Northwest Regional Economic Strategy - Northwest Regional Economic Strategy - 2006 2006 BASELINE REPORT BASELINE REPORT November 2006 November 2006
Mar 07, 2016
Northwest Regional Economic Strategy - 2006Northwest Regional Economic Strategy - 2006
BASELINE REPORTBASELINE REPORT
November 2006November 2006
IntroductionIntroduction
As part of the implementation of the RES, the Advisory Group committed to produce a baseline report, against which progress in implementing the RES can be gauged. Ultimately success in implementing the RES will be measured against the 8 headline targets set out in full in the RES and summarised below:
GVA Growth: Achieve GVA growth above the England average
Job Creation: Create 150,000 new jobs, 80,000 in knowledge occupations
Firm Formation: Raise the firm formation rate to 21,000 per annum
No Qualifications: Reduce the number of working age people with no qualifications to 80,000
Graduate Qualifications: Increase the number of working age people with graduate qualifications by 120,000
Employment Rate: Increase the number of people in the workforce by 83,000
Deprivation: Reduce the number of areas in the worst 5% nationally
CO2 Emissions: Reduce CO2 emissions per £ of GVA
This baseline report sets out, for each factor, the objectives agreed in the RES, and the key data which we will use to know if appropriate progress is being made. The report sets a baseline for each dataset and then either a target for 2009, or a direction of travel.
By looking at these more detailed monitoring indicators, on an annual basis against each RES factor, we will be able to understand how progress in each factor is contributing to the 8 headline targets. We will also be able to assess where the region is having the impact it requires and where further effort is required.
Under each factor this report then gives a number of key milestones. These will be used to assess, annually (or six-monthly for Transformational Actions), how the region is progressing with the implementation of each RES action. This may be different from the impact on the appropriate monitoring indicators for each factor, and will be a more up to date assessment of progress, rather than relying on historical data.
A monitoring report will be produced in May of each year, outlining the current progress of the region, by updating the data and milestones in this report. It will also look at expected progress in the following year and draw some conclusions about areas which require more focus. An initial assessment of how the headline targets each contribute to GVA Growth has been undertaken and further work will be carried out about the impact of individual monitoring indicators and RES actions on GVA, as the RES is implemented.
If you have any comments on this report please do not hesitate to contact Simon Nokes, at NWDA on [email protected]
RES Advisory GroupNovember 2006
RES Factor: ENTERPRISEAction on this RES Factor is designed to achieve the following objectives:1. Improve the formation, survival and growth rates of enterprises2. Improve availability of business finance3. Influence government policy on small business regulationThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 38,000 fewer businesses than England average35 business starts per 10,000 people (17,640 per annum). 85.5% of national rate750 net new VAT businesses per annumFirm Formation rate for women, BME groups and deprived communities to be
established via a study92.4% 12 month firm survival rate (92% England), 80.5% 24 month firm survival rate
(80.5% England) and 67.3% 36 month firm survival rate (67.3% England)11.4% self employment rate (12.6% nationally)5569 Business Link intensive assists per year with average GVA change of £3890% of people think setting up a business is a good career choice (baseline to be
established)% of people expect to start a business in the next 3 years (baseline to be established)7% of NW HE students participate in enterprise activities (comparable to the national
level); NW HEIs had 78 graduate business start-ups (14% of England total) in 2003/04, and 41 surviving at least 3 years (20% of England total); NW HEIs had 13% of England total of HEI owned spin-offs in 2003/04, and 11% of England total of those surviving to 3 years
8.27% NW share of National Small Firm Loans Guarantee disbursement (185 loans made under the new scheme)
The annualised and accumulated impact of regulation posed on NW business in 2006 was equal to £1.18bn
Where do we want to be (2009) / what will we monitor?
Reduce business stock gap from 38,000 fewer businesses than England average to 35,000
42 business starts per 10,000 people (21,000 per annum) Improvements in: net VAT registrations, firm formation rate for key groups above,
survival rates and self employment rates 9567 Business Link intensive assists per year with average GVA change of £4190Improvements in perception of setting up a business as a career choice and % of people
expecting to start up in the next 3 yearsGrow HE student participation in enterprise activities, NW HEIs share of graduate
business start-ups and NW share of HEI owned spin-offs VAT registrations / deregistrations (monitor)Increase NW % share from SFLGImpact of regulation on NW business (monitor)
Relevant RES Targets GVA GrowthJob CreationFirm Formation
Page 1
RES Actions linked to Enterprise:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/91 Transform Business
Link (NWDA/LSC) Workstreams in
place Submission to
agree formation of new company
HR/legal/KP and financial input to BL project team
Skills brokerage operational
Commence TUPE process
Build knowledge platform
Confirm new BL structure and location
Knowledge platform built
Transfer staff to new company
New service operational
Ensure BL targets met
Ensure skills brokerage targets met
New Business Link launched
Intensive assists increase by 20% on 06/07 delivery plan
Intensive Assist increase by 25% on 07/08 delivery plan
2 Promote Enterprise as a career choice (NWDA)
Finalise structure of NW Enterprise Forum Undertake research for enterprise culture initiative Build on the NCGE report by exploring opportunities
with HEIs to promote and support enterprise as a graduate career choice
Establish NW Enterprise Forum
Undertake enterprise culture pilot projects
Develop and implement schemes to promote graduate careers in enterprise
3 Business Start for high growth/ key groups / underperforming places (Business Link)
Procure contractor for regional start up services Explore opportunities to align initiatives with HE
schemes and facilitate graduate access to the service
New business start up service operational
4 Review Business Support needs of priority sectors/ high growth co’s / M co’s / rural co’s (Business Link)
Undertake review of existing business support arrangements in line with the Government’s Business Support Simplification Project
Explore opportunities for complementing and enhancing HE schemes in priority sectors, including alumni support
Review and simplify regional products and services
5 Target existing investment funds (NWDA)
Ongoing delivery of regional funds Develop Business Investment scheme successor fund
Ongoing delivery of regional funds
6 Address key business finance gaps (NWDA)
Review market gaps and procure small loans provision Create new funds to address equity gaps
Delivery of small loans fund
7 Highlight the impact of regulation (Employers)
Monitor impact via national surveys Chamber survey on local impact of regulation
Page 2
RES Factor: REGIONAL SECTORSAction on this RES Factor is designed to achieve the following objectives:1. Develop key internationally competitive sectors2. Develop sectors with large and widespread employmentThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 90,000 fewer people work in knowledge sectors than the England average (36.4% of all employment compared to 41.8% in England)
Priority sectors account for 55% of GVA (% in each priority sector to be established)Business services account for 40% of GVA gapLarge/widespread employment sectors account for 52% of employment
Where do we want to be (2009) / what will we monitor?
Same % of employment in knowledge sectors as the England averageIncreased % of GVA in priority sectors compared to England and increased growth rate
in GVA of those sectors Reduction in GVA gap in Business Services sectorCreate 150,000 net new jobs by 2009GVA, employment and job creation by sector (monitor)GVA, GVA/head, GVA per hour worked and average (median) wage (monitor)
Relevant RES Targets GVA GrowthJob Creation
RES Actions linked to Regional Sectors:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Output Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/98 Cluster programmes
in priority sectors (Cluster Orgs/NWDA)
Complete Food & Drink Strategy/review organisational structure
Undertake study of Business & Professional Services sector
Undertake study of Digital & Creative Industries (D&CI) sector
Set up Food NW Shadow Board
Complete Financial and Professional Services sector (FPS) Strategy and Action Plan
Complete D&CI Strategy and Action Plan
Establish Food NW
Finalise delivery arrangements for FPS Action Plan
Finalise delivery arrangements for D&CI Action Plan
Food NW co-ordinating delivery of Action Plan
FPS Action Plan being delivered
D&CI Action Plan being delivered
Undertake next phase of sector strategy reviews
Identify emerging clusters in preparation for new RES
9 Media Enterprise Zone linked to BBC (NWDA)
Develop partnership relationships with BBC
Preferred location identified by BBC
BBC to sign property lease agreements
Provisional timetable finalised once lease agreement signed
Ongoing planning for Media Zone – timetable/ key events to be agreed once lease signed
Page 3
Milestones/Output Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/910 Implement Regional
Tourism Strategy (Regional Tourism Forum)
Formulate Business Tourism Strategy to make NW the premier English region for Business Tourism
Launch visitor Information Strategy and Visitor Information improvement project to enhance the region’s communication with customers
Mid term review of Regional Tourism Strategy completed
Review of the composition and function of the Regional Tourism Forum
Implement review of Tourist Board programmes
Complete major study to evaluate the scale/ nature of tourism day visit activity in the NW
Visitor Information improvement projects - 1st phase
Update Tourism SSPA action plan to maximise the potential of people working in the sector
Regional Visitor Economy Forum formed and vision agreed. Regional Tourism Management Group established
Visitor Information improvement projects - 2nd phase
Update Tourism SSPA action plan to maximise the potential of people working in the sector
11 Skills / Procurement Initiatives in large employment sectors (SRPs/SSPAs)
Review SSPA Action Plans, align to National Sector Skills Agreements (SSAs) and contribute to Regional Statement of Skills Priorities
Ongoing work of SSPAs
Lancashire “Procurement and Skills” initiative commenced
Lancashire “Procurement and Skills” initiative concluded
Page 4
RES Factor: INNOVATIONAction on this RES Factor is designed to achieve the following objectives:1. Develop high added value activity through innovation2. Support knowledge transferThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 58% innovation active companiesBaseline for innovation rates to be established by end 2006, based on EU CORDIS Strategic
Innovation Indicators. Likely to include new product introductions and numbers trained in innovation (Further measures to capture innovative ideas being generated by the whole workforce in companies to be considered depending on the exact COORDS indicators)
274 patent applications granted in 20045139 businesses in the NW have Investors In People (IIP)2607 HEI engagements with SMEs557 FTE staff in NW HEIs dedicated to business and community engagement; £114.5m HEI
income to support business interaction; NW HEIs have a 8% share of research contracts with SMEs (comparable to the UK average)
Where do we want to be (2009) / what will we monitor?
