Contains Confidential Information of Both Dow and Saudi Aramco Ras Tanura Integrated Project Information Management Lessons Learned Bob Donaho March 2010
11

Document

Feb 20, 2016

Download

Documents

FIATECH

http://fiatech.org/images/stories/events/techconference/2010/presentations/general_session/6-lessons-learned-from-ras-tanura.pdf
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1:

Contains Confidential Information of Both Dow and Saudi Aramco

Ras Tanura Integrated Project Information Management Lessons Learned

Bob Donaho March 2010

Page 2:

Author <date> Contains Confidential Information of Both Dow and Saudi Aramco Pg. 2

What is the Ras Tanura Integrated Project •  Program to Design, Construct and Startup a Very Large

(GIGA) Grassroots Petrochemical Facility •  Joint Initiative of Dow Chemical and Saudi Aramco •  Located on East Coast of the Kingdom of Saudi Arabia •  Highly Integrated Facility •  > 25 Process Plants – Each a Major Project •  Current In the FEED Stage. •  Multiple Project Management and FEED Contractors

Located on Two Continents

Page 3:

Author <date> Contains Confidential Information of Both Dow and Saudi Aramco Pg. 3

Information Management on RTIP

•  A Critical Capability for Delivering the Assets •  Managed Strategically within the Program •  Developed Considering Critical Capabilities

Needed for the Program while Addressing Constraints from the Marketplace.

Page 4:

Contains Confidential Information of Both Dow and Saudi Aramco

Topics:

• What has been decided • What has not been decided • What has been learned • What is needed

Page 5:

Contains Confidential Information of Both Dow and Saudi Aramco

What has been decided (Engineering Tools):

SmartPlant P&ID •  Non-Hosted •  Blend of Owner and CPMC

existing standards •  Over 130 updates released

SmartPlant Instrumentation •  Non-Hosted •  CPMC existing standard •  Only 1 update released

Other Industry Staples •  Primavera •  Kbase •  ETAP (Electrical Design) •  Microstation

3D Modeling •  Contractor choice of PDS,

PDMS, SP3D for modeling •  Various for Review

Page 6:

Contains Confidential Information of Both Dow and Saudi Aramco

Skire’s Unifier Cost & Project Mgmt

Spares Managemen

t Legal

Library

File sharing & co-editing

Web pages, branding, news, communications

LiveCycle Electronic Reviews

RTIPSupplier Contracts Mgmt

MS Access DB Supply Planning

HP’s Quality Center Requirements Mgmt (MOM)

Proc Integration DB Process Integration

What has been decided (Giga-Project Enabling Tools):

Page 7:

Contains Confidential Information of Both Dow and Saudi Aramco

What has not been decided:

•  3D Review •  Format must accept data from all 3D systems used during EPC

phase •  Format must be consistent with best-in-class review animation

capability •  To be used for training, reviews, and visual navigation of

documents and drawings •  Spares Optimization system

•  Significant data modeling effort •  Significant data coordination effort across EPC Contractors

•  JV Document Management system •  Impacts meta-data handover instructions

•  JV Manufacturing, Operations and Maintenance systems •  Impacts handover instructions for equipment and material data

Page 8:

Contains Confidential Information of Both Dow and Saudi Aramco

What has been Learned:

The Vision: We will use value-based assessment to select “best of breed” Owner or CPMC solutions (tools, processes, standards).

The Reality: There was no “one best” solution. Instead new standards were built starting in pre-Feed, incorporating elements of the Owner and CPMC solutions.

The Vision: Organizations that are expert at supporting existing internal solutions can develop a new solution incorporating input from both Owners and CPMC quickly

The Reality: New or modified solutions take time to develop, and raise risk through unintended consequences and through increased demand for changes to “tune” untested standards.

The Vision: We will specify given systems to our Contractors, and we will get back coherent consistent data.

The Reality: Given the number of Contractors and diverse tool capabilities, it is unlikely that specifying Owner standards for systems is sustainable within cost and schedule.

Page 9:

Contains Confidential Information of Both Dow and Saudi Aramco

The Vision: We will specify ISO 15926 output format, which can then be “inhaled” by the as-yet unspecified Owner JV systems.

The Reality: We have not yet located a usable “Data Delivery Requirements” document which we can leverage into our specifications, which is a) understandable by all Owners, and b) biddable by all EPC’s.

The Vision: Engineering systems with rich and robust functionality sets are the tools-of-choice in the industry.

The Reality: The industry standard is Excel. Engineers think in lists, the simpler the better. Contractors can commit to placing data in Excel but freeze up when discussing databases (too many unknowns, too much impact on internal work processes, etc.).

What has been Learned (continued):

Page 10:

Contains Confidential Information of Both Dow and Saudi Aramco

What we (maybe the Industry) need:

•  “Portal” which is the entry point for all info regarding ISO 15926. •  Biddable delivery requirements document specifying ISO 15926

or derivative. •  Non-Invasive data comparison and validation tools/service to

ensure compliance with owners data delivery requirements. •  Common 3D Review platform.

Page 11:

Contains Confidential Information of Both Dow and Saudi Aramco

Questions