    High and extra high voltage cableswith synthetic insulation

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    2/16

    Gl ob a l e x p e r t i n c a b l e s a n d c a b l i n g s y s t e m s

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    3/16

    S u m m a r y

    TheevolutionofHVandEHVcableswithsyntheticinsulation 5

    Anoutlinehistoryofdevelopments 6

    ProjectengineeringforHVcablelinks 7

    ExamplesoftherangeofHVandEHV

    cableswithsyntheticinsulation 8

    Productiontools 9

    420 kVcabletechnology 10

    Checksandtests 11

    References 12

    Accessories 13

    Services 15

    Introduction 4

    H i g h a n d e x t r a h i g h vo l t a g e c a b l e s

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    4/16

    Nexans Switzerland

    supplieshighandvery

    highvoltagepowercables

    andaccessories,optical

    fibercables,opticalwave-

    guideandspecialcables

    fortheinternationalmarket.

    Nexans Switzerlandhas

    threeproductioncentres:

    theBreitenbachsite

    theCortaillodsite

    theCossonaysite.

    4

    I n t ro d u c t i o n

    Nexans Switzerland is

    Switzerlandsforemost

    cablemakerandsupplier.

    Itmanufactures,distributes,

    fitsandinstallsacompre-hensiverangeofproducts

    forunderground,submarine

    andaerialinstallations:

    high,mediumandlow

    voltagepowercables

    copperoropticalfiber

    telecommunications

    cables

    specialcablesfor

    manyapplications

    powerandtelecom

    accessories

    connectionequipment.

    Itsservicesrangefrom

    thesupplyofcablestothe

    implementationofcomplex

    turnkeyproducts,including

    development,engineering,

    constructionwork,systemtechnology,laying,installa-

    tionandprojectfinancing.

    Pos i t i on of N e x a n s S w i t z e r l a n d

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    5/16

    T h e ev o lu t i o n o f H V a n d E H V c a b les

    with synthet ic insulat ion

    T h e Ca b l e s

    aluminiumsheath

    compositesheath

    Thegreaterdemand

    forenergyrequiresthe

    implementationofinstallations

    designedtosupportincreas-

    inglyhighervoltageand

    powerlevels.

    ThisiswhyNexans

    SwitzerlandLtdhasdevel-

    opedcableswithsynthetic

    (ordry)insulationforvoltages

    upto420kVandcross-

    sectionsthatcanbelarger

    than2000mm2.

    Con d u c t or s

    Athighgradients,synthetic

    insulationissensitivetothe

    presenceofmoisture.Itis

    thereforeessentialtoavoid

    anycontactwithwateror

    steamduringfabrication

    processesandalsoduringlineoperation.

    Thecross-linkingoperation

    mustbecarriedoutinthe

    absenceofhumidity,either

    onacatenarylineinaninert

    atmosphere,oronahorizon-

    talline(MDCVprocess).

    Forallcables,theexternal

    protectionisprovidedbya

    polyethylenesheath.Over

    thisinsulation,theapplica-tionofawaterproofmetallic

    sheath,whichalsoactsasa

    screen,isgenerallyrequired.

    I n s u l a t i on

    Higherservicegradientsrequirebetterinsulation

    qualities.

    Thesematerialsshould

    beperfectlycleanthis

    isparticularlyimportant,

    astheirlong-termperfor-

    mancecanbeconsiderably

    affected,evenbymicro-

    impurities.Precautionsto

    ensurecleanlinessshould

    betakenbothduringtheproductionofrawmaterials

    andthroughouttheentire

    cablefabricationprocess.

    S h e a t h s

    Forconductorcross-sections

    largerthan1000mm2,seg-

    mentedconductorsmustbe

    producedtoreduceconsider-ablytheirresistancetoalter-

    natingcurrentbyreducing

    theskineffect.

    Thissheathcanbemadeof

    unweldedextrudedaluminum

    orlead,orofweldedor

    gluedcopperoraluminum.

