on
drawings , fans , fittings, flexible connections andspring mount, vibration damper .. as per capacity
as specified in drawings specifications and to the
Air handling Units
Fact
ImportFrie
DiscouClearing & Fr
Exchang
UAE Dh$ to
Heat Recovery Air handling unit on steel frame
including base channels, double skin, with all
required dampers, 2 way motorized valve, cooling
coils, heaters wherever shown on drawings , fans ,
fittings, flexible connections and spring mount,
Page 114
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 114/300
vibration damper, .. as per capacity as specified indrawings , specifications and to the Engineer
approval.
A AHU-1.1; 95 kW cooling capacity, 2389 L/s air flow 1 9,784.00
B AHU-1.2; 175 kW cooling capacity, 7147 L/s air flow 1 19,992.00
C AHU-1.3; 106 kW cooling capacity, 3480 L/s air flow 1 12,221.00
D AHU-1.4; 107 kW cooling capacity, 3657 L/s air flow 1 11,913.00
E AHU-1.5; 195 kW cooling capacity, 6845 L/s air flow 1 17,629.00
A AHU-1.6; 108 kW cooling capacity, 2127 L/s air flow 1 8,322.00
B AHU-2.1; 115 kW cooling capacity, 4039 L/s air flow 1 13,256.00
C AHU-2.4; 187.5 kW cooling capacity, 6302 L/s air flow 1 16,939.00
D AHU-3.1; 123 kW cooling capacity, 4249 L/s air flow 1 13,374.00
E AHU-3.2; 130 kW cooling capacity, 4888 L/s air flow 1 15,720.00
A AHU-3.3; 169 kW cooling capacity, 5824 L/s air flow 1 16,866.00
B AHU-3.4; 87 kW cooling capacity, 3601 L/s air flow 1 12,219.00
C AHU-4.1; 135 kW cooling capacity, 4720 L/s air flow 1 15,720.00
D AHU-4.2; 180 kW cooling capacity, 7387 L/s air flow 1 20,084.00
E AHU-4.3; 120 kW cooling capacity, 4494 L/s air flow 1 13,464.00
F AHU-4.4; 90 kW cooling capacity, 2989 L/s air flow 1 10,397.00
G AHU-5.1; 182kW cooling capacity, 6688 L/s air flow 1 17,877.00
AAHU-5.2;204 kW cooling capacity,7064 L/s air flow
119,806.00
Fact
Supply, Installation and commissioning the
following specified fan coil unit to suit the indicated
capacity, complete with coils, valves, thermostatic
controller, 2 way motorized valve, filters including
all accessories , plumbing and electrical
connection to complete the installation as per
Page 115
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 115/300
specification , described in drawings and to theEngineer approval s.
Ducted FCU 4 2 625
E Fan Coil Unit ref. FCU-3 decorative 30 525
Qty Access Unit RO
BMS 1 107000
Cabling & Conduiting 1 15%
$ to
Fact
ImportFrie
DiscouClearing & Fr
Exchang
UAE Dh
BMS
Fact
ImportFrie
DiscouClearing & Fr
ExchangUAE Dh
$
Unit RO Total RO Consider
McQuay
Page 116
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 116/300
50,105.21 250,526.05 50,105.21
250,526.05
5%0%
12.5%2.5%
0.1050.386
Unit RO Total RO
McQuay
rs :
Dutyghtnt (%)wdgChrgs
Rates :
to R.O.RO
Page 117
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 117/300
- - -
3,552.39 3,552.39 3,552.39
7,258.72 7,258.72 7,258.72
4,437.22 4,437.22 4,437.22
4,325.39 4,325.39 4,325.39
6,400.76 6,400.76 6,400.76
3,021.56 3,021.56 3,021.56
4,813.01 4,813.01 4,813.01
6,150.23 6,150.23 6,150.23
4,855.85 4,855.85 4,855.85
5,707.64 5,707.64 5,707.64
6,123.73 6,123.73 6,123.73
4,436.49 4,436.49 4,436.49
5,707.64 5,707.64 5,707.64
7,292.12 7,292.12 7,292.12
4,888.53 4,888.53 4,888.53
3,774.96 3,774.96 3,774.96
6,490.80 6,490.80 6,490.80
7,191.19 7,191.19 7,191.19 134,459.90
rs :
Page 118
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 118/300
233.41 466.82 233.41
196.06 5,881.80 196.06
198.39
5%0%
10.0%2.5%
0.1050.386
Unit RO Total RO Unit RO Unit RO Total RO
85,600.00 85,600.00 66,886.50 73200 66,886.50 66,886.50
16,050.00 16,050.00 10,980.00 10,980.00 10,980.00101,650.00 77,866.50 77,866.50
0% 5%0% 0%
20.0% 15.0%0.0% 2.5%
1 10 386 0 386
Clearing & FrwdgChrgs
Exchange Rates :UAE Dhs to R.O.
$ RO
Johnson
Factors :
Import DutyFrieght
Discount (%)
RO
rs :
Dutyghtnt (%)wdgChrgs
Rates :
to R.O.
TAC
rs :
Dutyghtnt (%)wdgChrgs
Rates :to R.O.
RO
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Page 119
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 119/300
Code AMOUNT Unit Rate
Figures R.O. RO
HVAC
CHILLED WATER PIPING
Supply, install, test and commission of Black
steel class B seamless pipe to BS 1387
including all fittings , valves, balancing valve,
brackets, clamps, clips and supports,
complete all as specified in flexible connection
. as shown on drawings or as require to
complete the connection and installations.
A 300 mm Dia 76 P lin m 122.400 9,302.400 72.230
B 250 mm Dia 259 P lin m 98.500 25,511.500 59.130
C 200 mm Dia 241 P lin m 68.500 16,508.500 39.150
D 150 mm Dia 155 P lin m 44.100 6,835.500 24.030
E 125 mm Dia 144 P lin m 36.800 5,299.200 18.500
F 100 mm Dia 108 P lin m 28.600 3,088.800 13.770
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Page 120
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 120/300
Code AMOUNT Unit Rate A
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
CHILLED WATER PIPING (Cont'd)
A 65 mm Dia 88 P lin m 15.500 1,364.000 7.290
B 50 mm Dia 22 P lin m 9.300 199.950 4.590
C 40 mm Dia 195 P lin m 7.700 1,501.500 3.380
D 32 mm Dia 64 P lin m 6.800 435.200 2.970
E 25 mm Dia 186 P lin m 5.400 1,004.400 2.300
4,505.050
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Page 121
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 121/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
INSULATION FOR PIPE
preformed rigid sections PUF/polyisocanurate
moulded in cylindrical foam 35 kg./m3 density
insulation with canvas / cloth to pipes
complete all in accordance with drawings andspecification
A 300 mm Dia 76 PI lin m 41.400 3,146.400 26.940
B 250 mm Dia 259 PI lin m 34.600 8,961.400 22.030
C 200 mm Dia 241 PI lin m 21.000 5,061.000 12.600
D 150 mm Dia 155 PI lin m 15.300 2,371.500 9.370
E 125 mm Dia 144 PI lin m 12.500 1,800.000 7.670
F 100 mm Dia 108 PI lin m 11.100 1,198.800 6.670
G 80 mm Dia 224 PI lin m 9.700 2,172.800 5.810
H 65 mm Dia 88 PI lin m 8.900 783.200 5.330
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Page 122
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 122/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
INSULATION PIPE (Cont'd)
A 50 mm Dia 22 PI lin m 6.100 131.150 3.370
B 40 mm Dia 195 PI lin m 5.900 1,150.500 3.290
C 32 mm Dia 64 PI lin m 5.400 345.600 2.960
D 25 mm Dia 186 PI lin m 5.000 930.000 2.710
Pre insulated Pipes laid below groundincluding all excavation/ rock(If any), bed and
backfilling, warning tape, thrust block,
complete with all in accordance with drawings
and specification
E 300 mm Dia 106 PIP lin m
F 125 mm dia 106 PIP lin m Inc in Bill 09
G 80 mm dia 106 PIP lin m
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Page 123
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 123/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
EQUIPMENT
Supply, installation, test & commission of
direct split unit including indoor and outdoor
units; complete with all refrigeration pipe work,
proprietary connectors, manifold andinsulation, all necessary electrical and
plumbing connection, fittings , supports, pipe
and cable containment, holding down bolts or
like all in accordance with specification ,
drawings and approval .
A IU-01/OU-01Split, 7kW cool ing capacity 1 SU nr. 440.500 440.500 345.084
Supply, installation, test & commission ofoutdoor unit for cold room freezers; complete
with refrigeration pipe work, proprietary
connectors, manifold and insulation, all
necessary electrical and plumbing connection,
fittings , supports, pipe and cable containment,
holding down bolts, DDC panels to connect
with BMS and like all in accordance with
specification and drawings to the Engineer
approval.
BODC-01 one working and one stand by , 7 kW
cooling capacity;7 CR ODU Set 605.700 4,239.900 495.084
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Page 124
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 124/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (Cont'd)
Plate heat exchanger unit on steel frame
including base channels, double skin, with all
required dampers, 2 way motorized valve, sand
trap louver filters, cooling coils, heaterswherever shown on drawings , fans , fittings,
flexible connections and spring mount,
vibration damper .. as per capacity as specified
in drawings , specifications and to the Engineer
approval.
AAHU-2.2; 250 kW cooling capacity, 5010 L/s air
flow with plate heat exchanger1 AHU nr. 12090.900 12,090.900 10,105.430
B AHU-2.3 300 kW cooling capacity, 5980 L/s airflow with plate heat exchanger
1 AHU nr. 13106.700 13,106.700 10,959.040
CAHU-5.3; 420 kW cooling capacity, 4826 L/s air
flow with plate heat exchanger1 AHU nr. 13070.800 13,070.800 10,928.900
DAHU-5.4; 430 kW cooling capacity, 4929 L/s air
flow with plate heat exchanger1 AHU nr. 13070.800 13,070.800 10,928.900
51,339.200
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Page 125
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 125/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (Cont'd)
Heat Recovery Air handling unit on steel frame
including base channels, double skin, with all
required dampers, 2 way motorized valve,cooling coils, heaters wherever shown on
drawings , fans , fittings, flexible connections
and spring mount, vibration damper, .. as per
capacity as specified in drawings ,
specifications and to the Engineer approval.
A AHU-1.1; 95 kW cooling capacity, 2389 L/s air flow 1 AHU nr. 5444.600 5,444.600 4,520.270
BAHU-1.2; 175 kW cooling capacity, 7147 L/s air
flow1 AHU nr. 10158.300 10,158.300 8,481.370
CAHU-1.3; 106 kW cooling capacity, 3480 L/s air
flow1 AHU nr. 6497.500 6,497.500 5,405.100
DAHU-1.4; 107 kW cooling capacity, 3657 L/s air
flow1 AHU nr. 6364.400 6,364.400 5,293.270
AHU-1 5; 195 kW cooling capacity 6845 L/s air
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Page 126
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 126/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (Cont'd)
AHU (Cont'd)
AAHU-1.6; 108 kW cooling capacity, 2127 L/s air
flow1 AHU nr. 4812.900 4,812.900 3,989.440
BAHU-2.1; 115 kW cooling capacity, 4039 L/s air
flow1 AHU nr. 6944.700 6,944.700 5,780.890
CAHU-2.4; 187.5 kW cooling capacity, 6302 L/s air
flow1 AHU nr. 8839.200 8,839.200 7,372.880
DAHU-3.1; 123 kW cooling capacity, 4249 L/s air
flow1 AHU nr. 6995.700 6,995.700 5,823.730
EAHU-3.2; 130 kW cooling capacity, 4888 L/s air
flow1 AHU nr. 8009.300 8,009.300 6,675.520
35,601.800
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
UNIT RATE
Page 127
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 127/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (Cont'd)
AHU (Cont'd)
AAHU-3.3; 169 kW cooling capacity, 5824 L/s air
flow1 AHU nr. 8807.600 8,807.600 7,346.380
B AHU-3.4; 87 kW cooling capacity, 3601 L/s air flow 1 AHU nr. 6496.700 6,496.700 5,404.370
CAHU-4.1; 135 kW cooling capacity, 4720 L/s air
flow1 AHU nr. 8312.500 8,312.500 6,930.290
DAHU-4.2; 180 kW cooling capacity, 7387 L/s air
flow1 AHU nr. 10198.000 10,198.000 8,514.770
EAHU-4.3; 120 kW cooling capacity, 4494 L/s air
flow1 AHU nr. 7034.600 7,034.600 5,856.410
F AHU-4.4; 90 kW cooling capacity, 2989 L/s air flow 1 AHU nr. 5709.400 5,709.400 4,742.840
GAHU-5.1; 182kW cooling capacity, 6688 L/s air
flow1 AHU nr. 9244.500 9,244.500 7,713.450
55,803.300
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
C d AMOUNT U i RUNIT RATE
Page 128
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 128/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (Cont'd)
AHU (Cont'd)
A AHU-5.2;204 kW cooling capacity,7064 L/s air flow 1 AHU nr. 10077.900 10,077.900 8,413.840
SAND TRAP LOUVER
BProvide sand trap louver for all AHU's complete all
in accordance with drawings and specifications.1 ATD Item 5953.000 5,953.000 4,217.400
THERMOMETER
CProvide thermometer for AHUS , as shown on
drawings.44 V nr. 21.400 941.600 15.100
PRESSURE GAUGE UNIT
DProvide pressure gauges for AHUS , as shown on
drawings.44 V nr. 11.800 519.200 7.800
FAN COIL UNIT
Supply, Installation and commissioning the
following specified fan coil unit to suit the
indicated capacity, complete with coils, valves,
thermostatic controller, 2 way motorized valve,
filters including all accessories , plumbing and
electrical connection to complete theinstallation as per specification , described in
drawings and to the Engineer approval s
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit RateUNIT RATE
Page 129
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 129/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
VARIABLE AIR VOLUME UNITS
Variable air volume units, by pass type
complete with thermostatic controller including
VAV heaters, accessories, electrical connection
and control wiring to complete the installationall in accordance with drawings and
specifications.