Increased in innovation active companies and innovation ratesIncrease in patent applications granted and number of NW companies with IIP 3200 HEI engagements with SMEs700 FTE staff in NW HEIs dedicated to business and community engagement; £131m HEI
income to support business interaction; NW HEIs research contracts with SMEs to exceed the UK average
Number of new firms working with the HEI knowledge base (monitor)
Relevant RES Targets
GVA GrowthJob CreationFirm Formation
RES Actions linked to Innovation:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/912 Process and
product/service innovation (NWDA)
Defence base KT product contracted
New strategic approach focused on service sector and training key managers approved
European Framework FP7 contracted
Regional position/ policy paper finalised
Procurement complete
New specialist innovation advisors and range of innovation products in place in conjunction with new Business Link
More innovation products developed
Page 5
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/913 Business / HEI
knowledge transfer (NWUA)
Commencement of HEFCE funded HE-Business Engagement Programme with focus on skills and cluster engagement
Secure funding to support expansion of the HE-Business Engagement Programme
Secure funding to do exploratory work in innovation platforms in non-science disciplines
6 detailed Knowledge Transfer plans agreed with partners
Expansion of HE-Business Programme
Innovation platform pilot projects start
Explore opportunities to increase HEI capacity for business interaction
Explore ways to enhance knowledge transfer via skills initiatives
Establish the two Northern Way CPEs
Continued operation of HE-Business Engagement Project
Continuation of innovation platform pilot projects
Develop/ deliver regional schemes to enhance HE capacity for business interaction
Develop and deliver regional skills schemes to support KT
Explore opportunities to facilitate HE employer engagement to expand the HLSP
Maximise opportunities to assist business innovation through the NW Operating Programme for Competitiveness 2007-2013
Completion and review of HE-Business Engagement Programme
Completion and report on innovation platform pilots
Maximise opportunities to assist businesses to innovate through the NW Operating Programme for Competitive-ness 2007-2013
14 Investigate HEIF type incentives to businesses (NWDA)
Design programme to provide incentives to businesses to collaborate with HEIs, focused on non-science sectors
New programme for involving industry with HEI available
Evaluation of approach and influence government policy
Page 6
RES Factor: SCIENCE / R&DAction on this RES Factor is designed to achieve the following objectives:1. Exploit the science base and R&DThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 2.0% R&D spend (private and public) as a % of GVA1.6% R&D spend (Business) as a % of GVA0.1% R&D spend (Government) as a % of GVA0.4% R&D spend (HE) as a % of GVA 12.7% of UK business R&D is in Northwest3% of government non HEI R&D
Where do we want to be (2009) / what will we monitor?
Increase in R&D spend as % of GVAMaintain share of private R&D spend5% of Government non HEI R&D funding
Relevant RES Targets
GVA GrowthJob CreationFirm Formation
RES Actions linked to Science / R&D:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/915 Implement the
Northwest Science Strategy (NW Science Council)
Complete NWSC
Establish “major projects bidding fund”
NWDA consider bid capability fund
Establish N8 Research Centres
Statement of nuclear science capability
Develop NW hub to improve co-ordination of STEM (also Action 39)
NHS Research centres decision
HECTOR supercomputer decision (Daresbury)
Launch NWSC
4GLS Decision Achieve the 55
actions in the Science Strategy
Maximise exploitation of science/ R&D base through NW Operating Programme for Competitive-ness 2007-2013
Maximise opportunities to support SME engagement with European Framework Programme 7
Achieve the 55 actions in the Science Strategy
16 Support major research concentrations (NWDA)
Launch Daresbury Science & Innovation Centre
LSP innovation centres opened
4GLS prototype in operation
National Microsystems Packaging Centre defined
MKC strategy published
Lancaster Science Park begun
Work continues on Lancaster Science Park
Page 7
RES Factor: INTERNATIONAL COMPETITIVENESSAction on this RES Factor is designed to achieve the following objectives:1. Maximise opportunities from globalisation and emerging markets2. Realise opportunities from international trade3. Realise opportunities from inward investmentThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 7,147 exporters£19.6bn value of exportsForeign Direct Investment accounts for 16% of the Northwest economy. In 2005/6 there
were 112 Foreign Direct Investment projects which created/safeguarded 6,800 jobs7% of all FDI projects are R&D intensive and 7% are from emerging markets25,000 international students studying at the region’s HEIsIn 2006 458 businesses have relocated outside the region and 493 businesses have
moved into the Northwest
Where do we want to be (2009) / what will we monitor?
10,000 exporters£22bn value of exportsIncrease in number of FDI projects to 150 per year with increase in % of region’s GVA
accounted for by FDI - 17% of all FDI projects to be R&D intensive, 25% to be for projects with average salary more than 35K and 17% to be from emerging markets
30,000 international students studying at the region’s HEIsJob creation by sector (monitor)Business relocations (monitor)
Relevant RES Targets
GVA GrowthJob Creation
RES Actions linked to International Competitiveness:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/917 Raise companies
awareness about global opportunities / risks (International Business Forum)
Development of Internationalisation Strategy
Consultation with key partners
International-isation Strategy completed
Implement new International-isation Strategy
New Top level national targets agree by UKTI – covering trade & investment
Ongoing implement-ation of International-isation Strategy
18 Business support to improve exporting performance (UKTI)
UKTI to develop new delivery structure for trade services in the region by March 2007 with Chamberlink (acting on behalf of the Northwest Chambers of Commerce)
Implement new delivery structure Implement new national 5 Year
UKTI strategy “Prosperity in a Changing World”
19 Focus inward investment and aftercare activity (NWDA)
Review Overseas Offices Key account management of 380 foreign owned companies
Implementation of new Inward Investment Strategy Action Plan as part of Internationalisation Strategy
Page 8
RES Factor: ICTAction on this RES Factor is designed to achieve the following objectives:1. Support ICT usage and digital content development2. Develop ICT infrastructureThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? At the end of 2005 125,707 or 62.1% of workplaces in the Northwest had broadband. 74% of businesses use computer systems
69% of businesses use Internet (79% in UK) and 48% use broadband (54% in UK)9% homeworkers (11% in UK) and 7% teleworkers (8% in UK) - rankings for the density of
homeworking across the UK regions shows that the NW is currently ranked 9th out of 11 regions
Less than 100% availability of 512kbps broadband service
Where do we want to be (2009) / what will we monitor?
88% of businesses use computer systems (to be confirmed)82% of businesses use Internet and 80% use broadband (to be confirmed)11% homeworkers and 8% teleworkers - NW will have made it into the top 5 density
listings for homeworking regions (to be confirmed)95% availability of 2Mbps broadband service£1billion investment by BT in 21CN (Monitor)
Relevant RES Targets
GVA GrowthJob CreationFirm FormationCO2 emissions
RES Actions linked to ICT:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/920 Support
companies ICT usage (Digital Development Agencies)
Effective delivery of Intelligent Business Events project to 500+ businesses
Effective roll out of Closing the ICT Knowledge Gap
Further milestones to be set
21 Encourage homeworking and mobile working (Employers)
Homeworking in England’s Northwest - 18 month programme of work to encourage homeworking. To be benchmarked in Summer 2006
Facilitation of NW Flexible Working Steering Group to promote the region’s competitiveness and quality of life through encouraging and supporting flexible and home working
Ongoing implementation of homeworking in England’s Northwest
22 Grow ICT infrastructure (Telecoms Providers)
Roll out of BT 21CN
Page 9
RES Factor: SUSTAINABLE CONSUMPTION AND PRODUCTIONAction on this RES Factor is designed to achieve the following objectives:1. Develop resource efficiency, sustainable procurement and corporate social responsibilityThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 30m tonnes of waste produced annually (11.1m tonnes of construction, demolition and excavation waste, 3.8m tonnes of commercial & 4.5m tonnes of industrial waste)
26,000 Kt CO2 emissions (2004) from industry, commercial and public sector3% of regional energy demand (2003) is produced from renewables and wasteTotal Energy Consumption 2003: 37 kilo tonnes of oil equivalent (Ktoe) or 215320 GWh CSR measure to be established via Chamber of Commerce Survey
Where do we want to be (2009) / what will we monitor?
Reduction in construction, commercial and industrial waste sent to landfill sitesReduction in CO2 emissions (from industry) by unit (£) of GVA (target to be set)Increase in % of energy from renewablesReduction in Ecological Footprint (target to be set)Reduction in Energy consumptionCSR measure to be established via Chamber of Commerce SurveyCarbon emissions per head of population (monitor)Ecological Footprint (monitor)
Relevant RES Targets
GVA GrowthCO2 Emissions
RES Actions linked to Sustainable Consumption and Production:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/923 Improve BREW
support to business (NWDA)
Contract signed with NW Waste Treatment Centre of Excellence
All BREW partners using toolkit
7 co-ordination projects developed and delivered.
Develop Resource Efficient Tourism and Sustainable procurement programmes.
