Top Banner
http:// miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013
56

Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Jan 11, 2016

Download

Documents

Elaine Marshall
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

http://miblsi.cenmi.org

Scaling-Up Within a Statewide Multi-Tiered System of Supports

(MTSS)

Kim St. Martin

March, 2013

Page 2: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

2

Outcomes

• Discuss the evolution of the MiBLSi model (school to district model)

• Provide an overview of the implementation infrastructures the MiBLSi district model is working to implement

• Present some sample products ISD partners are creating as they move through the stages of implementation of district-model for MTSS

• Discuss how the learning from this year (2012-2013) is shaping the district model for future years

Page 3: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

3

The Early Years…School Model

• School focused

• Technical assistance and training were provided regionally across the state

• Standardized scope and sequence for training building leadership teams

• Implementation success and challenges were present

• Durability and sustainability was an issue…

Page 4: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Participating Schools

2004 Schools (21)2005 Schools (31)2006 Schools (50)

2000 Model Demonstration Schools (5)

2007 Schools (165)2008 Schools (95)2009 Schools (150)

The Early Years

There are approximately 4,000 schools in the state

Page 5: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

5

MiBLSi Technical Assistance Regions

Page 6: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

6

MiBLSi Support Structure for the Early Years

• Technical Assistance Partners (TAPs)– Started with one TAP in 2005

– As the number of schools increased, so did the technical assistance provided across the state

– Determining where TAP support needed to be was in part, determined by the clustering of participating schools

– During the time period for the school-based model there were 8 TAPs hired to support technical assistance across the state

Page 7: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

7

Building Training Scope and Sequence

Page 8: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

8

Evolving to a “District Model”

Page 9: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

9

Page 10: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

10

Vision at ISD Level

47 of 57 ISD (80%) will have …

– MTSS Coordinator

– Implementation Team

– Cabinet level (executive leadership) support

•Effective/efficient data systems for collecting, storing and analyzing data at district level

•District trainers (training capacity)

•Coaching structures (coaching capacity and systems for coaching to occur in an on-going way)

Page 11: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

11

Vision at District Level

• 319 of 798 LEAs/PSAs (40%) will have the ability to support implementation of an integrated behavior and reading RtI model. This support may involve partnering with the ISD in implementation efforts or district implementation independent of ISD resulting in educators access to:

– MTSS Coordinator

– Implementation Team

– Cabinet level (executive leadership) support

– Effective/efficient data systems for collecting storing and analyzing data at district level

– District trainers

– Coaching structures

Page 12: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

12

Page 13: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

13

Vision at Building Level

• 1595 of 4192 schools (38%) will have the potential to be supported by district implementation of an integrated behavior and reading multi-tiered model of supports.

Page 14: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

14

Distinct Differences

• Increase emphasis on the implementation research

• Focus on implementation infrastructures at the ISD and district levels (Cabinet Team and Implementation Team)

• Extend the implementation timeline (five years instead of three)

Page 15: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

15

Distinct Differences

• Increase the emphasis on developing local capacity to support implementation efforts

– Training– Coaching– Evaluation/Measurement– Leadership

Page 16: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Stages of ImplementationFocusFocus StageStage DescriptionDescription

Exploration/Adoption

Develop Commitment at ISD and LEA level

Installation Establish ISD Implementation team and MTSS Coordinator, set up data systems. Audit of current resources and capacity, plan and prepare for work

Implementation(Initial/Full)

Try out the practices, work out details, learn from and provide significant support to implementers

Elaboration Expand the program/practices to other locations, individuals, times- adjust from learning in initial implementation.

Continuous Improvement/Regeneration

Make it easier, more efficient. Embed within current practices

Page 17: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

17

ISD/RESA CabinetISD/RESA Implementation Team• Vision

• Priority• Policy• Providing for implementation

supports (coaching, training, evaluation)

• Barrier busting

• Create materials• Collect and summarize data• Identify barriers to

implementationCoordination

MTSS Coordinator

Implementation SupportsDirectionTrainingCoachingContent ExpertiseMaterialsEvaluation

Implementation SupportsDirectionTrainingCoachingContent ExpertiseMaterialsEvaluation

Districts

Liaison

Page 18: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

18

Defining Critical Roles and Responsibilities to Support

Implementation

Page 19: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Defining Practice Profiles

Critical Component

Ideal “Gold Standard” of the

component

Emerging Practice

(Acceptable Variation)

Unacceptable Variation

Harmful Variation

Anything to the left of the line (emerging practice/acceptable variation or ideal) is okay!

Page 20: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

“Liaison”

Page 21: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Developing an Infrastructure to Support the Scope of the Work

Page 22: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

24

MiBLSi Scale-Up Plan

• Goal: By 2017 40% of districts within the state will have structures in place to support implementation of MTSS

• Plan:

– 2011-2012: Learn how to set up district implementation structures

– 2013-2014: Develop resources, materials, processes, guidelines while developing local competencies and implementation structures

– 2015-2017: Continuous improvement of resources, scale implementation in districts across state

– 2016-2017: Begin implementation of exit plan

Page 23: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

25

2011-2012: Learning How to Establish Implementation Infrastructures

• Started small– Accepted five ISDs and one stand alone school

district

– Each of the five ISDs identified a number of local districts to “partner” to implement a district-wide MTSS model

– The Project Director and Assistant Director were responsible for providing support to the accepted ISDs and stand alone district

– The initial learning was invaluable!