A VAV box 114 l/s air flow, inline 3 VAV nr. 119.200 357.600 91.348
B VAV box 117 l/s air flow, inline 4 VAV nr. 119.200 476.800 91.348
C VAV box 119 l/s air flow, inline 6 VAV nr. 119.200 715.200 91.348
D VAV box 122 l/s air flow, inline 1 VAV nr. 119.200 119.200 91.348
E VAV box 123 l/s air flow, inline 3 VAV nr. 119.200 357.600 91.348
F VAV box 127 l/s air flow, inline 1 VAV nr. 119.200 119.200 91.348
G VAV box 131 l/s air flow inline 6 VAV nr 119 200 715 200 91 348
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit RateUNIT RATE
Page 130
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 130/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (cont'd)
VARIABLE AIR VOLUME UNITS (Cont'd)
A VAV box 133 l/s air flow, inline 1 VAV nr. 119.200 119.200 91.348
B VAV box 138 l/s air flow, inline 6 VAV nr. 119.200 715.200 91.348
C VAV box 141 l/s air flow, inline 1 VAV nr. 119.200 119.200 91.348
D VAV box 143 l/s air flow, inline 3 VAV nr. 119.200 357.600 91.348
E VAV box 146 l/s air flow, inline 3 VAV nr. 119.200 357.600 91.348
F VAV box 148 l/s air flow, inline 4 VAV nr. 119.200 476.800 91.348
G VAV box 152 l/s air flow, inline 1 VAV nr. 119.200 119.200 91.348
H VAV box 134 l/s air flow, inline 2 VAV nr. 119.200 238.400 91.348
JVAV box 136 l/s air flow, inline
1 VAVnr.
119.200 119.200 91.348
2 622 400
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit RateUNIT RATEITEM ESTIMATED
Page 131
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 131/300
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (cont'd)
VARIABLE AIR VOLUME UNITS (Cont'd)
A VAV box 154 l/s air flow, inline 1 VAV nr. 119.200 119.200 91.348
B VAV box 175 l/s air flow, inline 1 VAV nr. 119.200 119.200 91.348
C VAV box 181 l/s air flow, inline 2 VAV nr. 119.200 238.400 91.348
D VAV box 200 l/s air flow, inline 1 VAV nr. 128.100 128.100 98.848
E VAV box 210 l/s air flow, inline 1 VAV nr. 128.100 128.100 98.848
F VAV box 324 l/s air flow, inline 4 VAV nr. 133.800 535.200 103.648
G VAV box 325 l/s air flow, inline 1 VAV nr. 133.800 133.800 103.648
1,402.000
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM ESTIMATED
Page 132
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 132/300
Code AMOUNT
Figures R.O. RO
UITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (cont'd)
VARIABLE AIR VOLUME UNITS (Cont'd)
A VAV box 211 l/s air flow, inline 2 VAV nr. 128.100 256.200 98.848
B VAV box 215 l/s air flow, inline 1 VAV nr. 128.100 128.100 98.848
C VAV box 217 l/s air flow, inline 3 VAV nr. 128.100 384.300 98.848
D VAV box 218 l/s air flow, inline 18 VAV nr. 128.100 2,305.800 98.848
E VAV box 229 l/s air flow, inline 1 VAV nr. 128.100 128.100 98.848
F VAV box 230 l/s air flow, inline 1 VAV nr. 128.100 128.100 98.848
G VAV box 238 l/s air flow, inline 1 VAV nr. 128.100 128.100 98.848
H VAV box 241 l/s air flow, inline 3 VAV nr. 128.100 384.300 98.848
J VAV box 245 l/s air flow, inline 1 VAV nr. 128.100 128.100 98.848
3 971 100
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM ESTIMATED
Page 133
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 133/300
Figures R.O. RO
ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (cont'd)
VARIABLE AIR VOLUME UNITS (Cont'd)
A VAV box 250 l/s air flow, inline 2 VAV nr. 128.100 256.200 98.848
B VAV box 259 l/s air flow, inline 9 VAV nr. 128.100 1,152.900 98.848
C VAV box 278 l/s air flow, inline 7 VAV nr. 128.100 896.700 98.848
D VAV box 287 l/s air flow, inline 1 VAV nr. 133.800 133.800 103.648
E VAV box 295 l/s air flow, inline 1 VAV nr. 133.800 133.800 103.648
F VAV box 304 l/s air flow, inline 4 VAV nr. 133.800 535.200 103.648
G VAV box 309 l/s air flow, inline 6 VAV nr. 133.800 802.800 103.648
3,911.400
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM ESTIMATED
Page 134
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 134/300
Figures R.O. RO
ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (cont'd)
VARIABLE AIR VOLUME UNITS (Cont'd)
A VAV box 329 l/s air flow, inline 2 VAV nr. 133.800 267.600 103.648
B VAV box 329 l/s air flow, fan assited 1 VAV nr. 133.800 133.800 103.648
C VAV box 351 l/s air flow, inline 1 VAV nr. 133.800 133.800 103.648
D VAV box 377 l/s air flow, inline 1 VAV nr. 133.800 133.800 103.648
E VAV box 378 l/s air flow, inline 1 VAV nr. 142.300 142.300 110.748
F VAV box 380 l/s air flow, inline 4 VAV nr. 142.300 569.200 110.748
G VAV box 391 l/s air flow, inline 7 VAV nr. 142.300 996.100 110.748
H VAV box 395 l/s air flow, fan assisted 15 VAV nr. 142.300 2,134.500 110.748
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM
DESCRIPTIONESTIMATED
UNIT
Page 135
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 135/300
Figures R.O. RO NO.
DESCRIPTION S
QUANTITY UNIT
HVAC (cont'd)
VARIABLE AIR VOLUME UNITS (Cont'd)
A VAV box 457 l/s air flow, inline 4 VAV nr. 142.300 569.200 110.748
B VAV box 470 l/s air flow, fan assisted 2 VAV nr. 142.300 284.600 110.748
C VAV box 480 l/s air flow, fan assisted 3 VAV nr. 142.300 426.900 110.748
D VAV box 491 l/s air flow, inline 4 VAV nr. 142.300 569.200 110.748
E VAV box 566 l/s air flow, inline 1 VAV nr. 142.300 142.300 110.748
F VAV box 650 l/s air flow, inline 1 VAV nr. 151.500 151.500 118.548
G VAV box 669 l/s air flow, inline 1 VAV nr. 151.500 151.500 118.548
2,295.200
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM
DESCRIPTIONESTIMATED
UNIT
Page 136
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 136/300
Figures R.O. RO NO.
DESCRIPTION QUANTITY
UNIT
HVAC (cont'd)
VENTILATING FANS
Supply, installation, testing & commissioning
of ventilating fan with electrically operated
louvers, as specified on the drawings,complete with all mounting requirements,
flexible connections, electrical connections,
support, back draft dampers, auto changeover
controller, complete all in accordance with
drawings, specification and to the Engineer
approval.
ATwin Exhaust Fan Ref EXF-1; 375 air flow 150 Pa
static fan.1 EF nr. 620.300 620.300 510.300
B Twin Exhaust Fan Ref EXF-2; 450 air flow 150 Pastatic fan.
1 EF nr. 620.300 620.300 510.300
CTwin Exhaust Fan Ref EXF-3; 350 air flow 150 pa
static fan.1 EF nr. 516.200 516.200 422.820
DTwin Exhaust Fan Ref EXF-4; 150 air flow 75 Pa
static fan.1 EF nr. 542.300 542.300 444.690
ETwin Exhaust Fan Ref EXF-5; 575 air flow 150 Pa
static fan.1 EF nr. 629.000 629.000 517.590
FTwin Exhaust Fan Ref EXF-7; 1052 air flow 200 Pa
i f1 EF nr. 629.000 629.000 517.590
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM
DESCRIPTIONESTIMATED
UNIT
Page 137
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 137/300
Figures R.O. RO NO.
DESCRIPTION QUANTITY
UNIT
HVAC (cont'd)
ATwin Exhaust Fan Ref EXF-9; 225 air flow 150 Pa
static fan.1 EF nr. 620.300 620.300 510.300
BTwin Exhaust Fan Ref EXF-10; 870 air flow 150 Pa
static fan.1 EF nr. 620.300 620.300 510.300
CTwin Exhaust Fan Ref EXF-11; 1321 air flow 200
Pa static fan.1 EF nr. 1010.700 1,010.700 838.350
DTwin Exhaust Fan Ref EXF-12; 1000 air flow 200
Pa static fan1 EF nr. 811.200 811.200 670.680
ETwin Exhaust Fan Ref EXF-13; 875 air flow 150 Pa
static fan.1 EF nr. 620.300 620.300 510.300
FTwin Exhaust Fan Ref EXF-14; 1455 air flow 250
Pa static fan.1 EF nr. 1036.800 1,036.800 860.220
GTwin Exhaust Fan Ref EXF-15; 150 air flow 75 Pa
static fan.1 EF nr. 542.300 542.300 444.690
5,261.900
Construction of Haematology and BMT Centre Building- Issue
Bill 4 - Haematology and BMT Cen
Code AMOUNT Unit Rate AmUNIT RATE ITEM
NODESCRIPTION
ESTIMATED
QUANTITYUNIT
Page 138
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 138/300
Figures R.O. RO RNO. QUANTITY
HVAC (cont'd)
AKitchen Exhaust Fan Ref K-EXF; 650 air flow 150Pa static fan.
1 EF nr. 670.700 670.700 552.580
B Staircase Pressurization Fan Ref FAN-1T05; 9567air flow 350 Pa static fan.
5 EF nr. 1084.500 5,422.500 900.320 4
6,093.200 5,
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM
NODESCRIPTION
ESTIMATED
QUANTITYUNIT
Page 139
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 139/300
Figures R.O. RO NO.
DESCRIPTION QUANTITY
UNIT
Supply, installation, testing & commissioning
of ventilating fan with electrically operated
louvers, as specified on the drawings,
complete with all mounting requirements,
flexible connections, electrical connections,support, back draft dampers, auto changeover
controller, complete all in accordance with
drawings, specification and to the Engineer
approval.