Agree Year 3 programme with Defra
Deliver Year 3 programme and assess whether Year 4 funding will be forthcoming
Implement regional waste coordination forum
Ongoing implementation of BREW strategic projects
To be confirmed if BREW funding forthcoming
24 Develop / implement Regional Climate Change Action Plan (NWDA)
Consultation Plan – June
Events held - Sept
Climate Change Action Plan to be launched
Commence delivery of Action Plan with partners
Undertake preliminary research
Devise and implement delivery vehicle (partnership)
Establish monitoring arrangements
Implement year 2 delivery programmes
Monitor progress and identify changes required to Action Plan if outputs not being achieved.
Implement Year 3 delivery programmes
25 Embed corporate social responsibility (Sustainability Northwest)
490 businesses assisted with corporate social responsibility
850 businesses assisted with corporate social responsibility
Page 10
RES Factor: BASIC SKILLSAction on this RES Factor is designed to achieve the following objectives:1. Tackle lack of basic skills/qualificationsThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 120,000 more people more with no qualifications than the England average2 districts have more than 29% of the population with no qualifications41.6% of 16 – 19 year olds do not have NVQ level 2 qualificationsAn estimated 1,299,800 adults in the working age population without a first level 2Number of adults without numeracy skills and without literacy skills in the North West (to be
confirmed)
Where do we want to be (2009) / what will we monitor?
By 2009, reduce number of people without qualifications by 80,000All districts to have less than 29% of the population with no qualificationsReduce % of 16-19 year olds who do not have NVQ Level 2 (150,700 16-19 year olds to
be educated to NVQ level 2)Number of adults to have secured a first level 2 between 2006 and 2009 to be confirmedReduction in the number of adults without numeracy and without literacy skills
Relevant RES Targets
No qualificationsEmployment Rate
RES Actions linked to Basic Skills:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/926 Deliver basic skills
(LSC/JCP) Basic skills
volumes (learners & achievement)
SfL Transfer - Wider access to LSC provision for the economically inactive
Pilot new LSC/JCP Employability programme
Continue to achieve Basic skills volumes on current programmes
Achieve volumes on Mainstream programmes
Launch Employability programme nationally
New ESF programme aimed at tackling harder-to-help starts
Achieve Basic Skills volumes on Mainstream programmes
Ensure ESF programme targets key customers
Page 11
RES Factor: SECTOR SKILLS AND WORKFORCE DEVELOPMENTAction on this RES Factor is designed to achieve the following objectives:1. Meet skills needs of sectors and growth opportunities2. Invest in Workforce DevelopmentThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 62.0% of the working age population with at least Level 2 qualifications (67.9% in rural areas); 39,100 adult learners studying a full Level 2 with 32% achievement (to be confirmed)
42.4% of the working age population with at least Level 3 qualifications (48.6% in rural areas); 31,386 adult learners studying a full level 3 with 44.8% achievement (to be confirmed)
24.2% of the working age population with at least Level 4 qualifications (28.7% in rural areas)
80,000 fewer people with degree level qualifications, than the England average (26.9% of those in the labour market, compared to 28.3% in England)
55% WBL Apprenticeships Success rate & 49% for WBL Apprenticeships Framework (to be confirmed)
4,410 students engaged in Foundation degrees – 36% which match skills shortage areas 16% of employers with Skills Gaps0.9% density of skills shortage vacancies1.3% density of hard to fill vacancies 64% of employers investing in training% of employers adopting workforce development tools (baseline to be established by RSP)
Where do we want to be (2009) / what will we monitor?
Increase in number and achievement of adult learners studying full Level 2 and 3 qualifications
Increase in the % of working age population with at least Level 2, 3 and 4 qualificationsBy 2009, increase the number of people in the workforce with level 4+ qualifications by
120,00060% WBL Apprenticeship and Framework success rates (to be confirmed)8,500 students engaged in Foundation degrees and increase % in skills shortage areasReduction in % of employers with Skills Gaps as well as density of skills shortage and hard
to fill vacancies Increase in the % of employers providing training and adopting workforce development
toolsJob creation by sector (monitor)
Relevant RES Targets
GVA GrowthJob CreationNo qualificationsGraduate Qualifications
Page 12
RES Actions linked to Sector Skills and Workforce Development:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/927 Deliver skills
required by priority sectors (Sector Skills Councils)
Develop and submit the Higher Level Skills Pathfinder Project (NWUA)
National Nuclear Skills Academy approved
Launch and start up of the HLSP with focus on four priority sectors
Appointment of HLSP staff including HE Specialist Advisors in 4 priority sectors
Commencement of HLSP project
Other National Skills Academies (NSA) of strategic importance to the NW approved
Grow Your Future Workforce phase 2 started.
Regional arm of Financial Services National Skills Academy (NSA) approved
Media Enterprise Zone skills strategy developed and agreed
Regional arm of Manuf. Services NSA approved
Implementation of Sector Skills Agreements
Building work started on the Nuclear Academy NW in West Cumbria
Operation of HLSP Maximise
opportunities to deliver sector skills priorities through the NW Operating Programme for Competitiveness 2007-2013
Ensure skills developed for Media Enterprise Zone
Continued operation of HLSP and review its performance
Phase 2 NSAs to be operational in the NW.
Nuclear Academy NW operational
28 Deliver skills for key growth opportunities (SRPs)
Skills Partnership in place for Omega SRS
Develop an Apprentice-ship Prog. for NW airports
Ongoing delivery via LSC Commissioning Plan
Kingsway Skills Strategy Action Plan approved and delivery started
Develop a Creative and Cultural skills action plan embracing the needs of the Capital of Culture
Skills Partnership in place for Basford SRS
Implement Lancashire Skills Strategy to capitalise on development of ports / airports and strategic employment sites
NEM developments supported by the NSA for Construction
Delivery of Airport Apprenticeship programme
29 Skills for workers moving from declining sectors to growth sectors (LSC)
Ongoing delivery via LSC Commissioning Plan
30 Skilled workforce in rural areas (SRPs)
Skills programmes in place through Cheshire & Warrington Rural Enterprise
Ongoing delivery via LSC Commissioning Plan
In Lancashire develop sub regional skills strategy and progress projects via SRAP
In Lancashire develop sub regional skills strategy and progress projects via SRAP
Page 13
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/931 Intermediate /
Higher Level skills in current workforce & linkages to workless people (RSP)
HLSP (as in 27 above)
Higher level skills Pathfinder approved
Development via NWUA of Higher Level Skills Strategy
Delivery of HE Skills Pathfinder
Development and approval of “Invest in Workforce” project
Commence delivery of the L3 pilot
Evaluation of HE Skills Pathfinder
Implementation of Higher Level Skills Strategy
Maximise opportunities to deliver higher level workforce skills through NW Operating Prog. for Competitiveness 2007-13
Implementation of “Invest in Workforce” Project
HLSP (as in 27 above)
Implementation of “Invest in Workforce” Project
32 Support roll out of Train to Gain (LSC)
Take up and outcome of Train to Gain and alignment with Higher Level Skills Pathfinder
33 Develop Language skills / IT skills and Business Improvement Techniques (LSC)
3,150 ITQ starts through Train to Gain 4,960 BIT starts within Engineering and
Manufacturing Technologies 10,539 modern foreign language learners (63%
achievement) Explore opportunities with HEIs to respond to the
Dearing Languages Review Explore opportunities with HEIs to utilise international
students to address language skills issues and meet regional skills shortages
Develop and implement international student pilot schemes
Review international student pilot schemes
34 Provision to overcome skills disparities in key groups (RSP)
Ongoing delivery via LSC Commissioning Plan
Page 14
RES Factor: LEADERSHIP AND MANAGEMENTAction on this RES Factor is designed to achieve the following objectives:1. Develop leadership, management and enterprise skillsThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? Management and Leadership Indicators (Baseline to be established by RSP)14% of workforce employed as managers and senior officials in NW (15.3% in England)Take up of leadership and management programmes by SME managers (baseline to be
established)Enterprise Skills – Baseline to be established by National Council for Graduate
Entrepreneurship (NCGE) by end of 06
Where do we want to be (2009) / what will we monitor?
Improvement in Management and Leadership IndicatorsIncrease % of workforce employed as managers and senior officials in NW, with 600
managers/leaders having developed management/leadership skills and 150 having participated in work-based training activity to improve their effectiveness
15% increase in take up of leadership and management programmes by SME managersImprovement in Enterprise Skills – measured by NCGE study
Relevant RES Targets
GVA GrowthJob CreationFirm Formation
RES Actions linked to Leadership and Management:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Output Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/935 Develop
Management/ Leadership & CSR skills (Skills for Business / NWDA)
Establish Northern Leadership Academy
58 people assisted in Skills Dev.