Page 24: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Green Dots = DC 1 ISD and one stand-alone district partner

Red Dots = Districts who applied to partner with their ISD

Kim’s Sites

Steve

Steve

Steve

Page 25: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

27

Lessons Learned

• Establishing fully functioning implementation infrastructures was easier said than done

• More guidance (teaching) was necessary

• Because support from MiBLSi occurred on-site, the networking, idea sharing and exploration of possibilities with fellow “neighbors” was absent

Page 26: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

28

Lessons Learned

• More time was needed to provide guidance and for the teams to engage in the work for supporting implementation

• The mode of supporting the initial partners was not sustainable…actually it was crazy!

Page 27: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

29

Future years….needed to be more manageable!

Page 28: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

30

Managing the Complexity of the Work

• Transformation Zones– Support to partners from across all units of the

project through a mechanism called, “Regional Focus Planning Sessions” (RFPS)

– Monthly problem solving following RFPSs with project staff who participate in a transformation zone

– Identified needs are addressed quickly and efficiently and result in the development of resources and adjustments to training content

Page 29: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

31

Other State-Wide Assistance to Manage the Complexity

• MTSS Coordinator Sessions: frequent sessions using a combination of face to face meetings and conference calls

• Structured learning at state events:– Coaches’ Conference– State Implementer’s Conference

Page 30: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

32

MiBLSi Scale-Up Plan

• Goal: By 2017 40% of districts within the state will have structures in place to support implementation of MTSS

• Plan:

– 2011-2012: Learn how to set up district implementation structures

– 2013-2014: Develop resources, materials, processes, guidelines while developing local competencies and implementation structures

– 2015-2017: Continuous improvement of resources, scale implementation in districts across state

– 2016-2017: Begin implementation of exit plan

Page 31: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Transformation ZonesPhase I: Developing ISD Infrastructure

Developing the structures to help LEAs develop support structures or to directly support school implementation

District Cohort 1

District Cohort 2

Readiness work for District Cohort 3

Page 32: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Sep Oct Nov Dec Jan Feb Mar Apr May Sep Oct Nov Dec Jan Feb Mar Apr May

Focus of Work: 2012- 2014

ISD CabinetISD Cabinet

ISD Implementation TeamISD Implementation Team

LEA CabinetLEA Cabinet

LEA Implementation TeamLEA Implementation Team

ISD Implementation Team (Phase I & Phase II Conversations)ISD Implementation Team (Phase I & Phase II Conversations)

LEA Implementation TeamLEA Implementation Team

Exploration/Adoption

Installation

Initial Implementation

School TeamsSchool Teams

ISDs have two meetings with LEA ISDs have two meetings with LEA leadership and a minimum of one leadership and a minimum of one formal meeting with project staff to formal meeting with project staff to confirm partnershipconfirm partnership

Monthly, full day District Monthly, full day District Implementation Team Implementation Team meetings for a minimum meetings for a minimum of one yearof one year

Admin TeamsAdmin Teams

Admin TeamsAdmin Teams

Monthly leadership supports Monthly leadership supports for the administrative teamfor the administrative team(1.5 hours/month)(1.5 hours/month)

Based on prior involvement with MiBLSi and Based on prior involvement with MiBLSi and implementation, school-based training occurs. implementation, school-based training occurs. Entrance and exit from the focus area (reading and Entrance and exit from the focus area (reading and behavior) and the tier are data-driven. Meeting program behavior) and the tier are data-driven. Meeting program quality and outcome data criteria and having a well-quality and outcome data criteria and having a well-articulated action plan determine entrance and exit.articulated action plan determine entrance and exit.

Following conditional acceptance of application, initial Following conditional acceptance of application, initial meeting(s) were conducted with ISD Cabinet to confirm meeting(s) were conducted with ISD Cabinet to confirm partnership (exploration). Monthly meetings occur with the partnership (exploration). Monthly meetings occur with the ISD implementation team (Installation and Initial ISD implementation team (Installation and Initial Implementation)Implementation)

Page 33: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

35

Levels of Work for the RFPSs

1. Foundational activities

1. Installing the mechanisms to support implementation:

– Determining how to develop competency, internal within the ISD and external to the local districts (coaching and training and selection of coaches and trainers)

– Organizational capacity (determining the data systems necessary; data sources needed to assess the quality of implementation, etc.)

Page 34: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

36

Foundational Activities

• Identifying goals for county-wide MTSS implementation

• Operationally defining the ISD’s MTSS model

• Articulating how the ISD will add value to the districts in their efforts to implement an integrated MTSS model

• Understanding how a partnership between the ISD and MiBLSi will add value in their efforts to implement their MTSS model

Page 35: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

37

Foundational Activities (cont.)

