Dredging Subcommittee Report HTAC Meeting 3/02/11 Gene Clark – Subcommittee Chair
11

HTAC 03/02/11 Dredging Subcte Report

Nov 16, 2014

Download

Business

Presentation on 3/2/11 by Gene Clark of the WI Sea Grant Program about recent issues and work conducted by the Dredging Subcommittee of the Duluth-Superior Harbor Technical Advisory Committee (HTAC).
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HTAC 03/02/11 Dredging Subcte Report

Dredging Subcommittee Report HTAC Meeting 3/02/11

Gene Clark – Subcommittee Chair

Page 2: HTAC 03/02/11 Dredging Subcte Report

Topics

•Update of the Erie Pier Management Plan

•21st Avenue West Habitat Complex Project Proposal

•I-35 Construction Project and Erie Pier Materials

Page 3: HTAC 03/02/11 Dredging Subcte Report

Updating the Erie Pier Management Plan

Page 4: HTAC 03/02/11 Dredging Subcte Report

Erie Pier Management Plan Update

•Current plan being followed but needs updates

•Text needs to reflect new work plus new opportunities since 2007

•New SRV Tables (Soil reference values)

•Operating permit reflects the 2008 SRV changes

•NOT a total rewrite, but updates

Page 5: HTAC 03/02/11 Dredging Subcte Report

21st Avenue West Habitat Complex Project

Page 6: HTAC 03/02/11 Dredging Subcte Report

•St Louis River Alliance – GLRI Proposal through US Fish & Wildlife

•Goal to delist two Beneficial Use Impairments (BUI’s)

•Proposal for tool to evaluate options, much like current 40th Ave West project

•Full support from dredging subcommittee!

•Could help with 21st Ave West & Interstate Island BU project designs

21st Avenue West Habitat Complex Project Proposal

Page 7: HTAC 03/02/11 Dredging Subcte Report

I-35 Construction Project and Erie Pier MaterialText from I-35 Construction Specs (March 2, 2010)

Page 8: HTAC 03/02/11 Dredging Subcte Report

I-35 Construction Project and Erie Pier Material

Meeting #1 – December 14, 2010

Participating Agencies

•MnDOT

•MPCA

•Port Authority

•Army Corps

•Wi Sea Grant

•Mn Sea Grant

•City of Duluth

•MIC

Issues Discussed

•Erie Pier operations

•Why EP material wasn’t used on I-35 project

•MnDOT’s environmental review process

•Perception of material coming from St Louis River

•MnDOT advised by their legal council not to use EP material.

Page 9: HTAC 03/02/11 Dredging Subcte Report

I-35 Construction Project and Erie Pier Material

Response from MnDOT Received 1-18-11

Page 10: HTAC 03/02/11 Dredging Subcte Report

I-35 Construction Project and Erie Pier Material

Meeting #2 – January 23, 2011

•The requirement for a standing BUD duplicates the permit issued from MPCA’s Water Quality division.

•Both Water Quality and Solid Waste Programs at the MPCA use the Soil Reference Values (SRV) as their clean standard.

•This issue brings forward a legal question of whether a determination from one MPCA program can cover other programs as well.

Page 11: HTAC 03/02/11 Dredging Subcte Report

I-35 Construction Project and Erie Pier Material

Committee Action Requested:

Send a letter from the Metropolitan Interstate

Council to the Commissioners of both MnDOT

and MPCA requesting the agencies resolve this

issue within a timely fashion.