A Smoke Exhaust Fan Ref S-EXF-1; 1 EF nr. 1485.300 1,485.300 1,237.110
B Smoke Exhaust Fan Ref S-EXF-2; 1 EF nr. 796.500 796.500 658.290
C Smoke Exhaust Fan Ref S-EXF-3; 1 EF nr. 950.000 950.000 787.320
D Smoke Exhaust Fan Ref S-EXF-4; 1 EF nr. 1009.900 1,009.900 837.620
E Smoke Exhaust Fan Ref S-EXF-5; 1 EF nr. 1485.300 1,485.300 1,237.110
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM
NODESCRIPTION
ESTIMATED
QUANTITYUNIT
Page 140
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 140/300
Figures R.O. RO NO. QUANTITY
HVAC (cont'd)
A Smoke Exhaust Fan Ref S-EXF-7; 1 EF nr. 950.000 950.000 787.320
B Smoke Exhaust Fan Ref S-EXF-8; 1 EF nr. 1346.400 1,346.400 1,120.470
C Smoke Exhaust Fan Ref S-EXF-9; 1 EF nr. 1485.300 1,485.300 1,237.110
D Smoke Exhaust Fan Ref S-EXF-10; 1 EF nr. 910.100 910.100 753.790
E Smoke Exhaust Fan Ref S-EXF-11; 1 EF nr. 917.000 917.000 759.620
F Smoke Exhaust Fan Ref S-EXF-12; 1 EF nr. 1494.800 1,494.800 1,245.130
7,103.600
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM
NODESCRIPTION
ESTIMATED
QUANTITYUNIT
Page 141
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 141/300
Figures R.O. RO NO. QUANTITY
HVAC (cont'd)
A Smoke Exhaust Fan Ref S-EXF-13; 1 EF nr. 950.000 950.000 787.320
B Smoke Exhaust Fan Ref S-EXF-14; 1 EF nr. 796.400 796.400 658.260
C Smoke Exhaust Fan Ref S-EXF-15; 1 EF nr. 1425.400 1,425.400 1,186.810
D Smoke Exhaust Fan Ref S-EXF-16; 1 EF nr. 1425.400 1,425.400 1,186.810
E Smoke Exhaust Fan Ref S-EXF-17; 1 EF nr. 910.100 910.100 753.790
5,507.300
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITYUNIT
Page 142
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 142/300
Figures R.O. RO NO. QUANTITY
HVAC (cont'd)
A Smoke Exhaust Fan Ref S-EXF-18; 1 EF nr. 950.000 950.000 787.320
B Smoke Exhaust Fan Ref S-EXF-19; 1 EF nr. 610.800 610.800 502.280
C Smoke Exhaust Fan Ref S-EXF-20; 1 EF nr. 730.500 730.500 602.880
D Smoke Exhaust Fan Ref S-EXF-21; 1 EF nr. 950.000 950.000 787.320
E Smoke Exhaust Fan Ref S-EXF-22; 1 EF nr. 1769.800 1,769.800 1,476.230
5,011.100
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITYUNIT
Page 143
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 143/300
Figures R.O. RO NO. QUANTITY
DUCT WORK
Supply and install Galvanized steel duct work
to HVAC DW-144 including control dampers,
fittings, joints, supports, hangers, stiffeners,
bends, black ends, bell mouths, protectivecoating , allow for acoustic lining, all required
accessories to complete installation as per
drawing and specification
ASupply G.I. Duct work 18 g. as per drawings based
on the size And associated insulation as per spec411 D kg 2.100 863.100 0.934
BSupply G.I. Duct work 20 g. as per drawings based
on the size And associated insulation as per spec3,105 D kg 2.000 6,210.000 0.888
CSupply G.I. Duct work 22 g. as per drawings based
on the size And associated insulation as per spec16,146 D kg 2.000 32,292.000 0.868
DSupply G.I. Duct work 24 g. as per drawings based
on the size And associated insulation as per spec18,885 D kg 2.400 45,324.000 1.071
EReturn G.I. Duct work 18 g. as per drawings based
on the size And associated insulation as per spec948 D kg 2.100 1,990.800 0.934
F Return G.I. Duct work 20 g. as per drawings basedon the size And associated insulation as per spec
542 D kg 2.000 1,084.000 0.888
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 144
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 144/300
Figures R.O. RO O QU
DUCT WORK
AReturn G.I. Duct work 24 g. as per drawings based
on the size as per spec15,843 D kg 2.400 38,023.200 1.071
B Exhaust G.I. Duct work 24 g. as per drawingsbased on the size as per spec
3,393 D kg 2.400 8,143.200 1.071
CExhaust G.I. Duct work 22 g. as per drawings
based on the size as per spec419 D kg 2.000 838.000 0.868
DExhaust G.I. Duct work 18 g. as per drawings
based on the size as per spec95 D kg 2.100 199.500 0.934
EFresh air intake G.I. Duct work 18 g. as per
drawings based on the size as per spec
34 D kg 2.100 71.400 0.934
FGeneral exhaust air intake G.I. Duct work 18 g. as
per drawings based on the size as per spec401 D kg 2.100 842.100 0.934
GToilet exhaust air intake G.I. Duct work 18 g. as
per drawings based on the size as per spec514 D kg 2.100 1,079.400 0.934
H
Allow for flexible connections; Flexible duct
connections to plenum boxes, grills and diffusers;
Anchor expansion loops, support for pipes and
duct work at expansion joint as applicable
1 D Item 6900.300 6,900.300 5,000.000
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate
Fi R O RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 145
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 145/300
Figures R.O. RO
DUCT WORK
Thermal insulation, as specified
A
Allow for access doors and panels for duct work
adjacent to fire damper as per required and
approval of HVAC Engineer/tender document/site
condition
1 Item 0.000 Excluded
B
40 mm thick , 48 kg/m3 Fibre reinforced
aluminium foil faced rigid fibreglass fixed to
ductwork and finished with 8 oz glass . Cora cloth
and three coats of vapour barrier as speified in
specification
12,421 DI sq m 7.900 98,125.900 3.877
C50 mm thick, expanded polystyrene rigid boards 35
kg/m3 insulation system to exposed/external
ductwork as specified.
1 DI Item 25018.100 25,018.100 12,546.526
D0.8 mm thick hammered aluminium cladding finish
to exposed ducts and pipes1 AL Item 26797.900 26,797.900 16,616.607
Acoustic insulation, as specified
E
25 mm thick, 48kg/m3 density sound absorbent
lining to ductwork, internally upto 8 meter distance
from HVAC unit outlet and to all supply / return air
plenums. .
1 A Item 21721.500 21,721.500 9,209.050
FTenderers are required to price for the complete
requirement of motorized volume control damper .
required
1 ATD Item 6664.500 6,664.500 4,585.100
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R O RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 146
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 146/300
Figures R.O. RO
Volume Control Damper (VCD)
Supply and install volume control damper as
per specification and tender drawings, sizes
shown below
A 150 x 100 mm 6 ATD nr. 9.400 56.400 6.000
B 200 x 100 mm 6 ATD nr. 9.800 58.800 6.300
C 250 x 100 mm 30 ATD nr. 10.200 306.000 6.600
D 300 x 100 mm 54 ATD nr. 10.300 556.200 6.700
E 350 x 100 mm 18 ATD nr. 11.000 198.000 7.200
F 350x150 mm 42 ATD nr. 9.800 411.600 6.300
G 400 x150 mm 48 ATD nr. 12.300 590.400 8.200
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R O RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 147
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 147/300
Figures R.O. RO
Volume Control Damper (VCD) (cont'd)
A 400 x 250 mm 36 ATD nr. 16.300 586.800 11.200
B 450 x 150 mm 30 ATD nr. 13.000 390.000 8.700
C 450 x 200 mm 12 ATD nr. 16.400 196.800 11.300
D 450 x 200 mm 12 ATD nr. 16.400 196.800 11.300
E 450 x 250 mm 12 ATD nr. 16.400 196.800 11.300
F 500 x 200 mm 6 ATD nr. 17.200 103.200 11.900
G 500 x 250 mm 7 ATD nr. 17.800 124.600 12.400
1,795.000
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 148
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 148/300
Figures R.O. RO
Volume Control Damper (VCD) (cont'd)
A 500 x 350 mm 6 ATD nr. 19.200 115.200 13.400
B 550 x 100 mm 6 ATD nr. 14.200 85.200 9.100
C 550 x 150 mm 8 ATD nr. 14.900 119.200 9.600
D 550 x 250 mm 6 ATD nr. 19.400 116.400 13.000
E 550 x 300 mm 26 ATD nr. 20.000 520.000 13.500
F 800 x 400 mm 7 ATD nr. 33.200 232.400 23.500
G 950 x 600 mm 9 ATD nr. 62.500 562.500 45.600
1,750.900
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 149
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 149/300
gu es O O
Volume Control Damper (VCD) (cont'd)
A 1200 x 500 mm 19 ATD nr. 60.500 1,149.500 43.000
B 1200 x 600 mm 12 ATD nr. 69.900 838.800 50.100
Fire Damper(FD)
Supply and install Fire damper as per
specification and tender drawings, sizes shown
below
C 200 x 100 mm 1 ATD nr. 14.300 14.300 9.200
D 200 x 150 mm 1 ATD nr. 15.300 15.300 9.900
E 250 x 100 mm 1 ATD nr. 15.100 15.100 9.800
F 300 x 100 mm 2 ATD nr. 15.900 31.800 10.400
G 300 x 200 mm 5 ATD nr. 17.800 89.000 11.800
H 300 x 250 mm 2 ATD nr. 19.000 38.000 12.700
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 150
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 150/300
g
Fire Damper (FD) (cont'd)
A 350 X 100 mm 3 ATD nr. 17.600 52.800 11.700
B 350 x 200 mm 2 ATD nr. 19.600 39.200 13.200
C 350 x 250 mm 1 ATD nr. 20.200 20.200 13.600
D 400 x 150 mm 6 ATD nr. 19.800 118.800 13.300
E 400 x 200 mm 5 ATD nr. 20.600 103.000 13.900
F 450 x 200 mm 2 ATD nr. 21.500 43.000 14.600
G 500 x 200 mm 3 ATD nr. 22.400 67.200 15.300
H 500 x 250 mm 4 ATD nr. 23.900 95.600 16.400
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 151
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 151/300
Fire Damper (FD) (cont'd)
A 500 x 350 mm 1 ATD nr. 26.900 26.900 18.700
B 550 x 250 mm 1 ATD nr. 25.500 25.500 17.100
C 550 x 300 mm 1 ATD nr. 27.100 27.100 18.300
D 550 x 350 mm 1 ATD nr. 28.800 28.800 19.600
E 550 x 650 mm 5 ATD nr. 41.600 208.000 29.300
F 600 x 250 mm 2 ATD nr. 26.600 53.200 17.900
G 600 x 300 mm 1 ATD nr. 28.200 28.200 19.100
H 650 x 250 mm 1 ATD nr. 28.400 28.400 19.300
J 650 x 300 mm 1 ATD nr 30 300 30 300 20 700
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 152
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 152/300
Fire Damper (FD) (cont'd)
A 650 x 450 mm 1 ATD nr. 39.300 39.300 27.500
B 750 x 500 mm 2 ATD nr. 43.900 87.800 31.000
C 800 x 350 mm 3 ATD nr. 39.000 117.000 27.300
D 800 x 700 mm 1 ATD nr. 52.500 52.500 37.500
E 850 x 400 mm 1 ATD nr. 51.800 51.800 37.000
F 850 x 450 mm 3 ATD nr. 54.700 164.100 39.200
G 850 x 550 mm 2 ATD nr. 59.100 118.200 42.500
H 900 x 300 mm 1 ATD nr. 47.100 47.100 33.400
J 900 x 450 mm 2 ATD nr 56 000 112 000 40 200
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 153
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 153/300
Fire Damper (FD) (cont'd)
A 900 x 550 mm 1 ATD nr. 60.400 60.400 43.500
B 900 x 600 mm 1 ATD nr. 68.900 68.900 49.900
C 900 x 800 mm 3 ATD nr. 74.200 222.600 53.900
D 950 x 500 mm 1 ATD nr. 183.000 183.000 136.200
E 950 x 600 mm 55 ATD nr. 60.500 3,327.500 43.600
F 950 x 800 mm 1 ATD nr. 85.900 85.900 62.800
G 1000 x 500 mm 2 ATD nr. 71.900 143.800 51.100
H 1000 x 550 mm 2 ATD nr. 71.900 143.800 51.100
J 1000 x 600 mm 1 ATD nr 76 300 76 300 54 400
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 154
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 154/300
Fire Damper (FD) (cont'd)
A 1000 x 650 mm 2 ATD nr. 82.100 164.200 58.800
B 1000 x 700 mm 2 ATD nr. 85.500 171.000 61.400
C 1000 x 750 mm 2 ATD nr. 89.100 178.200 64.100
D 1000 x 800 mm 6 ATD nr. 114.600 687.600 83.400
E 1000 x 850 mm 1 ATD nr. 144.700 144.700 106.200
F 1000 x 1150 mm 2 ATD nr. 71.900 143.800 51.100
G 1050 x 500 mm 2 ATD nr. 80.100 160.200 57.300
H 1050 x 650 mm 1 ATD nr. 81.700 81.700 58.500
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 155
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 155/300
Fire Damper (FD) (cont'd)
A 1100 x 650 mm 1 ATD nr. 81.700 81.700 58.500
B 1100 x 700 mm 1 ATD nr. 85.400 85.400 61.300
C 1100 x 750 mm 1 ATD nr. 89.000 89.000 64.000
D 1150 x 500 mm 2 ATD nr. 74.700 149.400 53.200
E 1200 x 500 mm 2 ATD nr. 76.100 152.200 54.300
F 1200 x 600 mm 3 ATD nr. 81.200 243.600 58.100
G 1200 x 650 mm 1 ATD nr. 84.900 84.900 60.900
H 1200 x 700 mm 3 ATD nr. 88.600 265.800 63.700
J 1200 x 900 mm 1 ATD nr 140 000 140 000 102 600
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 156
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 156/300
Fire Damper (FD) (cont'd)
A 1250 x 500 mm 1 ATD nr. 79.400 79.400 56.800
B 1250 x 800 mm 18 ATD nr. 100.100 1,801.800 72.400
C 1300 x 850 mm 2 ATD nr. 148.400 296.800 109.000
D 1350 x 900 mm 2 ATD nr. 152.300 304.600 111.900
E 1400 x 700 mm 1 ATD nr. 97.000 97.000 70.100
F 1500 x 700 mm 1 ATD nr. 101.100 101.100 72.600
G 1500 x 750 mm 1 ATD nr. 105.400 105.400 75.900
H 1500 x 800 mm 1 ATD nr. 106.900 106.900 77.000
J 1600 x 700 mm 2 ATD nr 104 400 208 800 75 100
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 157
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 157/300
Diffusers
Supply, install, test and commission Supply
diffuser (600 x 600 mm face) Aluminum powder
coated with volume damper and complete with
all required accessories, quantity of air flow .