58 Businesses assisted with management/ leadership skills
Agree contract with Business Link for delivery of Coaching to 20 high growth SMEs
Agree contract arrangements with NW Enterprise Agency for Business Volunteer Mentoring for 500 companies
Develop NW Leadership & Management Action
Establish a NW L&M Advisory Board
Agreed Business Plan for the NLA up to March 2008
NLA - 102 people assisted in Skills Development
NLA - 102 Businesses assisted with leadership/ mng skills
10 High Growth SMEs undertaking coaching
250 SMEs on BVM prog’s
BVM interim evaluation
Complete NW Leadership and Management Action Plan
NLA – 104 people assisted in Skills Development
NLA - 104 Businesses assisted with management/ leadership skills
A further 10 high growth SMEs undertaking coaching
A further 250 SMEs participating in BVM programme
Delivery of NW Leadership and Management Action Plan including Coaching and Mentoring Programmes delivered to high growth SMEs and supporting first-line supervisory managers
Explore rollout of SSDA national programmes in NW e.g. action learning sets
Delivery and Evaluation of NW Leadership and Management Action Plan including Coaching and Mentoring Programmes delivered to high growth SMEs and supporting first-line supervisory managers
Page 15
Milestones/Output Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/936 Develop
Enterprise Skills (LAs/ AOC/ NWUA/ Business Link)
FE Colleges: 12 colleges participating in pilot 36 enterprise champions recruited (3 from each college) 4 days CPD in enterprise education for each enterprise
champion At least 12 curriculum pilots in a range of vocational
courses
HEIs:Explore current enterprise skills activities within HEIs to identify the opportunities for regional enhancement (NWUA)
Also see Action 2
FE Colleges: At least 350
students engaged in enterprise learning
60 colleges received copies of enterprise college toolkit
60 colleges received copies of enterprise in FE policy guide
HEIs: Develop and
implement regional enterprise pilot schemes
Further support and develop Infolab 21’s Graduate Academy
HEIs: Operation and
monitoring of regional enterprise pilot schemes
General:Support implementation of successful LEGI bids
Page 16
RES Factor: EDUCATION INFRASTRUCTUREAction on this RES Factor is designed to achieve the following objectives:1. Develop education infrastructure, and skills of the future workforceThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 56% of pupils at the end of Key stage 4 have achieved 5+ A-C grades at GCSE or equivalent
Approximately half of school leavers at 16 lack a Level 2 qualification8.5% of young people not in education or training268 average points score per candidate at A/AS level71% of 19 year olds educated to at least Level 249% of 19 year olds educated to at least Level 328% of 19 year olds educated to at least Level 4177,150 FTE HE students 21% of all students at HE level studying science, engineering and technology
Where do we want to be (2009) / what will we monitor?
Increase % of 15 yr olds achieving 5 A-C gradesReduce % of school leavers with no Level 2 qualification, and the % of young people not in
education or trainingIncrease average points score per candidate at A/AS level and % of 19 year olds educated
to at least Level 2, 3 and 4Increase number of FTE HE students (especially in Cumbria and East Lancs)Increase in % of students studying science, engineering and technology to HE level,
especially from state schools
Relevant RES Targets
GVA GrowthNo QualificationsGraduate Qualifications
RES Actions linked to Education Infrastructure:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/937 Develop
educational attainment (LSC / LAs)
Key Stage 4 Engagement programme Introduced
Learning pilot commenced
Launched NEET Tool Kit
Renew 06/07 September Guarantee
Delivery of enhanced September Guarantee
Deliver 14-19 Area prospectuses across Region
Substantial progress re integration of Connexions services into Children’s Trust
Introduction of first four specialist diplomas for 14-16 year olds
38 Develop University for Cumbria and HE opportunities in East Lancs (HEFCE)
Review of FE/HE needs in Burnley completed
U4C Business Plan prepared
U4C Business plan approved
Proposals for University Centre in Burnley submitted to HEFCE
U4C launched Burnley FE/HE
proposals agreed and being implemented
FE/HE centre in Burnley developed
Page 17
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/939 Increase the
number studying science, engineering and technology (AOC/ NWUA)
Undertake mapping of current initiatives to encourage access to initiatives and identify gaps in provision to inform the need for further complementary initiatives
Develop NW hub to improve co-ordination of STEM (also Action 15)
Develop/implement regional intervention schemes, once need established via mapping/gap analysis
Delivery of regional intervention schemes
40 Support Post 16 learning providers Kitemark (LSC)
Testing/piloting Kitemark New Standard launched Phased introduction of the Standard with providers
First accreditation of Standard
Page 18
RES Factor: JOB LINKAGESAction on this RES Factor is designed to achieve the following objectives:1. Tackle barriers to work2. Link workless people and vacancies to improve employment ratesThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? Number of businesses signed up to minimum standard agreement on diversity practice (baseline to be established)
219,300 Ofsted registered childcare places.83,000 fewer people working, than the England average (73.4% employment rate
compared to 74.7% in England)4 districts have an employment rate less than 68%43.9% employment rate amongst disabled people (50.9% in England); 54.7% amongst
non-white working age people (58.7% in England); 33.9% for over 50’s (38% in England). (% for lone parents and ex-offenders not regularly updateable)
10.2% of the working age population on Incapacity Benefit (400,000 people), compared to 7.5% in England
2.5% and 7.6% of working age population on JSA and Income Support respectively (compared to 2.6% and 6.0% in England)
Where do we want to be (2009) / what will we monitor?
Increase number of businesses agreeing minimum standard of diversity practice, and increase good practice among NW businesses promoted through employment relations forum NW
Increase number of Ofsted registered childcare places By 2009, increase the number of people in the workforce by 83,000 to meet the England
average employment rateAll districts to have an employment rate greater than 68%Increase employment rate of disabled people, BME groups and over 50’s (target to be set).
(% for lone parents and ex-offenders not regularly updateable)Reduce % of working age population on Incapacity Benefit, JSA and Income Support
Relevant RES Targets
GVA GrowthNo QualificationsEmployment Rate
RES Actions linked to Job Linkages:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/941 Employment
practices that value diversity (JCP/ACAS)
ACAS Northwest Core Business Support Services Diversity in Business Forum established
Minimum standard practice in diversity developed and promoted
Diversity activity mainstreamed within Employment Relations forum NW.
42 Develop childcare initiatives (LAs)
JCP Childcare Partnership Managers in every District Implement Surestart initiatives
Childcare places available for all children under 3
Page 19
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/943 Employability
activities in deprived areas (JCP/LSC)
Deliver core JCP programmes
3 City Strategy (CES) bids successful for Blackburn & Darwen, Greater Manchester and Greater Merseyside
Develop CES business plans by end of quarter
Roll-out started in Greater Mersey
DAF funding allocated by JCP to Districts to support CES & improve employment rates in the regions most deprived wards
Outputs from Deprived Areas Fund (to be confirmed)
Establish clear operational delivery for CES areas
Delivery and evaluation of CES in 3 areas
October 2007 roll out of Pathways to work will commence in Greater Manchester East & West.
DAF 07/08 funds available April 07
In April 2008, providers will complete the roll-out of the Pathways
44 Employability activities with key groups (JCP/LSC)
Deliver core JCP programmes
3 City Strategy (CES)bids successful for Blackburn & Darwen, Greater Manchester and Greater Merseyside
Develop CES business plans by end of quarter
Outputs from Deprived Areas Fund (to be confirmed)
Establish clear operational delivery for CES areas
Delivery and evaluation of CES in 3 areas
45 Job brokerage (JCP/LSC)
National Employment Panel announced Job Developer roles in key pilot areas – Liverpool and Manchester – working to increase employment prospects for ex-offenders
Commence 1st Job Developer pilot in Liverpool
Launch of 2nd Job Developer in Manchester
Evaluation of Job Developer pilots
Brokerage scheme in place to support Golden Square development, Warrington
Brokerage schemes in place to support Northgate development, Chester and Crewe Town Centre
46 Innovative approaches to engage people (Vol Sector/JCP)
Pathways to Work programme fully rolled out in 5 of 7 Jobcentre Plus areas engaging voluntary and community sector as well as government agencies.
Private sector lead on Pathways in 2 Jobcentre Plus districts
Page 20
RES Factor: LOCAL EMPLOYMENTAction on this RES Factor is designed to achieve the following objectives:1. Stimulate economic activity in areas remote from growth2. Develop local employment and business start-up opportunities in areas remote from growth and areas
with low employment rates3. Support and sustain conditions for growth in areas with strong economic driversThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 579 NW super output areas in the worst 5% deprived, nationally 4 DEFRA lagging districts (worst performing 20%)£326.70 mean taxpayer income earned by rural districts (£333 in NW), with 30.7% earning
below 2/3rds of English median (£355)366 Businesses per 10,000 population in rural areas, with 12.6% Knowledge Intensive
Business Services
Where do we want to be (2009) / what will we monitor?
