Top Banner
Copyright: Shell Exploration & Production Ltd. 23 April 2014, Norsk Olje & Gass Pieter Swart HSE Challenges operating in the Sakhalin Offshore Environment Installation Piltun B Platform
23

HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Jul 18, 2018

Download

Documents

doankhuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Cop

yrig

ht: S

hell

Expl

orat

ion

& P

rodu

ctio

n Ltd

.

23 April 2014, Norsk Olje & Gass Pieter Swart

HSE Challenges operating in the Sakhalin Offshore Environment

Installation Piltun B Platform

Page 2: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Sakhalin Island

Page 3: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Climate - Sakhalin Island

• Remote

• Lack of infrastructure

• Low population density – 600,000

• Seismically active area

• Rich onshore and offshore wildlife

• Territory: 87,100 km2

• Length: 948 km

• Min. width: 30km

• Mountain areas 66%

• Extreme Climate

• Regional center: Yuzhno-Sakhalinsk

• Military Activity

Page 4: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Sub Arctic Offshore HSE Challenges

Special HSE

measurements

Sea-Ice

Cyclone Storm

& Currents

Snow & Ice

accumulations

Fog Cold Water

Remoteness Temperature

Contraction &

expansion

Page 5: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Offshore Conditions in the Sea of Okhotsk • Temperatures range from +25 to –40

degrees •Offshore ice from December till June •Waves up to 10 metres significant • Temperature offshore can drop to –40

degrees with wind chill • Frequent fog in spring and summer •Strong currents in summer • Earthquake zone

Page 6: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Sakhalin Phase II – Project Overview

Piltun-B platform Piltun-A year round production Lunskoye-A platform Onshore processing facility Oil and gas (multiphase) pipelines Booster station LNG plant and oil export terminal

Page 7: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Piltun B Platform Transport & Installation

Piltun-Astokhskoye-B

• 4 leg concrete gravity base.

• Topside 28,000 tonnes.

Page 8: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Aug 2005- Gravity Base Structure Inst.

Page 9: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

LMU INSTALLATION (CASTORO 8, 2006)

Page 10: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Interim Package Fuel Tank

Interim Package Generator

Navigation Mast

Basket

Landing

Platform

Basket

Landing

Platform

DCL CAP

ACCESS LADDER

Page 11: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Some Specific HSE Measures

With fleet of Ice class vessels and offshore workforce of 500+, numerous HAZIDs/HAZOPs, RA’s and SIMOPS meetings were held to have agreed :

• Clear Communication plans

• Agreed Adverse Weather procedure

• Personnel transfer plan incl Rescue

• Marine Operations manual

• Vessel Inspection & Certification

• Personnel Travel briefing pack

• Emergency Response Plan incl Medivac / Test

• Oil Spill prevention and response plan

Page 12: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Vessel utilized for the GBS preparation activities in May 2007

Page 13: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure
Page 14: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure
Page 15: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

GBS from the Talagy ,30 June 07

Page 16: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

2007 – Piltun B Topside loadout

• Loadout in Korea of 28,000 t topside

• Ready to tow to Sakhalin June 2007.

•A world heaviest shipping – 34,200 t.

ready to go

Page 17: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

PA-B Topside on Tow to Sakhalin

Page 18: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Piltun B Topside Tow Route

PA-B 1700 Nm

Page 19: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

July 1st 2007 Topside approaches GBS

Page 20: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

PA-B Installation in the Fog

Page 21: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

Ballasting down

Page 22: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

5th of July 2007 – Installation Safely completed with 500,000 manhours without LTI and/or Incident

Page 23: HSE Challenges operating in the Sakhalin Offshore ... · Onshore processing facility Oil and gas ... RA’s and SIMOPS ... •Agreed Adverse Weather procedure

TODAY