    NexansSwitzerlandLtduses

    allthesetechniqueswith

    completemastery.

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    6/16

    An out l ine history of developments

    De ve l op m e n t s f r om 1 9 7 3 t o t h e p r e s e n t d a y

    Sincetheintroductionof

    cross-linkablesynthetic

    insulation,productionand

    controltechniqueshavegone

    throughawholeseriesof

    developmentsteps.

    1973

    1974

    1976

    1977

    1978

    1983

    1986

    1987

    19891991

    1996

    1998

    2006

    Implementation ofa cross-linkingcatenary line

    Delivery of the firstHV cables with dryinsulation

    Introduction of the triple-head extrusion process

    Delivery of the first150 kV extruded

    insulation cable

    Modification of thecatenary line fornitrogen cross-linking

    Delivery of the first220 kV cable withXLPE insulation

    Construction andstart-up of a laboratoryfor measuring partialdischarges up to 480 kV

    Production of the firstXLPE Cable 220kVwith a cross-section of2500 mm2

    Production of the first275 kV cable withXLPE insulation

    Implementation of a2nd cross-linking linefor large conductorcross-sections and thicklayers of insulation

    Production of the first400 kV cable withXLPE insulation

    Delivery of the first400 kV cable withXLPE insulationabroad

    Delivery of the first400 kV cable with XLPEinsulation in Switzerland

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    7/16

    Project engineering for HV cable l inks

    De ve l op m e n t

    plan

    territorialplanning

    increaseddemand

    connectionofheavyusers

    networkplan

    networkcalculation

    powerflowdetermination

    customer

    Cause and nature of operations Effects Intervening parties

    Pr e - s t u d y

    plan decisiontoreinforcenetwork

    preliminaryfeasibilitystudy

    pilotstudy

    choiceofconnectiontype :underground,overheadormixed

    technicalsolutions

    customer

    Nexans

    S t u d y

    Impactstudy

    collaborationwithotherdepartments :engineeringoffices,industrialdepartments,etc.

    noticetomunicipalauthoritiesandlandowners

    choiceofconnectiontype :underground,overheadormixed

    drawingupofspecifications

    customer

    Nexans

    Pr oje c t

    choiceofdefinitiverun

    definitionoflayingparameters

    measurementoflinelength

    preparationofcontractorsfile

    customer

    Nexans

    O f f e r s

    definitionofpossiblecabletypesorvariants

    calculationofthecross-sectionaccordingtovoltage,powerandcivilengineeringparameters

    distributionofpartiallengths

    groundingsystem

    preparationofrequestsforoffersandcontracttendersformaterialsandcontractors

    costofcivilengineeringwork

    costofinstallationandset-up,scheduleanddetails

    customer

    Nexans

    Authorizations

    filefortheauthoritiesconcerned

    handlingofpossibleobjections

    buildingauthorization customer inspectors

    Nexans

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    8/16

    E x a m p les o f t h e ra n g e o f H V a n d E H V

    c a b les w i t h sy n t h et i c i n su la t i o n

    45kV

    EPR insulation

    60kV

    XLPE insulation

    150 kV

    XLPE insulation

    500 mm2

    220 kV

    XLPE insulation

    2000 mm2

    400 kV

    XLPE insulation

    800 mm2

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    9/16

    HVExtrusionline

    Product ion tools

    HVlaboratory

    Aluminiumpress

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    10/16

    10

    extrudedcross-linkedpoly-

    ethylene(XLPE)insulation

    cableswhich,withthe

    progressofthetechniques

    usedinthemanufacturing

    ofbasicmaterialsand

    aboveallforinstallation,

    haveachievedtherelia-

    bilitylevelrequiredfor

    useinextrahighvoltage

    (EHV)networks.