By 2009, reduce the number of areas in the worst 5% deprived, nationallyFor each area – remote from growth or with strong economic drivers – by district:
Population change (by age), average (median) wage levels, skills levels, jobs created, employment rate & structure, number of companies, business start up & survival rates, investment levels, floorspace created, commercial & domestic property prices, crime rates (monitor)
No DEFRA lagging districts Increase mean taxpayer income earned by rural districts and reduced % earning below
2/3rds of English median366 Businesses per 10,000 population in rural areas, with 13.5% Knowledge Intensive
Business ServicesPrivate investment (via URC’s; HMRs; NWDA etc) (monitor where possible)
Relevant RES Targets
GVA GrowthJob CreationFirm FormationDeprivation
RES Actions linked to Local Employment:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/947 Integrated plan for
East Lancs (LEP) Chief Exec’s body
established to deliver the East Lancs Transformational Agenda
Support adv. manuf. including portfolio of employment sites, specifically Michelin Technology Park
Address specific skills/ training needs via SRAP to encourage higher value activity
Support the Elevate HMR programme
East Lancs Rapid Transit scheme will improve accessibility within the area
Support the Elevate HMR programme
Page 21
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/948 Blackpool
Masterplan (Re Blackpool)
Central Seafront commenced
Casino Licence decision
Land assembly underway for casino site
49 Barrow Masterplan (CV)
Land assembly ongoing
Land assembly ongoing
Review Barrow Masterplan in light of the RES/ SRAP
Work on Innovation Park commences (1500 jobs)
Acquisitions programme for Marina Village
50 Integrated plan for West Cumbria (CV)
West Cumbria Masterplan out to consultation
West Cumbria Masterplan launched
Presentation of Masterplan to Ministers
51 Diversify economic base in lagging rural areas (Rural Development Partnerships)
Sub-Regional Rural Recover Partnerships developed Projects progressed via SRP Action Plans
Rural Development Programme for England first full year
Post Rural Renaissance Partnership Activity
52 Encourage employment creation in / near deprived areas (LAs / URCs)
SRP priorities endorsed
Develop new Business Start up Programme
URC business plans approved
Develop proposals for Weston Docks, Liverpool
Develop proposals for Northshore, Liverpool
Deliver proposals under Manchester Knowledge Capital
Oldham/ Rochdale economic programme commissioned
53 Business Start in / near deprived areas (Business Link)
Develop new Business Start up Programme Implement any successful LEGI bids
Implement Regional Business Start Up / Support Programme
Page 22
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/954 Build on strengths
of Liverpool, Manchester and Preston (SRPs)
CRDPs updated City Employment Strategies submitted for L’pool, GM and Blackburn
Mann Island projects started
Proposals for Liverpool PLC developed
Develop proposals for Oxford Road Corridor
MediaZone: licence fee agreed & start on site
Implement SRP Action Plans
Deliver proposals under Manchester Knowledge Capital
Maximise opportunities through BBC relocation
Kings Waterfront completed
Mann Island projects ongoing
Key projects in Lancs include the Tithebarn development, creation of a Commercial Quarter & restoring quality public realm, incl. Riverworks
Support Preston City Vision Board
Implement SRP Action Plans
Mann Island completed
Key projects in Lancs include the Tithebarn development, creation of a Commercial Quarter & restoring quality public realm, incl. Riverworks
Support Preston City Vision Board
55 Capitalise on private investment in Crewe, Chester, Warrington, Lancaster, Carlisle (SRPs)
Understand impact and scale of public £ required in these places to realise objectives in SRP action plans
£200 m Town Centre redevelopment started in Warrington – job brokerage developed
Implement SRP Action plans
Redevelop Luneside, develop the Lancaster Canal Corridor & exploit tourism potential of Lancaster Castle
Develop Bailrigg Science Park
Support Lancaster & Morecambe Vision Board
£250m Northgate development in Chester started, linked to job brokerage and public realm improvements through Chester Culture Park.
Development starts at Omega, Warrington
Carlisle Renaissance programme launched
Implement SRP Action plans
£200m Crewe Town Centre redevelopment, linked to £80m investment at MMU Cheshire. Job brokerage schemes in place
Ongoing developments near Lancaster as 07/8
56 Rural growth as part of RRDF (SRPs)
Regional Rural Delivery Framework developed
Development of RDPE Programme
NWDA Rural Policy developed
Rural Development Programme for England first full year
Post Rural Renaissance programme
Page 23
RES Factor: HEALTHAction on this RES Factor is designed to achieve the following objectives:1. Improve the health of (potential) workers and reduce the number of incapacity benefit claimantsThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? Life expectancy in the Northwest in 2004 is 75 compared to the England average of 8028% of the Northwest population smoke compared to 26% of the England averageProportion of adults who are obese in the NW = 13.7%20% of adults in the NW has a CIS-R score of 12 and over (significant neurotic symptoms)16.9% Prevalence of Cardiovascular disease among men over 35 in the NW, 16.1% for
women400,000 IB claimants (10.7% of working age population)9.1 days lost per employee through sickness absence in public sector, 6.4 in private sector1.2m people taking 3 x 30 minute moderate activities per week
Where do we want to be (2009) / what will we monitor?
Improvement in Key Health Stats – eg Life Expectancy at Birth, Smoking Prevalence, Obesity compared to England, Mental Health Rate, Heart Disease rate
Reduction in level of IB claimantsReduction in days lost in public sector to 6.11.3m people taking moderate activities per week
Relevant RES Targets
GVA GrowthEmployment RateDeprivation
RES Actions linked to Health:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/957 Reduce causes of
ill-health and reduce level of IB claimants (SHA/JCP)
Improved access to health services (esp. in areas of deprivation) via re-configuration of services and development of community hospital services
Pathways to Work Pilots Launched
58 Healthy workplaces (Workplace Health Direct)
Produce NW Healthy Workplace Strategy Implement strategy
59 Promote Access to sport & physical activity (Sport England)
Deliver North West on the Move strategy - 1% increase in participation year on year whilst widening access and reducing inequality in participation amongst priority groups
Page 24
RES Factor: POPULATION CHANGEAction on this RES Factor is designed to achieve the following objectives:1. Retain and attract people to the region2. Respond to an older workforce and fewer young peopleThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 25,124 ESOL enrolments31,300 NI registrations in the NW in 2004/5 in respect of non-UK nationals11,000 net in-migration; 1,000 in-migration from other English regions Graduates from NW universities: 73% of students originating from NW retained, 24% of
graduates originating from outside NW retained; NW students: 37.9% of graduates studying outside NW return to work25,000 international students studying in the region Current forecasts suggest a 2.5% drop in the number of young people (0-14 year olds) in
the region compared to a 1.3% drop for England (2006 – 9)34% employment rate of over 50’s (38% in England)
Where do we want to be (2009) / what will we monitor?
Increase in ESOL enrolments, NI registrations and net in-migrationIncrease in in-migration from other English regionsNet in-migration by broad age group (monitor)Increase in graduate retention / return30,000 international students studying in the regionSlower decline in the number of young people in the region compared to current forecastsIncrease in % employment rate of over 50% (target to be set)Population Tails (monitor)
Relevant RES Targets
GVA GrowthGraduate QualificationEmployment Rate
RES Actions linked to Population Change:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/960 Transitional
Programmes for migrant workers (LSC)
Deliver contracted ESOL volumes Set up Migrant workers NW - Launch
conference Feb 07 Web-based information centre for MW
established MWNW partnership expanded
Minimum standard for employment for migrants promoted and signed up to
Employers engaged in promoting employment to local workless
Increased resources for employers and migrants through web-portal
Ongoing engagement with business and employees to maximise potential of migration for NW
61 Promote quality employment opportunities (Employers)
Identify key messages through consultation with major NW employers
Develop effective promotion campaign
Increased awareness of range and diversity of quality employment opportunities in NW
62 Promote the benefits of older workers (5050 Vision)
5050 Vision Business Plan 5050 business plan delivered
5050 activity mainstreamed
Page 25
RES Factor: TRANSPORTAction on this RES Factor is designed to achieve the following objectives:1. Improve and better manage the road and rail infrastructure2. Develop airports and ports3. Link areas of opportunity and needThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? Average vehicle delay on key routes (to be confirmed)Highest trunk road congestion outside London - 5 seconds lost per vehicle km23% of all journeys to work are non car trips (2005)Non car trips per annum - 58m rail journeys, 472m bus journeys, 19.5m Metrolink journeys55% non car morning peak modal split to Manchester (baseline for other areas to be
established)39% non car morning peak modal split to other key GM regional centres (baseline for other
areas to be established)22.5m passengers using Manchester Airport, 4.4m using Liverpool John Lennon Airport
and 0.35m using Blackpool Airport (baseline for number of in-bound passengers to be established)
33.8m tonnes handled via Port of Liverpool & 3.7m tonnes via Heysham90% of people in receipt of Jobseekers Allowance in Greater Manchester within 30 mins
access by public transport to a category A interchange or to a City Centre by 0800 (similar baseline for other areas to be established)
Where do we want to be (2009) / what will we monitor?
Reduced average vehicle delay on the 10% slowest journeysReduced trunk road congestionIncrease proportion of journeys to work by non car tripsIncrease in non car trips (target set for 65m rail journeys and 19.7m Metrolink journeys)Increased non car morning peak modal split to key centres25m passengers using Manchester Airport, 5.6 using Liverpool John Lennon Airport and
2m using Blackpool Airport; Increased % of in-bound passengersIncreased tonnage handled via Port of Liverpool & HeyshamIncreased public transport access to key centres by those on Jobseekers Allowance (to be
confirmed)
Relevant RES Targets
GVA GrowthCO2 Emissions
RES Actions linked to Transport:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/963 Capacity /demand
management on GM / C&W motorways (Highways Agency)
Motorway Access Management introduced
200 Traffic Officers in place
M6 Carlisle to Guardsmill Extension starts
A5117/A550 Deeside Park Junction Improvements start
M60 Jn18-12 Study TPI submission to DfT by HA
M6 widening targeted programme improvement submission
M62 Jn 6 improvements start
Start improvements to J15-13 4th lane M60
Page 26
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/964 Improve road
access to Liverpool City Centre (TMP)
Edge Lane work commences
Edge Lane / Eastern approaches work commences
Edge Lane West work commences
Edge Lane Central work complete
Edge Lane West work complete
65 Develop the second Mersey Crossing (TMP)
Agree Traffic Model Spec with DfT
Procurement Strategy Approved
PFI schemes announced
Make Planning Application
Public Inquiry
66 Tackle congestion by increased public transport and reducing peak traffic (PTEs / Employers)
Liverpool South Parkway station opened
Await DfT approval for the Leigh – Salford – Manchester and M60 JETTS QBC
Approval of TIF ‘pump priming’ bid
Completion of committed Northern Orbital and SEMMMS QBC’s
Implement Leigh – Salford – Manchester QBC
Submit C-TIF bid July 2007
Increase rail capacity through rolling stock leasing subject to funding being available
Begin implementation of TIF schemes subject to approval of bid
67 Deliver improvements to Manchester Rail Hub (GMPTE)
Publication of the final North West Route Utilisation Strategy
Further investigation of NW RUS short/medium term proposal to consider changes to routeing of services through central Manchester
Implement Manchester Airport 3rd Rail Platform
Further investige NW RUS short/medium term proposal to consider changes to routeing of services through central Manchester
68 Enhance Road access to Barrow (DfT)
A590 High and Low Newton Bypass work commences Completion of A590 High and Low Newton Bypass
69 Enhance public transport between L’pool/ M’chester/ Lancs/ Leeds/ Sheffield (PTEs)
Completion of introduction of new Trans Pennine Express fleet
Northern Way Transport Connectivity Priorities to be established by early 2007
New cross country franchise let Dec 2007
Further investigation of NW RUS short/medium term proposal to improve service provision on Manchester – Sheffield/Leeds (including longer trains)
70 Complete West Coast Mainline upgrade (Network Rail)
Continuing implementation of infrastructure upgrades as part of WCML Progress Report 2006
Implementation of Dec 2008 timetable revision
71 Develop proposals for new high speed rail line to London (Network Rail)
Publication of Eddington Transport Study will make recommendations about any future for a high speed line
72 Grow Manchester and Liverpool Airports (Airport Owners)
Opening of Liverpool South Parkway Railway Station.
