METRO RAILWAY, KOLKATAPRESENTATION
BY
ELECTRICAL DEPARTMENT
ON THE VISIT
OF
SRI R.S.GROVER, ADDL. MEMBER ELECTRICALON
14th JULY, 2005
8/2/2019 huiy
2/36
CONSTRUCTION OF 5 RAPIDTRANSIT LINES OF TOTAL
ROUTE LENGTH OF 97.5 KMWAS PREPARED IN
1971.
8/2/2019 huiy
3/36
DUM DUM TO TOLLYGUNGEROUTE LENGTH - 16.45 KMs
BEING THE BUSIEST CORRIDOR
SANCTIONED ON 1-6-1972.
8/2/2019 huiy
4/36
8/2/2019 huiy
5/36
First METRO Service commencedon 24-10-1984 between ESP-NBN
covering 5 stations.
Thereafter different sections wereopened progressively and Finally
the stretch on 27.9.95.
8/2/2019 huiy
6/36
SALIENT FEATURE
OF
METRO RAILWAY
KOLKATA
8/2/2019 huiy
7/36
GAUGE : 1676 mmLENGTH (DMI to TOL ) : 16.45 km
GRADIENT : 2% on running line & 4% on
approach to carshed.COACH : BG Bogie & MG Shell
General Features
8/2/2019 huiy
8/36
UNDERGROUND : 15
ELEVATED : 1
SURFACE : 1
DISTANCE BETWEEN STATIONS
AVERAGE : 1.020 km
MAXIMUM : 2.151 km (DMI BEL)
MINIMUM : 0.597 km (CEN-CWC)
NO. OF STATIONS
8/2/2019 huiy
9/36
TRAIN FREQENCY
PEAK HOUR : EVERY 8 MINUTESNON PEAK HOUR : EVERY 10/15 MINUTES
NO. OF TRAINS
WEEKDAYS : 190
SATURDAY & HOLIDAYS : 164
SUNDAYS : 64
8/2/2019 huiy
10/36
ROLLING STOCK/ TRACTION
NO. OF COACHES : 144 (9 NGEFRAKE + 9 BHELRAKE)
TRAIN COMPOSITION : 2 DMC
2 NDMC-MA
2 NDMC MC
2 TC
CLASS OF ACCOMODATION : ONECLASS
8/2/2019 huiy
11/36
VENTILATION AND AIRCONDITIONING
Main Parameters
MAX PERMISSIBLE TEMP AT STATION : 30 oC
MAX TEMP. IN TUNNEL : 32.8 0C
MAX. RELATIVE HUMIDITY AT STATION : 87%
MAX HUMIDITY IN TUNNEL : 77%
MAX. AIR VELOCITY AT STATION : 2.5 m /sec
AT TUNNEL : 3.0 m/sec
8/2/2019 huiy
12/36
a) TOTAL ESCALATORS : 38
b) MINIMUM RISE : 4 Mt.
c) MAXIMUM RISE : 7 Mt.
d) INCLINATION : 30O
e) WIDTH : 1.1 Mt.
f) PASSENGER CLEARING
CAPACITY : 800 Persons/Hour
g) SPEED : 0.45 Mt./Sec.
h) MOTOR CAPACITY : 7.5 KW TO 12 KW
ESCALATORS:
8/2/2019 huiy
13/36
8/2/2019 huiy
14/36
Power supply
8/2/2019 huiy
15/36
33 KV 50 Hz 3 o supply is obtainedfrom CESC at 4 receiving sub-station.
These sub-station are inter-countered
with MR 33 KV feeder cable laidthrough the tunnel.
33 KV is stepped down to 11 KV at
receiving sub-station.
Except Rabindra Sadan, all other MetroRailway Stations are having twoindependent feeders.
33 KV SYSTEM
8/2/2019 huiy
16/36
3rd Rail
Running
Rail
33 KVIncoming From
CESC
33KV/11 KV
16 MVA(Oil Type)
11 KV System
Traction
Transformer
Rectifier
33 KV System
415 Volt System
To Loads like pump, fan, light,ACP
lant etc.
Auxiliary Transformer
33 KV Orange
11 KV Green
750 Volt (DCPositive) Red
415 Volt Brown
750 Volt (DCNegative) Black
Metro Railway Electric Power Distribution Systems
Isolators
HSCB
8/2/2019 huiy
17/36
Third Rail System
Technical assistance extended by OSAKAMunicipal Transport Bureau for 3rd rail current
collection and rolling stock design.
Air condition and ventilation of OSAKA Metrowas adopted as climatic condition are same i.e.high humidity and temperature.
Flat bottom foot 52 kg/m rail of high conductivity
(specific resistance being seven times that of copper)also known as rimming steel is used as conductor of
power at 750 V dc.