    4 2 0 kV c a b le t ec hn o lo g y

    For420kVcables,there

    arecurrentlytwoalternatives

    totraditionalfluidoilimpreg-

    natedpaperinsulation :

    cableswithPPLPinsulation,consistingofthree-layer

    laminatedpaperand

    polypropylenetapes,

    formedintoribbonsand

    impregnatedwithoil.

    E H V c a b l e s w i t h PPL P a n d X L PE i n s u l a t i on

    PPLPinsulation,whichwas

    introducedattheendofthe

    0s,isstilllimitedtocables

    tobeusedatavoltageof

    400 kVorhigher.Thisisdue

    ontheonehandtoitsprice,

    whichishigherthantheprice

    ofpaper,andontheother

    totheincreasinglygeneral-

    izeduseofXLPEinsulationfor

    voltagesupto220kVand400 kV.

    XLPE Insulation

    Cross-linkedpolyethylene

    (XLPE)wasintroducedinthe

    0s.Itwasinitiallyusedfor

    mediumvoltagecables,but

    isnowusedasinsulationfor

    extrahighvoltagecables

    (EHV).Itsuseatvoltage

    levelsof400 kVandhigherrequires,ofcourse,sophisticat-

    edstate-of-the-arttechnology.In

    particular,weshouldmention :

    PPLP Insulation

    Forextrahighvoltage

    (400 kVandhigher),new

    typesoftapesmadeofPPLP

    (PolyPropyleneLaminated

    Paper)areused.Theyhave

    theadvantageofcombin-

    ingthetraditionalapplica-

    tiontechnologyusedfor

    impregnatedpapercables

    withtheexcellentelectrical

    anddielectricpropertiesof

    syntheticinsulators.PPLPisa

    three-layerinsulationconsist-

    ingofapolypropylene(PP)

    sheetlaminatedbetween

    twosheetsofpaper.PP

    improvesthequalityofthe

    insulation,whilethesheetsof

    paperensurethecirculation

    ofoilbetweenthelayers.

    Comparedwithpaperinsula-tion,PPLPhasahigherbreak-

    downstrengthandaboveall

    lowerdielectriclosses.

    PPL P a n d X L PE i n s u l a t i on

    therigorousselectionof

    insulatingandsemi-con-

    ductingmaterials,which

    mustbeofaveryhigh

    puritylevel,

    thecheckingoffiltering

    duringapplication,

    three-layerextrusion(inter-

    nalsemi-conductor,insula-

    tionandexternalsemi-con-ductor)usingasingletool,

    theobtentionofperfectly

    smoothinsulationsemi-con-

    ductorinterfaces,

    protectionoftheinsulation

    againstthepenetrationof

    moisture,

    stringentelectricalteststo

    detectanyfaults.

    Forconnectionprojectsat

    420 kV,exhaustivetestshave

    beensuccessfullycarried

    outforbothXLPEandPPLP

    cables.Themainfeaturesof

    thesetwotypesofcablesare

    comparedbelow.

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    11/16

    11

    Forallthesetasks,reli-

    ableandfastmeasurement

    equipmentisrequired.

    Considerableinvestments

    havebeenmadetoequipourmaterialstestlaborato-

    rieswiththemostmodern

    equipment,suchasthermal

    analysisinstruments,tensile

    strengthapparatus,optical

    Checks and tests

    Thematerialsusedinthecon-

    structionofEHVcablesare

    subjectedtoverystringent

    qualitycontrolchecks,both

    beforeandafterproduction.Plastics,metalsandtapesall

    undergoelectricalresistance

    testsandmeasurementsof

    theirdielectricormechanical

    properties.

    F r om c h e c k s on m a t e r i a l s . . .

    After-laying tests

    tocheckthequalityof

    assemblyofaccessoriesafter

    installationandtosimulate

    cableoperationandrapidly

    provideinformationoncable

    efficiencyafterprolonged

    periodsofuse.

    Accelerated ageing teststosimulateworkinglifeand

    toprovideinformationwithin

    ashorttimeframeontheir

    behaviorinlong-termuse.