Implementation of Air Services Development Alternative Measures Programme: Invitation of project applications
Publication of Airport Masterplans
PFI schemes announced
Progress report on Air Transport White Paper
Implement Manchester Airport 3rd Rail Platform
Page 27
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/973 Grow Port of
Liverpool (Port Owners)
Outcome of DfT Ports Policy Review
Publication of Network Rail Freight Route Utilisation Strategy
Public consultation into options to improve road access into the Port of Liverpool
Ports Policy review published
Implementation of improved Access to the Port of Liverpool (Olive Mount Chord and Gauge Enhancement)
Completion of new In River Post Panamax Container Terminal, subject to statutory approval
74 Grow Blackpool Airport (Airport Owners)
Publication of Airport Masterplan Implementation of Air Services Development Measures
Alternative Programme: Invitation of project applications
Progress report on Air Transport White Paper
Implement Masterplan – expansion and refurbishment for increased patronage
Develop Aviation & Training Centre to support higher value activity/ jobs
Implement Masterplan – expansion and refurbishment for increased patronage
Develop Aviation & Training Centre to support higher value activity/ jobs
75 Support more international routes to region’s airports (SRPs)
Deliver Liverpool John Lennon Masterplan Develop plans for Blackpool airport in line with SRP/URC action plan
Deliver Liverpool John Lennon Masterplan
76 Grow Port of Heysham (Port Owners)
Lancashire County Council have approved Planning Application for the Northern Route of the Heysham – M6 route
PFI schemes announced
Ports Policy review published
77 Develop Metrolink & mass transit in L’pool/Mersey Belt & links to Deeside (PTEs)
Commencement of Metrolink phase 1 and 2 renewals project
Continuing development of project development for phases 3a and 3b
Network Rail start Merseyside route utilisation strategy
Complete Metrolink Phase 1 track upgrades
Entry into service of additional vehicles for Metrolink Phase 1 and 2
Start construction of Metrolink Phase 3a
78 Improve public transport between East Lancs and Preston/ Manchester (LEP)
Publication of the final North West Route Utilisation Strategy
The East Lancashire Rapid Transit project will develop better public transport connectivity and an integrated transport network within East Lancashire
Policy framework developed by C.Lans City Region to ensure it is better connected to the other northern city regions
East Lancs Rapid Transit construction starts
79 Develop innovative transport solutions to link people and jobs (SRPs)
Develop projects via SRAP to ensure Lancashire employment sites are accessible by local people
Measures introduced in Warrington through LAA
Page 28
RES Factor: LAND USEAction on this RES Factor is designed to achieve the following objectives:1. Deliver high quality employment sites and premises2. Secure new uses for brownfield landThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? In 2004/5 835,896 sqm of floorspace was developed in the Northwest for industrial and/or other commercial use. 78/7% was located in the region’s Regeneration Priority Areas
8420 hectares of brownfield land – 24% of the England total5.6% vacant and derelict land and buildings (as % of all developed land)77% of new dwellings built on PDL
Where do we want to be (2009) / what will we monitor?
Sqm floorspace developed and % in Regeneration Priority Areas (monitor)Percentage of employment land in regeneration priority areas and on PDL/Total amount of
employment land available for employment use & and on PDL (monitor)Reduce hectares of brownfield land and % of land vacant or derelictIncrease % of new dwellings on PDL
Relevant RES Targets
GVA GrowthJob CreationDeprivation
RES Actions linked to Land Use:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/980 Deliver Strategic
Regional Sites (NWDA)
Ditton Rail Freight concept approval
Bailrigg concept approval
Annual Strategic Sites monitoring report produced
Ditton Rail Freight financial approval
Whitebirk concept approval
Planning application submitted for Parkside intermodal freight terminal
CPO to progress Ditton
Annual Strategic Sites monitoring report produced
Annual Strategic Sites monitoring report produced
81 Pursue reserve sites for major investment (NWDA)
Secure policy framework in RSS Final version of RSS issued by Secretary of State setting out policy framework
RSS policy framework begun to be implemented by Local Planning Authorities through Local Development Framework process
82 Develop portfolio of sub-region employment sites (SRPs)
Commence research to agree appropriate sites in each sub region
Agree appropriate sites & strategy in each sub region
Page 29
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/983 Invest in quality
business accommodation / workspace (HMRs/URCs/Rural Development Partnerships)
Develop new Workspace Strategy in Greater Manchester / Merseyside through SRPs
Implement projects in SRAPs in line with Workspace Strategy
In Lancs deliver rural workspace via LRRAP
84 Develop new uses for brownfield land (English Partnerships)
Market Derwent Forest to the private sectorReview Cumbria Land Reclamation Strategy in line with
sub regional priorities and West Cumbria Masterplan
Development of EP’s Preston East site
Deliver REMADE programme of land restoration across Lancashire
Deliver REVIVE programmes across Cheshire & Warrington
Secure private sector partner for Derwent Forest
Page 30
RES Factor: HOUSINGAction on this RES Factor is designed to achieve the following objectives:1. Create a high quality and diverse housing stock2. Reduce areas of housing market failureThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? Current dwelling stock for the NW = 3,007,000 or 13.7% of the England dwelling stockRatio of house prices to earnings in the Northwest is 5.2 compared to a ratio of 7.0 for
England, ranking the Northwest 8th of the English regions% gap between house values in Pathfinder areas and the regional average (to be
confirmed)55,443 local authority and 29,314 low demand dwellings (18% and 10% respectively)5.4% of the dwelling stock is deemed unfit, compared with 4.7% nationally (2004/5)The proportion of vacant dwellings in the region in 2004/05 was 4.2%
Where do we want to be (2009) / what will we monitor?
Increase in current dwelling stockImprove access to Affordable HousingReduce gap between house values in Pathfinder areas and the regional average by a thirdReduction in incidence and impact of low demand housingReduction in the % of housing stock deemed unfit (monitor by tenure type & area)Reduction in the % of vacant dwellings split by tenure
Relevant RES Targets
GVA GrowthJob CreationGraduate QualificationsDeprivation
RES Actions linked to Housing:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/985 Ensure housing in
locations which support regeneration and knowledge based growth (LAs)
Draft RSS consultation on district level housing provision and policy framework
Draft RSS Examination in Public considers district level housing provision and policy framework
Final version of RSS issued by Secretary of State setting out district level housing provision and policy framework
RSS district level housing provision and policy framework begun to be implemented by Local Planning Authorities through Local Development Framework process
Page 31
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/986 Secure affordable
housing in key locations (Regional Housing Board)
Secure policy framework in RSS NW housing market review published and updated
on six monthly basis RHS Action Plan to be published at the beginning of
December to lead development and implementation of RHS
RHB/ RPB to commission research to establish regional/sub-regional targets for affordable housing to inform RHS and RSS
RHB to advise Ministers on allocation of Regional Housing Pot for the next 2/3 years, incl. National Affordable Housing programme
Annual scheme update submitted for NW HMR Pathfinders
Develop and implementation of RHS
Review RHS Action Plan
Annual scheme update submitted for NW HMR Pathfinders
87 Set HMR in strong economic context (HMRs)
Develop proposals for Elevate and Oldham/ Rochdale economic programmes
Develop proposals for Elevate and Oldham/ Rochdale economic programmes
Elevate economic programme commissioned
Liverpool PLC developed and linked to HMR priorities
Oldham/Rochdale economic programme commissioned
Elevate economic programme commissioned
Liverpool PLC developed and linked to HMR priorities
Oldham/Rochdale economic programme commissioned
Page 32
RES Factor: PLANNINGAction on this RES Factor is designed to achieve the following objectives:1. Ensure planning supports sustainable growth2. Ensure appropriate utilities infrastructureThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 87% of planning applications granted. Of those granted 85% granted within 8 weeks3,044 business planning applications in 2005/6In 2005/06, 78.3% of outstanding planning permissions were on previously developed land;
84.1% of new dwellings granted planning permission was on previously developed land50% objections from local planning authorities to utilities infrastructure
Where do we want to be (2009) / what will we monitor?