as per schedule in the drawing
A Supply diffuser 150 x 150 mm 21 ATD nr. 64.800 1,360.800 47.400
B Supply diffuser 225 x 225 mm 193 ATD nr. 64.800 12,506.400 47.400
C Supply diffuser 300 x 100 mm 11 ATD nr. 64.800 712.800 47.400
D Supply diffuser 300 x 300 mm 293 ATD nr. 64.800 18,986.400 47.400
E Supply diffuser 375 x 375 mm 78 ATD nr. 64.800 5,054.400 47.400
F Supply diffuser 450 x 450 mm 13 ATD nr. 64.800 842.400 47.400
G Supply diffuser 500 x 200 mm 5 ATD nr 64 800 324 000 47 400
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 158
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 158/300
Supply, install, test and commission Return
diffuser (600 x 600 mm face) Aluminum powder
coated with volume damper and complete with
all required accessories, quantity of air flow .
as per schedule in the drawing
A Return diffuser 225 x 225 mm 142 ATD nr. 29.300 4,160.600 20.500
B Return diffuser 225 x 255 mm 11 ATD nr. 29.300 322.300 20.500
C Return diffuser 300 x 100 mm 7 ATD nr. 29.300 205.100 20.500
D Return diffuser 300 x 300 mm 242 ATD nr. 29.300 7,090.600 20.500
E Return diffuser 375 x 375 mm 72 ATD nr. 29.300 2,109.600 20.500
F Return diffuser 450 x 450 mm 7 ATD nr. 29.300 205.100 20.500
G Return diffuser 500 x 200 mm 5 ATD nr. 29.300 146.500 20.500
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 159
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 159/300
Exhaust Diffuser
Supply, install, test and commission Exhaust
diffuser Aluminum power coated with
complete with all required accessories,
quantity of air flow . as per schedule in the
drawing
A Exhaust diffuser 150 x150 mm 118 ATD nr. 8.700 1,026.600 4.900
B Exhaust diffuser 225 x 225 mm 29 ATD nr. 17.600 510.400 11.700
C Exhaust diffuser 225 x 255 mm 2 ATD nr. 17.600 35.200 11.700
D Exhaust diffuser 300 x 100 mm 3 ATD nr. 17.600 52.800 11.700
E Exhaust diffuser 300 x 300 mm 50 ATD nr. 17.600 880.000 11.700
F Exhaust diffuser 375 x 375 mm 6 ATD nr. 24.000 144.000 16.500
G Exhaust diffuser 450 x 450 mm 3 ATD nr. 31.300 93.900 22.000
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 160
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 160/300
Supply Grilles
Supply, install, test and commission Supply
Grilles complete with all required accessories,
quantity of air flow .. as per schedule in the
drawing
A Supply Grille 200 x 100 mm 4 ATD nr. 4.800 19.200 2.300
B Supply Grille 225 x 225 mm 2 ATD nr. 7.800 15.600 4.600
C Supply Grille 300 x 100 mm 46 ATD nr. 6.000 276.000 3.200
D Supply Grille 350 x 150 mm 1 ATD nr. 8.100 8.100 4.800
E Supply Grille 400 x 150 mm 3 ATD nr. 8.900 26.700 5.400
F Supply Grille 500 x 100 mm 3 ATD nr. 8.500 25.500 5.100
G Supply Grille 500 x 150 mm 8 ATD nr. 10.600 84.800 6.700
H Supply Grille 500 x 200 mm 1 ATD nr. 12.600 12.600 8.200
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 161
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 161/300
Return Grill
Supply, install, test and commission return
grilles complete with all required accessories,
quantity of air flow .. as per schedule in the
drawing
A Return Grille 200 x 100 mm 4 ATD nr. 3.900 15.600 1.600
B Return Grille 300 x 100 mm 11 ATD nr. 4.500 49.500 2.100
C Return Grille 400 x 150 mm 3 ATD nr. 6.400 19.200 3.500
D Return Grille 500 x 100 mm 3 ATD nr. 6.100 18.300 3.300
E Return Grille 500 x 150 mm 7 ATD nr. 7.400 51.800 4.300
F Return Grille 500 x 200 mm 1 ATD nr. 8.600 8.600 5.200
163.000
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 162
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 162/300
Exhaust Grill
Supply, install, test and commission Exhaust
Grilles complete with all required accessories,
quantity of air flow .. as per schedule in the
drawing
A Exhaust Grille 200 x 100 mm 7 ATD nr. 3.900 27.300 1.600
B Exhaust Grille 300 x 100 mm 14 ATD nr. 4.500 63.000 2.100
C Exhaust Grille 350 x 150 mm 1 ATD nr. 5.800 5.800 3.100
D Exhaust Grille 500 x 150 mm 1 ATD nr. 7.400 7.400 4.300
E Exhaust Grille 1210 x 610 mm 7 ATD nr. 46.100 322.700 31.600
426.200
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 163
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 163/300
HVAC INSTALLATIONS
Exhaust cowl
Supply, install , test and commission Exhaust
cowl, complete with SS bird screen, all required
accessories and as hown on drawings.
A 45 Degree cowl size 300 x 150 mm 1 ATD nr. 4.400 4.400
B 45 Degree cowl size 300 x 200 mm 1 ATD nr. 4.400 4.400
C 45 Degree cowl size 400 x 200 mm 2 ATD nr. 4.400 8.800
D 45 Degree cowl size 400 x 250 mm 1 ATD nr. 4.400 4.400
E 45 Degree cowl size 500 x 300 mm 1 ATD nr. 4.400 4.400
F 45 Degree cowl size 550 x 200 mm 1 ATD nr. 4.400 4.400
G 45 Degree cowl size 550 x 300 mm 2 ATD nr. 4.400 8.800
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 164
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 164/300
Exhaust cowl
Supply, install , test and commission Exhaust
cowl, complete with SS bird screen, all required
accessories and as hown on drawings.
A 45 Degree cowl size 650 x 200 mm 1 ATD nr. 73.100 73.100 52.000
B 45 Degree cowl size 650 x 350 mm 1 ATD nr. 124.700 124.700 91.000
C 45 Degree cowl size 750 x 350 mm 1 ATD nr. 143.200 143.200 105.000
D 45 Degree cowl size 750 x 750 mm 6 ATD nr. 301.800 1,810.800 225.000
E 45 Degree cowl size 800 x 700 mm 1 ATD nr. 300.500 300.500 224.000
F 45 Degree cowl size 900 x 600 mm 1 ATD nr. 289.900 289.900 216.000
G 45 Degree cowl size 950 x 800 mm 1 ATD nr. 406.200 406.200 304.000
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 165
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 165/300
Exhaust cowl (Cont'd)
A 45 Degree cowl size 1000 x 750 mm 2 ATD nr. 400.900 801.800 300.000
B 45 Degree cowl size 1000 x 800 mm 1 ATD nr. 427.400 427.400 320.000
C 45 Degree cowl size 1000 x 900 mm 1 ATD nr. 480.200 480.200 360.000
D 45 Degree cowl size 1000 x 950 mm 1 ATD nr. 506.700 506.700 380.000
E 45 Degree cowl size 1100 x 750 mm 1 ATD nr. 440.600 440.600 330.000
F 45 Degree cowl size 1100 x 800 mm 1 ATD nr. 469.700 469.700 352.000
G 45 Degree cowl size 1200 x 700 mm 1 ATD nr. 448.500 448.500 336.000
H 45 Degree cowl size 1250 x 800 mm 1 ATD nr. 533.100 533.100 400.000
J 45 Degree cowl size 1300 x 850 mm 1 ATD nr. 588.600 588.600 442.000
K 45 Degree cowl size 1350 x 900 mm 1 ATD nr 646.800 646.800 486.000
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Mi ll
Page 166
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 166/300
Miscellaneous
AAllow for connection to al l return, Exhaust, fresh
and supply ducts as necessary at FCU AHU and
extract fans,
1 D Item 733.700 733.700 500.000
B
Allow for Control System for fan coil units including
interconnecting wiring for all control items, motors,sensors and the like as per specification
1 CS Item 0.000 -
C Ditto for Air Handling Units 1 CS Item 0.000 -
D Ditto for Fresh Air handling units 1 CS Item 0.000 -
E Ditto for smoke exhaust fans 1 CS Item 0.000 -
FAllow for Control System for Extract Fan including
interconnecting wiring for all control items, motors,
sensors and the like as per specification
1 CS Item 0.000 -
733.700
Construction of Haematology and BMT Centre Building- Issu
Bill 4 - Haematology and BMT Cen
Code AMOUNT Unit Rate Am
Figures R.O. RO R
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Allow for providing all necessary BMS control
Page 167
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 167/300
A
Allow for providing all necessary BMS control
system including, DDC panels, work stations
interconnecting wiring, for all control items, motors,
sensors and in the installation of control panels,
sensors/ remote set points, switches, control
valves, thermostats, wiring ., and operation of the
complete BMS installation air-conditioning andventilating system comprising with commissioning
of BMS system.
