HUBBALLI- DHARWAD SMART CITY Ltd. Vision: Hubballi Dharwad aspires to be the gateway to southern Deccan region, for trade, business and commerce. It intends to achieve this, with the spirit of inclusion and citizen empowerment, by synergizing the locational advantage, technology, infrastructure, manpower resource and smart governance. This will also make the city high on livability and sustainability, preserving its rich cultural heritage. Projects Progress Status 23 May 2018
12

HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

Apr 15, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

HUBBALLI- DHARWAD

SMART CITY Ltd.

Vision: Hubballi Dharwad aspires to be the gateway to southern Deccan region, for trade, business and commerce. It intends toachieve this, with the spirit of inclusion and citizen empowerment, by synergizing the locational advantage, technology,infrastructure, manpower resource and smart governance. This will also make the city high on livability and sustainability,preserving its rich cultural heritage.

Projects Progress Status

23 May 2018

Page 2: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

Are

a B

ased

D

evel

op

men

tRenovation of Core city Market MG Market & Janta Bazar

Industrial Development-Skill development Considered in New Projects

Upgradation of SME Not under consideration

Transport Terminal Hub Taken up by BRTS

MLCP Currently in PPP mode

IPT Connectivity Project termed as Public Bicycle sharing

Street Scape Redesign

Junction Improvement

NMT Zones

Storm water Drains

Underground Ducting

Open Space Upgradation

Tolankere

Nehru Stadium

MG Park

Nala upgradationGreen Corridor

24x7 Water Supply Taken up by ILFS

Underground Drainage

Rainwater Harvesting

Solid Waste Management

Public Toilets Termed as Smart Toilet (e toilet)

Affordable Housing Termed as Basic services to urban poor

LED street Lighting Taken up in PPP mode

Roof top Solar Taken up in PPP mode

Railway Station Redevelopment Taken up in PPP mode

PAN

C

ity

ICT Package-1 (ICCC & Smart SWM)ICCC

Smart Poles (taken in PPP mode)ICT Package-2 (E-Governance) Project dropped

Hubballi Dharwad

Smart City

Projectivised as Smart Road and split into 3 packages

1

PPP1

2

3, 4, 5

67

89

10

11

1213

14

15

PPP2PPP3

PPP4

16PPP5

Additional Projects taken up

Electric Crematorium

Dharwad Super market (PPP mode)

PPP6

17

Project Count–SCP vs Current

Page 3: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

17 17 17 17 17

9

7 76

Feasibility Report Draft DPR Final DPR RFP Tender Notification

Total Count Completed

Project Status–Non PPP ProjectsHubballi Dharwad

Smart City

63

1.7

Cr

64

.52

7 C

r

81

.52

7 C

r

81

.52

7 C

r

16

2.5

27

Cr

Page 4: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

6 6 6 6

5 5

4

Feasibility Report REIA & SIA RFP Tender Notification

Total Count Completed

Project Status–PPP ProjectsHubballi Dharwad

Smart City

30

8.4

5 C

r

28

3.3

7 C

r

13

7.3

7 C

r

28

3.3

7 C

r

Page 5: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

a) Project Status – Tendered Projects

5

Hubballi Dharwad

Smart City Ltd.

Sr.

No.Project Name

Cost

(Cr.)Funding Status

Last date for

tender

submission

Technical

Opening

Implementation

Duration

1

Solid Waste

Management –

Litter Free Zones

3.20 SCM

Due to no participation in

1st round.

Project is Retendered.

SWM_LFZ Technical Bid is

being opened on 23 May

2018.

02 Mar 2018 04 Mar 2018 3 months

2Electric

Crematorium1.80 SCM 20 Mar 2018 22 Mar 2018 6 months

3Rain water

Harvesting0.37 SCM

Technical Bid is being

opened on 23 May 201816 Mar 2018 17 Mar 2018 3 months

4 Smart Toilets 1.55 SCM

LoA is given. Installation of

units will start from 24 May

2018.

23 Jan 2018 25 Jan 2018 6 months

5 Roof Top Solar 2.31 PPP

Tender invited on 6th Jan

2018. No participation. To be

retendered. Requested KERC

to change the tariff rate.

09 March 2018 12 March 2018 4 months

Page 6: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

a) Project Status – Tendered Projects

6

Hubballi Dharwad

Smart City Ltd.

Sr.

No.Project Name

Cost

(Cr.)Funding Status

Last date for

tender

submission

Technical

Opening

Implementation

Duration

**Desilting of Raj Nala

(North)0.937 SCM

Tender notified on 30 Jan

2018. LoA is given.16 Feb 2018 17 Feb 2018 1 month

**Desilting of Raj Nala

(South)0.80 SCM

Tender notified on 27 Feb

2018. LoA is given.12 March 2018 13 March 2018 1 month

6

Smart Parking Tower

(Multi Level Car

Parking)

50

PPP

(INR 10

Cr SCM)Tendered Notified on 04

March 2018

20 June 2018 23 June 2018 24 months

7 Smart Poles 48 PPP 30 May 2018 01 June 2018 12 months

8 ICCC 39.57 SCMTender notified on 07 March

201828 April 2018 01 May 2018 9 months

9 LED Street Lighting 37 PPP Tender Notified on 23 May

2018

20 July 2018 23 July 2018 4 months

10 Tolankere Lake 16.3 SCM 20 July 2018 23 July 2018 24 months

# Total 201.837 Cr.

** Desilting of Nala is part of Nala Rehabilitation Project

Page 7: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

c) Project Status -RFP under Progress

7

Hubballi Dharwad

Smart City Ltd.