Increase in % of planning applications granted within 8 weeksIncrease in business planning applicationsSustain the proportion of outstanding planning permissions and new dwellings granted
permission on previously developed land % objections from local planning authorities to utilities infrastructure (monitor)Investment in utilities infrastructure (monitor)
Relevant RES Targets
GVA Growth
RES Actions linked to Planning:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/988 Ensure a positive
physical planning framework (LAs)
Ensure RSS and RES are aligned Implement Employment Land Strategies undertaken in East and West Lancs to ensure a sustainable approach to future land planning
89 Deliver plans which support growth in Lake District (CV)
Strategic partners committed to delivery of new vision for Lake District (published by new Lake District National Park Partnership).Key first steps include public realm improvements in main market towns and raising quality of accommodation & tourist offer
Ongoing plans to be developed as part of the CV Sub Region Action Plan
90 Ensure forward planning and investment in utilities (Utilities Companies)
Develop and establish contact between LAs and utility operators
Exchange information for feeding into respective utility and LA programmes
Programmes and plans in place that are deliverable
Page 33
RES Factor: ENERGYAction on this RES Factor is designed to achieve the following objectives:1. Develop appropriate energy policies and suppliesThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? Energy efficiency/intensity – energy consumption per unit of GVA = 1.28 GWh/£m GVA 929 employees in renewable energy sector with annual turnover of £104m3% of regional energy demand is produced from renewables, which equates to 9% of
renewable energy in England coming from the NWTotal Energy Consumption 2003: 37 kilo tonnes of oil equivalent (Ktoe) or 215320 GWh
Where do we want to be (2009) / what will we monitor?
3% pa improvement in regional energy intensityGrowth rate in renewable energy sector (employees & turnover) over 10%pa At least 10% of the region’s electricity supply from renewable sources by 2010 - 1231 MW
installed capacity/ 3500 GWh generated from renewablesReduction in Energy consumption from non renewable sources
Relevant RES Targets
GVA GrowthCO2 emissions
RES Actions linked to Energy:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/991 Implement
Northwest Energy Strategy (NW Energy Council)
Deliver Carbon Trust programmes Deliver Energy Savings Trust programmes Deliver Enworks programme
Ongoing delivery of programmes and monitoring of Strategy
Ongoing delivery of programmes and monitoring of Strategy
Page 34
RES Factor: INVESTMENTAction on this RES Factor is designed to achieve the following objectives:1. Encourage and make better use of, public and private investment in the regionThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? Appropriate Baselines to be established
Where do we want to be (2009) / what will we monitor?
Appropriate Targets to be establishedGVA and GVA/head growth (monitor)Structural Funds Outputs (monitor)RDPE Outputs (monitor)
Relevant RES Targets
GVA Growth
RES Actions linked to Investment:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/992 Influence EU
programmes to support RES (NWDA / NWRA)
Alignment of ERDF/ESF 2007-2013 with RES Rural Development Programme (RDPE) alignment with
RES priorities Contract with RTC North to deliver Frameworks NW to
assist SME’s to access 7th Framework R&D programme and Competitiveness & Innovation Programme
Examine links with External Relations (European) budget for International-isation
Participate in Regions for Economic Change territorial co-operation
93 Align investment and service delivery at all spatial levels (NWDA/ NWRA/ GONW)
SRP Action Plans produced and endorsed Northern Way delivery reviewed CRDPs updated
94 Explore mechanism to stimulate private sector investment (NWDA)
Develop joint project with Treasury and other RDAs, in advance of CSR & Budget 2007, to identify financial / regulatory changes required to stimulate private investment
Page 35
RES Factor: CULTURE AND IMAGEAction on this RES Factor is designed to achieve the following objectives:1. Promote the image of the region2. Maximise cultural and major event opportunities3. Develop the quality of the visitor experienceThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 87% residents viewed the region as a good place to live 45% of businesses believe the region is a good place to operate21% of UK businesses think that the Northwest is better than the other regions in the UK
as a business locationVisitor economy is worth £10.9bn to the region, supporting 200,000 FTE jobs29m staying tourists and 240m day visitors (STEAM)11% share of domestic visitor trips and 11.3% share of spend (UKTS)7.8% share of overseas visits and 6.3% share of overseas visitor spend (IPS)47% of domestic trips out of season 86% participating in Arts (regional rank 5th)
Where do we want to be (2009) / what will we monitor?
Improved perceptions of the region as a good place to live and do businessIncrease in the size of the visitor economy by 1% (GVA and number of jobs) Increase in number and % share of visitors, visitor nights and spend (domestic and
international)% of domestic trips out of season (monitor)Increase participation in the ArtsNumber of major events and their economic impact (monitor)
Relevant RES Targets
GVA GrowthJob Creation
RES Actions linked to Culture and Image:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/995 Implement
marketing programmes (NWDA)
For Visitors: Run themed and destination campaigns to generate increased visitor spend and visitor numbers.
For Business and Investment: Identify key regional competitive messages, develop regional inward investment web site, publish a Northwest Business Supplement in national broadsheet
For Visitors: Focus themed marketing on Culture and the Natural Environment. Develop a new regional tourism marketing strategy to deliver the new tourism strategy and promote attack brands
For Business: Implement a sector marketing campaign to promote key sectors in national and international market places
For Visitors: Maximise impact of Capital of Culture on image of the region and visitor numbers.
For Business: Implement a sector marketing campaign to promote key sectors in national and international market places
Page 36
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/996 Support Liverpool
2008 (Liverpool Culture Company)
2008 programme unveiled
National Marketing Campaign to promote Liverpool as a “must see” destination
Maximise visitors from outside region to key events (eg Turner Prize)
National Marketing Campaign to promote Liverpool as a “must see” destination
Maximise visitor numbers from outside of the region to key events
97 Develop the Cultural Offer (Culture Northwest)
Ongoing programme of development throughout period
Manchester International Festival
Capital of Culture
Capital of Culture
Cheshire Year of Gardens
98 Secure major events (NWDA)
Baseline data to be set by March 2007 Cheshire Year of Gardens 2008 (linked to Capital of Culture)
99 Develop opportunities linked to London 2012 (NWDA)
Establish NW Business Forum (2012 Games) Complete research into business opportunities from
the Games Draft regional plan to be completed by December
and finalised following consultation by March 2007
Establish business support programme
Development of Cultural Olympiad
100Develop plans to exploit growth of sport (NWDA)
Develop a Sport Sector Strategy and Action Plan Implement strategy
101Improve tourism product of attack brands / signature projects (Tourist Boards)
Hadrian’s Wall Heritage Board formed
Lowther Park Steering Group established
Chester Super Zoo - Risk Analysis produced
Lake District Vision published
Chester Culture Park Board formed and vision agreed
Manchester Conference Quarter - improved public realm and orientation project commences
Blackpool Casino decision
Prioritised implement-ation plan for Chester Culture Park
Publication of Chester Super Zoo Business Plan & detailed implementation plan
Liverpool Cruise Terminal opens
Arena and Convention Centre Liverpool (ACCL) opens
Lowther Park initial phase completed
Hadrian’s Wall annual Delivery Plan agreed
Manchester Conference Quarter - improved public realm and orientation project completed
102Capitalise on Southport as a classic resort (TMP)
Plans for Southport included as part of the Sub Regional Action Plan
Improve public realm – Lord St improvement project
103Implement Business Tourism Strategy (Regional Tourism Forum)
Business Tourism strategy and framework agreed to increase business visitors and their spend in the region
Monitor progress with Strategy implementation
Monitor progress with Strategy implementation
104Implement Visitor Information Strategy (Regional Tourism Forum)
Visitor Information Strategy published Visitor Information Improvement project launched
Monitor progress with Strategy implementation and projects
Monitor progress with Strategy implementation and projects
105Support business development for tourism businesses (Tourist Boards)
Tourism Connect project - Cumbria Profit through Productivity commenced May 2006 -
160 businesses to be supported through to June 2008
Welcome to Excellence (National Skills Training Programme) delivered
Quarter 4 - agree working relationship and protocols with Business Link
Delivery of business signposting in partnership with Business Link
Profit through Productivity completed with 160 tourism SME’s
Tourism Connect project completion
Page 37
RES Factor: COMMUNITYAction on this RES Factor is designed to achieve the following objectives:1. Support cleaner, safer, greener communities2. Develop community cohesion3. Develop high quality local services4. Reduce health inequalities and social exclusionThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? 579 NW super output areas in the worst 5% deprived, nationally5 local authorities in the region fall more than 25% outside the regional average with regard
to incapacity benefit claimants.4 local authorities in the region fall more than 25% outside the regional average with regard
to housing affordability.3 local authorities in the region fall more than 25% outside the regional average with regard
to NVQ Level 3+Crime statistics (burglaries: regional rank – 6th 743 per 10,000 population, vehicle crime:
regional rank 7th 1530 per 10,000 population, violent crime regional rank 9th 613 per 10,000 population , 7847 hate crime (racist incidents) in 2004/5
Feelings of insecurity – males 7th (4%) females 6th (16%)10 local authorities with comprehensive ‘four star rating’12% of households below 60% of the median income level43.9% employment rate amongst disabled people; 54.7% amongst non-white working age
people; 33.9% for over 50’s
Where do we want to be (2009) / what will we monitor?