• Considering district readiness to determine where to initially implement the MTSS model

– Learn from initial implementation efforts and make adaptations before going to scale across the county

• Developing guiding questions to ask district Cabinet Teams to help determine if a partnership in supporting district-wide MTSS would be mutually beneficial

• Exploratory conversations ISDs will have with local districts were framed around the “Hexagon Tool”

Page 36: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

38

Exploration/Adoption Tool

Page 37: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

39

Foundational Activities: Examples

Page 38: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

45

What impact is our support having on our consumers?

Page 39: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

46

Evaluating Our Impact

• Retrospective self-assessment data and end of day evaluations

– Completed at the end of each RFPS

• Implementation Fidelity Data – Teams complete a “new checklist” every month that

is reflective of the previous month’s activities/assignments (“not started,” “in progress,” “completed”)

– Teams go back to previous checklists (via excel spreadsheet) and update progress and include successes and barriers for each of the items

Page 40: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

47

Retrospective Self Assessment

Page 41: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

48

End of Day Evaluations

Page 42: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

49

Implementation Fidelity Data

Page 43: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

Transformation ZonesPhase I: Developing ISD Infrastructure

Developing the structures to help LEAs develop support structures or to directly support school implementation

District Cohort 1

District Cohort 2

Readiness work for District Cohort 3

Page 44: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

51

“Readiness Sessions”

• Three sessions during the fall and winter• Emphasis was on assisting the ISDs in

determining:– If there was a need across their constituent districts

for supporting the implementation of a MTSS model– How collaborating with MiBLSi could add value to

the ISD’s efforts– How the development of a MTSS model would “fit”

with existing district priorities– Outlining the evidence base MiBLSi materials and

support are developed– Articulating the resources needed to successfully

engage in the work

Page 45: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

52

Exploration/Adoption Tool

Page 46: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

53

Lessons Learned and Preparing for Next Year (2013-2014)

Page 47: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

54

Lessons Learned • More background knowledge and implementation

experience is necessary for Implementation Team members and for identified MTSS Coordinators to know what they are going to be supporting/coordinating

• Underestimated the skill sets available to support the work

• Time to engage in the work is a common barrier identified by Implementation Team members on a monthly basis

• ISD capacity to support districts is limited (e.g. this work is an “add-on” or only one person has time to devoted to support the work)

Page 48: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

55

1. ISD District Implementation Team

2. MTSS Coordinator(s)

3. District Implementation Team

4. Administrative Team

5. Trainer Support• Deepening Implementation Knowledge• Deepening Content Knowledge through Trainer

Workdays

6. Coaching Support• Deepening Implementation Skills and

Knowledge through Coach Workdays

7. Building Level Trainings

8. Evaluation Support

Defining the 8 Areas of Support (Technical Assistance)

Page 49: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

56

Lessons Learned

• We need to compensate for the limited capacity and limited knowledge about the data, systems and practices for supporting MTSS.

– Content for deepening knowledge of trainers and coaches who will be needed for school-level implementation

– Sustainable methods for deepening knowledge need to be considered (e.g. Deepening Trainer Knowledge Sessions; Trainer Workdays, Deepening Coaches’ Knowledge Session)

– A Technical Assistance Group “TAG” (team) will compensate for the heavy demands for project staff time to develop the many layers necessary for supporting implementation

Page 50: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

57

• Extending support to ISD and District partners to include work of unit staff other than TAPs

• Careful consideration of what areas of technical assistance will be direct, what will be indirect (through virtual means, etc.) and what will be based on ISD needs.

Technical Assistance Group (TAG)

Page 51: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

58

• Grouping of staff across units to support the ISD and District partners within the TAG region

– Skill sets of staff within the team can be leveraged to provide even stronger support to DC Partners

• Goal is to build the skills and capacity of the DC Partners to sustain the work on their own

• Goal is to also leverage knowledge across all staff to build our own knowledge and skills as well

Technical Assistance Groups (TAGs)

Page 52: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

59

• The following variables are taken into consideration when designing a TAG:

1. Skill sets

2. Location

3. Representation across units

• End result: 5 TAG teams located across the state. On-going problem-solving will occur across each group - assuming the function of the “Transformation Zones”

Technical Assistance Groups (TAGs)

Page 53: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

60

Lessons Learned Impacting New Partners

• Gated approach that includes the application, two meetings and a capacity assessment (Intermediate Unit Capacity Assessment-IUCA)

• Data from the assessment and meetings will inform a differentiated support plan for each potential partner

• Support plans will be presented to partners for consideration and their approval. This is necessary before mutual selection for acceptance occurs

Page 54: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

61

Options for Differentiation

1.Readiness (3 sessions)

1.Expedited Readiness with Installation (13 sessions)

3.Installation (10 sessions)

Page 55: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

62

Stay tuned…we look forward to continuously learning how best to scale-up within a statewide multi-tiered system of supports and by doing so, also learning from our colleagues across the country!

Page 56: Http://miblsi.cenmi.org Scaling-Up Within a Statewide Multi-Tiered System of Supports (MTSS) Kim St. Martin March, 2013.

63

Thank You!

Kim St. Martin, MiBLSi Assistant Director

[email protected]