1 CS Item 137596.000 137,596.000 101,650.000 101
137,596.000 101
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC INSTALLATION
Page 168
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 168/300
HVAC INSTALLATION
COLLECTION AMOUNT, R.O., IN FIGURES
Page HB-HVAC- Page 171,339.500 -
Page HB-HVAC- Page 24,505.050 -
Page HB-HVAC- Page 325,495.100 -
Page HB-HVAC- Page 42,651.250 -
Page HB-HVAC- Page 54,680.400 -
Page HB-HVAC- Page 651,339.200 -
Page HB-HVAC- Page 737,602.100 -
Page HB-HVAC- Page 835,601.800 -
Page HB-HVAC- Page 955,803.300 -
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC INSTALLATION
Page 169
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 169/300
HVAC INSTALLATION
COLLECTION (Cont'd) AMOUNT, R.O., IN FIGURES
Brought Forward 317,520.600 -
Page HB-HVAC- Page 113,099.200 -
Page HB-HVAC- Page 122,622.400 -
Page HB-HVAC- Page 131,402.000 -
Page HB-HVAC- Page 143,971.100 -
Page HB-HVAC- Page 15
3,911.400 -
Page HB-HVAC- Page 164,653.400 -
Page HB-HVAC- Page 172,295.200 -
Page HB-HVAC- Page 184,186.100 -
Page HB-HVAC- Page 19 5 261 900
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC INSTALLATION
Page 170
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 170/300
HVAC INSTALLATION
COLLECTION (Cont'd) AMOUNT, R.O., IN FIGURES
Brought Forward 362,228.800 -
Page HB-HVAC- Page 227,103.600 -
Page HB-HVAC- Page 235,507.300 -
Page HB-HVAC- Page 245,011.100 -
Page HB-HVAC- Page 25121,965.900 -
Page HB-HVAC- Page 26
56,097.100 -
Page HB-HVAC- Page 27198,577.600 -
Page HB-HVAC- Page 282,177.400 -
Page HB-HVAC- Page 291,795.000 -
Page HB-HVAC- Page 30 1 750 900
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC INSTALLATION
Page 171
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 171/300
HVAC INSTALLATION
COLLECTION (Cont'd) AMOUNT, R.O., IN FIGURES
Brought Forward 764,946.300 -
Page HB-HVAC- Page 33456.400 -
Page HB-HVAC- Page 34789.800 -
Page HB-HVAC- Page 354,312.200 -
Page HB-HVAC- Page 361,731.400 -
Page HB-HVAC- Page 37
1,292.000 -
Page HB-HVAC- Page 383,210.700 -
Page HB-HVAC- Page 3940,500.000 -
Page HB-HVAC- Page 4014,591.400 -
Page HB-HVAC- Page 41 2 742 900
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC INSTALLATION
Page 172
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 172/300
COLLECTION (Cont'd) AMOUNT, R.O., IN FIGURES
Brought Forward 835,690.700 - 5
Page HB-HVAC- Page 44
426.200 -
Page HB-HVAC- Page 45
44.000 -
Page HB-HVAC- Page 46
3,470.000 -
Page HB-HVAC- Page 47
5,982.300 -
Page HB-HVAC- Page 48
733.700 -
Page HB-HVAC- Page 49
137,596.000 - 1
983,942.900 - 6
Construction of Haematology and BMT Centre Building- Iss
Bill 4 - Haematology and BMT Ce
Code AMOUNT Unit Rate A
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Additional Items
Page 173
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 173/300
Additional valves for pumps 1 V 9559.800 9,559.800 7,121.840
Additional valves for chillers 1 V 6195.900 6,195.900 4,577.100
Hepa filter for sterile room 375x375mm 4 ATD 2716.500 10,866.000 2,000.000
0.000 -
0.000 -
0.000 -
26,621.700 1
Construction of Haematology and BMT Centre Building- Is
Bill 4 - Haematology and BMT C
Code AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Total BOQ + Additional 1,010,564.600 -
Page 174
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 174/300
Items Qty Code Make Discount Total Mat Total Mhr To
Acoustic Insulation 1.00 A 9,209.050 6,566.320
Air handling units 22.00 AHU 158,810.500 1,100.000Al cladding 1.00 AL 16,616.607 3,323.321
Air terminal devices 2130.00 ATD 95,446.400 4,602.200
Chillers 0.00 C - -
Cold room outdoor unit 7.00 CR ODU 3,465.591 350.000
Control system(BMS) 6.00 CS 101,650.000 12,706.250
Ducting 77839.00 D 81,030.135 48,222.834
Ducting insulation 12422.00 DI 60,700.151 29,150.889
Dosing system 0.00 DS - -
Extract fans 42.00 EF 33,466.920 420.000
Fan coil unit 32.00 FCU 8,549.900 640.000Piping 1761.50 P 42,280.455 13,715.100
Piping insulation 1761.50 PI 17,244.985 3,636.150
Pre insulated piping 318.00 PIP - -
Pumps 0.00 PUMP - -
Pressurisation unit 0.00 PU - -
Split units 1.00 SU 345.084 50.000
Valves 100.00 V 12,766.540 298.000
Varaiable air volume 169.00 VAV 16,960.112 1,352.000
658,542.429 126,133.065
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 175
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 175/300
7,036.080
19,303.270
12,483.800
5,173.900
4,010.400
2,336.580
3,626.560
53,970.590
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
1,028.720
Page 176
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 176/300
,0 8 0
150.715
1,131.000
330.880
755.160
3,396.475
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 177
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 177/300
2,381.840
6,788.390
3,831.900
1,793.350
1,357.920
910.440
1,646.400
590.040
19,300.280
Construction of Haematology and BMT Centre Building- Issued for Tend
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
98.470
Page 178
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 178/300
877.500
259.840
708.660
-
-
-
71.000
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 179
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 179/300
400.084
3,850.591
4,250.675
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 180
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 180/300
10,160.430
11,014.040
10,983.900
10,983.900
43,142.270
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 181
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 181/300
4,575.270
8,536.370
5,460.100
5,348.270
7,678.410
31,598.420
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
4,044.440
Page 182
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 182/300
5,835.890
7,427.880
5,878.730
6,730.520
29,917.460
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
7,401.380
Page 183
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 183/300
5,459.370
6,985.290
8,569.770
5,911.410
4,797.840
7,768.450
46,893.510
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
8,468.840
Page 184
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 184/300
4,503.400
712.800
391.600
9,253.900
23 330 540
Construction of Haematology and BMT Centre Building- Issued for Tend
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 185
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 185/300
300.444
400.592
600.888
100.148
300.444
100.148
600.888
200.296
2 603 848
Construction of Haematology and BMT Centre Building- Issued for Tend
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
100.148
Page 186
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 186/300
600.888
100.148
300.444
300.444
400.592
100.148
200.296
100.148
2,203.256
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
100.148
Page 187
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 187/300
100.148
200.296
107.648
107.648
449.792
112.448
1,178.128
Construction of Haematology and BMT Centre Building- Issued for Tend
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
215.296
Page 188
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 188/300
107.648
322.944
1,937.664
107.648
107.648
107.648
322.944
107.648
3,337.088
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
215.296
Page 189
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 189/300
968.832
753.536
112.448
112.448
449.792
674.688
3,287.040
Construction of Haematology and BMT Centre Building- Issued for Tend
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
224.896
Page 190
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 190/300
112.448
112.448
112.448
119.548
478.192
836.836
1,793.220
119.548
3,909.584
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
478.192
Page 191
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 191/300
239.096
358.644
478.192
119.548
127.348
127.348
1,928.368
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 192
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 192/300
521.300
521.300
433.820
455.690
528.590
528.590
528.590
3,517.880
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
521.300
521 300
Page 193
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 193/300
521.300
849.350
681.680
521.300
871.220
455.690
4,421.840
Construction of Haematology and BMT Centre Building- Issued for TenderBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
563.580
4,556.600
Page 194
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 194/300
5,120.180
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 195
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 195/300
1,248.110
669.290
798.320
848.620
1,248.110
1,248.110
6,060.560
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
798.320
1,131.470
Page 196
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 196/300
,
1,248.110
764.790
770.620
1,256.130
5,969.440
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
798.320
669.260
Page 197
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 197/300
1,197.810
1,197.810
764.790
4,627.990
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
798.320
513.280
Page 198
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 198/300
613.880
798.320
1,487.230
4,211.030
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 199
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 199/300
648.294
4,675.873
24,300.781
33,859.470
1,495.336
816.207
25,738.119
91,534.080
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
28,405.379
6,083.409
Page 200
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 200/300
630.622
149.849
53.630
632.521
810.762
5,220.000
41,986.172
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
-
Page 201
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 201/300
73,840.252
18,925.876
20,272.261
16,432.002
5,041.600
15,318.600
149,830.591
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
42.600
Page 202
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 202/300
44.400
231.000
421.200
149.400
310.800
446.400
1,645.800
Construction of Haematology and BMT Centre Building- Issued for TendeBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
442.800
294 000
Page 203
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 203/300
294.000
148.800
148.800
148.800
78.000
94.500
1,355.700
Construction of Haematology and BMT Centre Building- Issued for TendeBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
87.000
64.500
Page 204
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 204/300
90.000
87.900
393.900
176.050
425.250
1,324.600
Construction of Haematology and BMT Centre Building- Issued for TendBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
869.250
634.200
Page 205
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 205/300
10.850
11.550
11.450
24.100
67.250
28.700
1,657.350
Construction of Haematology and BMT Centre Building- Issued for TendBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
40.050
29.700
Page 206
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 206/300
15.250
89.700
77.750
32.500
50.850
72.200
408.000
Construction of Haematology and BMT Centre Building- Issued for TenBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
20.350
19.300
Page 207
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 207/300
20.500
21.800
157.500
40.200
21.300
21.500
22.900
345.350
Construction of Haematology and BMT Centre Building- Issued for TenBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
29.700
66.400
Page 208
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 208/300
88.500
39.700
39.200
124.200
89.400
35.600
84.800
597.500
Construction of Haematology and BMT Centre Building- Issued for TendBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
45.700
52.100
Page 209
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 209/300
168.300
138.400
2,519.000
65.000
108.800
108.800
57.700
3,263.800
Construction of Haematology and BMT Centre Building- Issued for TendBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
124.200
129.400
Page 210
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 210/300
134.800
520.200
109.500
108.800
121.200
61.800
1,309.900
Construction of Haematology and BMT Centre Building- Issued for TendBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
61.800
64.600
Page 211
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 211/300
67.300
113.000
115.200
184.200
64.200
201.000
105.900
977.200
Construction of Haematology and BMT Centre Building- Issued for TenBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
60.100
1,362.600
Page 212
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 212/300
224.600
230.400
73.400
76.450
79.750
80.850
157.900
82.350
Construction of Haematology and BMT Centre Building- Issued for TendeBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
Page 213
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 213/300
1,030.050
9,466.650
539.550
14,371.650
3,825.900
637.650
245.250
539.550
30 656 250
Construction of Haematology and BMT Centre Building- Issued for TendeBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
3,145.300
Page 214
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 214/300
,
243.650
155.050
5,360.300
1,594.800
155.050
110.750
265.800
11,030.700
Construction of Haematology and BMT Centre Building- Issued for TendeBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
772.900
Page 215
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 215/300
387.150
26.700
40.050
667.500
108.900
70.950
2,074.150
Construction of Haematology and BMT Centre Building- Issued for TenBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
14.480
Page 216
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 216/300
11.840
207.920
6.120
20.160
19.260
64.160
9.520
352.940
14.480
Construction of Haematology and BMT Centre Building- Issued for TenderBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
11.680
Page 217
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 217/300
37.620
14.460
13.860
39.340
6.520
123.480
Construction of Haematology and BMT Centre Building- Issued for TenderBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
20.440
Page 218
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 218/300
47.880
4.420
5.620
244.300
322.660
Construction of Haematology and BMT Centre Building- Issued for TendBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
3.300
Page 219
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 219/300
3.300
6.600
3.300
3.300
3.300
6.600
3.300
33.000
Construction of Haematology and BMT Centre Building- Issued for TendBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
55.300
Page 220
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 220/300
94.300
108.300
1,369.800
227.300
219.300
307.300
243.300
2,624.900
Construction of Haematology and BMT Centre Building- Issued for TenBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
606.600
323.300
363.300
Page 221
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 221/300
383.300
333.300
355.300
339.300
403.300
445.300
489.300
483.300
4 525 600
Construction of Haematology and BMT Centre Building- Issued for Tende
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
555.000
-
-
Page 222
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 222/300
-
-
-
555.000
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
115,626.875
115,626.875
Page 223
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 223/300
Construction of Haematology and BMT Centre Building- Issued for TendBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
53,970.590
3,396.475
Page 224
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 224/300
19,300.280
2,015.470
4,250.675
43,142.270
31,598.420
29,917.460
46,893.510
23,330.540
257,815.690
Construction of Haematology and BMT Centre Building- Issued for TeBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
257,815.690
2,603.848
2,203.256
Page 225
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 225/300
1,178.128
3,337.088
3,287.040
3,909.584
1,928.368
3,517.880
4,421.840
5,120.180
Construction of Haematology and BMT Centre Building- Issued for TenBill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
295,383.462
5,969.440
4,627.990
Page 226
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 226/300
4,211.030
91,534.080
41,986.172
149,830.591
1,645.800
1,355.700
1,324.600
1,657.350
Construction of Haematology and BMT Centre Building- Issued for Te
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
599,934.215
345.350
597.500
Page 227
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 227/300
3,263.800
1,309.900
977.200
2,428.400
30,656.250
11,030.700
2,074.150
720.880
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
653,461.825
322.660
33.000
Page 228
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 228/300
2,624.900
4,525.600
555.000
115,626.875
777,149.860
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
7,231.840
4,687.100
8,220.000
Page 229
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 229/300
-
-
-
20,138.940
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill 4 - Haematology and BMT Centre
Amount (R.O.)
(R.O.)
797,288.800
Page 230
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 230/300
Construction of Haematology and BMT Centre Building - Is
Bill 5 - Corridor Connection
CODE AMOUNT Unit Rate Amount
Figures R.O. RO RO
HVAC
CHILLED WATER PIPING
Supply, install, test and commission of Black
steel class B seamless pipe to BS 1387
including all fittings , valves, balancing valve,
brackets, clamps, clips and supports,
insulation complete all as specified in flexible
connection as shown on drawings or as
UNIT RATE ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY UNIT
Page 231
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 231/300
connection . as shown on drawings or asrequire to complete the connection and
installations.
A 40 mm Dia 55 P lin m 7.700 423.500 3.380 185.
B 50 mm Dia 81 P lin m 9.300 753.300 4.590 371.
C 65 mm Dia 32 P lin m 15.500 496.000 7.290 233.
D 80 mm Dia 321 P lin m 21.400 6,869.400 9.590 3,078.
8,542.200 3,869.
Construction of Haematology and BMT Centre Building - Iss
Bill 5 - Corridor Connection
CODE AMOUNT Unit Rate Amount
Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
preformed rigid sections PUF/ polyisocanurate
moulded in cylindrical foam 35 kg./m3 density
insulation with canvas / cloth to pipes
complete all in accordance with drawings and
specification
A 40 mm Dia 55 PI lin m 5.900 324.500 3.290 180.
Page 232
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 232/300
B 50 mm Dia 81 PI lin m 6.100 494.100 3.370 272.
C 65 mm Dia 32 PI lin m 8.900 284.800 5.330 170.
D 80 mm Dia 321 PI lin m 9.700 3,113.700 5.810 1,865.
4,217.100 2,489.4
Construction of Haematology and BMT Centre Building - Is
Bill 5 - Corridor Connection
CODE AMOUNT Unit Rate Amount
Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
EQUIPMENT
Supply, installation of chilled water Cassette
unit; complete with integral actuator valves,
thermostatic controller, filters, 2 way
motorized valve, including all accessories,
plumbing and electrical connection to
complete the installation as per specification,
described in drawings and to the Engineer
approval
Page 233
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 233/300
approval.