Overall resistance 0.029 ohms per km.
8/2/2019 huiy
18/36
3rd rail laid as specially prepared bed on
the outer side of running track with
insulating high density polyethyleneinserts for fixing the conductor rail
mounting assembly consisting of 3.3 KV
porcelain insulator, galvanized mild steel
frame work for mounting FRP shroudboard on top and rear. 3.3 KV insulators
are spaced at 2.50 mt apart .
Third Rail Laying System
8/2/2019 huiy
19/36
Neutral section (air gap) is provided in the trailing
direction of station platform at every traction station .
Length ofN/section :15.50 mts; current collectors are
spaced at 13.50 meters.
Neutral Section
8/2/2019 huiy
20/36
Need for ventilation
To ensure supply of fresh Air forPassengers(O2)
To dilute obnoxious & hazardous gases
To bring down the relative humidity
To dispose of large quantity of heat by Traction
Eq.,Auxiliary appliances, Human Body
To dispose of heat leaked inside the subway from the
surrounding soil
8/2/2019 huiy
21/36
Air Ventilation Design criteria
Fixing Up Ambient Condition (90% of day of any season)
from last 5 YearRecord from Metrological Department at 10
Hrs. when peakTraffic Occurs.
SeasonSeason TemperatureTemperature Relative HumidityRelative Humidity
Summer 36 55
Monsoon 33 70
Winter 27.2 57
Because of pollution and Dust, Air washery had been provided
at every fresh air intake.Now at Esplanade station, dry air filters
have been provided & air washery closed to save electricity
consumption.
8/2/2019 huiy
22/36
8/2/2019 huiy
23/36
8/2/2019 huiy
24/36
EXTENSION OF METRO FROM TOL TO GARIA
SANCTIONED IN 1999-2000
TOTAL ROUTE LENGTH : 8.70 Kms.
VIADUCT : 8.60 Kms.
LEVEL TRACK: 0.10 Kms.
NO. OF STATIONS : 6
KUDGHAT,BANSDRONI,NAKTALA,GARIA
BAZAAR,PRANABNAGAR and NEW GARIA
SANCTIONED COST : Rs. 907 Crores
1/3 COST OF THE PROJECT WILL BE SHARED BY
THE STATE GOVERNMENT
T.D.C. : MAR. 2007
8/2/2019 huiy
25/36
Number of Stations
Elevated Stations 5 (five) Nos.
Surface Station 1 (one) No.
NAME OF STATIONS :
KUDGHAT
BANSDRONI
NAKTALA
GARIA BAZAR
PRANABNAGAR
NEW GARIA ( AT SURFACE )
8/2/2019 huiy
26/36
CIRCULAR RAILWAY EXTENSION:
Metro Rly. is also executing Circular Railway extension
project for E.Rly.
a) Extension from Prinsepghat to Majerhat:
Project sanctioned in 1999-00
Route length : 5.75 Kms.
Viaduct : 4.00 Kms.
Level track : 1.75 Kms.
No. of station : 2 (Both elevated)
Khidderpore & Remount road
Estimated cost : 118 Crores
T.D.C. : Work Over CRSs
sanction awaited
8/2/2019 huiy
27/36
CIRCULAR RAILWAY EXTENSION Contd.:
b) Extension from Dumdum Cantt. to NSC Bose Airport:
Project sanctioned in 2000-01
Route length : 4.00 Kms.
Viaduct : 3.25 Kms.
Level track : 0.75 Kms.
No. of station : 2 (Both elevated)
Jessore Road & Airport station
Estimated cost : 111 Crores
T.D.C. : Aug. 2005
8/2/2019 huiy
28/36
8/2/2019 huiy
29/36
8/2/2019 huiy
30/36
8/2/2019 huiy
31/36
8/2/2019 huiy
32/36
8/2/2019 huiy
33/36
8/2/2019 huiy
34/36
50 M3
80 M3 80 M3
50 M3
30 M3
UnderPlatform exhaust
25 M3
5 M3 5 M3
30 M3
Platform leakage
To Tunnel
Mid
Tunnel
exhaust
MidTunnel
exhaust
Air FlowAir Flow
Diagram in perDiagram in per
SecondSecond
Air intake (110M3)
Air intake(110 M3)
Air intake
60 M3(Total) 60 M3(Total)
Platform (60 M3)
Tunnel (80 M3)
UnderPlatform (25 M3)
Platform leakage (5 M3)
(50 M3)
(30 M3)
8/2/2019 huiy
35/36
Plate 14: Opposite Dum-Dum TSSSingle Bolt connection for two cables on 3
rdrail. At least two bolts connections suggested
8/2/2019 huiy