By 2009, reduce the number of areas in the worst 5% deprived, nationallyNo local authority area to be more than 25% below the regional average in at least 2 of the
following indicators: Incapacity Benefit claimants, Housing Affordability, NVQ Level 3+Reduction in crime incl. hate crimeIncrease in feelings of securityIncrease in the number of local authorities with comprehensive ‘four star rating’Reduction in % of households below 60% of the median income levelImprovement in economic participation rates for key groups (target to be set)
Relevant RES Targets
GVA GrowthEmployment rateDeprivation
RES Actions linked to Community:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/9106Develop support
to cleaner, safer, greener communities (GONW/ Regional Alcohol Forum/ LAs)
NW Reducing Reoffending Plan – Progress through engagement with other agencies and develop policies on key themes (“Pathways”)
Develop NW Alcohol Strategy – Q4 North West Liveability Foundation Pilot commenced
Re-offending Plan: Develop, review & integrate strategies
Publish NW Alcohol Strategy
Cleaner, Safer, Greener issues included in LAA Delivery Plans
Re-offending Plan: Health Pathway – implement researched regional pilot with dangerous offenders
Page 38
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/9107Implement the
Sustainable Communities Plan (GONW / RENEW Northwest)
Programme of capacity building events by RENEW, GONW and other partners in place by end of Q3. Programme and monitoring evaluation methodology established – Q3
Regional Masterclasses and good practice workshops – Q1/2 – 1380 attendees; Q3 – 500 attendees; Q4 – 500 attendees
Regeneration Leadership Training Q1/2 – 100 days; Q3 – 60 days
2000 Practitioners attended Masterclass
2000 Practitioners attended Masterclass
108Promote role of voluntary sector in tackling social exclusion (Voluntary Sector)
Development of VCS Strategy by end of Q4 Creation of VCS Co-ordinating Committee by end of Q4 Preparation of Regional Infrastructure Development
Plans Templates – Q1/2; submit to GONW and grant offers issued – Q3/4
LAAs – GONW Partnership Directors ensure VCS engagement in consultation on service delivery across all 4 blocks – Q4
VCS Strategy Action plan agreed by end of q1
07/08 Regional Infrastructure Development Plans submitted, approved and monitored
VCS Steering Grp to monitor delivery and oversee review process
08/09 Regional Infrastructure Development Plans submitted, approved and monitored
109Capacity building of voluntary sector and social enterprise to deliver public services (NW Improvement Network)
Development of VCS Strategy by end of Q4 Creation of VCS Co-ordinating Committee by end of Q4 Preparation of Regional Infrastructure Development
Plans Templates – Q1/2; submit above to GONW and grant offers issued – Q3/4
Regular GO liaison to influence Capacity Builders’ forward plans – Q4
VCS Strategy Action plan agreed by end of Q1
Regular GO liaison to influence Capacity Builders’ forward plans
Regular GO liaison to influence Capacity Builders’ forward plans
Increased number of VCS organisations delivering public services by raising skills levels of the VCS workforce
110Use Local Area Agreements to improve access to public services (Local Authorities)
Undertake 6 monthly reviews of 2 pilot LAAs and 9 R2 LAAs – Q3
11 R3 LAAs in place by April 07
June/July 2007 Annual Review – opportunity to renegotiate targets with depts & Nov 07 – 6 month reviews
June/July 2008 Annual Reviews and November 2008 – 6 monthly reviews
111Deliver the Regional Equality and Diversity Strategy (GONW/ NWDA/ NWRA)
Establish implementation plan for ED strategy
Regional strategic coordination group set up
Initiate projects to deliver strategy
Agree delivery arrangements / influence partner projects
Outputs against plan reported and progress measured at annual review
Celebrate event to promote the economic impact of diversity
Outputs against plan reported and progress measured at annual review
112Deliver the Investment for Health strategic plan (Dept. of Health)
Review progress on Investment for Health Strategic Plan and update implementation plan in light of new NHS structure and Government Agenda re Health
Page 39
RES Factor: ENVIRONMENTAction on this RES Factor is designed to achieve the following objectives:1. Realise and nurture the natural and built heritage assets2. Improve the physical environmentThe data below shows, for the factor, what the region is hoping to achieve and how progress will be monitored. This will be updated annually
Where are we now? £1.36b GVA of the natural environment sector, supporting 64,000 jobsThe Lake District is estimated to have received 8.2 million visitors in 200596,171 hectares of woodland – 6.8% of land cover in NW EnglandAgriculture contributes 3% of rural GVA and employees 39,347579 super output areas in the worst 5% deprived, nationallyQuality public realm measure – to be established as part of Liveability Foundation Pilot53% of region’s flood management systems meet performance specifications to protect
locations to an appropriate standardFlood warning service to 77,000 properties
Where do we want to be (2009) / what will we monitor?
Increase in the GVA and jobs of the natural environment sectorLake District visitors (monitor)Increase in woodland cover by 1200 hectaresMaintain agriculture’s employment and contribution to rural GVA at 3%By 2009, reduce the number of areas in the worst 5% deprived, nationallyQuality public realm measure - to be established as part of Liveability Foundation Pilot Hectares of derelict land reclaimed (monitor)100% of region’s flood management systems meet performance specifications to protect
locations to an appropriate standardFlood warning service to 97,800 propertiesAir Quality and Water Quality (monitor)Condition of Sites of Special Scientific Interest (monitor)“At Risk” Historic Environment Assets (monitor)Access to Greenspace (monitor)
Relevant RES Targets
GVA GrowthDeprivation
RES Actions linked to Environment:
Progress with the specific RES actions designed to achieve these objectives will be monitored quarterly for transformational actions (those shaded) and annually for all other actions. The key milestones/outputs we are expecting to achieve are outlined below.
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/9113Develop
economic benefit of the natural environment (Natural Economy NW)
Natural Economy Northwest set up as 3 year programme
Natural Benefits for Business Conference held
Business advisers training programme in Cumbria started
Natural environment & socio economic deprivation regional map produced
Natural Economy Northwest launch
Training prog. launched & best practice published
Natural Tourism Challenge Fund launched
Wetland, Coastal, Green Infra. & Natural Tourism projects developed
6 SITA projects initiated
In Lancs, deliver Green Grid strategic green infra.
More wetland, coastal, Green Infra., Natural Tourism & SITA projects developed
Natural Economy Awards held
Increased business advice on benefits from natural env.
Green Infra. approach used to integrate env. and economic delivery
Natural environment projects show clear economic benefits
Page 40
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/9114Implement Lake
District Futures Policy (CV)
Plans for Lake District included as part of the Sub Regional Action Plan
Partners committed to delivery of new vision for Lake District. First steps include public realm improvementin main market towns and raising quality of accomm. & tourist offer
Ongoing plans to be developed as part of the CV Sub Region Action Plan
115Use heritage environment to deliver growth (SRPs)
Merseyside Heritage Investment Strategy completed
Roll out of Heritage Investment Strategy process across region
Chester Culture Park implementation
Develop the Lancaster Canal Corridor and further exploit the tourism potential of Lancaster Castle
Chester Culture Park implementation
116Create Regional Parks (Regional Park Organisations)
Finalise support arrangements for individual regional park proposals
Weaver Valley implementation
Develop strategic connecting ‘green infrastructure’ incl. further development of the East Lancashire and Ribble Estuary Regional Parks
Weaver Valley implementation
Develop strategic connecting ‘green infrastructure’ incl. further development of the East Lancashire and Ribble Estuary Regional Parks
117Implement Regional Forestry Framework (Forestry Commission)
Newlands Programme delivered Regional Forestry Framework Action Plan in
place Identification of RPDE Forestry Activity
Newlands programme delivered
Regional Forestry Framework Champion in place
RDPE Forestry Activity
Newlands programme delivered
RDPE Forestry Activity
118Promote sustainable farming and food production (GONW)
SSFF Champion in place Review of SFF Delivery Document Regional Food and Drink Strategy produced
Regional Food and Drink Strategy, RDPE and SSFF Objectives aligned
“Food Northwest” established
Delivery alignment of Regional Food and Drink Strategy, RDPE; and SSFF
Page 41
Milestones/Outputs Q1/2 06/7 Q3 06/7 Q4 06/7 07/8 08/9119Invest in quality
public realm, green space and environmental quality (SRPs/ Tourist Boards/ HMRs/ URCs)
Blackpool Central Seafront commenced
Liverpool City Centre Movement Strategy underway
Public realm improvement implemented in Crewe town centre
Review and formulate framework for sustainable tourism activity with BREW partners
North West Liveability Foundation Pilot commenced
Develop proposals for public sector investment in Oxford Road corridor
Mann Island (L’pool) projects started
Develop mechanism for measuring the economic impact of investment in public realm
Delivery of key projects in SRAPs, including through all URCs
Public realm improvements in Chester (Culture Park) and Cheshire market towns (Weaver Valley)
Improve public realm to establish Southport as a Classic Resort
Mann Island (L’pool) projects ongoing
Mann Island (L’pool) projects completed
120Understand economic case for, and promote, good design (RENEW Northwest)
Research study into the economic case for, and value of, good design, including developing an assessment framework
Data collection to set standards in design and initial take up amongst regional partners
Disseminate study findings
Conduct Design review
121”Future proof” physical developments (LAs)
Develop “future proofing” policy and good practice guide
122Protect areas from flooding (Environment Agency)
Flood defence prioritised programme to improve the standard of protection in specified locations
Flood defence prioritised programme to improve protection in agreed locations
Flood defence prioritised programme to improve protection in agreed locations
Page 42