    Diagnostic tests

    tohighlightanydegradation

    phenomenainthelineinser-

    viceandtoprovideinforma-

    tionontheresidualcablelife.

    Thequalityofhighvoltage

    cablelinksishighlydepen-

    dentontherigorousnature

    ofthetestscarriedoutonthe

    cablesandtheiraccessories.

    Themorestringentthesetests

    are,theloweristheriskof

    failureduringoperation.

    Theprincipaltestsareas

    follows :

    Routine tests

    toevaluateproduction

    quality.

    Type tests

    tovalidateatypeof

    construction,foreither

    cablesoraccessories.

    Special tests

    undertakeninthecase

    ofmajordesignchanges.

    . . . t o e l e c t r i c a l t e s t s

    microscopes,infra-redspec-

    trometer,chromatograph,

    amongothers.

    Theseexactingchecksenable

    ustoreducetoaminimumthepresenceofundesirable

    matterandtoguaranteethe

    qualityofourcables.

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    12/16

    12

    R ef eren c es

    Pr e s t i g i ou s p r o je c t s

    1990 Thefirst420kVcablewasinstalledinSwitzerlandwithXLPEinsulationconnectedtothenetworkatthe"Bassecourt"substationofthe

    BerneseElectricityCompany.ThissubstationwasconnectedtoLaufenburgandFranceby0kVoverheadlines.Thecopperconductorcross-sectionwas1200mm2.

    1996 Variousinstallationsofdesalinationplantsweresetupalongthecoastofcer-tainArabcountries.Themostimportantoneamongstthemissuppliedwithcablesandacces-

    soriesfromNexansSwitzer-landLtd,formerlyCortaillodCossonayCable.Wesuppliedsectionsof400kVcable,withXLPEinsulationandacor-rugatedaluminiumsheath.

    1997 NexansSwitzerlandLtd,wasawardedanimpor-tantcontractbyPowerGrid,awhollyownedsubsidiaryofSingaporePower,tosupplyandinstall20 kVXLPEpowercables,2'000mm2withacor-rugatedaluminiumsheathandaccessories.Thiscontractwasthefirstofitskindtobeaward-edbyPowerGridinSingapore.Theprojectconsistedoftwocablerouteswithatotalcablelengthofabout km.

    1998 CleusonDixenceproject,Switzerland.

    Withawaterfallof1m,

    Peltonturbineof42MW,alternatorof.MVA/pole,thisPowerStationsetsworldrecords.

    just.monthsbetweentheorderdateandcommissioning.

    2000 NexansSwitzerlandlaidtwosublakelinksforSocietElettricaSopracenerina

    inLagoMaggiore.Foreachlinkwithalengthof2200m,threecablesoftheXDAluWETtype,1x00mm2,0kVwereruninPEtubespreviouslyinstalledonthelakebed.

    2000 Nexanscompleteda20kV(,00mofXAluWT,1x4000mm2)cableinstallationanda12kVinstallation(24 kmofXDFcuCuT,

    1x0mm2

    )fortwocustom-ersinSpain.

    2004 WhentheextensionoftheChicoasenpowerstationnearTuxtlainMexicowasdecidedtoaddafurthergenerators(eachof10MW)tothegeneratorsalreadyinserviceandbringthetotalcapacityto240MW(practicallyonethirdofthetotalproductioninSwitzerland),

    Nexansdeveloped,manufac-tured,installedandtestedthex400 kVcablelinks-400kVtypePoAluWET1x400mm2Cu-fromthetransformertothestartingpointoftheoverheadlines.Withthisproject,Nexansonceagainconfirmsitshighlevelsofexpertiseinprojectandinstallationengineering.

