09.09.13 How to Use the EPM Connector to Visualize BPC Data via Dashboard Design (aka Xcelsius) | planingandconsolidation planingandconsolidation.wordpress.com/2013/07/03/how-to-use-the-epm-connector-to-visualize-bpc-data-via-dashboard-design-aka-xcelsius/ 1/13 planingandconsolidation SAP BPC, FC, Outlooksoft, Hyperion, HFM, EPM, BI, Konsolidierung, Planung by Camille Pieume in SAP BO BI, SAP BO BI on BPC Leave a Comment How to Use the EPM Connector to Visualize BPC Data via Dashboard Design (aka Xcelsius) This article explains the steps to visualize BPC data in a dashboard build using SAP Dashboard Design (formerly Xcelsius). It shows how to use the SAP BPC EPM-Add-In for Excel to build a report, and the SAP BPC EPM Connector to enhance the functionality of the dashboard. The SAP BPC product version referred in this post is SAP BusinessObjects Planning and Consolidation 10.0, version for SAP NetWeaver. 1 Business Scenario In this scenario, the business wants to view real-time data from their SAP Business Planning and Consolidation, version for SAP NetWeaver (BPC for NW) system via a dashboard created with the SAP Dashboard Design tool (formerly called Xcelsius). Using a flash-based dashboard provides a zero footprint solution for viewing critical data in real-time. The dashboard user would not need anything more than flash player to view the data. This type of data visualization is very attractive to high level decision makers in the enterprise. 2 Software Versions The following software are required (only to build the dashboard. The versions mentioned here are the one I used for this tutorial.): 1. SAP Dashboard Design SP06 Patch 01 2. SAP BPC 10 EPM Add-In SP14 Patch 02 3. EPM Connector of EPM Add-In, (add-On for Dashboard Design, located in the EPM Add-In installation folder) July 3, 2013
13
Embed
How to Use the EPM Connector to Visualize BPC Data via Dashboard Design (Aka Xcelsius) _ Planingandconsolidation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
09.09.13 How to Use the EPM Connector to Visualize BPC Data via Dashboard Design (aka Xcelsius) | planingandconsolidation
planingandconsolidation SAP BPC, FC, Outlooksoft, Hyperion, HFM, EPM, BI, Konsolidierung,Planung
by Camille Pieumein SAP BO BI, SAP BO BI on BPCLeave a Comment
How to Use the EPM Connector to VisualizeBPC Data via Dashboard Design (aka Xcelsius)
This article explains the steps to visualize BPC data in a dashboard build using SAP DashboardDesign (formerly Xcelsius). It shows how to use the SAP BPC EPM-Add-In for Excel to build areport, and the SAP BPC EPM Connector to enhance the functionality of the dashboard.
The SAP BPC product version referred in this post is SAP BusinessObjects Planning andConsolidation 10.0, version for SAP NetWeaver.
1 Business Scenario
In this scenario, the business wants to view real-time data from their SAP Business Planning andConsolidation, version for SAP NetWeaver (BPC for NW) system via a dashboard created with the
SAP Dashboard Design tool (formerly called Xcelsius). Using a flash-based dashboard provides azero footprint solution for viewing critical data in real-time. The dashboard user would not needanything more than flash player to view the data. This type of data visualization is very attractive tohigh level decision makers in the enterprise.
2 Software Versions
The following software are required (only to build the dashboard. The versions mentioned here arethe one I used for this tutorial.):
1. SAP Dashboard Design SP06 Patch 012. SAP BPC 10 EPM Add-In SP14 Patch 023. EPM Connector of EPM Add-In, (add-On for Dashboard Design, located in the EPM Add-In
4. SAP BPC 10 ODBO Client5. Microsoft Visual C++ 2005 SP1 Redistributable Package(x86)
For simply running and viewing the dashboard, only Flash Player is required.All software (except for the Microsoft Visual C++ component) can be downloaded from the SAPService Marketplace. It is suggested to always apply the latest support package for each softwarecomponent.