ACU-1; decorative, 7 kW cooling capacity, 330 l/sair flow
12 FCU nr. 932.400 11,188.800 813.790 9,765
B
Allow for control system for cassette unitsincluding interconnecting wiring for all controlitems, motors sensors and like complete all as per
specifications and drawings
1 CS Item 0.000 Included
SUNDRIES
C
Allow for control system for complete airconditioning system including DDC panels,interconnecting wiring, for al l control items, motorssensors and the like, not included above but
deemed to be necessary to complete BMSinstallation, installation and commissioning ofBMS system.
1 CS Item 0.000 Included
11 188 800 9 765
Construction of Haematology and BMT Centre Building - Iss
Bill 5 - Corridor Connection
CODE AMOUNT Unit Rate Amount
Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC INSTALLATION
COLLECTION AMOUNT, R.O., IN FIGURES
Page CC-HVAC- Page 18,542.200 - 3,869.3
Page CC-HVAC- Page 24,217.100 - 2,489.4
Page CC-HVAC- Page 3
Page 234
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 234/300
Page CC HVAC Page 311,188.800 - 9,765.4
23,948.100 16,124.3
Construction of Haematology and BMT Centre Building - I
Bill 5 - Corridor Connection
CODE AMOUNT Unit Rate Amoun
Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Items Qty Code Make Discount Total Mat Total Mhr Total Mat
Acoustic Insulation 0.00 A - -
Air handling units 0.00 AHU - -
Al cladding 0.00 AL - -
Air terminal devices 0.00 ATD - -
Chillers 0.00 C - -
Cold room outdoor unit 0.00 CR ODU - -
Control system(BMS) 2.00 CS - -
Page 235
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 235/300
Control system(BMS) .00 CSDucting 0.00 D - -
Ducting insulation 0.00 DI - -
Dosing system 0.00 DS - -
Extract fans 0.00 EF - -
Fan coil unit 12.00 FCU 9,765.480 360.000 10,16
Piping 489.00 P 3,869.360 2,353.200 6,45
Piping insulation 489.00 PI 2,489.490 639.000 3,19
Pre insulated piping 0.00 PIP - -
Pumps 0.00 PUMP - -
Pressurisation unit 0.00 PU - -Split units 0.00 SU - -
Valves 0.00 V - -
Varaiable air volume 0.00 VAV - -
16,124.330 3,352.200 19,811
Construction of Haematology and BMT Centre Building- Is
Bill 6 - Service Compound
AMOUNT Unit Rate Amoun
CODE Figures R.O. RO RO
HVAC
CHILLED WATER PIPING
Supply, install, test and commission of Black
steel class B seamless pipe to BS 1387
including all fittings , valves, balancing valve,
brackets, clamps, clips and supports,
insulation complete all as specified in . as
shown on drawings or as require to complete
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 236
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 236/300
g q p
the connection and installations.
A 150 mm Dia 103 P lin m 44.100 4,542.300 24.030 2,475
B 125 mm Dia 14 P lin m 36.800 515.200 18.500 259
C 80 mm Dia 12 P lin m 21.400 256.800 9.590 115
D 32 mm Dia 48 P lin m 6.800 326.400 2.970 142
E 25 mm Dia 41 P lin m 5.400 221.400 2.300 94
5,862.100 3,086
Construction of Haematology and BMT Centre Building- Is
Bill 6 - Service Compound
AMOUNT Unit Rate Amou
CODE Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
CHILLED WATER PIPING (Cont'd)
Supply, install, test and commission of Black
steel class B seamless pipe to BS 1387
including all fittings , valves, balancing valve,
brackets, clamps, clips and supports,
insulation complete all as specified in flexible
connection . as shown on drawings or as
require to complete the connection and
installations.
Page 237
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 237/300
A 300 mm Dia 124 P lin m 122.400 15,177.600 72.230 8,956
B 200 mm Dia 44 P lin m 68.500 3,014.000 39.150 1,722
Insulation for Pipe
Thermal insulation for chilled water pipes
including Aluminium cladding complete all in
accordence with drawings and specifications
C 300 mm Dia 124 PI lin m 51.600 6,398.400 33.570 4,162
D 200 mm Dia 44 PI lin m 28.500 1,254.000 17.189 756
Construction of Haematology and BMT Centre Building- Iss
Bill 6 - Service Compound
AMOUNT Unit Rate Amount
CODE Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
CHILLED WATER PIPING (Cont'd)
A 125 mm Dia 14 PI lin m 18.000 252.000 10.732 150.
B 80 mm Dia 12 PI lin m 13.900 166.800 7.851 94.
Page 238
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 238/300
C 32 mm Dia 48 PI lin m 7.600 364.800 4.124 197.
D 25 mm Dia 41 PI lin m 7.100 291.100 3.731 152.
1,074.700 595.
Construction of Haematology and BMT Centre Building- Is
Bill 6 - Service Compound
AMOUNT Unit Rate Amou
CODE Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
VALVES AND FIXING
Double regulating valves
A 150 mm Dia 10 V nr. 352.400 3,524.000 253.380 2,533
Gate valves
B 150 mm Dia 10 V nr. 212.500 2,125.000 147.550 1,47
Isolating Valves
Page 239
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 239/300
Isolating Valves
C 32 mm Dia 1 V nr. 11.800 11.800 6.140
Non Return valve 0
D 150 mm Dia 10 V nr. 186.100 1,861.000 127.570 1,27
Flexible Connection 0
E 150 mm Dia 10 V nr. 69.700 697.000 39.500 395
Strainer 0
F 150 mm Dia 10 V nr. 164.400 1,644.000 111.200 1,112
G Pressure Gauge 20 V nr. 11.800 236.000 7.800 156
Construction of Haematology and BMT Centre Building- Is
Bill 6 - Service Compound
AMOUNT Unit Rate Amou
CODE Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
EQUIPMENT
Supply, installation, test & commission of
Primary chilled water pumps, constant speed;
as per section 22 part 4.5 of the contract
specification and drawings; including hoisting
and setting in positin, anti vibration mountings,
control panel, wiring , labelling, final
connections and other required materials to
complete all works in accordenec with
Page 240
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 240/300
drawings and specifications. .
APrimary chilled water pump (P1 to P5); 56 L/s
water flow rate 25 m TDH, 32 kW motor rating5 PUMP nr. 2713.000 13,565.000 2,246.830 11,234
Supply, installation, test & commission of
Secondary chilled water pumps; fitted to a
propulsion headers complete with cut-off valve,
strainers, pressure switch, thermometer,
manometer, flexible connections, motorized
valve, drain valve, connecting pipes, hangers,
supports, anti vibration bases and connection
to power supply for the proper operation of the
system; including hoisting and setting in
position, anti-vibration mountings, control
panel wiring, labelling and other required
materials to complete all works in accordenec
Construction of Haematology and BMT Centre Building- Is
Bill 6 - Service Compound
AMOUNT Unit Rate Amoun
CODE Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (Cont'd)
Chilled water network equipment; including
valves, controls, accessories, base frames,
vibration isolator, control panel, wiring,
labelling, and other required materials, as
specified in drawings , specifications and to
the Engineer/Client approval.
APressurization unit; including break tank,
1 PU nr 3058 900 3 058 900 2 281 050 2 281
Page 241
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 241/300
Apressurization pump and expansion vessel,
1 PU nr. 3058.900 3,058.900 2,281.050 2,281
B Automativ chemical Dosing system 1 DS nr. 1259.100 1,259.100 925.000 925
Fan coil unit; complete with heating, cooling
coils, valves, control valves, thermostatic
controller, filters, grill, including all
accessories, 2 way motorized valves plumbingand electrical connection to complete the
installation, and other required materials, as
specified in drawings , specifications and to
the Engineer/Client approval.
CFCU-1; decorative, 7 kW cooling capacity, 330 L/s
air flow.6 FCU nr. 341.400 2,048.400 264.850 1,589
6 366 400 4 795
Construction of Haematology and BMT Centre Building- Is
Bill 6 - Service Compound
AMOUNT Unit Rate Amoun
CODE Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC (Cont'd)
Supply and install , test and commission
ventilating fan with electrically operated
louvers, as specified on the drawings,
complete with all mounting requirements,
flexible connections, electrical connections,
support, back draft dampers, auto changeover
controller, complete all in accordence withdrawings and specifications.
Page 242
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 242/300
g p
AEXF-16 (Substation); Twin axial fan, 4000 L/s air
flow, 100 Pa.ESP, 3 kW motor capacity2 EF nr. 1356.000 2,712.000 1,128.490 2,256
B
Allow for providing all necessary BMS control
system including, DDC panels, work stations
interconnecting wiring, for all control items, motors,
sensors and in the installation of control panels,sensors/ remote set points, switches, control
valves, thermostats, wiring ., and operation of the
complete BMS installation air-conditioning and
ventilating system comprising with commisioning of
BMS sysytem.
1 CS Item 0.000 -
2,712.000 2,256
Construction of Haematology and BMT Centre Building- Is
Bill 6 - Service Compound
AMOUNT Unit Rate Amou
CODE Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC INSTALLATION
COLLECTION AMOUNT, R.O., IN FIGURES
Page SC-HVAC- Page 15,862.100 - 3,086
Page SC-HVAC- Page 228,058.500 - 16,930
Page SC-HVAC- Page 31,074.700 - 595
Page 243
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 243/300
,
Page SC-HVAC- Page 410,117.600 - 6,966
Page SC-HVAC- Page 551,071.900 - 42,554
Page SC-HVAC- Page 66,366.400 - 4,795
Page SC-HVAC- Page 72,712.000 - 2,256
0 263 200 8
Construction of Haematology and BMT Centre Building- Is
Bill 6 - Service Compound
AMOUNT Unit Rate Amou
CODE Figures R.O. RO RO
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Items Qty Code Make Discount Total Mat Total Mhr Total Ma
Acoustic Insulation 0.00 A - -
Air handling units 0.00 AHU - -
Al cladding 0.00 AL - -
Air terminal devices 0.00 ATD - -
Chillers 0.00 C - -
Cold room outdoor unit 0.00 CR ODU - -
Control system(BMS) 0.00 CS - -Ducting 0.00 D - -
Page 244
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 244/300
g
Ducting insulation 0.00 DI - -
Dosing system 1.00 DS 925.000 25.000 95
Extract fans 2.00 EF 2,256.980 20.000 2,27
Fan coil unit 6.00 FCU 1,589.100 120.000 1,72
Piping 386.00 P 13,765.150 4,028.100 18,19
Piping insulation 386.00 PI 6,847.020 1,303.700 8,28
Pre insulated piping 0.00 PIP - -
Pumps 8.00 PUMP 42,554.670 330.000 42,9
Pressurisation unit 1.00 PU 2,281.050 30.000 2,3Split units 0.00 SU - -
Valves 73.00 V 6,966.140 624.500 7,65
Varaiable air volume 0.00 VAV - -
77,185.110 6,481.300 84,31
Construction of Haematology and BMT Centre Building - Issu
Bill 7 - Chiller Yard
CODE AMOUNT Unit Rate A
Figures R.O. RO
HVAC
CHILLED WATER PIPING
Supply, install, test and commission of Black
steel class B pipe to BS 1387 including all
fittings , valves, balancing valve, brackets,
clamps, clips and supports, insulation completeall as specified in . as shown on drawings or as
UNIT RATE ITEM
NO.DESCRIPTION
ESTIMATED
QUANTITY UNIT
Page 245
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 245/300
require to complete the connection and
installations.
Above Ground
A 150 mm Dia 117 P lin m 44.100 5,159.700 24.030 2
Supply, install, test and commission of Black
steel class B seamless pipe to BS 1387including all fittings , valves, balancing valve,
brackets, clamps, clips and supports, insulation
complete all as specified in flexible connection .
as shown on drawings or as require to
complete the connection and installations.
Above Ground
B 200 mm Dia 66 P lin m 68 500 4 521 000 39 150 2
Construction of Haematology and BMT Centre Building - Issu
Bill 7 - Chiller Yard
CODE AMOUNT Unit Rate A
Figures R.O. RO
UNIT RATE ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY UNIT
Insulation for Pipe
preformed rigid sections PUF/polyisocanurate
moulded in cylindrical foam 35 kg./m3 density
insulation with canvas / cloth to cover pipes
and vapour barrier compound to pipes and
aluminium cladding to complete all in
accordance with drawings and specification
Page 246
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 246/300
A 150 mm Dia 117 PI lin m 21.500 2,515.500 12.939
B 200 mm Dia 66 PI lin m 28.500 1,881.000 17.189
C 300 mm Dia 88 PI lin m 51.600 4,540.800 33.570
Chilled water pipe specialist / accessories;
including all related fixing materials, completeall in accordence with the drawings and
specificaions.
