Top Banner
Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking
18

Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

Dec 17, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

Hurricane Season 2008

What is it?Siting

requirementsPre approvalSite

managementTracking

Page 2: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

What is storm debris?Storm debris can be made up of ‘vegetative’ type

debris…Yard trash as in landscape maintenance (trees, shrubs,

etc.)Land clearing debris

ORC & D debris

Waste from construction or destruction of a structureNot hazardous (can be tricky after a storm)Not household garbage (putrescible) - must go to Class I

Page 3: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

Siting requirementsNot in wetlands

(natural or artificial)C & D – 200 feetYard waste – 50 feet

Potable water wellC & D – 500 feetYard waste – 100 feet

Community water supplyC & D – 1000 feetYard waste – 200 feet

Page 4: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

Siting requirementsOther things to

considerNeighbors (odors,

etc.)!!!Hours of operationtraffic

patterns/accessibilitySecurityEndangered species

(gopher tortoise, scrub jay, eagles, etc.)

Site rehabilitation/loss of use

Page 5: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

Pre ApprovalLetter went out May 2008 requesting site locations

Data will be compiledSite visits conducted as necessary

New site vs. old Potential wetlands

Approval letters providedStaging area information

Need current contact information (gov’t and contractor)

Location including GPS coordinatesType of operation expected

Type of waste Type of source reduction (grinding , burning, etc.)

Page 6: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

Site ManagementDon’t mix waste

C & D should be separate from vegetative waste or it is all C & D

Household wastes segregated and removed within 48 hours

Used oil and hazardous wastes must be segregated and disposed of properly (preferably within 48 hours)

Page 7: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

Site ManagementManager on duty

County or assigned by countyContractorShould be trained

Maintain set back limits (should be marked)

Security (Temporary fences, gates, etc.)Closure planning/timeline (as outlined in

Emergency Order)

Page 8: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

InspectionsDEP required to

perform site inspectionsNew sites for pre

approvalPeriodically during

life of siteClosure at end of

Emergency Order

Page 9: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

TrackingDEP web site –

http://appprod.dep.state.fl.us/www_rcra/wht/Internet link allows user to view various sites

including HW, permitted SW, and staging sitesMaintained by DEP

Page 10: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.
Page 11: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.
Page 12: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.
Page 13: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.
Page 14: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.

TrackingCounty user web site – http://tlhdwf2.dep.state.fl.us/stormtracker/login.asp

User updated with site status, etc.

Page 15: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.
Page 16: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.
Page 17: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.
Page 18: Hurricane Season 2008 What is it? Siting requirements Pre approval Site management Tracking.