3 Steps to build you dashboard tovisualize the BPC data
1- In SAP Dashboard Design, create a new dashboard and click on the EPM tab in the Excel-Workspace
Enter the BPC-BW server name. Also, enter the BPC user and password. This is the same user andpassword that you would used to connect to BPC via the BPC Excel Client. Click “Next”.
For each dimension in the row and column box, select the members by clicking the checkboxes,then clicking the “Right-Arrow” key to move the selections into the “Selected Members” box. Thenclick “Ok”.
6- Before starting to build the layout of your dashboard, I recommend to prepare your excel sheetin order to facilitate your subsequent actions.
I’ll first recommend to copy a subset of the data returned by you report (actually those data youwant to show on your dashboard – for example the Top 10 entities) in a specific area on your sheet.
In the sheet, mark your different data area with different colors
This command retrieves the XML based definition of the BPC report and puts it in this cell. Lateryou will bind a property of the EPM connector to this cell.
10- Add a new connection to your dashboard
Call the data manager by clicking on “Data > Connections” in the main menu on by clicking on themanage connection button in the toolbar
Next choose the EPM Application which you want to connect to. In this case, select “Planning andConsolidation, version for SAP NetWeaver platform”.
For the “Operation” field, select “EPM Report”.
In the “Input Details” section:
Next, enter the host name of the BPC web server. Enter both the host name and port.
Click the button next to “Report Definition” and bind it to the cell where the BPC Report definitionresides then click “OK”. The other information like Report Name, Environment, Models and alsothe “Result” field in the “Output Details” section should be filled automatically from the reportdefinition.
The finished connection configuration should now look like this. Notice that the cell range for theoutput has automatically been configured based on the EPM report definition. Click “Close”.
You can configure your connection to refresh on load. This could be necessary if you do not like tohave the dashboard loaded initially with the static data used for the dashboard creation (which datacould have been updated and would then not reflect the real data in BPC).
For that, just check the “Refresh on Load” checkbox in the “Output Details” section of the EPMConnection configuration
By copying the Label data in the report data area to avoid the unsupported EPM-Excel functions inDashboard Design, you make this area of data static for the dashboard, i.e.: if these data change(member name modified or deleted) in the BPC-System, these changes will not be reflected on thedashboard, which could conduct to inconsistency.
To avoid that, you can create a new EPM Connection to retrieve the dimension member and replacethe default one. This connection should then be refreshed the same time as the previous “dataRead”connection.
To define the connection:
First set the connection name and choose the EPM Application which you want to connect to. In thiscase, select “Planning and Consolidation, version for SAP NetWeaver platform”.
For the “Operation” field, select “Retrieve Dimension Members”.
In the “Input Details” section:
Next, enter the host name of the BPC web server. Enter both the host name and port.
Click the dropdown box next to “Data Source” and select “Retrieve”, the data source will then beretrieved according to the hostname and port you entered previously.
Repeat this action for the other fields (Environment, Models, and Member) and choose whennecessary the right value between the one shown by the retrieve operation.
You end up with a configuration similar to the one shown below.
Click on the button next to “Result” and bind this to the cells where you want dimension membersto be loaded on your sheet.
You can also select a cell where to put an eventual error message for the connection by clicking onthe button next to “Message” and binding this to a cell on the sheet.
You can choose the Connection to be refreshed on load (this is a good idea if you want to have thedashboard loaded with the real/right data, but this will make the dashboard to wait for the dataload before showing, which could be annoying if you do not have a high-performance connection to
I currently work within the Reporting & Analytics team of Business & Decision in Germany,specialising in SAP BusinessObjects technologies including SAP BusinessObjects, SAP In Memorytechologies (HANA) , Mobile BI and Data Visualisation. I have a wealth of experience in the SAP BITechnologies from working in the Business Intelligence sector for many years now. Mostimportantly, I am Dad to 1 wonderful kid and Husband to an accommodating wife.View all posts by Camille Pieume »