    2004 WhenTranselectrica(thenationalRomanianelectric-

    itytransmissioncompany)issuedaninternationalinvitationfortherestorationofa220 kVcircuitanda400kVcircuit

    connectedtothesametrans-formerandbuildingupacrucialpartoftheoperatingsystemofthe"PortiledeFier"(doorsofsteel)powerstation,

    Nexanswonthecontract.Incollaborationwithalocalcompanyandwithinanambi-tiouscompletiondate,Nexansremovedtheexistingoil-filledcablesandreplacedthemwithsyntheticallyinsulatedcableswithahigherpowerrating400 kVtypeXDCuTAluWET,1x0mm2Cuand220 kVtypeXKDAlT-Tsc,1x1000mm2Cu.

    2006 NexansSuissebegantoexpandintoChinain1,inpartnershipwithanintegrator,withintheframeworkoftheDaYuanDuhydro-elec-tricpowerstationprojectinHunanprovince,forwhichasystemof110kVXLPEcableswassuppliedandinstalled.Furtherprojectsfollowed,inwhichNexansSuissehadthesameresponsibilitiesforthe

    supplyofcompletecablingsystemsandfortheon-sitesupervisionoftheinstallations:thefirst220kVXLPEcablesfortheZhengJiangpowerstationweresuppliedinearly200;andsince200,almost0 kmofcables,inparticular220kVcableswithacoppercrosssectionof200mm2,forthesupplyofsub-stationsinPekinginanticipationofthe200OlympicGames.Over

    aperiodof10years,nofewerthan21circuitsintotalhavebeeninstalledthroughoutthecountry.

    NexansSwitzerlandLtd,manufacturedandinstalledx400m,400 kVXLPEcables,00mm2withacor-rugatedaluminiumsheathand

    accessoriesforconnectingthethreetransformerslocatedintherock-cavetotheswitchingsta-tion,acrosstheRhoneriver.

    1999 ThroughNexansFrance,NexansSwitzerlandhaswonacontractforthesup-plyof0 kmofXKDAlTcable,1x2000mm2,11kVforTaiwanPower,inTaiwan.

    2000 Nexanssupplied

    andinstalledXAluWTcablecircuits,1x400mm2and1x0mm2,20kVand120kVcablecircuitsonanindustrialsiteinDearbornintheUnitedStates.

    2000 Followingamechani-calaccident,thegaspressurecablesofthe10kVForetailleChnesublakelinkingsec-tionoperatedbyServicesIndustrielsdeGenve,were

    damagedinNovember1.NexansSwitzerlandreplacedthesublakelinkwithalengthof200mbycablesoftheXDAluTtypeinarecordtimeofmonthsbetweentheorderandcommissioning.

    2000 Followingafireintheaccesstunneltothe"ElCajon"powerplantinHonduras,twooil-filled220kVcablesweredamaged.Nexans

    replaced2circuitswithalengthofaround1000mbyXAluWTcables1x00mm2,220 kV.Thisprojectwascompletedin

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    13/16

    1

    A c c esso r i es

    O u t d oor s e a l i n g e n d s w i t h p or c e l a i n i n s u l a t or

    Theconceptofthesealing

    endwithporcelaininsulator

    hasalong-termexperience

    withpaperinsulatedcables

    ofmorethan0years.The

    sealingendincludesapre-moldedslip-onstresscone.

    Com p os i t e i n s u l a t or s f or va r i ou s a p p l i c a t i on s

    Thousandsofcompos-

    iteinsulatorshavebeen

    installedsince10byour

    companies,someofthem

    areinserviceundervery

    severeconditions,atthefull

    satisfactionoftheirusers.

    Asanalternative,customers

    worldwideaskmoreand

    moreforsyntheticinsulators.

    Suchinsulatorsarecomposed

    ofafibreglassreinforced

    epoxytubewithtwoalumi-

    niumflangesandinsulated

    bysiliconesheds.

    Specialadvantagesare

    lowweight,excellentseismic,

    mechanicalandpollutionperformancesaswellas

    noexplosionrisk.