Iron Isolating valves
D 150 mm Dia 10 V nr. 212.500 2,125.000 147.550
Double Regulating valves
Construction of Haematology and BMT Centre Building - Issu
Bill 7 - Chiller Yard
CODE AMOUNT Unit Rate A
Figures R.O. RO
UNIT RATE ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY UNIT
Cast Iron Y type Strainers
A 150 mm Dia 10 V nr. 164.400 1,644.000 111.200 1
Thermometer
B For 150 mm Dia 20 V nr. 21.400 428.000 15.100
Pressure Gauge
Page 247
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 247/300
Pressure Gauge
C 150 mm Dia 20 V nr. 11.800 236.000 7.800
Flow Switch
D 150 mm Dia 20 V nr. 73.400 1,468.000 50.000 1
Automatic Airvent
E 150 mm Dia 10 V nr. 9.400 94.000 6.000
Motorised Butterfly Valve
F for Chillers 150 mm Dia 5 V nr. 550.400 2,752.000 399.900 1
6,622.000 4
Construction of Haematology and BMT Centre Building - Issu
Bill 7 - Chiller Yard
CODE AMOUNT Unit Rate A
Figures R.O. RO
UNIT RATE ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY UNIT
EQUIPMENT
Supply, installation, test & commission of Air
cooled chiller; as per the contract specification
and drawings; including hoisting and setting in
positin, anti vibration mountings, control panel,
wiring , labelling, final connections and other
required materials to complete all works in
accordenec with drawings and specifications. .
Page 248
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 248/300
accordenec with drawings and specifications. .
AChiller 1 to 5 ; Screw type 1134 kW cooling
capacity 54 L/s flow Rate5 C nr. 60083.300 300,416.500 50,105.210 250
B
Allow for providing all necessary BMS control
system including, DDC panels, work stations
interconnecting wiring, for all control items, motors,
sensors and in the installation of control panels,
sensors/ remote set points, switches, control
valves, thermostats, wiring ., and operation of the
complete BMS installation air-conditioning and
ventilating system comprising with commisioning of
BMS sysytem.
1 CS Item 0.000 Included
300,416.500 250
Construction of Haematology and BMT Centre Building - Issue
Bill 7 - Chiller Yard
CODE AMOUNT Unit Rate Am
Figures R.O. RO R
UNIT RATE ITEM
NO. DESCRIPTION
ESTIMATED
QUANTITY UNIT
HVAC INSTALLATION
COLLECTION AMOUNT, R.O., IN FIGURES
Page CY-HVAC- Page 120,451.900 - 11,
Page CY-HVAC- Page 2
15,980.300 - 10,
Page CY-HVAC- Page 3
Page 249
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 249/300
g g6,622.000 - 4,
Page CY-HVAC- Page 4300,416.500 - 250,
343,470.700 277,
Construction of Haematology and BMT Centre Building - Iss
Bill 7 - Chiller Yard
CODE AMOUNT Unit Rate
Figures R.O. RO
UNIT RATE ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY UNIT
Items Qty Code Make Discount Total Mat Total Mhr Tota
Acoustic Insulation 0.00 A - -
Air handling units 0.00 AHU - -
Al cladding 0.00 AL - -
Air terminal devices 0.00 ATD - -
Chillers 5.00 C 250,526.050 1,750.000 2Cold room outdoor unit 0.00 CR ODU - -
Control system(BMS) 1.00 CS - -
Page 250
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 250/300
Control system(BMS) 1.00 CS
Ducting 0.00 D - -
Ducting insulation 0.00 DI - -
Dosing system 0.00 DS - -
Extract fans 0.00 EF - -
Fan coil unit 0.00 FCU - -
Piping 271.00 P 11,751.650 3,381.500
Piping insulation 271.00 PI 5,602.439 1,055.000
Pre insulated piping0.00 PIP - -
Pumps 0.00 PUMP - -
Pressurisation unit 0.00 PU - -
Split units 0.00 SU - -
Valves 125.00 V 9,428.800 825.000
Varaiable air volume 0.00 VAV - -
277,308.939 7,011.500 28
Construction of Haematology and BMT Centre Building - Issued for Tender
Bill 7 - Chiller Yard
Amount
(R.O.)
(R.O.)
Page 251
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 251/300
3,905.460
3,418.800
8,147.040
15,471.300
Construction of Haematology and BMT Centre Building - Issued for TendeBill 7 - Chiller Yard
Amount
(R.O.)
(R.O.)
1,899.905
1,424.874
Page 252
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 252/300
3,438.160
1,607.500
2,665.800
1 054 000
Construction of Haematology and BMT Centre Building - Issued for TendeBill 7 - Chiller Yard
Amount
(R.O.)
(R.O.)
1,244.000
324.000
178.000
Page 253
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 253/300
1,110.000
71.000
2,082.000
5,009.000
Construction of Haematology and BMT Centre Building - Issued for Tender
Bill 7 - Chiller Yard
Amount
(R.O.)
(R.O.)
252,451.050
Page 254
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 254/300
-
252,451.050
Construction of Haematology and BMT Centre Building - Issued for Tender
Bill 7 - Chiller Yard
Amount
(R.O.)
(R.O.)
15,471.300
12,090.239
5,009.000
252,451.050
Page 255
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 255/300
285,021.589
Construction of Haematology and BMT Centre Building - Issued for Tender
Bill 7 - Chiller Yard
Amount
(R.O.)
(R.O.)
Page 256
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 256/300
Construction of Haematology and BMT centre Building - Issued for
Bill 9 - External services (All are Provision
CODE AMOUNT
Figures R.O. RO R
EXTERNAL SERVICES (ALL ARE PROVISIONAL)
FOUAL DRAINAGE INSTALLATIONS
Supply, install; Unplasticized Polyvinyl chloride
(uPVC) pipe; above ground confirming to BS
4514 for above ground and BS 4660 for below
ground piping including all supports fittings,
markings, excavation, bedding, backfilling,concrete encasement (where applicable), flexible
joints , consumables and other required
Unit Rate ITEM
NO.
DESCRIPTION QUANTITY UNIT
UNIT RATE
Page 257
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 257/300
materials to complete the piping installation; all
in accordance with the drawings and
specifications.
Below Ground piping, including all related civil
works
Not Applicable for
HVAC
A 160 mm. pipe 210 lin m
B 110 mm. pipe 76 lin m
C 80 mm. pipe 43 lin m
Waste drainage specialist/fixtures; including all
related fixing materials, complete; all
accordance with drawings and specifications
Gully trap double sealed access DI cover
Construction of Haematology and BMT centre Building - Issued for
Bill 9 - External services (All are Provision
CODE AMOUNT
Figures R.O. RO R
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
MANHOLES
Construct manholes, comprising 150 mm RCC in
150 mm thick base and cover slab, medium
ductile iron grating and frame to BS 497 bedded
on and pointed in cement mortar including all
necessary reinforcement, formwork, benching,
rendering, bituminous paint externally,
excavation, backfill and disposal all in
accordence with drawings and specifications.
MH 1 ; 800 X 800 X 600 mm deep with 600 x 600
Page 258
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 258/300
AMH-1 ; 800 X 800 X 600 mm deep with 600 x 600
mm ductile iron cover1 nr.
BMH-2 ; 800 X 800 X 840 mm deep with 600 x 600
mm ductile iron cover1 nr.
Not Applicable for
HVAC
CMH-3 ; 800 X 800 X 1160 mm deep with 600 x 600
mm ductile iron cover1 nr.
DMH-4 ; 800 X 800 X 1310 mm deep with 600 x 600mm ductile iron cover
1 nr.
EMH-5 ; 800 X 800 X 1390 mm deep with 600 x 600
mm ductile iron cover1 nr.
FMH-6 ; 800 X 800 X 1440 mm deep with 600 x 600
mm ductile iron cover1 nr.
HLS1 ; 1200 X 1200 X 4000 mm with 800 x 800 mm
1 nr
Construction of Haematology and BMT centre Building - Issued for T
Bill 9 - External services (All are Provision
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
MANHOLES (Cont'd)
AMH-7 ; 800 X 800 X 1490 mm deep with 600 x 600mm ductile iron cover
1 nr.
BMH-8 ; 800 X 800 X 1620 mm deep with 600 x 600mm ductile iron cover
1 nr.
C MH-9 ; 800 X 800 X 600 mm deep with 600 x 600mm ductile iron cover 2 nr.
MH 10 800 X 800 X 720 d i h 600 600
Page 259
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 259/300
DMH-10 ; 800 X 800 X 720 mm deep with 600 x 600mm ductile iron cover
1 nr.
EMH-11 ; 800 X 800 X 920 mm deep with 600 x 600mm ductile iron cover
1 nr.Not Applicable for
HVAC
F
MH-12 ; 800 X 800 X 990 mm deep with 600 x 600
mm ductile iron cover 1 nr.
GMH-13 ; 800 X 800 X 1060 mm deep with 600 x 600mm ductile iron cover
1 nr.
HMH-13 ; 800 X 800 mm with 600 x 600 mm ductileiron cover
1 nr.
Construction of Haematology and BMT centre Building - Issued for Te
Bill 9 - External services (All are Provisiona
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
LIFTING STATION
A
Allow for providing a lifting station construct withRCC, sewage lifting pumps – duty and
standby/assist, pump control panel, pump lifting
chains, guide rail, level switches, manhole covers,
valves and associated fittings, sewage pumps shall
be self-priming centrifugal, non-clogging type suitable
for mounting on dry bed at floor level, (otherwised
measured elsewhere) complete all in accordence
with drawings and specification
1 ItemNot Applicable for
HVAC
Page 260
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 260/300
Construction of Haematology and BMT centre Building - Issued for Te
Bill 9 - External services (All are Provisiona
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
FIRE PROTECTION /CWS INSTALLATION
Wet Standpipe and Hose Sytem
Galvanised Steel pipe, confirming to BS 1387
heavy duty GI class C pipe; including all
supports, fittings , grooved couplings, markings,
paintings materials, fire stops, consumbles and
other required materials, complete all in
accordence with drawings and specification.
pipes laid below ground, including all related
civil works
A 200 mm. Dia pipe 122 lin m
Page 261
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 261/300
B 150 mm. Dia pipe 4 lin mNot Applicable for
HVAC
C 110 mm. Dia pipe 147 lin m
D 75 mm. Dia pipe 195 lin m
E 65 mm. Dia pipe 78 lin m
Construction of Haematology and BMT centre Building - Issued for Tend
Bill 9 - External services (All are Provisional)
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
FIRE PROTECTION /CWS INSTALLATION
(Cont'd)
ISOLATING VALVE
A 110 mm. Dia pipe 3 nr.
B 75 mm. Dia pipe 3 nr.
B 65 mm. Dia pipe 9 nr.
Page 262
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 262/300
Valve Chamber
C 1200 x 1200 1 nr.Not Applicable for
HVAC
FIRE HYDRANT
Fire hydrant; including all fixing accessories,complete all in accordence with drawings and
specifications.
D Fire Hydrant 4 nr.
Construction of Haematology and BMT centre Building - Issued for Ten
Bill 9 - External services (All are Provisional
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
Pipes laid below ground, including all related
civil works
A 200 mm Dia pipe 98 lin m
B 300 mm Dia pipe 97 lin m
FIRE PROTECTION /CWS INSTALLATION
(Cont'd)
Pre insulated Pipes laid below ground including
Page 263
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 263/300
Pre insulated Pipes laid below ground including
all excavation/ rock(If any), bed and backfilling,
warning tape complete with all in accordance
with drawings and specification (All are
provisional)
Not Applicable forHVAC
C 200 mm Dia pipe 98 lin m
D 300 mm Dia pipe 97 lin m
Construction of Haematology and BMT centre Building - Issued for Te
Bill 9 - External services (All are Provisiona
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
CHILLED WATER PIPES
Pre insulated Pipes laid below ground including
all excavation/ rock(If any), bed and backfilling,
warning tape complete with all in accordance
with drawings and specification (All are
provisional)
A 300 mm Dia pipe 85 PIP lin m 0.000 0.000 0.000
B 125 mm Dia pipe (55m) 1 PIP lin m 23677.000 23677.000 14048.100 14048.1
Page 264
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 264/300
C 80 mm Dia pipe 220 PIP lin m 0.000 0.000 0.000
23,677.00 14,048
Construction of Haematology and BMT centre Building - Issued fo
Bill 9 - External services (All are Provisio
CODE AMOUNT
Figures R.O. RO R
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
ELECTRICAL INSTALLATION
Incoming primary cable from existing 11kV ring
net work utility service of the hospital; including
all cost related to the, terminations , cable joints,
final connection for electrical supply and fees
imposed and works to be carried out by the local
authorities, and laid below ground in 1000 mm
deep service trenches and the like, including
trench excavation/rock cutting in any material,
sand bedding, backfilling with selected
excavated/imported material, compact in layer,
i t PVC bl til t ti bl
Page 265
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 265/300
warning tapes, PVC cable tile protection, cable
makers for side walks and cable joint/route
markers, complete installationall other related
civil and ancilary works.