Sr.

No.Project Name Cost (Cr.) Category Funding Status

11Public Bike

Sharing8.09

ABD + Non

ABDPPP

Citizen survey is completed. Industry consultation is also

completed at KUIDFC. RFP is under review at HDMC.

12Super Market at

Dharwad146 Non ABD PPP

Citizen & vendors interaction meeting done. The subject is placed before

the HDMC council after detailed note, council has given authority to

Commissioner for seeking Govt. relaxation on allotment of stallage to the

existing vendors and fixation of rent at ULB level. Hence, the proposal is

under various stages of implementation.

1. – Rehabilitation of vendors & stall holders.

2. – Relaxation on allotment of stalls to the existing vendors.

3. – Phase wise implementation.

13Railway Station

Redevelopment25.08 ABD PPP

Feasibility Report prepared & submitted to Railway Authority on 4 Nov

2017. 4 meetings held with Senior Officers of railway authority for

discussion on proposal. Project is proposed under PPP model.

Concurrence is awaited from Railways.

# Total 179.17 Cr.

Page 8: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

d) Project Status - DPR under Progress

8

Hubballi Dharwad

Smart City Ltd.– Impactful Projects

Sr.

No.Project Name

Cost

(Cr.)Category Funding Status

14 Nehru Stadium 14.3 ABD SCM

Draft DPR submitted & reviewed by Technical Committee

at KUIDFC.

As per the suggestions of TC, Corrections on design &

drawings Final DPR is under preparation.

15 M.G. Park 10 ABD SCM

Revised FR reviewed by Technical Committee at KUIDFC.

Draft DPR is under review at KUIDFC.

# Total 40.6 Cr.

Page 9: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

Major Smart City Project Diagrams

Hubballi Dharwad

Smart City Ltd.

TolankereMG Park

Nehru Stadium

Integrated

Command &

Control Centre

Smart Parking

Tower

Page 10: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

e) Project Status - DPR under progress

10

Hubballi Dharwad

Smart City Ltd.

Sr.

No.Project Name Cost (Cr.) Category Funding Status

16

Street Scape Redesign,

footpath improvement,

underground ducting

260 ABD SCM

Project will be implemented Phase Wise as Smart

Roads.

Stakeholders’ consultation is convened under the

Chairmanship of DC for consent on the project.

BoD provided administrative approval for newly

identified road worth 150 Crs. HPSC approval

obtained on 06 March 2018

DPR reviewed at HDMC for Gokul Road (5 Km- SCP)

17 Junction Improvement

18

Underground Ducting of

electrical /data with Electrical

Smart Metering

19 NMT Zones

20 Underground Drainage 6.5ABD + Non

ABDSCM DPR is under preparation.

21 Core Markets 108 ABD SCM

2 rounds of Consultation with the vendors done.

Finalization of Rehabilitation site under discussion.

Page 11: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

e) Project Status - DPR under progress

11

Hubballi Dharwad

Smart City Ltd.

Sr.

No.Project Name Cost (Cr.) Category Funding Status

22 Nala Renovation 29ABD + Non

ABDSCM

Financial approval is obtained during 4th BoD

meeting. Tender invited for Preparatory process of

Nala Renovation - North: 01 Feb 2018 & South: To be

floated within a week. However, Technical approval

obtained from HDMC at the cost INR 1.73 Cr.

Survey, FR & DPR is under preparation.

23

Affordable Housing / Basic

Services to the Urban Poor

(Infrastructure)

41.3 ABD SCMSurvey is completed. Project is under preparation of

revised FR.

24 Storm Water Drains 2.5 Non ABD SCM

The project comes outside ABD area. Obtained BoD’s

approval for new scope of the project. Revised

Feasibility Report under process.

25 Ropeway to Hillock -- Non ABD SCMImplementation of the project during Second Phase

after detailed survey with NOC from various dept.

# Total 487.9 Cr.

Page 12: HUBBALLI- DHARWAD SMART CITY Ltd. Projects... · 2018-05-23 · DPR reviewed at HDMC for Gokul Road (5 Km- SCP) 17 Junction Improvement 18 Underground Ducting of electrical /data

Thank you

Hubballi Dharwad

Smart City

http://www.facebook.com/hubballidharwa

dsmartcityltd

http://twitter.com/hdsmartcity

http://www.Instagram.com/hubballidharw

adsmartcity/

http://hubballidharwadsmartcity.com/

Follow us on