    Dr y t y p e ou t d oor s e a l i n g e n d s

    to14kV,offersmany

    additionaladvantageslike:

    noriskofleakage;

    noenvironmentaleffect

    easyhandling

    quickinstallation

    Since20years,Nexans

    offersslip-ondrytype

    outdoorsealingends,

    whichdontneedanyoilorgasfilling.

    Amonoblocversion

    availableforvoltagesup

    O u t d o o r s e a l i n g e n d s w i t h c o m p o s i t e i n s u l a t o r

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    14/16

    14

    GI S s e a l i n g e n d s / T r a n s f or m e r s e a l i n g e n d s

    TheGISsealingendsaredesignedinaccordance

    withIEC0standard,

    eitheraccordingtoitem.1

    forfluidfilledterminationsor

    item.2,TypeAfordrytype

    terminations.

    FortheconnectionofHVcablestotransformer

    orgasinsulatedswitch-

    gears,Nexansmanu-

    facturingprogramme

    includesadequate

    terminations.

    Jo i n t s

    coppertubeandarobustPEcovering.Shieldbrake

    facilitiesareintegrated,

    factorymadeandfactory

    tested.

    MOP :MediumOuter

    Protectionconsistingofa

    synthetic,rigidcover.

    LOP :LightOuterProtection

    madeofheatshrink

    components.

    Nexansprefabricatedhighvoltagejoints(2-0 kV)

    arebasicallycomposedof

    apremoldedelastomerjoint

    body,andanoutercasing.

    Forthe2 kVLevel,a

    cablejointwithpremolded,

    factoryexpandedjointbody

    isavailable.

    Outerprotectionsforjoints

    areavailableindifferentversions :

    HOP :HeavyOuterProtection

    casingconsistingofastrong

    Tr a n s i t i on jo i n t s

    Nexanshasdevelopeda

    conceptwhichguaranteesa

    highreliableandcompactconnectionforHVcablesof

    differenttechnologies.

    Whenpaperinsulated

    HVcableshavetobe

    connectedtosyntheticinsulatedcables,aso

    calledtransitionjointis

    needed.

    V a r i ou s a c c e s s or i e s a n d t ool s

    acableinstallation,such

    ascablescreendiscon-

    nectingsystems,surgearrestors,cableclamps,

    etc.

    Wherespecialequipments

    arerequiredfortheproper

    installationofHVPowerAccessories,Nexansoffers

    suchtools,aswellasthevar-

    iousaccessoriestocomplete

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    15/16

    1

    N ex a n s S w i t z er la n d

    Nexans Switzerland

    providesawiderange

    ofservicestoitscustomers,

    extendingfromengineering

    tocablelayingandinstallation.

    Workingtotheinstructions

    ofexperiencedteamsof

    engineers,highlyqualified

    fittersinstallcablesystems

    allovertheworld.Laying

    andinstallationmaterials

    whichareoptimizedinevery

    respect,togetherwithmea-

    suringandtestinginstrumentsforeveryneed,permitthe

    implementationofallkinds

    ofinstallationsunderthebest

    possibletechnicalandcom-

    mercialconditions.

    Cablesdeliveredand

    installedbyNexans

    Switzerlandguarantee

    areliableservicefor

    manyyears.

    Basedonitsextensiveexperi-

    encewithlowandmedium

    voltagecables,Nexans

    Switzerlandoffersitsclients

    anexpertpartnershipto

    solveproblemsandimple-

    mentpracticalsolutions.

    A n e x p e r t a n d c om p r e h e n s i ve s e r v i c e

  • 7/27/2019 HV-EHV Cables Synthetic Isolation

    16/16

    Nexans Switzerland Ltd2, rue de la Fabrique CH 2016 Cortaillod

    Phone. 41(0) 32 843 55 55 Fax 41(0) 32 843 54 43

    http://www.nexans.ch

    G l o b a l e x p e r t i n c a b l e s a n d c a b l i n g s y s t e m s

    2006