A
Supply, installation, testing and commissioning of 2 x
3C -240 sq.mm XLPE 11KV cables from proposedprimary substation. 1,020 lin m
Not Applicable for
HVAC
B
Allow for providing outdoor telephone (600 pairs)cable from BLock 3 building through existing andducts; as shown on the External services drawings.(otherwised measured elsewhere) completeinstallation all other related civil and ancilary works.
1 ItemNot Applicable for
HVAC
Construction of Haematology and BMT centre Building - Issued for T
Bill 9 - External services (All are Provisiona
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
CABLES (Cont'd)
A
Allow for providing fibre optic cables from BLock 9building, through existing and ducts; as shown on theExternal services drawings (otherwised measuredelsewhere) complete installationall other related civiland ancilary works. ,
1 ItemNot Applicable for
HVAC
LV CABLE DUCT
Excavate trench for LV cable duct; including
grading bottoms, dune sand bed and surround,
backfilling with cable tiles, cable marker ,
warning tape , complete all in accordence with
drawings and specifications.
Page 266
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 266/300
drawings and specifications.
BFor 1200 x 100 mm underground trench with 4 x 200mm dia PVC duct
40 lin mNot Applicable for
HVAC
Construction of Haematology and BMT centre Building - Issued for
Bill 9 - External services (All are Provision
CODE AMOUNT
Figures R.O. RO R
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
CABLES
Power supply distribution copper cables with
earth continuity cable cable laid in floor trench,
drawn in conduits and the like surface fixed in
cable ladders, trays,trunkiing with approved
supports or/and laid in floor service trenches,
drawn in conduits as specified and the like, If
buried then and laid below ground in 1000 mm
deep service trenches and the like, includingtrench excavation/rock cutting in any material,
sand bedding, backfilling with selected
excavated/imported material, compact in layer ,
warning tapes PVC cable tile protection cable
Page 267
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 267/300
warning tapes, PVC cable tile protection, cable
makers for side walks and cable joint/route
markercomplete installation with terminations at
both ends; all as specified and detailed on
drawings
14 - 1C 630 sq mm XLPE/SWA/ PVC copper
cables
A From Transformer 1 1to AMF Panel 1 25 lin m
B From AMF panel 1to EMDB-1 25 lin mNot Applicable for
HVAC
C From Transformer 3 1to MDB 1 25 lin m
Construction of Haematology and BMT centre Building - Issued for Te
Bill 9 - External services (All are Provisiona
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
ELECTRICAL INSTALLATION
CABLES (Cont'd)
14 - 1C 630 sq mm XLPE/SWA/ PVC copper
cables (Cont'd)
A From Transformer 4 1to AMF Panel 2 25 lin m
B From AMF panel 2to EMDB-2 25 lin m
C From transformer and RMU -1 25 lin m
Page 268
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 268/300
D From transformer and RMU -2 25 lin m
3 - 4C x 240 sqmm XLPE + 3 - 1C 70 sq mm ECC
cables
Not Applicable for
HVAC
E From EMDB 1 to Chiller 1 spliter panel 80 lin m
F From MDB 1 to Chiller 3 spliter panel 95 lin m
G From MDB 1 to Chiller 4 spliter panel 98 lin m
H From MDB 1 to Chiller 5 spliter panel 105 lin m
Construction of Haematology and BMT centre Building - Issued for Te
Bill 9 - External services (All are Provisional
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
ELECTRICAL INSTALLATION
CABLES (Cont'd)
4C x 240 sqmm XLPE + 3 - 1C 70 sq mm ECC
cables
A From EMDB 2 to Chiller 2 spliter panel 95 lin m
4C - 16 sq mm XLPE + 1C 16 sq mm ECC
B From Kitchen SMEDB to feeder filler - 1 95 lin m
C From Kitchen SMEDB to feeder filler - 2 115 lin m
Page 269
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 269/300
D From EMDB2 to EXT DB 1 15 lin mNot Applicable for
HVAC
E From EMDB2 to Service Compound DB 15 lin m
F From EMDB2 to Transfer Pump 50 lin m
G From EMDB2 to External feeder piller - 3 92 lin m
Construction of Haematology and BMT centre Building - Issued for Ten
Bill 9 - External services (All are Provisional)
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
ELECTRICAL INSTALLATION
CABLES (Cont'd)
4C - 10 sq mm XLPE + 1C 10 sq mm ECC
A From Control panel (essential) to chiller - 1 50 lin m
B From Control panel (essential) to chiller - 2 55 lin m
C From Control panel (non essential) to chiller - 3 60 lin m Not Applicable forHVAC
D From Control panel (non essential) to chiller - 4 65 lin m
Page 270
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 270/300
E From Control panel (non essential) to chiller - 5 70 lin m
Construction of Haematology and BMT centre Building - Issued for Te
Bill 9 - External services (All are Provisional
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
FEEDER PILLER
A 63A External Feeder Pillars 2 nr.
B Feeder Pillar -3 1 nr.
HV man hole with hevy duty frame and covercomplet with engraving, including excavation,
disposal , back filling, concrete work including
all necessary reinforcement, formwork,
benching, rendering, bituminous paint
Not Applicable for
HVAC
Page 271
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 271/300
benching, rendering, bituminous paint
externally, excavation, backfill and disposal all in
accordence with drawings and specifications.
C Electrical Manhole (EMH) 3 nr.
D Man hole (ELV) 5 nr.
Construction of Haematology and BMT centre Building - Issued for
Bill 9 - External services (All are Provision
CODE AMOUNT
Figures R.O. RO R
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
Supply and install cable conduit in concealed
installations including device boxes, cover
plates, conduits and wiring between devices and
distribution boards, switching panels ,complete
alll in accordance with drawings and
specifications
A To luminaries 21 nr.
EQUIPMENT
Supply and provide light fittings complete with
Page 272
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 272/300
Supply and provide light fittings complete with
lamps, conduit or chain suspension, flexible
cords, ceiling roses, ballast and starters to
complete the installation,
The rate shall include for cable 3C x 10 sq mm
XLPE cable from Feeder piller 2 to Type K2 pole
and Feder piller 1 to Type K1 pole referdrawings
Not Applicable for
HVAC
BType K1- single spherical luminarie mounted on 3
meter pole c/w 1x50w MBFU lamp, cable entryterminations fuse carrier + control gear
10 nr.
CType K2- single spherical luminarie mounted on 3meter pole c/w 4x50w MBFU lamp, cable entry
terminations fuse carrier + control gear
11 nr.
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
CODE AMOUNT
Figures R.O. RO RO M
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
COLLECTION (Cont'd) AMOUNT, R.O., IN FIGURES
EX-S-Page 9-1
EX-S-Page 9-2
EX-S-Page 9-3
EX-S-Page 9-4Not Applicable for
HVAC
Page 273
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 273/300
EX-S-Page 9-5
EX-S-Page 9-6
EX-S-Page 9-7
Construction of Haematology and BMT centre Building - Issued for Ten
Bill 9 - External services (All are Provisional)
CODE AMOUNT
Figures R.O. RO RO
Unit Rate ITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
COLLECTION (Cont'd) AMOUNT, R.O., IN FIGURES
Brought Forward
EX-S-Page 9-8
23677.000 0 14048.10
EX-S-Page 9-9
EX-S-Page 9-10
EX-S-Page 9-11
Page 274
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 274/300
EX-S-Page 9-12Not Applicable for
HVAC
EX-S-Page 9-13
EX-S-Page 9-14
EX-S-Page 9-15
Construction of Haematology and BMT centre Building - Issued
Bill 9 - External services (All are Provisi
CODE AMOUNT
Figures R.O. RO
Unit RatITEM
NO.DESCRIPTION QUANTITY UNIT
UNIT RATE
Items Qty Code Make Discount Total Mat Total Mhr Tot
Acoustic Insulation 0.00 A - -
Air handling units 0.00 AHU - -
Al cladding 0.00 AL - -
Air terminal devices 0.00 ATD - -
Chillers 0.00 C - -
Cold room outdoor unit 0.00 CR ODU - -
Control system(BMS) 0.00 CS - -Ducting 0.00 D - -
Ducting insulation 0.00 DI - -
Dosing system 0.00 DS - -
Extract fans 0.00 EF - -
Page 275
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 275/300
Fan coil unit 0.00 FCU - -
Piping 0.00 P - -
Piping insulation 0.00 PI - -
Pre insulated piping 306.00 PIP 14,048.10 3,512.03
Pumps 0.00 PUMP - -
Pressurisation unit 0.00 PU - -
Split units 0.00 SU - -
Valves 0.00 V - -
Varaiable air volume 0.00 VAV - -
14,048.10 3,512.03
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 276
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 276/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 277
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 277/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 278
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 278/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 279
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 279/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 280
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 280/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 281
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 281/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 282
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 282/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
0.000
17911.328
0.000
17,911.33
Page 283
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 283/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 284
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 284/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 285
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 285/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 286
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 286/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 287
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 287/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 288
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 288/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 289
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 289/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 290
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 290/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 291
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 291/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 292
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 292/300
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
17911.328
Page 293
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 293/300
17,911.33
Construction of Haematology and BMT centre Building - Issued for Tender
Bill 9 - External services (All are Provisional)
Amount
(R.O.)
(R.O.)
Page 294
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 294/300
Bills Area Total Mat Total Mhr Total Mat+Mhr Selling
Bill 4-1 Main Building 658,542.43 126,133.06 797,288.80 1,010,564.60
Bill 5-1 Corridor 16,124.33 3,352.20 19,811.75 23,948.10
Bill 6-1 Service compound 77,185.11 6,481.30 84,314.54 105,263.20
Bill 7-1 Chiller yard 277,308.94 7,011.50 285,021.59 343,470.70
Bill 9 External 14,048.10 3,512.03 17,911.33 23,677.00
1,043,208.91 146,490.09 1,204,348.01 1,506,923.60
Items Qty Code Make
Acoustic Insulation 1.00 A
Air handling units 22.00 AHU McQuay
Al cladding 1.00 AL
Air terminal devices 2,130.00 ATD
Chillers 5 00 C McQuay
Page 295
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 295/300
Chillers 5.00 C McQuay
Cold room outdoor
unit7.00 CR ODU
Control
system(BMS) 9.00 CS Johnson
Ducting 77,839.00 D
Ducting insulation 12,422.00 DI
Dosing system 1.00 DS Ebara
Extract fans 44.00 EF Dynair
Fan coil unit 50.00 FCU McQuay
100,902.98
Page 296
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 296/300
Equip 19%
LS 32%
SU 10%
Discount Total Mat Total Mhr Total Mat+Mhr Selling
9,209.05 6,566.32 16,432.00 21,721.50
12.50% 158,810.50 1,100.00 160,020.50 190,424.30
16,616.61 3,323.32 20,272.26 26,797.90
95,446.40 4,602.20 100,508.82 132,855.00
12.50% 250,526.05 1,750.00 252,451.05 300,416.50
Page 297
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 297/300
, , , ,
3,465.59 350.00 3,850.59 4,239.90
15% 101,650.00 12,706.25 115,626.88 137,596.00
81,030.13 48,222.83 134,075.25 178,796.70
60,700.15 29,150.89 92,766.13 123,144.00
7.50% 925.00 25.00 952.50 1,259.10
10% 35,723.90 440.00 36,207.90 43,087.50
12.50% 19,904.48 1,120.00 21,136.48 24,248.40
Page 298
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 298/300
Page 299
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 299/300
Mat Mhr
GI 141,730.29 77,373.72
Preinsulated 114,282.40 43,477.00
27,447.89 33,896.72
Ducting
Construction of Haematology and BMT Centre Building- Issued for Tender
Bill of Quantities - Grand Summary
1 Preliminaries
2 Day works
3 Provisional sum and Prime cost
4 Haematology and BMT Centre
5 Corridor connection
6 Service Compound
7 Chiller Yard
8 External works
9 External services
Sub total
Contingencies (5% Excluding Bill number 1, 2 & 3)
Total
TOTAL TENDER VALUE CARRIED TO THE FORM OF TENDER
(In Words, the Total Tender Value in Omani Rial)
DESCRIPTION BILL
NO.AMOUNT (R.O.)
Page 300
8/2/2019 Hvac Costing Bmt
http://slidepdf.com/reader/full/hvac-costing-bmt 300/300
Name of Tenderer Date Signature of Tenderer
…………………………………………. ………………………... ………………..………………………………
Gulf Engineering Consutancy Grand Summary - Page 1