1 Eng . Ahmed Abdulhalim Sedik
24

how to be certified factory

Apr 12, 2017

Download

Documents

Ahmed Halim
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: how to be certified factory

1

Eng . Ahmed Abdulhalim Sedik

Page 2: how to be certified factory

2

List Contents.

Page 3: how to be certified factory

3

Page 4: how to be certified factory

4

PLANTS

LABORATORY

APPROVED

MATERIAL

SOURCES

- General Requirements.

Page 5: how to be certified factory

5

Batching plant

requirements

Material storage and

handling

Factory conditions

Management of

Waste materials

1-Plants .

Page 6: how to be certified factory

6

A - Computer controlled .

B- Plant type ( dry or wet ).

C- Computer print out .

D- Calibration certificate .

E- certified operation .

1 - 1 Batching plant

requirements.

1 - PLANTS .

Page 7: how to be certified factory

A – Aggregate .

B- Cement & cementations

materials.

C- Admixture.

D- Water .

1 - 2 Material Storage And

Handling.

1 - PLANTS .

Page 8: how to be certified factory

8

1 - PLANTS .

A – Floor .

B- Axis .

C-Drainage & washing area &

waste materials. .

1-3a Factory condition

In ready mix

Page 9: how to be certified factory

9

1 - PLANTS .

1-3b Factory condition

In precast

A . Every Thing As Ready Mix +

The Following .

A. Curing area.

B. Final Products storage area .

Page 10: how to be certified factory

10

LAB Equipment's Calibration

Curing Room Test Records Traceability

2 - Laboratory .

Page 11: how to be certified factory

11

• Internal calibrations (sieves ,molds, cones) • External calibrations (Balances, machines)

• Tanks (3 Nos for N.M ,6 Nos for D.M) • How to control the temperature (thermometers)

• Internal frequency tests • External frequency tests

• Traceability (printer)

2 - Laboratory .

Page 12: how to be certified factory

12

2 - Laboratory .

2-1 Equipment calibration validity.

Page 13: how to be certified factory

13

2 - Laboratory .

2-2 Curing tanks Room .

Page 14: how to be certified factory

14

2 - Laboratory .

2-3 Test Records.

Page 15: how to be certified factory

15

2 - Laboratory .

2-4 Traceability .

Page 16: how to be certified factory

16

• Physical , Chemical and Mechanical Properties for all material.

• Aggregates ( fine & coarse ) • Cementitious material • Additives.

3.APPROVED MATERIAL SOURCES

Page 17: how to be certified factory

17

Specifications

Implementation

Certifications

Page 18: how to be certified factory

18

Specifications

1 a

Conflict

18

Page 19: how to be certified factory

19

Specifications

1 b

Generalization

Durable concrete properties .

Using Of SRC Cement with cementitious materials .

Using Of recycle aggregate in mix .

Using Of more standard to produce cement with restriction of strength .

Page 20: how to be certified factory

20

1 c

Specifications

Test Methods & Tolerances

Segmented concrete “colors division “. Dry concrete cubes .

Dry concrete quality statistics .

20

Page 21: how to be certified factory

21

2 Implementation

Curing method .

Damage repairing .

Training of staff .

Accuracy in implementation. ( strength of concrete To cut the strand in hollow core slab).

Represantive sampling .

Testes of bearing for pre cast elements . 21

Factory & Site

Page 22: how to be certified factory

22

Certifications

3

22

Qualified Staff

!!!!!

Factory

Page 23: how to be certified factory

23

Page 24: how to be certified factory

24

Thank you Eng . Ahmed abdulhalim